-The PERT Chart-The tendering time schedule for Adar Produced Water Re-injection Plant

56
Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish TTS - Adar Project The tendering time schedule for Adar ... 790 7-9-14 4-11-16 7-9-14 4-11-16 7-9-14 4-11-16 TTS-Adar Project The tendering time schedule for Adar Prod... 790 7-9-14 4-11-16 7-9-14 4-11-16 7-9-14 4-11-16 TTS-Adar Project.1 Milestone 790 7-9-14 4-11-16 7-9-14 4-11-16 7-9-14 4-11-16 TTS-Adar Project.1.1 Contract Effective Date 427 7-9-14 7-11-15 7-9-14 7-11-15 7-9-14 7-11-15 TTS-Adar Project.1.1.1 Instructions To Proceed 427 7-9-14 7-11-15 7-9-14 7-11-15 7-9-14 7-11-15 A1000 Contract effective date 0 7-9-14* 7-9-14 7-9-14 A10001 The complete date of project for provisional acceptance session 0 7-11-15* 7-11-15 7-11-15 TTS-Adar Project.1.2 Mechanical Completion Date 93 2-8-15 3-11-15 2-8-15 3-11-15 31-8-15 7-11-15 TTS-Adar Project.1.2.1 Civil engineering 0 2-8-15 2-8-15 2-8-15 2-8-15 31-8-15 31-8-15 A1010 The Completion Date of Civil engineering session 0 2-8-15* 2-8-15 31-8-15 TTS-Adar Project.1.2.2 Mechanical 0 12-10-15 12-10-15 12-10-15 12-10-15 7-11-15 7-11-15 A1020 The Completion Date of Mechanical session 0 12-10-15* 12-10-15 7-11-15 TTS-Adar Project.1.2.3 Electrical 0 3-11-15 3-11-15 3-11-15 3-11-15 7-11-15 7-11-15 A1030 The Completion Date of Electrical session 0 3-11-15* 3-11-15 7-11-15 TTS-Adar Project.1.2.4 Instrument 0 3-11-15 3-11-15 3-11-15 3-11-15 7-11-15 7-11-15 A1040 The Completion Date of Instrumentl session 0 3-11-15* 3-11-15 7-11-15 TTS-Adar Project.1.2.5 Piping & Pipeline 0 30-10-15 30-10-15 30-10-15 30-10-15 7-11-15 7-11-15 A1050 The Completion Date of Piping & Pipeline session 0 30-10-15* 30-10-15 7-11-15 TTS-Adar Project.1.3 Provisional Acceptance Date 9 27-10-15 5-11-15 27-10-15 5-11-15 5-11-15 5-11-15 TTS-Adar Project.1.3.1 Mechanical 0 27-10-15 27-10-15 27-10-15 27-10-15 5-11-15 5-11-15 A1060 The Provisinal Acceptance Date of Mechanical session 0 27-10-15* 27-10-15 5-11-15 TTS-Adar Project.1.3.2 Electrical 0 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15 A1070 The Provisinal Acceptance Date of Electrical session 0 5-11-15* 5-11-15 5-11-15 TTS-Adar Project.1.3.3 Instrument 0 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15 A1080 The Provisinal Acceptance Date of Instrument session 0 5-11-15* 5-11-15 5-11-15 TTS-Adar Project.1.4 Final Aceeptance Date 9 26-10-16 4-11-16 26-10-16 4-11-16 4-11-16 4-11-16 TTS-Adar Project.1.4.1 Mechanical 0 26-10-16 26-10-16 26-10-16 26-10-16 4-11-16 4-11-16 A1090 The Final Aceeptance Date of Mechanical session 0 26-10-16* 26-10-16 4-11-16 TTS-Adar Project.1.4.2 Electrical 0 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16 A1100 The Final Aceeptance Date of Electrical session 0 4-11-16* 4-11-16 4-11-16 TTS-Adar Project.1.4.3 Instrument 0 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16 A8470 The Final Aceeptance Date of Instrument session 0 4-11-16* 4-11-16 4-11-16 TTS-Adar Project.2 Engineering 92 7-9-14 7-12-14 7-9-14 7-12-14 7-9-14 7-12-14 A16030 The milestone of Process session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14 A16040 The milestone of Mechanical session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14 A16050 The milestone of Electrical session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14 A16060 The milestone of Instrument session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14 A16070 The milestone of Piping & Pipeline session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14 J A J A J J A J J A J 14 2015 2016 17 4-11 4-11 4-11 7-11-15, TTS-Adar Proj 7-11-15, TTS-Adar Proj Contract effective date The complete date of p 3-11-15, TTS-Adar Proj 2-8-15, TTS-Adar Proj ect.1.2 The Completion Date of Civi 12-10-15, TTS-Adar Proj The Completion Date of 3-11-15, TTS-Adar Proj The Completion Date o 3-11-15, TTS-Adar Proj The Completion Date o 30-10-15, TTS-Adar Pr o The Completion Date of 5-11-15, TTS-Adar Proj 27-10-15, TTS-Adar Pr o The Provisinal Acceptan 5-11-15, TTS-Adar Proj The Provisinal Acceptan 5-11-15, TTS-Adar Proj The Provisinal Acceptan 4-11 26-1 The 4-11 The 4-11 The 7-12-14, TTS-Adar Proj ect.2 Eng i neeri ng The milestone of Process session and HA The milestone of Mechanical session and The milestone of Electrical session and H The milestone of Instrument session and The milestone of Piping & Pipeline sessi o The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 1 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1

Transcript of -The PERT Chart-The tendering time schedule for Adar Produced Water Re-injection Plant

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    TTS - Adar PrTTS - Adar Project The tendering time schedule for Adar ... 790 7-9-14 4-11-16 7-9-14 4-11-16 7-9-14 4-11-16

    TTS-Adar ProTTS-Adar Project The tendering time schedule for Adar Prod... 790 7-9-14 4-11-16 7-9-14 4-11-16 7-9-14 4-11-16TTS-Adar ProjecTTS-Adar Project.1 Milestone 790 7-9-14 4-11-16 7-9-14 4-11-16 7-9-14 4-11-16TTS-Adar ProjectTTS-Adar Project.1.1 Contract Effective Date 427 7-9-14 7-11-15 7-9-14 7-11-15 7-9-14 7-11-15TTS-Adar ProjecTTS-Adar Project.1.1.1 Instructions To Proceed 427 7-9-14 7-11-15 7-9-14 7-11-15 7-9-14 7-11-15A1000 Contract effective date 0 7-9-14* 7-9-14 7-9-14A10001 The complete date of project for provisional acceptance session 0 7-11-15* 7-11-15 7-11-15

    TTS-Adar ProjectTTS-Adar Project.1.2 Mechanical Completion Date 93 2-8-15 3-11-15 2-8-15 3-11-15 31-8-15 7-11-15TTS-Adar ProjecTTS-Adar Project.1.2.1 Civil engineering 0 2-8-15 2-8-15 2-8-15 2-8-15 31-8-15 31-8-15A1010 The Completion Date of Civil engineering session 0 2-8-15* 2-8-15 31-8-15

    TTS-Adar ProjecTTS-Adar Project.1.2.2 Mechanical 0 12-10-15 12-10-15 12-10-15 12-10-15 7-11-15 7-11-15A1020 The Completion Date of Mechanical session 0 12-10-15* 12-10-15 7-11-15

    TTS-Adar ProjecTTS-Adar Project.1.2.3 Electrical 0 3-11-15 3-11-15 3-11-15 3-11-15 7-11-15 7-11-15A1030 The Completion Date of Electrical session 0 3-11-15* 3-11-15 7-11-15

    TTS-Adar ProjecTTS-Adar Project.1.2.4 Instrument 0 3-11-15 3-11-15 3-11-15 3-11-15 7-11-15 7-11-15A1040 The Completion Date of Instrumentl session 0 3-11-15* 3-11-15 7-11-15

    TTS-Adar ProjecTTS-Adar Project.1.2.5 Piping & Pipeline 0 30-10-15 30-10-15 30-10-15 30-10-15 7-11-15 7-11-15A1050 The Completion Date of Piping & Pipeline session 0 30-10-15* 30-10-15 7-11-15

    TTS-Adar ProjectTTS-Adar Project.1.3 Provisional Acceptance Date 9 27-10-15 5-11-15 27-10-15 5-11-15 5-11-15 5-11-15TTS-Adar ProjecTTS-Adar Project.1.3.1 Mechanical 0 27-10-15 27-10-15 27-10-15 27-10-15 5-11-15 5-11-15A1060 The Provisinal Acceptance Date of Mechanical session 0 27-10-15* 27-10-15 5-11-15

    TTS-Adar ProjecTTS-Adar Project.1.3.2 Electrical 0 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15A1070 The Provisinal Acceptance Date of Electrical session 0 5-11-15* 5-11-15 5-11-15

    TTS-Adar ProjecTTS-Adar Project.1.3.3 Instrument 0 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15A1080 The Provisinal Acceptance Date of Instrument session 0 5-11-15* 5-11-15 5-11-15

    TTS-Adar ProjectTTS-Adar Project.1.4 Final Aceeptance Date 9 26-10-16 4-11-16 26-10-16 4-11-16 4-11-16 4-11-16TTS-Adar ProjecTTS-Adar Project.1.4.1 Mechanical 0 26-10-16 26-10-16 26-10-16 26-10-16 4-11-16 4-11-16A1090 The Final Aceeptance Date of Mechanical session 0 26-10-16* 26-10-16 4-11-16

    TTS-Adar ProjecTTS-Adar Project.1.4.2 Electrical 0 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16A1100 The Final Aceeptance Date of Electrical session 0 4-11-16* 4-11-16 4-11-16

    TTS-Adar ProjecTTS-Adar Project.1.4.3 Instrument 0 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16A8470 The Final Aceeptance Date of Instrument session 0 4-11-16* 4-11-16 4-11-16

    TTS-Adar ProjecTTS-Adar Project.2 Engineering 92 7-9-14 7-12-14 7-9-14 7-12-14 7-9-14 7-12-14A16030 The milestone of Process session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14A16040 The milestone of Mechanical session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14A16050 The milestone of Electrical session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14A16060 The milestone of Instrument session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14A16070 The milestone of Piping & Pipeline session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14

    J A J A J J A J A J A J14 2015 2016 17

    4-11

    4-11

    4-117-11-15, TTS-Adar Proj7-11-15, TTS-Adar Proj

    Contract effective dateThe complete date of p3-11-15, TTS-Adar Proj

    2-8-15, TTS-Adar Project.1.2

    The Completion Date of Civi12-10-15, TTS-Adar Proj

    The Completion Date of 3-11-15, TTS-Adar Proj

    The Completion Date o3-11-15, TTS-Adar Proj

    The Completion Date o30-10-15, TTS-Adar Pro

    The Completion Date of5-11-15, TTS-Adar Proj27-10-15, TTS-Adar Pro

    The Provisinal Acceptan5-11-15, TTS-Adar Proj

    The Provisinal Acceptan5-11-15, TTS-Adar Proj

    The Provisinal Acceptan4-1126-1

    The 4-11

    The4-11

    The7-12-14, TTS-Adar Project.2 Engineering

    The milestone of Process session and HAThe milestone of Mechanical session andThe milestone of Electrical session and HThe milestone of Instrument session and The milestone of Piping & Pipeline sessio

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 1 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    A16080 The milestone of civil engineering session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14

    TTS-Adar ProjectTTS-Adar Project.2.1 Process 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14TTS-Adar ProjecTTS-Adar Project.2.1.1 Induced Gas Flotation (IGF) 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14A1110 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14A1120 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14A1130 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14A1140 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14A1150 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14A1160 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14A1180 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14A1170 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.2 Centrifugal Transfer Pumps 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14A1190 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14A1200 Data sheet design 7 22-9-14 28-9-14 22-9-14 28-9-14 1-11-14 7-11-14A1210 Detailed drawings Rev.A 10 29-9-14 8-10-14 29-9-14 8-10-14 8-11-14 17-11-14A1220 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14A1230 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14A1240 Detailed drawings Rev.B 10 9-10-14 18-10-14 9-10-14 18-10-14 28-11-14 7-12-14A1260 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14A1250 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.3 Filter feed pump 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14A1270 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14A1280 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14A1290 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14A1300 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14A1310 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14A1320 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14A1340 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14A1330 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.4 Nutshell Filter Vessel 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14A1350 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14A1360 Data sheet design 7 22-9-14 28-9-14 22-9-14 28-9-14 1-11-14 7-11-14A1370 Detailed drawings Rev.A 10 29-9-14 8-10-14 29-9-14 8-10-14 8-11-14 17-11-14A1380 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14A1390 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14A1400 Detailed drawings Rev.B 10 9-10-14 18-10-14 9-10-14 18-10-14 28-11-14 7-12-14A1420 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14A1410 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.5 Media Scrub Pump 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14

    J A J A J J A J A J A J14 2015 2016 17

    The milestone of civil engineering sessio17-11-14, TTS-Adar Project.2.1 Process

    23-10-14, TTS-Adar Project.2.1.1 Induced

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced28-10-14, TTS-Adar Project.2.1.2 Centrifug

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced23-10-14, TTS-Adar Project.2.1.3 Filter fee

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced28-10-14, TTS-Adar Project.2.1.4 Nutshell

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced23-10-14, TTS-Adar Project.2.1.5 Media Sc

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 2 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    A1430 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14A1440 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14A1450 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14A1460 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14A1470 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14A1480 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14A1500 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14A1490 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.6 Booster Pumps 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14A1510 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14A1520 Data sheet design 7 22-9-14 28-9-14 22-9-14 28-9-14 1-11-14 7-11-14A1530 Detailed drawings Rev.A 10 29-9-14 8-10-14 29-9-14 8-10-14 8-11-14 17-11-14A1540 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14A1550 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14A1560 Detailed drawings Rev.B 10 9-10-14 18-10-14 9-10-14 18-10-14 28-11-14 7-12-14A1580 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14A1570 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.7 Injection Pumps 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14A1590 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14A1600 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14A1610 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14A1620 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14A1630 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14A1640 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14A1660 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14A1650 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.8 Produced Water Skim Tank with internals 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14A1670 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14A1680 Data sheet design 7 22-9-14 28-9-14 22-9-14 28-9-14 1-11-14 7-11-14A1690 Detailed drawings Rev.A 10 29-9-14 8-10-14 29-9-14 8-10-14 8-11-14 17-11-14A1700 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14A1710 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14A1720 Detailed drawings Rev.B 10 9-10-14 18-10-14 9-10-14 18-10-14 28-11-14 7-12-14A1740 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14A1730 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.9 Solids Hydro-transporting Units and ancillaries for the ski... 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14A1750 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14A1760 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14A1770 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14

    J A J A J J A J A J A J14 2015 2016 17

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced28-10-14, TTS-Adar Project.2.1.6 Booster

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced23-10-14, TTS-Adar Project.2.1.7 Injection

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced28-10-14, TTS-Adar Project.2.1.8 Produce

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced23-10-14, TTS-Adar Project.2.1.9 Solids Hy

    Client inputData sheet designDetailed drawings Rev.A

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 3 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    A1780 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14A1790 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14A1800 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14A1820 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14A1810 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.10 Break Tank 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14A1830 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14A1840 Data sheet design 7 22-9-14 28-9-14 22-9-14 28-9-14 1-11-14 7-11-14A1850 Detailed drawings Rev.A 10 29-9-14 8-10-14 29-9-14 8-10-14 8-11-14 17-11-14A1860 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14A1870 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14A1880 Detailed drawings Rev.B 10 9-10-14 18-10-14 9-10-14 18-10-14 28-11-14 7-12-14A1900 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14A1890 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.11 Solids Hydro-transporting Units for Break Tank 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14A1910 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14A1920 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14A1930 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14A1940 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14A1950 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14A1960 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14A1980 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14A1970 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.12 Buffer Tank. 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14A1990 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14A2000 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14A2010 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14A2020 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14A2030 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14A2040 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14A2060 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14A2050 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.13 Solids Hydro-transporting Units for Buffer Tank 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14A2070 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14A2080 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14A2090 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14A2100 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14A2110 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14A2120 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    J A J A J J A J A J A J14 2015 2016 17

    Detailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced28-10-14, TTS-Adar Project.2.1.10 Break T

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced23-10-14, TTS-Adar Project.2.1.11 Solids H

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced2-11-14, TTS-Adar Project.2.1.12 Buffer Ta

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce2-11-14, TTS-Adar Project.2.1.13 Solids H

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.B

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 4 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    A2140 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14A2130 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.14 Recovered Oil Tank. 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14A2150 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14A2160 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14A2170 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14A2180 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14A2190 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14A2200 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14A2220 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14A2210 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.15 Recovered Oil Pumps. 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14A2230 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14A2240 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14A2250 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14A2260 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14A2270 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14A2280 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14A2300 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14A2290 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.16 Backwash heat exchanger for the Nutshell Filters. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A2310 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A2320 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14A2330 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14A2340 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14A2350 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14A2360 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14A2380 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A2370 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.17 Backwash Clarifiers 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A2390 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A2400 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14A2410 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14A2420 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14A2430 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14A2440 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14A2460 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A2450 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.18 Centrifugal Backwash Supply Pumps for the Nutshell Filt... 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14

    J A J A J J A J A J A J14 2015 2016 17

    Bill of Materials Rev.BDetailed Specifications, Reports and Proce2-11-14, TTS-Adar Project.2.1.14 Recover

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce2-11-14, TTS-Adar Project.2.1.15 Recover

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce7-11-14, TTS-Adar Project.2.1.16 Backwa

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce7-11-14, TTS-Adar Project.2.1.17 Backwa

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce

    23-10-14, TTS-Adar Project.2.1.18 Centrifu

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 5 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    A2470 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14A2480 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14A2490 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14A2500 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14A2510 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14A2520 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14A2540 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14A2530 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.19 Water Pumps associated with the backwash clarifiers. 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14A2550 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14A2560 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14A2570 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14A2580 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14A2590 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14A2600 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14A2620 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14A2610 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.20 Drain Pumps 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14A2630 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14A2640 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14A2650 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14A2660 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14A2670 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14A2680 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14A2700 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14A2690 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.21 Sludge Pumps. 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14A2710 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14A2720 Data sheet design 7 7-10-14 13-10-14 7-10-14 13-10-14 1-11-14 7-11-14A2730 Detailed drawings Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 8-11-14 17-11-14A2740 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14A2750 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14A2760 Detailed drawings Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14A2780 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14A2770 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.22 Disposal Water Pumps 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14A2790 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14A2800 Data sheet design 7 7-10-14 13-10-14 7-10-14 13-10-14 1-11-14 7-11-14A2810 Detailed drawings Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 8-11-14 17-11-14

    J A J A J J A J A J A J14 2015 2016 17

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced23-10-14, TTS-Adar Project.2.1.19 Water P

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced23-10-14, TTS-Adar Project.2.1.20 Drain P

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced12-11-14, TTS-Adar Project.2.1.21 Sludge

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce12-11-14, TTS-Adar Project.2.1.22 Dispos

    Client inputData sheet designDetailed drawings Rev.A

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 6 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    A2820 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14A2830 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14A2840 Detailed drawings Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14A2860 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14A2850 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.23 Motive Water Pumps. 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14A2870 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14A2880 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14A2890 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14A2900 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14A2910 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14A2920 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14A2940 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14A2930 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.24 Chemical Injection Skids. 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14A2950 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14A2960 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14A2970 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14A2980 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14A2990 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14A3000 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14A3020 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14A3010 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.25 Instrument Air System 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14A3030 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14A3040 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14A3050 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14A3060 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14A3070 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14A3080 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14A3100 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14A3090 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.26 Nitrogen Generator package 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14A3110 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14A3120 Data sheet design 7 7-10-14 13-10-14 7-10-14 13-10-14 1-11-14 7-11-14A3130 Detailed drawings Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 8-11-14 17-11-14A3140 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14A3150 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14A3160 Detailed drawings Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14

    J A J A J J A J A J A J14 2015 2016 17

    Detailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce

    23-10-14, TTS-Adar Project.2.1.23 Motive W

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced23-10-14, TTS-Adar Project.2.1.24 Chemic

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced23-10-14, TTS-Adar Project.2.1.25 Instrum

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced12-11-14, TTS-Adar Project.2.1.26 Nitroge

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.B

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 7 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    A3180 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14A3170 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.1.27 Firefighting system 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14A3190 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 27-9-14 6-10-14A3200 Data sheet design 7 12-10-14 18-10-14 12-10-14 18-10-14 1-11-14 7-11-14A3210 Detailed drawings Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 8-11-14 17-11-14A3220 Detailed Specifications, Reports and Procedures Rev.A 10 29-10-14 7-11-14 29-10-14 7-11-14 18-11-14 27-11-14A3230 Bill of Materials Rev.A 7 29-10-14 4-11-14 29-10-14 4-11-14 24-11-14 30-11-14A3240 Detailed drawings Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14A3260 Bill of Materials Rev.B 7 5-11-14 11-11-14 5-11-14 11-11-14 1-12-14 7-12-14A3250 Detailed Specifications, Reports and Procedures Rev.B 10 8-11-14 17-11-14 8-11-14 17-11-14 28-11-14 7-12-14

    TTS-Adar ProjectTTS-Adar Project.2.2 Mechanical 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14TTS-Adar ProjecTTS-Adar Project.2.2.1 Induced Gas Flotation (IGF) 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14A3270 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14A3280 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14A3290 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14A3300 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14A3310 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14A3320 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14A3340 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14A3330 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.2 Centrifugal Transfer Pumps 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14A3350 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14A3360 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14A3370 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14A3380 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14A3390 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14A3400 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14A3420 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14A3410 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.3 Filter feed pump 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14A3430 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14A3440 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14A3450 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14A3460 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14A3470 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14A3480 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14A3500 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14A3490 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14

    J A J A J J A J A J A J14 2015 2016 17

    Bill of Materials Rev.BDetailed Specifications, Reports and Proce17-11-14, TTS-Adar Project.2.1.27 Firefig

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce12-11-14, TTS-Adar Project.2.2 Mechanic12-11-14, TTS-Adar Project.2.2.1 Induced

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce12-11-14, TTS-Adar Project.2.2.2 Centrifu

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce12-11-14, TTS-Adar Project.2.2.3 Filter fe

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 8 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    TTS-Adar ProjecTTS-Adar Project.2.2.4 Nutshell Filter Vessel 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14A3510 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14A3520 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14A3530 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14A3540 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14A3550 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14A3560 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14A3580 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14A3570 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.5 Media Scrub Pump 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14A3590 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14A3600 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14A3610 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14A3620 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14A3630 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14A3640 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14A3660 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14A3650 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.6 Booster Pumps 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14A3670 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14A3680 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14A3690 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14A3700 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14A3710 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14A3720 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14A3740 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14A3730 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.7 Injection Pumps 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14A3750 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14A3760 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14A3770 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14A3780 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14A3790 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14A3800 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14A3820 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14A3810 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.8 Produced Water Skim Tank with internals 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14A3830 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14A3840 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14

    J A J A J J A J A J A J14 2015 2016 17

    12-11-14, TTS-Adar Project.2.2.4 Nutshel

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce12-11-14, TTS-Adar Project.2.2.5 Media S

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce12-11-14, TTS-Adar Project.2.2.6 Booster

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce12-11-14, TTS-Adar Project.2.2.7 Injection

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce12-11-14, TTS-Adar Project.2.2.8 Produce

    Client inputData sheet design

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 9 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    A3850 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14A3860 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14A3870 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14A3880 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14A3900 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14A3890 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.9 Solids Hydro-transporting Units and ancillaries for the ski... 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14A3910 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14A3920 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14A3930 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14A3940 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14A3950 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14A3960 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14A3980 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14A3970 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.10 Break Tank 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14A3990 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14A4000 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14A4010 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14A4020 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14A4030 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14A4040 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14A4060 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14A4050 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.11 Solids Hydro-transporting Units for Break Tank 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A4070 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A4080 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14A4090 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14A4100 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14A4110 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14A4120 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14A4140 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A4130 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.12 Buffer Tank. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A4150 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A4160 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14A4170 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14A4180 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14A4190 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14

    J A J A J J A J A J A J14 2015 2016 17

    Detailed drawings Rev.ADetailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce12-11-14, TTS-Adar Project.2.2.9 Solids H

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce12-11-14, TTS-Adar Project.2.2.10 Break

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce7-11-14, TTS-Adar Project.2.2.11 Solids H

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce7-11-14, TTS-Adar Project.2.2.12 Buffer T

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.A

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 10 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    A4200 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14A4220 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A4210 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.13 Solids Hydro-transporting Units for Buffer Tank 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A4230 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A4240 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14A4250 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14A4260 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14A4270 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14A4280 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14A4300 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A4290 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.14 Recovered Oil Tank. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A4310 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A4320 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14A4330 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14A4340 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14A4350 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14A4360 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14A4380 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A4370 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.15 Recovered Oil Pumps. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A4390 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A4400 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14A4410 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14A4420 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14A4430 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14A4440 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14A4460 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A4450 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.16 Backwash heat exchanger for the Nutshell Filters. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A4470 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A4480 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14A4490 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14A4500 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14A4510 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14A4520 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14A4540 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A4530 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    J A J A J J A J A J A J14 2015 2016 17

    Detailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce7-11-14, TTS-Adar Project.2.2.13 Solids H

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce7-11-14, TTS-Adar Project.2.2.14 Recover

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce7-11-14, TTS-Adar Project.2.2.15 Recover

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce7-11-14, TTS-Adar Project.2.2.16 Backwa

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 11 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    TTS-Adar ProjecTTS-Adar Project.2.2.17 Backwash Clarifiers 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A4550 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A4560 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14A4570 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14A4580 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14A4590 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14A4600 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14A4620 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A4610 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.18 Centrifugal Backwash Supply Pumps for the Nutshell Filt... 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A4630 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A4640 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14A4650 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14A4660 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14A4670 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14A4680 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14A4700 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A4690 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.19 Water Pumps associated with the backwash clarifiers. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A4710 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A4720 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14A4730 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14A4740 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14A4750 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14A4760 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14A4780 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A4770 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.20 Drain Pumps 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A4790 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A4800 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14A4810 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14A4820 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14A4830 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14A4840 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14A4860 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A4850 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.21 Sludge Pumps. 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14A4870 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14A4880 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14

    J A J A J J A J A J A J14 2015 2016 17

    7-11-14, TTS-Adar Project.2.2.17 Backwa

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce7-11-14, TTS-Adar Project.2.2.18 Centrifu

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce7-11-14, TTS-Adar Project.2.2.19 Water P

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce7-11-14, TTS-Adar Project.2.2.20 Drain Pu

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce28-10-14, TTS-Adar Project.2.2.21 Sludge

    Client inputData sheet design

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 12 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    A4890 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14A4900 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14A4910 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14A4920 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14A4940 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14A4930 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.22 Disposal Water Pumps 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14A4950 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14A4960 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14A4970 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14A4980 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14A4990 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14A5000 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14A5020 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14A5010 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.23 Motive Water Pumps. 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14A5030 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14A5040 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14A5050 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14A5060 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14A5070 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14A5080 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14A5100 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14A5090 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.24 Chemical Injection Skids. 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14A5110 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14A5120 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14A5130 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14A5140 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14A5150 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14A5160 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14A5180 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14A5170 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.25 Instrument Air System 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14A5190 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14A5200 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14A5210 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14A5220 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14A5230 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14

    J A J A J J A J A J A J14 2015 2016 17

    Detailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced28-10-14, TTS-Adar Project.2.2.22 Disposa

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced28-10-14, TTS-Adar Project.2.2.23 Motive

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced28-10-14, TTS-Adar Project.2.2.24 Chemic

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced28-10-14, TTS-Adar Project.2.2.25 Instrum

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.A

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 13 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    A5240 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14A5260 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14A5250 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.26 Nitrogen Generator package 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14A5270 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14A5280 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14A5290 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14A5300 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14A5310 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14A5320 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14A5340 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14A5330 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.2.27 Firefighting system 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14A5350 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14A5360 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14A5370 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14A5380 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14A5390 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14A5400 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14A5420 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14A5410 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14

    TTS-Adar ProjectTTS-Adar Project.2.3 Electrical 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14TTS-Adar ProjecTTS-Adar Project.2.3.1 33kV cables 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14A5430 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14A5440 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14A5450 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14A5460 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14A5470 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14A5480 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14A5500 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14A5490 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.3.2 33kV/6.9kV step-down transformer 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14A5510 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14A5520 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14A5530 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14A5540 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14A5550 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14A5560 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14A5580 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14

    J A J A J J A J A J A J14 2015 2016 17

    Detailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced28-10-14, TTS-Adar Project.2.2.26 Nitroge

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced28-10-14, TTS-Adar Project.2.2.27 Firefigh

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced17-11-14, TTS-Adar Project.2.3 Electrical

    23-10-14, TTS-Adar Project.2.3.1 33kV cab

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced23-10-14, TTS-Adar Project.2.3.2 33kV/6.9

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.B

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 14 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    A5570 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.3.3 6.6kV/0.42kV step-down transformer 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14A5590 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14A5600 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14A5610 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14A5620 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14A5630 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14A5640 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14A5660 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14A5650 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.3.4 6.6kV switchgear and EICS 54 7-9-14 30-10-14 7-9-14 30-10-14 15-10-14 7-12-14A5670 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 15-10-14 24-10-14A5680 Data sheet design 7 24-9-14 30-9-14 24-9-14 30-9-14 1-11-14 7-11-14A5690 Detailed drawings Rev.A 10 1-10-14 10-10-14 1-10-14 10-10-14 8-11-14 17-11-14A5700 Detailed Specifications, Reports and Procedures Rev.A 10 11-10-14 20-10-14 11-10-14 20-10-14 18-11-14 27-11-14A5710 Bill of Materials Rev.A 7 11-10-14 17-10-14 11-10-14 17-10-14 24-11-14 30-11-14A5720 Detailed drawings Rev.B 10 11-10-14 20-10-14 11-10-14 20-10-14 28-11-14 7-12-14A5740 Bill of Materials Rev.B 7 18-10-14 24-10-14 18-10-14 24-10-14 1-12-14 7-12-14A5730 Detailed Specifications, Reports and Procedures Rev.B 10 21-10-14 30-10-14 21-10-14 30-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.3.5 400V motor control center and EICS and distribution boar... 54 7-9-14 30-10-14 7-9-14 30-10-14 15-10-14 7-12-14A5750 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 15-10-14 24-10-14A5760 Data sheet design 7 24-9-14 30-9-14 24-9-14 30-9-14 1-11-14 7-11-14A5770 Detailed drawings Rev.A 10 1-10-14 10-10-14 1-10-14 10-10-14 8-11-14 17-11-14A5780 Detailed Specifications, Reports and Procedures Rev.A 10 11-10-14 20-10-14 11-10-14 20-10-14 18-11-14 27-11-14A5790 Bill of Materials Rev.A 7 11-10-14 17-10-14 11-10-14 17-10-14 24-11-14 30-11-14A5800 Detailed drawings Rev.B 10 11-10-14 20-10-14 11-10-14 20-10-14 28-11-14 7-12-14A5820 Bill of Materials Rev.B 7 18-10-14 24-10-14 18-10-14 24-10-14 1-12-14 7-12-14A5810 Detailed Specifications, Reports and Procedures Rev.B 10 21-10-14 30-10-14 21-10-14 30-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.3.6 Motor starters for all pumps. 54 7-9-14 30-10-14 7-9-14 30-10-14 15-10-14 7-12-14A5830 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 15-10-14 24-10-14A5840 Data sheet design 7 24-9-14 30-9-14 24-9-14 30-9-14 1-11-14 7-11-14A5850 Detailed drawings Rev.A 10 1-10-14 10-10-14 1-10-14 10-10-14 8-11-14 17-11-14A5860 Detailed Specifications, Reports and Procedures Rev.A 10 11-10-14 20-10-14 11-10-14 20-10-14 18-11-14 27-11-14A5870 Bill of Materials Rev.A 7 11-10-14 17-10-14 11-10-14 17-10-14 24-11-14 30-11-14A5880 Detailed drawings Rev.B 10 11-10-14 20-10-14 11-10-14 20-10-14 28-11-14 7-12-14A5900 Bill of Materials Rev.B 7 18-10-14 24-10-14 18-10-14 24-10-14 1-12-14 7-12-14A5890 Detailed Specifications, Reports and Procedures Rev.B 10 21-10-14 30-10-14 21-10-14 30-10-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.3.7 EICS panel with power systems 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14A5910 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14

    J A J A J J A J A J A J14 2015 2016 17

    Detailed Specifications, Reports and Proced23-10-14, TTS-Adar Project.2.3.3 6.6kV/0.4

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proced30-10-14, TTS-Adar Project.2.3.4 6.6kV sw

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce30-10-14, TTS-Adar Project.2.3.5 400V mo

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce30-10-14, TTS-Adar Project.2.3.6 Motor st

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce2-11-14, TTS-Adar Project.2.3.7 EICS pan

    Client input

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 15 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    A5920 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14A5930 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14A5940 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14A5950 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14A5960 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14A5980 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14A5970 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.3.8 Variable Frequency Driver(VFD) 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14A5990 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14A6000 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14A6010 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14A6020 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14A6030 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14A6040 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14A6060 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14A6050 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.3.9 Power and control cables. 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14A6070 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14A6080 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14A6090 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14A6100 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14A6110 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14A6120 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14A6140 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14A6130 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.3.10 Neutral earthing resistors. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A6150 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A6160 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14A6170 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14A6180 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14A6190 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14A6200 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14A6220 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A6210 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.3.11 Cabling, glanding and associated materials 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A6230 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A6240 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14A6250 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14A6260 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14

    J A J A J J A J A J A J14 2015 2016 17

    Data sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce2-11-14, TTS-Adar Project.2.3.8 Variable F

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce2-11-14, TTS-Adar Project.2.3.9 Power an

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce7-11-14, TTS-Adar Project.2.3.10 Neutral

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce7-11-14, TTS-Adar Project.2.3.11 Cabling,

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and Proced

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 16 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    A6270 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14A6280 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14A6300 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A6290 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.3.12 Small power and lighting system 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A6310 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A6320 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14A6330 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14A6340 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14A6350 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14A6360 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14A6380 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A6370 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.3.13 Uninterrupted Power Supply (UPS) 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14A6390 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14A6400 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14A6410 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14A6420 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14A6430 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14A6440 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14A6460 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14A6450 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.3.14 Electrical Heat Tracing System. 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14A6470 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14A6480 Data sheet design 7 7-10-14 13-10-14 7-10-14 13-10-14 1-11-14 7-11-14A6490 Detailed drawings Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 8-11-14 17-11-14A6500 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14A6510 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14A6520 Detailed drawings Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14A6540 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14A6530 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.3.15 Earthing and lightning protection system 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14A6550 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14A6560 Data sheet design 7 7-10-14 13-10-14 7-10-14 13-10-14 1-11-14 7-11-14A6570 Detailed drawings Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 8-11-14 17-11-14A6580 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14A6590 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14A6600 Detailed drawings Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14A6620 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14

    J A J A J J A J A J A J14 2015 2016 17

    Bill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce7-11-14, TTS-Adar Project.2.3.12 Small po

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce7-11-14, TTS-Adar Project.2.3.13 Uninterr

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProcedBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce12-11-14, TTS-Adar Project.2.3.14 Electri

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.BDetailed Specifications, Reports and Proce12-11-14, TTS-Adar Project.2.3.15 Earthin

    Client inputData sheet designDetailed drawings Rev.ADetailed Specifications, Reports and ProceBill of Materials Rev.ADetailed drawings Rev.BBill of Materials Rev.B

    The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART

    Project Baseline BarPrimary Baseline

    Actual WorkRemaining Work

    Critical Remaining WorkBaseline Milestone

    MilestoneSummary

    Page 17 of 45 The TTS for Adar Produced Water Re-injection PlantDate Revision Checked Approved

    19-6-14 Rev.1

  • Activity ID Activity Name OriginalDuration

    Start Finish Early Start Early Finish Late Start Late Finish

    A6610 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14

    TTS-Adar ProjecTTS-Adar Project.2.3.16 Cathodic protection system up to the plant battery limit i... 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14A6630 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 27-9-14 6-10-14A6640 Data sheet design 7 12-10-14 18-10-14 12-10-14 18-10-14 1-11-14 7-11-14A6650 Detailed drawings Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 8-11-14 17-11-14A6660 Detailed Specifications, Reports and Procedures Rev.A 10 29-10-14 7-11-14 29-10-14 7-11-14 18-11-14 27-11-14A6670 Bill of Materials Rev.A 7 29-10-14 4-11-14 29-10-14 4-11-14 24-11-14 30-