    Plan of Development:

     A comprehensive plan involving

    Geophysics, Geology, Reservoir

    Engineering, Production Engineering,

    Drilling Engineering, Environment and

    Economics knowledge and practices to best

    develop a field.

    Plan of DevelopmentPlan of Development

  • 8/17/2019 01 Plan of Development

    3/17

    What are in the processes ?

    How to do the processes?

    Essential of Essential of Plan of DevelopmentPlan of Development

  • 8/17/2019 01 Plan of Development

    4/17

    Evaluation

    Planning

    Looking for Highest NPV

    Seek lowest cost

    Environmentally friendly

    Objectives of Objectives of Plan of DevelopmentPlan of Development

  • 8/17/2019 01 Plan of Development

    5/17

    Proceed

    With

    Development?

    N P V

    Well

    Opening

    Cost

    Facility

    Op.Cost

    Transport

    Cost

    Overhead

    Opening

    Cost

    Field

    Management

    Cost

    Workover 

    Cost

    Terminal&

    Base

    Flowlines

    &

    Pipelines

    Proceed

    With

    Development

    FacilityCapital

    Plugging

    Cost

    Number 

    Of 

    Well

    Cost

    Revenue

    Production

    Profile

    Reserves

    Oil

    Price

    Gas

    Price

    Recovery

    Factor 

    Figure 1. Influence Factors in Field

    Development Optimization

  • 8/17/2019 01 Plan of Development

    6/17

    Design Basis

    Exploitation

    Operations and Maintenance

    Engineering

    Economic

    SSystematics of ystematics of Plan of DevelopmentPlan of Development

  • 8/17/2019 01 Plan of Development

    7/17

    Exploration andExploration and

    Prospective ProjectProspective Project

    Appraisal andAppraisal and

    DevelopmentDevelopment

    ProductionProduction

    Project Initiation

    Feasibility Study

    Plan of Development

    Design Basis Memorandum

    Project Execution Plan

    Project Stage, Completion,

    Cost, Exception Report

    Yearly Field Reviews

  • 8/17/2019 01 Plan of Development

    8/17

    Study of Geology and Geophysics (G&G)

    Study of Reservoir and Production Development Scenarios

    Economics Analysis

    General Scope ofGeneral Scope of Plan ofPlan of

    DevelopmentDevelopment

  • 8/17/2019 01 Plan of Development

    9/17

    Tectonic Frame

    Regional Stratigraphic

    Petroleum System

    Geology Reconstruction

    Well Data Intrepretation

    Interpretasi Data Seismik (2D/3D)

    Integration of Well Data and Seismic

    Volumetric Calculation

    GeologGeologyy andand GeoGeophysicsphysics

  • 8/17/2019 01 Plan of Development

    10/17

    Reservoir EngineeringReservoir Engineering

    PVT Analysis

    Rock Properties

    Welltest Analysis

    Material Balance

    Original Oil In Place (OOIP) /OGIP

    ReservoirReservoir andand ProduProductctiionon

    EngineeringEngineering

  • 8/17/2019 01 Plan of Development

    11/17

    Production EngineeringProduction Engineering

    Inflow Performance Relationship

    Tubing Wellbore Outflow Nodal Analysis

    Well Diagram

  • 8/17/2019 01 Plan of Development

    12/17

    Well Completions

    Production History and Completion

    Production Splitting

    Lifting Methode

    Forecasting Production Performance

    Using Decline Curve

  • 8/17/2019 01 Plan of Development

    13/17

    Data Gathering

    Reservoir Modelling

    Inisialization

    History Matching

    Forecasting Future Performance

    Reservoir Reservoir SimulaSimulationtion

  • 8/17/2019 01 Plan of Development

    14/17

    Well Drilling Schedule

    Drilling

    Production Facilities Production Problems

    Transportation

    Environment

    DevelopmentDevelopment SSccenarioenarioss

  • 8/17/2019 01 Plan of Development

    15/17

    Rate of Return (ROR)

    Pay Out Time (POT)

    Profit to Investment Ratio (PIR)

    Net Present Value (NPV)

    EcEconomionomicscs AnalisAnalisysys

  • 8/17/2019 01 Plan of Development

    16/17

  • 8/17/2019 01 Plan of Development

    17/17

     Work Schedule

    1 2 3 4 5 6 7 8 10

    Start

    Geological

    Model

    Geological Modelling :

    Geophysics, Geology,

    Petrophysics, Res. and

    Prod. Eng.

    Reservoir Characterization using

    Geostatistical Modelling

    Strart of Res

    Simulation

    Surface Fac

    9 11 12

    Economic

     Analysis

    Reservoir 

    Model

    ForecastingFinish