ROAD 6.00 M WIDE CAMPUS ROAD 7.50 M WIDE ROAD 6.00 M WIDE EMERGENCY ENTRY ROAD 6.00 M WIDE EXISTING HOSPITAL BUILDING (A) MAIN ENTRY CITY ROAD CAMPUS ROAD CAMPUS ROAD PEDESTRIAN ZONE CAMPUS ROAD 7.50 M WIDE EXISTING HOSPITAL BUILDING (B) EMERGENCY ENTRANCE SERVICE ENTRY SERVICE ENTRY/EXIT PEDESTRIAN ENTRY CONNECTOR FROM THIRD FLOOR OF PROPOSED HOSPITAL BUILDING TO FOURTH FLOOR OF PROPOSED HOSTEL BUILDING (NON MCI WARD) CONNECTOR BETWEEN SECOND, THIRD & FOURTH FLOOR OF EXISTING NEW HOSPITAL BUILDING TO SECOND , THIRD & FOURTH FLOOR OF PROPOSED HOSPITAL BUILDING CONNECTOR FROM FOURTH FLOOR OF EXISTING NEW HOSPITAL BUILDING TO FIFTH FLOOR OF PROPOSED AUDITORIUM & HOSTEL BUILDING RAMP DN RAMP IN DROP OFF HOSTEL ENTRY FACULTY ENTRY RAMP OUT 7800 7800 7800 7800 7800 7800 7800 7800 7450 7800 7800 7800 7800 7800 7800 7800 5958 7800 7800 7800 7800 7800 7800 7800 3750 1125 3750 1125 W6 W1 W1 W1 D4 D4 W6 W6 D7 D7 D7 D6 LIFT LOBBY 3000X8090 VISITOR'S LIFT LOBBY 4290X4990 PATIENT LIFT LOBBY DIRTY SERVICE LIFT MEP SERVICE AREA MEP SERVICE AREA 4320X3820 FHC FHC CWP CWP D6 D6 D6 D6 D2 W4 D6 W6 PATIENT LIFT LOBBY 3120X8090 D7 MS STAIRCASE W4 W4 CLEAN SERVICE LIFT DIRTY SERVICE LIFT W6 W1 W1 W1 ADULT CARDIOLOGY OPD ADULT CARDIAC SURGERY OPD D1 D3 D6 D2 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 D3 D6 D6 D6 D7 D6 D3 D3 D6 D6 D2 D3 D3 D3 D2 D7 D7 D7 D7 D7 D6 D7 D3 D3 D3 D4 D4 D3 D2 D2 D2 D2 D2 D3 D6 D6 D6 D3 D3 D2 D3 D3 D3 D3 D3 D3 D4 D4 D3 D6 D6 D7 D7 D7 D6 D6 D6 D3 D1 D2 D2 D1 D1 D1 D1 D4 D1 D1 D1 D1 D2 D2 D2 D2 D6L D6L WAITING 47695X9480 3000 MM. WIDE CORRIDOR 3.0 M WIDE CORRIDOR CONSULT ROOM 1 4100X4800 SCREENING OPD 14050X4455 HMIS COUNTER 3325X4915 ECHO 8320X9370 X-RAY MINOR OT / DRESSING 4845X5600 CHANGE & SCRUB 5250X2375 CASUALTY 5915X4155 WAITING QUEUE CONSULT ROOM 1 4570X3820 3.0 M WIDE CORRIDOR CONSULT ROOM 3 4570X3890 CONSULT ROOM 2 4570X4000 CASE DEMO 4570X4000 CONSULT ROOM 4 4570X3890 EXAMINATION ROOM 4570X2805 DRESSING (M) 2225X2850 SCREENING ROOM 4570X14185 PHLEBOTOMY ROOM DRESSING (F) 2230X2850 PAIN CLINIC CASE DEMO 4975X4455 AHU 6370X3300 TOILET 1500X1630 DOUBLE HEIGHT ATRIUM 14200X12370 SERVICES 8320X3820 DOUBLE HEIGHT ATRIUM 14200X8320 ENTRY FOR PHYSIOTHERAPY CONNECTOR AT FIRST FLOOR LEVEL DIETICIAN 3965X4800 EXAMINATION ROOM 3200X4455 TMT/HOLTER PHLEBOTOMY ROOM AHU INJECTION ROOM 3235X4585 ADMINISTRATION 9475X15225 TOILET 1800X2000 CASE WINDOWS RMO PATIENT'S TOILET (M) 4825X6365 PATIENT'S TOILET (F) 3260X6365 DRINKING WATER 2415X1210 WAITING AREA 6885X16235 PATIENT'S TOILET (M) 5950x8090 PATIENT'S TOILE (F) 3265X8090 SEMINAR ROOM 6070X8090 WAITING AREA 10050X8320 ECG 4570X12255 STORE 3705X3935 RESEARCH ROOM 3220X4585 WAITING AREA 4385X4705 WAITING AREA 8200X3000 WAITING AREA 3465X2655 TOILET STORE 3590X5225 STORE 3730X3760 STAFF TOILET (M) 1970X6775 ENTRANCE LOBBY FOR PHYSIOTHERAPY TOILET WC 1150X1200 STAFF TOILET (F) 1965X5160 STAFF TOILET (M) 2995X3935 STAFF TOILET (F) 2475X3935 STAIRCASE 2885 MM. WIDE CORRIDOR 3000 MM. WIDE CORRIDOR PSYCHIATRY 3200X4455 DIAGNOSTIC BILLING 3325X4685 WC 1150X1200 WC 1150X1200 WC 1150X1200 WC 1150X1200 WC 1150X1200 WC 1150X1200 WC 1150X1200 TOILET WC 1235X900 TOILET TOILET D7 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D3 D3 3800X3935 STAIRCASE W = 2000 T = 300 R = 150 STAIRCASE W = 2000 T = 300 R = 150 WC 1250X1200 DRINKING WATER WC 1365X1200 WC 1250X1200 WC 1365X1200 WC 1250X1200 WC 1365X1200 WC 1250X1200 WC 1365X1200 WC 1250X1200 WC 1365X1200 WC 900X1350 WC 900X1350 WC 900X1350 WC 900X1350 CONSULT ROOM 2 4105X4800 CONSULT ROOM 3 3965X4800 CONSULT ROOM 4 5090X4800 CONSULT ROOM 5 3965X4800 WC 1350X900 WC 1235X900 WC 1350X900 7085 71165 13760 56475 30110 8040 4220 14200 56270 53040 30470 3005 8550 GL GL D7 D7 W3 W7 GL GL GL GL GL GL GL GL W6 D7 D7 GL GL W1 W1 W1 W1 W1 GL GL W1 W1 W1 W1 W1 W1 W6 W6 W6 W6 W6 W1 W1 W6 W4 W4 W1 W1 W4 W4 W4 W4 W4 W4 W4 GL GL W3 W4 W4 7800 750 PATIENT LIFT PASS. LIFT ELE PASS. LIFT LIFT LIFT CONSOLE CATH LAB.-2 SCRUB SCRUB CSSD STERILE CORRIDOR EMERGENCY WAITING CLEAN CORRIDOR DOC'S RM VESTIBULE VESTIBULE WAITING VESTI. 29 28 32 33 30 ENTRANCE/WAITING PHARMACY S.I. ROOM VESTIBULE CUT OUT ABOVE OFFICE S.I. ROOM CONTROL UP CONSOLE CATH LAB.-4 ELE DOC'S VIP ENTRANCE UP DRI. WATER MECH. RM SOIL ICU 3 EMERGENCY ICU 1 LIFT LOBBY LIFT LOBBY G-01 G - 03 G - 04 G - 05 G-04a G - 05a G - 06 G - 07 G - 07a G - 08 G - 09 G-10 G - 11 G - 12 G-13 G-14 G - 15 G-16 G-17 G - 21 G - 22 G - 31 G - 30b G - 30 G - 33 G-10A G - 41 G - 42 G - 44 G - 43 G - 52 G - 49 G -51 G - 50a G - 50b G - 50c G - 50d G - 51a G - 51b G - 51c G - 51d G - 47 G - 42a STAIR-4 FOYER / WAITING WAITING PATIENT WAITING NURSE RM 6.11x5.89 3.60x5.89 6.065x5.89 6.115x5.89 3.97x4.13 6.115x5.89 6.55x1.80 6.55x1.80 6.55x1.80 7.35x4.16 2.0x4.32 1.8x4.32 2.13x2.55 3.11x3.14 4.65x3.14 3.11x1.63 7.25x6.85 4.6x5.12 15.56x2.70 7.65x6.82 23.40x2.70 6.17x2.75 6.40X3.10 6.17X2.93 2.10x3.82 2.52x2.27 1.87x2.38 8.70x6.67 8.70x6.60 8.70x6.55 8.70x6.60 8.70x6.60 8.70x6.60 11.15X22.40 5.0x6.65 3.97x3.0 ISOLATION-1 ANTI RM 4.09x2.55 D.W. D.W. CSSD 2.55x3.04 CLEAN DIRTY 1.5 mt WIDE DIRTY CORRIDOR DN UP STORE RM G-35 3.0x1.72 CONTROL SPACE D.W. Emergency Exit CATH LAB.-1 AHU FOR CONTROL TOI 31 CONTROL G.F. ICU 1.75x2.02 TOI 3.97x3.0 ISOLATION-2 VEST 4.0 X 4.39 3.0x2.58 NURSE 3.35x2.50 3.37x3.47 HVAC SHAFT 2000x600 SHAFT FOR HVAC CLEAN UTILITY TOILET COUNCILING 1.75x2.02 TOI 3.35x2.0 X RAY/ABG DOCTOR'S/ MOST EMERGENCY PATIENT LIFT PHAR. 2.77x2.41 SHOE CHANGE COUNCIL DOC'S LOCKER/ LOUNGE/TOILET NUR'S LOCKER/ LOUNGE/TOILET TECH'S LOCKER/ LOUNGE/TOILET G - 26 G-26c G - 26d G-26a G-27c G- 27d 5.17x3.92 ATT 3.75x3.11 as/detail 36.0 SQM 18.44SQM 36.72 SQM 36.00 SQM 17.0 SQM 36.00 SQM 46.79 SQM 8.28x5.58 24.55 SQM 8.00 SQM 7.78 SQM 8.65 SQM 5.44 SQM 1.10x1.65 1.82 SQM 9.42 SQM 14.61 SQM 15.15x16.66 256.73 SQM 76.76 SQM 29.78 SQM G- 27 6.36x6.85 37.92 SQM 4.48x6.85 36.27 SQM 11.07 SQM 3.64x3.73 10.79 SQM 52.66 SQM 20.57 SQM 11.71 SQM 386.23 SQM 18.07 SQM 19.87 SQM 6.24x7.0 45.46 SQM ICU 3 4.17 SQM 10.46 SQM 11.66 SQM 12.0 SQM 4.47 SQM 8.38 SQM 6.67 SQM 6.71 SQM 16.96 SQM 5.98 SQM 4.18 SQM 5.17 SQM 2.88x2.70 7.78 SQM G-33a G - 30d G - 30e G - 30f 2.45x2.58 7.55 SQM 2.75x2.58 6.79 SQM 2.99x2.58 6.90 SQM 10.00 SQM 8.73 SQM 7.74 SQM 17.58 SQM 6.24x7.58 49.15 SQM G-31 G-31a G-31b G - 31c G - 31d G-40 G-39 G-38 G-22a G-22b G - 28 G-28d G-28c G-18 G-19 15.04x2.70 G- 26b G-27a G - 27b G-28a G- 28b G - 34 G - 36 G-37 G - 46 G - 48 13.44 SQM 2.67 SQM 2.65 SQM 8.15 SQM 40.62 SQM NURSE'S RM DOC'RM CHANGE RM TOILET PANTRY 2.70x3.70 2.95x1.5 1.35x1.59 2.70x3.31 2.52x3.31 G-30g G-30h G-30i G-30k G - 30L ICU 3 ICU 2 ICU 2 ICU 2 4.19 SQM G - 30c G-30b1 2.50x18.80 2.70X15.50 G - 30c1 STAIR-2 SHAFT FOR HVAC 750 mm WIDE F.H.C. 600x900 DUCT ELECTRICAL 725x1885 HVAC SHAFT FOR UP UP 1 2 3 4 5 10 3a 5a 2a 3b UP CUT OUT ABOVE 2.24x3.60 as/detail 50 MM EXPANSION JOINT A -a F.H.C. 900X600 HVAC SHAFT 2.42x0.60 CUT OUT 435x450 -b -c UP SLOPE DN R.W.P R.W.P UP SHAFT HVAC SHAFT MEDICAL GASES F.H.C. 900x600 STAIR-1 as/detail STAIR-3 as/detail 7.34X6.74 49.17 SQM PATIENT HOLDING STRETCHER HOLDING BABY WARMER 6- BED PEAD. ICU PEAD. ICU 5 BED 5 BED PASS WIN 8 NOS TOILET DN DN UP DN UP EQUIPMENT G-01-a 6.55x1.80 14..31 SQM G - 02 43.05x1.5 64.58 SQM 15.76 SQM CORRIDOR 11.20x1.40 G - 30M G - 34 15.76 SQM CORRIDOR 11.20x1.40 G - 30a G - 46a 4.45 SQM 1 2 R.W.P R.W.P R.W.P fix panel MASONRY AFTER HVAC DUCTING FIX GLASS M.S. STAIR AS/DETAIL TOILET 1.35x1.59 G-30J 3.60x3.36 11.02 SQM G-37 STRET. FEMALE TOI. JAN.CL. 1.94X6.27 2.58x6.27 2.92x2.76 2.00x1.65 1.25X0.95 1.25X1.30 MALE TOI. 2.15X1.65 1.50X1.20 1.25X0.95 1.25X0.95 1.25X0.95 2.92x3.27 8.08 SQM 9.54 SQM 11.23 SQM 14.24 SQM G -50 PLUMBING DUCT 1180x475 PLUMBING DUCT 350x700 FIX GLASS plumbing wall 1.5 mt. ht.115 th. fix panel fix panel fix panel fix panel LEADLINE GLASS WIN. LINTEL & SILL AS/CATH WENDER 1500x800 1500x800 LINTEL =1700 SILL = 900 LINTEL =1700 SILL = 900 PLUMBING 835x385 DUCT 2155x1200 LINTEL =2200 SILL = 1000 LEADLINE GLASS DRG. AS/CATH WENDER DRG. WIN. LINTEL & SILL STORE WALL UP TO 3000 Ht WALL UP TO 3000 Ht FIRE ZONE 2 EMERGENCY ENTRANCE ENTRANCE UP ramp DOCTOR'S/ 3 4 5 8 2 3 9 BATTERIES UPS 1.28 1.31 1.30 BATTER UPS STAB MAINS PANEL EQUIPMENT 1.28 1.30 1.31 STATION ALU. SLIDING SHUTTER V1 W4A W3A W2C W2a W5A W6 W7 W9a W10 W11 W11 W11 W11 W1a W12b W13b W14 W15 W15 DW1 W17 W11a W17a W20a W21 V2 V2 W28a W27 W26a W26a W15 W2a V1 W1 W1 W1 W8 W8a W33 W8b W32 W30b W40 W39 W41 W42 D4a D4a D4a D7 D7 D7 D7 D6 D1 D2 D1 D7a D11 D11 D1 D11 D2 D11 D15 D1 D11 D2 D2 D7 D3 D7 D15A D2 D7 D4a D7 D7 D8a D7 D7 D7 D7 D7 D7 D7 D9 D9 D9 D9 D9 D9 D7 D7 D4 FD11 D14 D7 D7 D7 D7 D9 D9 D8a D7 D11 D7 D7a D7 D7 D7 D9a D7 D7 D7 D7 D7 DW4 DW5 D15B D7 D17 D17 D4 D4 D8 D7 D9 D14 D7C D9 D9 D9 D7C D9 D9 D8 DW6 D1 D8 D8 D7 D4b D4b D4b D4b D11 D16b D9 D9 D16b D9 D9 D9 D9 D9 D16b D16b DW7 D4 D4 FD11 FD11 FD11 D11 D18 W2C W2C W2C W2C W2C W2C W2C W3A D11 W44 W44 W44 W44 W44 W44 W44 W44 W44 DW5 PLANTERS PLANTERS PLANTERS PLANTERS PLANTERS MEMORIAL WOODEN FLORING D7 RAIN WATER ramp UP RO WATER RO WATER RO WATER RO WATER RO WATER RO WATER RO WATER RO WATER UP V6 BATTER UPS STAB MAINS PANEL EQUIPMENT 1.28 1.30 1.31 4 5 8 2 3 9 BATTERIES UPS EQUIPMENT 1.28 1.31 1.30 230 230 7127 3050 575 SERVICE LIFT 2200X3000 LIFT 3050X2500 LIFT 3050X2250 P LIFT 2200X3000 P LIFT 2200X3000 LIFT 3050X2500 LIFT 3050X2250 7800 7800 7800 1125 5200 5200 7800 7800 7800 4675 7800 7800 7800 7800 5615 7800 5820 LIFT 3050X2500 LIFT 3050X2250 1125 4055 5200 DN UP DN UP LIFT 3050X2500 LIFT 3050X2250 LIFT LOBBY RAMP TO 1st BASEMENT GROUND FLOOR HOSTEL ENTRANCE AUDITORIUM PRE FUNCTION LOBBY 23775X12290 AREA=292.20 SQ.M. AUDITORIUM ENTRANCE MULTIPURPOSE HALL (DOUBLE HEIGHT) EMERGENCY FIRE EXIT EMERGENCY FIRE EXIT EMERGENCY FIRE EXIT EMERGENCY FIRE EXIT 16350 KITCHEN SERVICE ONLY TOILET (M) TOILET (F) DOCTOR'S & STAFF CAFE ENTRY Lvl: +1200 1130X1500 1130X1500 1130X1500 1575X1500 D7 D7 D2 D2 D1 D1 D1 D1 D7 D6 1615 960 PROJECTION ABOVE EMERGENCY FIRE EXIT EMERGENCY FIRE EXIT D6 D6 D6 D6 D6 D6 D6 D6 D6 D6 D6 D6 Lvl: +1200 15740 27905 13555 W1 W1 W1 W3 W4 W4 W5 W5 W5 W5 W6 V1 EMERGENCY FIRE EXIT AUDITORIUM ENTRANCE V1 Lvl: +1200 D4 D1 D1 D1 D1 D1 D1 D2 D2 2M WIDE CORRIDOR 23775 F.H.C ELECT. 455 1800 D7 D7 12290 D1 D7 D7 D7 D7 D7 31155 LIFT & STAIR LOBBY Lvl: +1200 4705 X 7015 7015 4705 4645 2000 4530 3590 LIFT & STAIR LOBBY Lvl: +1200 4545 X 5605 5605 4545 UP DN +1200 +1975 +270 - 505 UP DN +1200 +1975 - 505 +270 7350 2755 2895 2820 D7 D7 12900 LIFT LOBBY 2240 X 3490 STEPS ADDED HERE..! D6 D6 D6 D6 HALL 13555X27530 36625 37940 34400 14165 34400 60400 1570 ARCHITECT C.O.W. OWNER ST. ENGINEER AUTHORITY SCALE : 1cm = 10.00 mts. ZONE : GENERAL HOSPITAL USE : HOSPITAL, HOSTEL, AUDITORIUM HALL NOTES:- x ENGINEER IS FULLY RESPONSIBLE FOR LEAVING OPEN SPACE AND MARGIN. x THE DEPTH AND POSITION OF EXISTING MUNICIPAL MAIN HOLE IS VERIFIED ME ON SITE AND PREMISES CAN GET DRAINAGE CONNECTION. x IT IS CERTIFY THAT ACCORDING TO GDCR 2021 ALL REQUIREMENTS OF THE BUILDING ARE CHECKED AND NECESSARY ACTION ARE TAKEN. x IT IS CERTIFY THAT ACCORDING TO THE CLAUSE NO. 4.5.3 OF THE GDCR, THE STRUCTURE OF AS PER THE NORMS OF THE INDIAN STANDARDS. x DESIGN OF STAIRCASE AND RAILING IS PROVIDED AS PER THE PROVISION OF THE CLAUSE NO. 23.1.12 AND 23.14 AND 24.6 OF GDCR. x PEDESTRIANS RAMP IS PROVIDED AS PER THE PROVISION OF THE CLAUSE NO. 23.1.15 OF GDCR. x LIFT IS PROVIDED AS PER THE PROVISION OF THE CLAUSE NO. 23.12 AND 24.7 OF GDCR. x WATER TANK PROVIDED AS PER THE PROVISION OF THE CLAUSE NO. 23.6 OF GDCR. x SEPARATE LETTER BOX IS PROVIDED AT GROUND LEVEL FOR EACH UNIT. x WATER TANK FOR FIRE SAFETY REQUIREMENT PROVIDED AS PER CHAPTER NO. 24 OF GDCR. x ELECTRICAL INFRASTRUCTURE SHALL BE PROVIDED AS PER CLAUSE NO. 23.11 x DRINKING WATER FACILITY FOR DISABLED PERSON IS PROVIDED AS PER THE CLAUSE NO. 23.6.2 x DRAINAGE FACILITY IS PROVIDED AS PER THE CLAUSE NO. 23.10 x 6,*1$*(¶6 2) 7+( 3$5.,1* 3/$&( ,6 72 %( 3529,'(' $6 3(5 &/$86( 12 2) 7+( *'&5 x ENTRANCE OF THE BUILDING IS PROVIDED AS PER THE CLAUSE NO. 23.1.7 OF GDCR x THE PAVING OF BUILDING UNIT/FINL PLOT AS PER THE PROVISION OF THE CLAUSE NO. 23.1.4 OF GDCR x THE STRUCTURE OF THE BUILDING IS AS PER THE NORMS OF THE SPECIFIED IN THE INDIAN STANDARD AND TAKE NECESSARY ACTION FOR THE STRUCTURAL SAFETY DURING THE CONSTRUCTION. x RAIN WATER STORAGE TANK AND RAIN WATER HARVESTING SYSTEM IS PROVIDED AS PER THE CLAUSE NO. 27.2 OF GDCR 2021 x COMMUNITY BIN PROVIDED AS PER THE PROVISION OF THE CLAUSE NO. 27.3 OF GDCR. x GREY WATER RECYCLING SYSTEM IS PROVIDED AS PER THE CLAUSE NO. 27.4 OF GDCR. x TREE PLANTATION IS PROVIDED AS PER THE CLAUSE NO. 27.5 OF GDCR. x SOLAR WATER HEATING SYSTEM IS PROVIDED AS PER THE CLAUSE NO. 27.6 OF THE GDCR. x POLLUTION CONTROL SYSTEM IS PROVIDED AS PER THE CHAPTER NO. 28 OF GDCR. x FIRE SAFETY SYSTEM IS PROVIDED AS PER CHAPTER NO. 24 OF GDCR 2021 x MAINTENANCE AND UP GRADATION OF BUILDING IS AS PER CHAPTER NO. 29 OF GDCR 2021 SITE PLAN APPROVAL OF DRAWINGS AND ACCEPTANCE OF ANY STATEMENT, DOCUMENTS, STRUCTURAL REPORT, STRUCTURAL DRAWINGS, PROGRESS CERTIFICATE OR BUILDING COMPLETION CERTIFICATES SHALL NOT DISCHARGE THE OWNER, ENGINEER, ARCHITECT, CLERK OF WORK/ SITE SUPERVISOR, STRUCTURAL DESIGNER, DEVELOPER, OWNER FROM THEIR RESPONSIBILITIES, IMPOSED UNDER THE ACT, THE DEVELOPMENT CONTROL REGULATIONS AND THE LAWS OF TORT AND LOCAL ACTS. LIABILITY (G.D.R. - 3.31) :- NO WITHSTANDING ANY DEVELOPMENT PERMISSION GRANTED UNDER THE ACT AND THESE REGULATIONS, ANY PERSON UNDERTAKING ANY DEVELOPMENT WORK SHALL CONTINUE TO BE WHOLLY & SOLELY LIABLE FOR ANY INJURY OR DAMAGE OR LOSS WHATSOEVER THAT MAY BE CAUSED TO ANY ONE IN LIABILITY WHATSOEVER IN THIS REGARD SHALL BE CAST ON THE AUTHORITY. 1. HYDRANT SYSTEM: ON/OFF switches located near the hose reel hose or hydrant outlet, at each floor the main Fire Pump at the underground water tank with a capacity to discharge 900 liters per minute at 3 bar. pressure as measured at the terrace level should be installed. The Riser for the building exceeding 18 meters and above 18 meters height should not be of less than 100 mm. internal diameter, The riser should be connected to the bottom of the terrace tank with a stop valve and a NRV to act as a Down-comer. One riser is required for every 1000 sq, meters floor area and if the building is divided into, two or more parts then each part should have a separate riser with all the fittings at floor level. Each floor should have one hydrant outlet with a coupling for attaching a 63 mm. dia hose and 25 mm.bore hose-reel hose with 8 mm. SS. Shut-off nozzle at each floor landing. The length of hose reel hose should be enough to reach the farthest corner of the floor. Hose-box with 15 meters long 63 mm. dia. hose and 12.5 mm. bore nozzle at alternate floors. The Hose-reel hose should be coupled to the riser. Fire service inlet should be installed at a point near the entry to the premises where a fire service vehicle can approach easily. A permanent hydrant point comprising of 63 mm. dia size 2nos of hydrant valves should be installed at the terrace level. Overhead tank Refilling bypass connection should be done at the terrace level. The overhead tank shall be of a capacity of not less than 20,000 liters. The Underground tank shall be of not less than 1,00,000 liters. 2. FIRE LIFT : The fire-lift and all the lifts should have a provision to ground automatically in case of electricity failure. Each building should have at least one lift as a fire- lift and if the building is divided into two or more parts then each should have a Fire-lift. Lift well should have blowers to pressurize the lift well so connected that it will be automatically operate when alarm call point is operate, so that it prevents the lift well getting smoke logged. 3. FIRE ALARM: Fire alarm call points to be installed at each floor with sounders capable of being heard all throughout the building. 4. FIRE EXTINGUISHERS One Carbon Dioxide (CO2) type extinguisher of 4.5 kg. with ISI mark and one extinguisher of 5 kg. dry Chemical Powder (DCP) type extinguisher with ISI mark to be installed on each- floor in case of commercial building. One Carbon Dioxide (CO2) type extinguisher of 4.5 with ISI mark OR Two Carbon Dioxide (CO2) type extinguisher of 2 kg. with ISI mark capacity on alternate floors in case of residential building. If the building is divided into two or more parts then each part should have these extinguishers installed. 5. STAIRCASE: The staircase has to be open from at least one or two sides but if the staircase is in the centre core of the buildings it has to be pressurized to prevent it from getting smoke logged. The Riser/Down-comer should be located in the staircase or close to in to make it easily approachable in case of Fire from the floor below or above. 6. BASEMENT: The Basement of 200 sq. meters or more should be protected with Automatic Sprinkler system with at least one sprinkler head for actual car parking space. Additionally be protected by a Hydrant outlet and two 25 mm. bore hose reel hoses with 8 mm. bore nozzles at each basement level. 7. LIGHTENING ARRESTER : A lightening arrester should also be installed and be properly earthed to prevent damage to the building when the lightening strike. 8. PHOTO LUMINESCENT (AUTO GLOW) SIGNAGE'S If the building falls in a confined area or if it has an enclosed staircase or is not well lit-up on the inside, then adequate photo luminescent (auto glow) signage's should be displayed at each floor / landing/ pathway/dead end along all exits routes leading to ground level. The signage should indicate fire fighting. fire safety equipment present on the respective floor/landing/pathway/dead end and along all exit routes leading to the ground level. 9. ELECTRIC POWER SUPPLY TO THE ENTIRE FIRE-SAFETY SYSTEM Electricity supply to the fire pump, fire alarm system, staircase pressurization system and fire lift should be made available from the main electricity supply. (i.e. from electrical power supply of the company) this is ensure availability of power supply to the fire protection & safety system even after the main electrical supply to the building ids switched off at the time of fire. 10. INDIVIDUAL FIRE SAFETY SYSTEM FIRE SAFETY SYSTEM SHOULD BE PROVIDED INDIVIDUAL SHOW ROOM BY OWNER IMPORTANT INSTRUCTIONS : After inspection of low rise building by the fire service authority , if the fire officer concerned feel the need for additional fire prevention/protection measures / Ventilation system required or equipment (i.e. - Passive system/ Suppression system / Fire door - Window / Detection system / Active system / Sprinkler / Drencher etc.) as per fire load / firerick / Public gathering. Potential / Occupancy / Confined area, those additional measures / equipment have to be implemented / installed. (B2) (B2) (B1) 4.50 4.60 4.50 4.60 3.48 EXI. BUILT UP AREA TO BE REMOVED (B3) REVISED LAY OUT PLAN SHOWING PROPOSED BUILDINGS FOR HOSPITAL BUILDING OF CITY SUR. NO. 7673/P, F.P. NO. 202/P, T.P.S. NO. 8 (ASARAWA) MOUJE : ASARAWA, TALUKA : CITY, DIST: AHMEDABAD. 'CIVIL HOSTEL CAMPUS AS A 'U N MEHTA INSTITUTE OF CARDIOLOGY AND RESEARCH CENTER'

Transcript of 01 SITE PLAN -...

Page 1: 01 SITE PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/.../200920160QPW6SXWSITEPLANFINAL.pdf · shoe change council doc's locker/ ... stretcher holding baby warmer

R

O

A

D

6

.0

0

M

W

ID

E

C

A

M

P

U

S

R

O

A

D

7

.

5

0

M

W

I

D

E

ROAD 6.00 M WIDE

E

M

E

R

G

E

N

C

Y

E

N

T

R

Y

R

O

A

D

6

.0

0

M

W

ID

E

EXISTING HOSPITAL BUILDING

(A)

M

A

IN

E

N

T

R

Y

C

IT

Y

R

O

A

D

CAMP

US R

OAD

CAMPUS ROAD

PEDESTRIAN ZONE

C

A

M

P

U

S

R

O

A

D

7

.5

0

M

W

ID

E

EXISTING HOSPITAL BUILDING

(B)

EMERGENCY

ENTRANCE

SERVICE ENTRY

SERVICE ENTRY/EXIT

P

E

D

E

S

T

R

IA

N

E

N

T

R

Y

CONNECTOR FROM THIRD FLOOR

OF PROPOSED HOSPITAL BUILDING

TO FOURTH FLOOR OF PROPOSED

HOSTEL BUILDING (NON MCI WARD)

CONNECTOR BETWEEN SECOND,

THIRD & FOURTH FLOOR OF

EXISTING NEW HOSPITAL BUILDING

TO SECOND , THIRD & FOURTH

FLOOR OF PROPOSED HOSPITAL

BUILDING

CONNECTOR FROM FOURTH

FLOOR OF EXISTING NEW

HOSPITAL BUILDING TO FIFTH

FLOOR OF PROPOSED

AUDITORIUM & HOSTEL BUILDING

R

A

M

P

D

N

RA

MP

IN

DROP OFF

HOSTEL

ENTRY

FACULTY ENTRY

RA

MP

O

UT

7800 7800 7800 7800 7800 7800 7800 7800 7450 7800 7800 7800 7800 7800 7800 7800

5958

7800

7800

7800

7800

7800

7800

7800

3750

1125

3750

1125

W6 W1

W1

W1

D4D4

W6W6

D7

D7D7

D6

LIFT LOBBY3000X8090

VISITOR'SLIFT LOBBY4290X4990

PATIENTLIFT LOBBY

DIRTYSERVICE

LIFT

MEP SERVICE AREA

MEP SERVICEAREA

4320X3820

FHC

FHC

CWP

CWP

D6

D6

D6

D6

D2

W4

D6

W6

PATIENTLIFT LOBBY3120X8090

D7

MS STAIRCASE

W4

W4

CLEANSERVICE LIFT

DIRTYSERVICE

LIFT

W6 W1

W1

W1

ADULT CARDIOLOGY OPD

ADULT CARDIAC SURGERY OPD

D1

D3

D6

D2

D3

D3

D3

D3

D3

D3

D3

D3

D3

D3

D3

D3

D3

D3 D3D3

D3 D3 D3

D6

D6

D6

D7

D6

D3

D3

D6D6

D2

D3

D3

D3

D2

D7

D7

D7D7

D7

D6

D7

D3

D3

D3

D4

D4

D3

D2

D2

D2

D2

D2

D3

D6

D6

D6

D3

D3

D2

D3 D3

D3

D3

D3D3

D4

D4

D3

D6

D6

D7

D7D7

D6

D6

D6

D3

D1

D2

D2

D1D1

D1D1

D4

D1D1

D1D1

D2 D2

D2 D2

D6L

D6L

WAITING47695X9480

3000 MM. WIDE CORRIDOR3.0 M WIDE CORRIDOR

CONSULT ROOM 14100X4800

SCREENING OPD14050X4455

HMISCOUNTER3325X4915

ECHO8320X9370

X-RAY

MINOR OT /DRESSING4845X5600

CHANGE & SCRUB5250X2375

CASUALTY5915X4155

WAITING QUEUE

CONSULTROOM 1

4570X3820

3.0 M WIDE CORRIDOR

CONSULTROOM 3

4570X3890

CONSULTROOM 2

4570X4000

CASE DEMO4570X4000

CONSULTROOM 4

4570X3890

EXAMINATIONROOM

4570X2805

DRESSING (M)2225X2850

SCREENING ROOM4570X14185

PHLEBOTOMYROOM

DRESSING (F)2230X2850

PAIN CLINIC

CASE DEMO4975X4455

AHU6370X3300

TOILET1500X1630

DOUBLE HEIGHT ATRIUM14200X12370

SERVICES8320X3820

DOUBLE HEIGHT ATRIUM14200X8320

ENTRY FORPHYSIOTHERAPY CONNECTOR AT FIRST FLOOR LEVEL

DIETICIAN3965X4800

EXAMINATIONROOM

3200X4455

TMT/HOLTER

PHLEBOTOMYROOM

AHU

INJECTIONROOM

3235X4585

ADMINISTRATION9475X15225

TOILET1800X2000

CASE WINDOWS

RMO

PATIENT'STOILET (M)4825X6365

PATIENT'STOILET (F)3260X6365

DRINKINGWATER

2415X1210

WAITING AREA6885X16235

PATIENT'STOILET (M)5950x8090

PATIENT'STOILE (F)

3265X8090

SEMINAR ROOM6070X8090

WAITING AREA10050X8320

ECG4570X12255

STORE3705X3935

RESEARCHROOM

3220X4585

WAITING AREA4385X4705

WAITING AREA8200X3000

WAITING AREA3465X2655

TOILET

STORE3590X5225

STORE3730X3760

STAFFTOILET (M)1970X6775

ENTRANCE LOBBYFOR PHYSIOTHERAPY

TOILET

WC1150X1200

STAFFTOILET (F)1965X5160

STAFFTOILET (M)2995X3935

STAFFTOILET (F)2475X3935

STAIRCASE

2885

MM.

WID

E CO

RRID

OR

3000

MM.

WID

E CO

RRID

OR

PSYCHIATRY3200X4455

DIAGNOSTICBILLING

3325X4685

WC1150X1200

WC1150X1200

WC1150X1200

WC1150X1200

WC1150X1200

WC1150X1200

WC1150X1200

TOILET

WC1235X900

TOILETTOILET

D7

D2D2

D2D2

D2D2

D2D2

D2

D2

D2

D2

D2

D2

D2

D2

D2

D3

D3

3800X3935

STAIRCASEW = 2000T = 300R = 150

STAIRCASEW = 2000T = 300R = 150

WC1250X1200

DRINKINGWATER

WC1365X1200

WC1250X1200

WC1365X1200

WC1250X1200

WC1365X1200

WC1250X1200

WC1365X1200

WC1250X1200

WC1365X1200

WC900X1350

WC900X1350

WC900X1350

WC900X1350

CONSULT ROOM 24105X4800

CONSULT ROOM 33965X4800

CONSULT ROOM 45090X4800

CONSULT ROOM 53965X4800

WC1350X900

WC1235X900

WC1350X900

7085 71165

1376

0

56475

3011

0

8040

4220

14200

56270

53040

30470

3005

8550

GL

GL

D7 D7

W3

W7

GL

GLGL

GLGLGL

GL

GL

W6

D7D7

GL GL

W1

W1

W1

W1

W1

GLGLW1 W1 W1 W1 W1 W1

W6

W6

W6

W6

W6

W1

W1

W6

W4

W4

W1 W1

W4

W4

W4

W4

W4

W4

W4

GL

GL

W3

W4

W4

7800

750

PATIENTLIFT

PASS.LIFT

ELEPASS.LIFT

LIFTLIFT

CONSOLECATH LAB.-2

SCRUB

SCRUB

CSSD

STERILE CORRIDOR

EMERGENCYWAITING

CLEAN CORRIDOR

DOC'S RM

VESTIBULE

VESTIBULE

WAITING

VESTI.

29 28

32 33

30

ENTRANCE/WAITING

PHARMACY

S.I. ROOM

VESTIBULE

CUT OUTABOVE

OFFICE

S.I. ROOM

CONTROL

UP

CONSOLECATH LAB.-4

ELE

DOC'SVIP

ENTRANCE

UP

DRI. WATER

MECH. RM

SOIL

ICU 3

EMERGENCY

ICU 1

LIFT LOBBY

LIFT LOBBY

G-01

G - 03G - 04

G - 05

G-04a G - 05a

G - 06 G - 07

G - 07a

G - 08G - 09

G-10

G - 11

G - 12

G-13G-14

G - 15

G-16

G-17

G - 21

G - 22

G - 31

G - 30b

G - 30

G - 33

G-10A

G - 41

G - 42

G - 44

G - 43

G - 52

G - 49G -51

G - 50a

G - 50b

G - 50c

G - 50d

G - 51a

G - 51b

G - 51c

G - 51d

G - 47

G - 42a

STAIR-4

FOYER / WAITING

WAITING

PATIENT WAITING

NURSE RM

6.11x5.893.60x5.89

6.065x5.89 6.115x5.89

3.97x4.13

6.115x5.89

6.55x1.806.55x1.806.55x1.80

7.35x4.16

2.0x4.321.8x4.32

2.13x2.55

3.11x3.144.65x3.14

3.11x1.63

7.25x6.85

4.6x5.12

15.56x2.70

7.65x6.82

23.40x2.70

6.17x2.75

6.40X3.10

6.17X2.93

2.10x3.82

2.52x2.271.87x2.38

8.70x6.67

8.70x6.60

8.70x6.55

8.70x6.60

8.70x6.60

8.70x6.60

11.15X22.40

5.0x6.65

3.97x3.0

ISOLATION-1

ANTI RM

4.09x2.55

D.W.D.W.

CSSD

2.55x3.04

CLEANDIRTY

1.5 mt WIDE DIRTY CORRIDOR

DNUP

STORE RMG-35

3.0x1.72

CONTROL

SPACE

D.W.

Emergency Exit

CATH LAB.-1

AHU FOR

CONTROL

TOI

31

CONTROL

G.F. ICU

1.75x2.02

TOI

3.97x3.0

ISOLATION-2

VEST

4.0 X 4.39

3.0x2.58

NURSE

3.35x2.50

3.37x3.47

HVAC SHAFT 2000x600SHAFT FOR

HVAC

CLEAN UTILITYTOILET

COUNCILING

1.75x2.02

TOI

3.35x2.0

X RAY/ABG

DOCTOR'S/MOST EMERGENCY

PATIENTLIFT

PHAR.2.77x2.41

SHOE CHANGE

COUNCIL

DOC'S LOCKER/LOUNGE/TOILET

NUR'S LOCKER/LOUNGE/TOILET

TECH'S LOCKER/LOUNGE/TOILET

G - 26

G-26c

G - 26d

G-26a

G-27c

G- 27d

5.17x3.92ATT

3.75x3.11

as/detail

36.0 SQM

18.44SQM36.72 SQM

36.00 SQM

17.0 SQM36.00 SQM

46.79 SQM

8.28x5.58

24.55 SQM

8.00 SQM

7.78 SQM 8.65 SQM

5.44 SQM

1.10x1.651.82 SQM

9.42 SQM 14.61 SQM

15.15x16.66

256.73 SQM

76.76 SQM

29.78 SQMG- 27

6.36x6.85

37.92 SQM

4.48x6.8536.27 SQM

11.07 SQM

3.64x3.73

10.79 SQM

52.66 SQM

20.57 SQM

11.71 SQM

386.23 SQM

18.07 SQM

19.87 SQM

6.24x7.045.46 SQM

ICU 3

4.17 SQM10.46 SQM

11.66 SQM 12.0 SQM

4.47 SQM

8.38 SQM

6.67 SQM

6.71 SQM

16.96 SQM

5.98 SQM4.18 SQM

5.17 SQM

2.88x2.707.78 SQM

G-33a G - 30d G - 30eG - 30f

2.45x2.587.55 SQM

2.75x2.586.79 SQM

2.99x2.586.90 SQM

10.00 SQM8.73 SQM

7.74 SQM

17.58 SQM

6.24x7.58

49.15 SQM

G-31G-31a G-31b

G - 31c G - 31d

G-40

G-39

G-38

G-22a

G-22bG - 28

G-28dG-28c

G-18

G-19

15.04x2.70

G- 26b G-27aG - 27b

G-28aG- 28b

G - 34

G - 36

G-37

G - 46

G - 48

13.44 SQM 2.67 SQM2.65 SQM8.15 SQM

40.62 SQM

NURSE'S RM DOC'RMCHANGE RM

TOILETPANTRY

2.70x3.70

2.95x1.5

1.35x1.59

2.70x3.312.52x3.31

G-30g

G-30h

G-30i

G-30k

G - 30L

ICU 3

ICU 2

ICU 2

ICU 2

4.19 SQM

G - 30c

G-30b12.50x18.80

2.70X15.50G - 30c1

STAIR-2

SHAFT FOR HVAC

750 mm WIDE

F.H.C.600x900

DUCTELECTRICAL

725x1885HVAC

SHAFT FOR

UP

UP

1

2

3

4

5

10

3a

5a

2a

3b

UP

CUT OUT ABOVE2.24x3.60

as/detail

50 MM EXPANSIONJOINT

A

-a

F.H.C.900X600 HVAC SHAFT 2.42x0.60

CUT OUT435x450

-b

-c

UPSLOPE

DN

R.W.P R.W.P

UP

SHAFT HVAC SHAFT MEDICAL GASESF.H.C.

900x600

STAIR-1

as/detail

STAIR-3as/detail

7.34X6.7449.17 SQM

PATIENT HOLDING

STRETCHERHOLDING

BABY WARMER6- BED

PEAD. ICUPEAD. ICU

5 BED5 BED

PASS WIN

8 NOS

TOILET

DN

DN

UP

DN

UP

EQUIPMENTG-01-a 6.55x1.8014..31 SQM

G - 02 43.05x1.564.58 SQM

15.76 SQMCORRIDOR

11.20x1.40

G - 30M

G - 34

15.76 SQM

CORRIDOR

11.20x1.40G - 30a

G - 46a4.45 SQM

1 2

R.W.P R.W.P R.W.P

fix panel

MASONRYAFTER HVAC

DUCTING

FIXGLASS

M.S. STAIRAS/DETAIL

TOILET

1.35x1.59

G-30J

3.60x3.3611.02 SQM

G-37

STRET.

FEMALE TOI.

JAN.CL.1.94X6.27

2.58x6.27

2.92x2.76

2.00x1.65

1.25X0.95

1.25X1.30

MALE TOI.

2.15X1.65

1.50X1.20

1.25X0.95

1.25X0.95

1.25X0.95

2.92x3.27

8.08 SQM

9.54 SQM

11.23 SQM

14.24 SQM

G -50

PLUMBING DUCT1180x475

PLUMBING DUCT350x700

FIXGLASS

plumbing wall1.5 mt. ht.115 th.

fix panel fix panel fix panel fix panel

LEADLINE GLASS

WIN. LINTEL & SILLAS/CATH WENDER

1500x800 1500x800LINTEL =1700SILL = 900

LINTEL =1700SILL = 900

PLUMBING

835x385DUCT

2155x1200LINTEL =2200

SILL = 1000

LEADLINE GLASS

DRG.

AS/CATH WENDER DRG.

WIN. LINTEL & SILL

STORE

WALL UP TO 3000 Ht WALL UP TO 3000 Ht

FIRE ZONE 2

EMERGENCYENTRANCE

ENTRANCE

UP

ramp

DOCTOR'S/

3

4

5

8

2 39

BATTERIES

UPS

1.281.311.30

BATTER

UPS

STAB

MAINS

PANEL

EQUIPMENT

1.281.30 1.31

STATION

ALU. SLIDINGSHUTTER

V1

W4A

W3A

W2C

W2a

W5A

W6W7W9a

W10W11W11W11W11W1a

W12b

W13b

W14 W15

W15

DW1

W17

W11a

W17a

W20aW21

V2 V2

W28a

W27

W26a W26a

W15

W2a

V1

W1 W1W1W8

W8a

W33

W8b

W32

W30b

W40 W39

W41W42

D4a D4a D4aD7 D7

D7 D7

D6

D1

D2 D1

D7a

D11

D11

D1

D11

D2

D11

D15D1

D11

D2

D2

D7

D3

D7

D15A

D2

D7

D4a

D7

D7

D8a

D7

D7

D7

D7

D7D7 D7

D9D9D9

D9

D9D9

D7

D7

D4

FD11

D14

D7 D7 D7 D7

D9 D9

D8a

D7

D11

D7

D7a

D7

D7

D7

D9a

D7

D7

D7

D7

D7 DW4

DW5

D15B

D7

D17

D17

D4

D4

D8

D7

D9

D14D7CD9

D9

D9

D7C

D9

D9

D8

DW6

D1

D8 D8

D7

D4b D4b D4b D4b

D11

D16b

D9

D9D16b

D9

D9

D9

D9 D9D16bD16b

DW7

D4

D4

FD11

FD11FD11

D11

D18

W2C

W2C

W2C

W2C

W2C

W2C

W2C

W3A

D11

W44 W44 W44

W44 W44 W44

W44W44 W44

DW5

PLANTERSPLANTERS

PLANTERS

PLANTERS PLANTERS

MEMORIALWOODENFLORING

D7

RAIN WATER

ramp

UP

RO WATER RO WATER

RO WATERRO WATER

RO WATER

RO WATER

RO WATER

RO WATER

UP

V6

BATTER

UPS

STAB

MAINS

PANEL

EQUIPMENT

1.281.30 1.31

4

5

8

2 39

BATTERIES

UPS

EQUIPMENT

1.281.311.30

230

230

7127 3050575

SERVICE

LIFT

2200X3000

LIFT

3050X2500

LIFT

3050X2250

P L

IF

T

22

00

X3

00

0

P L

IF

T

22

00

X3

00

0

LIFT

3050X2500

LIFT

3050X2250

7800

7800

7800

1125

5200

5200

7800 7800 7800 4675 7800 7800 7800 7800 56157800

5820

L

IF

T

30

50

X2

50

0

L

IF

T

30

50

X2

25

0

1125

4055

5200

DN

UP

DN

UP

L

IF

T

30

50

X2

50

0

L

IF

T

30

50

X2

25

0

LIFT

LOBBY

RAMP TO

1st BASEMENT

GROUND FLOOR

HOSTEL

ENTRANCE

AUDITORIUM

PRE FUNCTION LOBBY

23775X12290

AREA=292.20 SQ.M.

AUDITORIUM

ENTRANCE

MULTIPURPOSE HALL

(DOUBLE HEIGHT)

EMERGENCY

FIRE EXIT

EMERGENCY

FIRE EXIT

EMERGENCY

FIRE EXIT

EMERGENCY

FIRE EXIT

16350

KITCHEN SERVICE

ONLY

TOILET

(M)

TOILET

(F)

DOCTOR'S & STAFF

CAFE ENTRY

Lvl: +1200

11

30

X1

50

0

11

30

X1

50

0

11

30

X1

50

0

15

75

X1

50

0

D7

D7

D2 D2

D1 D1 D1 D1

D7

D6

16

15

960

PR

OJE

CT

IO

N A

BO

VE

EMERGENCY

FIRE EXIT

EMERGENCY

FIRE EXIT

D6 D6 D6 D6

D6

D6 D6 D6 D6

D6

D6

D6

Lvl: +1200

15

74

0

27

90

5

13555

W1 W1 W1

W3

W4 W4

W5 W5

W5 W5

W6

V1

EMERGENCY

FIRE EXIT

AUDITORIUM

ENTRANCE

V1

Lvl: +1200

D4

D1

D1

D1

D1

D1

D1

D2 D2

2M WIDE CORRIDOR

23775

F.H

.C

EL

EC

T.

455 1800

D7

D7

12

29

0

D1

D7

D7

D7

D7

D7

31155

LIFT &

STAIR

LOBBY

Lvl: +1200

4705 X 7015

70

15

4705

46

45

20

00

45

30

3590

LIFT &

STAIR

LOBBY

Lvl: +1200

4545 X 5605

56

05

4545

UP

DN

+1200+1975

+270- 505

UP

DN

+1200

+1975

- 505

+270

7350

27

55

2895 2820

D7 D7

12900

LIFT

LOBBY

2240

X 3490

STEPS

ADDED

HERE..!

D6

D6

D6

D6

HALL

13555X27530

36625

37940

34400

14165

34400

60400

1570

ARCHITECT C.O.W.

OWNER ST. ENGINEER

AUTHORITY

SCALE : 1cm = 10.00 mts.

ZONE : GENERAL HOSPITAL USE : HOSPITAL, HOSTEL, AUDITORIUM HALL

NOTES:- ENGINEER IS FULLY RESPONSIBLE FOR LEAVING OPEN SPACE AND MARGIN. THE DEPTH AND POSITION OF EXISTING MUNICIPAL MAIN HOLE IS VERIFIED ME ON SITE AND

PREMISES CAN GET DRAINAGE CONNECTION. IT IS CERTIFY THAT ACCORDING TO GDCR 2021 ALL REQUIREMENTS OF THE BUILDING ARE

CHECKED AND NECESSARY ACTION ARE TAKEN. IT IS CERTIFY THAT ACCORDING TO THE CLAUSE NO. 4.5.3 OF THE GDCR, THE STRUCTURE OF AS

PER THE NORMS OF THE INDIAN STANDARDS. DESIGN OF STAIRCASE AND RAILING IS PROVIDED AS PER THE PROVISION OF THE CLAUSE NO.

23.1.12 AND 23.14 AND 24.6 OF GDCR. PEDESTRIANS RAMP IS PROVIDED AS PER THE PROVISION OF THE CLAUSE NO. 23.1.15 OF GDCR. LIFT IS PROVIDED AS PER THE PROVISION OF THE CLAUSE NO. 23.12 AND 24.7 OF GDCR. WATER TANK PROVIDED AS PER THE PROVISION OF THE CLAUSE NO. 23.6 OF GDCR. SEPARATE LETTER BOX IS PROVIDED AT GROUND LEVEL FOR EACH UNIT. WATER TANK FOR FIRE SAFETY REQUIREMENT PROVIDED AS PER CHAPTER NO. 24 OF GDCR. ELECTRICAL INFRASTRUCTURE SHALL BE PROVIDED AS PER CLAUSE NO. 23.11 DRINKING WATER FACILITY FOR DISABLED PERSON IS PROVIDED AS PER THE CLAUSE NO. 23.6.2 DRAINAGE FACILITY IS PROVIDED AS PER THE CLAUSE NO. 23.10 SIGNAGE’S OF THE PARKING PLACE IS TO BE PROVIDED AS PER CLAUSE NO. 23.7 OF THE GDCR. ENTRANCE OF THE BUILDING IS PROVIDED AS PER THE CLAUSE NO. 23.1.7 OF GDCR THE PAVING OF BUILDING UNIT/FINL PLOT AS PER THE PROVISION OF THE CLAUSE NO. 23.1.4 OF

GDCR THE STRUCTURE OF THE BUILDING IS AS PER THE NORMS OF THE SPECIFIED IN THE INDIAN

STANDARD AND TAKE NECESSARY ACTION FOR THE STRUCTURAL SAFETY DURING THECONSTRUCTION.

RAIN WATER STORAGE TANK AND RAIN WATER HARVESTING SYSTEM IS PROVIDED AS PER THECLAUSE NO. 27.2 OF GDCR 2021

COMMUNITY BIN PROVIDED AS PER THE PROVISION OF THE CLAUSE NO. 27.3 OF GDCR. GREY WATER RECYCLING SYSTEM IS PROVIDED AS PER THE CLAUSE NO. 27.4 OF GDCR. TREE PLANTATION IS PROVIDED AS PER THE CLAUSE NO. 27.5 OF GDCR. SOLAR WATER HEATING SYSTEM IS PROVIDED AS PER THE CLAUSE NO. 27.6 OF THE GDCR. POLLUTION CONTROL SYSTEM IS PROVIDED AS PER THE CHAPTER NO. 28 OF GDCR. FIRE SAFETY SYSTEM IS PROVIDED AS PER CHAPTER NO. 24 OF GDCR 2021 MAINTENANCE AND UP GRADATION OF BUILDING IS AS PER CHAPTER NO. 29 OF GDCR 2021

SITE PLAN

APPROVAL OF DRAWINGS AND ACCEPTANCE OF ANY STATEMENT,DOCUMENTS, STRUCTURAL REPORT, STRUCTURAL DRAWINGS,PROGRESS CERTIFICATE OR BUILDING COMPLETION CERTIFICATESSHALL NOT DISCHARGE THE OWNER, ENGINEER, ARCHITECT, CLERK OFWORK/ SITE SUPERVISOR, STRUCTURAL DESIGNER, DEVELOPER,OWNER FROM THEIR RESPONSIBILITIES, IMPOSED UNDER THE ACT,THE DEVELOPMENT CONTROL REGULATIONS AND THE LAWS OF TORTAND LOCAL ACTS.LIABILITY (G.D.R. - 3.31) :-NO WITHSTANDING ANY DEVELOPMENT PERMISSION GRANTED UNDERTHE ACT AND THESE REGULATIONS, ANY PERSON UNDERTAKING ANYDEVELOPMENT WORK SHALL CONTINUE TO BE WHOLLY & SOLELYLIABLE FOR ANY INJURY OR DAMAGE OR LOSS WHATSOEVER THAT MAYBE CAUSED TO ANY ONE IN LIABILITY WHATSOEVER IN THIS REGARDSHALL BE CAST ON THE AUTHORITY.

1. HYDRANT SYSTEM:ON/OFF switches located near the hose reel hose or hydrant outlet,at each floor the main Fire Pump at the underground water tank witha capacity to discharge 900 liters per minute at 3 bar. pressure asmeasured at the terrace level should be installed.The Riser for the building exceeding 18 meters and above 18 metersheight should not be of less than 100 mm. internal diameter, The risershould be connected to the bottom of the terrace tank with a stop valveand a NRV to act as a Down-comer.One riser is required for every 1000 sq, meters floor area and if thebuilding is divided into, two or more parts then each part should havea separate riser with all the fittings at floor level. Each floor should haveone hydrant outlet with a coupling for attaching a 63 mm. dia hose and 25mm.bore hose-reel hose with 8 mm. SS. Shut-off nozzle at each floorlanding. The length of hose reel hose should be enough to reach thefarthest corner of the floor. Hose-box with 15 meters long 63 mm. dia.hose and 12.5 mm. bore nozzle at alternate floors. The Hose-reel hoseshould be coupled to the riser.Fire service inlet should be installed at a point near the entry to thepremises where a fire service vehicle can approach easily.A permanent hydrant point comprising of 63 mm. dia size 2nos of hydrantvalves should be installed at the terrace level.Overhead tank Refilling bypass connection should be done at the terrace level.The overhead tank shall be of a capacity of not less than 20,000 liters. TheUnderground tank shall be of not less than 1,00,000 liters.2. FIRE LIFT :The fire-lift and all the lifts should have a provision to ground automatically incase of electricity failure. Each building should have at least one lift as a fire-lift and if the building is divided into two or more parts then each should havea Fire-lift. Lift well should have blowers to pressurize the lift well so connectedthat it will be automatically operate when alarm call point is operate, so that it preventsthe lift well getting smoke logged.3. FIRE ALARM:Fire alarm call points to be installed at each floor with sounders capable of beingheard all throughout the building.4. FIRE EXTINGUISHERSOne Carbon Dioxide (CO2) type extinguisher of 4.5 kg. with ISI mark and one extinguisherof 5 kg. dry Chemical Powder (DCP) type extinguisher with ISI mark to be installed on each-floor in case of commercial building.One Carbon Dioxide (CO2) type extinguisher of 4.5 with ISI mark OR Two CarbonDioxide (CO2) type extinguisher of 2 kg. with ISI mark capacity on alternate floors in caseof residential building.If the building is divided into two or more parts then each part should have these extinguishers installed.5. STAIRCASE:The staircase has to be open from at least one or two sides but if the staircase is in thecentre core of the buildings it has to be pressurized to prevent it from getting smoke logged.The Riser/Down-comer should be located in the staircase or close to in to make it easily approachable in case of Firefrom the floor below or above.6. BASEMENT:The Basement of 200 sq. meters or more should be protected with Automatic Sprinkler systemwith at least one sprinkler head for actual car parking space.Additionally be protected by a Hydrant outlet and two 25 mm. bore hose reel hoses with 8 mm.bore nozzles at each basement level.7. LIGHTENING ARRESTER :A lightening arrester should also be installed and be properly earthed to prevent damage to the building when thelightening strike.8. PHOTO LUMINESCENT (AUTO GLOW) SIGNAGE'SIf the building falls in a confined area or if it has an enclosed staircase or is notwell lit-up on the inside, then adequate photo luminescent (auto glow) signage'sshould be displayed at each floor / landing/ pathway/dead end along all exits routesleading to ground level. The signage should indicate fire fighting. fire safety equipmentpresent on the respective floor/landing/pathway/dead end and along all exit routesleading to the ground level.9. ELECTRIC POWER SUPPLY TO THE ENTIRE FIRE-SAFETY SYSTEMElectricity supply to the fire pump, fire alarm system, staircase pressurizationsystem and fire lift should be made available from the main electricity supply.(i.e. from electrical power supply of the company) this is ensure availabilityof power supply to the fire protection & safety system even after the mainelectrical supply to the building ids switched off at the time of fire.10. INDIVIDUAL FIRE SAFETY SYSTEMFIRE SAFETY SYSTEM SHOULD BE PROVIDED INDIVIDUAL SHOW ROOM BY OWNERIMPORTANT INSTRUCTIONS :After inspection of low rise building by the fire service authority , if the fire officerconcerned feel the need for additional fire prevention/protection measures/ Ventilation system required or equipment (i.e. - Passive system/ Suppression system/ Fire door - Window / Detection system / Active system / Sprinkler /Drencher etc.) as per fire load / firerick / Public gathering.Potential / Occupancy / Confined area,those additional measures / equipment have to be implemented /installed.

(B2)

(B2)

(B1)

4.50 4.60

4.50 4.60

3.48

EXI. BUILT UP AREA TO BE REMOVED

(B3)

REVISED LAY OUT PLAN SHOWING PROPOSED BUILDINGS FORHOSPITAL BUILDING OF CITY SUR. NO. 7673/P, F.P. NO. 202/P, T.P.S.NO. 8 (ASARAWA)MOUJE : ASARAWA, TALUKA : CITY, DIST: AHMEDABAD.

'CIVIL HOSTEL CAMPUS AS A'U N MEHTA INSTITUTE OF CARDIOLOGY AND RESEARCH CENTER'