! SPE DL_ MVD DL BA

55
Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow their professionals to serve as lecturers Additional support provided by AIME Society of Petroleum Engineers Distinguished Lecturer Program www.spe.org/dl

Transcript of ! SPE DL_ MVD DL BA

Page 1: ! SPE DL_ MVD DL BA

Primary funding is provided by

The SPE Foundation through member donations

and a contribution from Offshore Europe

The Society is grateful to those companies that allow their

professionals to serve as lecturers

Additional support provided by AIME

Society of Petroleum Engineers

Distinguished Lecturer Program www.spe.org/dl

Page 2: ! SPE DL_ MVD DL BA

Society of Petroleum Engineers

Distinguished Lecturer Program www.spe.org/dl

Mary Van Domelen, PE

Engineering Advisor

Argentine Section

Buenos Aries, Argentina

16 March 2016

Bridging the Gap Between

Drilling and Completions Challenges and Solutions in Horizontal Wells

Page 3: ! SPE DL_ MVD DL BA

My Background BS Chemical Engineering, University of Oklahoma

11 years Halliburton Research Center

12 years international – Leiden, The Netherlands

– Cairo, Egypt

– Copenhagen, Denmark

7 years with operating companies – Maersk Oil, Danish Operations

– Chesapeake Energy, Fracturing Services

– Continental Resources, Bakken

3

Page 4: ! SPE DL_ MVD DL BA

Presentation Format

• Define the challenge

• Evolution of technologies

• Establish today’s baseline

• What does the future hold

• Conclusions

4

Page 5: ! SPE DL_ MVD DL BA

The Challenge

Economic development of unconventional reservoirs necessitated the development of leading edge

horizontal drilling and well completion techniques.

5 Photo courtesy of US Energy Information Association

Page 6: ! SPE DL_ MVD DL BA

The question for today

Can we drill longer wells than we can effectively complete?

6

Photo courtesy of MT ACTION Photography Photo courtesy of Continental Resources

Page 7: ! SPE DL_ MVD DL BA

Scope: Stimulated horizontal wells

Horizontal wells… • Are getting longer and longer

• Require more stimulation stages

• Must be optimized; not just efficient and economical

• Environmental concerns can not be ignored

7 Photo courtesy of Halliburton Energy Services

2 miles = 3.2 km 3 miles = 4.8 km

Page 8: ! SPE DL_ MVD DL BA

When, and where, was the first horizontal well with multi-stage fracturing treatments?

First HZ Well Multi-Stage Fracturing

Treatments

8

Page 9: ! SPE DL_ MVD DL BA

Multi-Stage PSI Completions (1988) Perforate-Stimulate-Isolate

Retrievable

ISO-Packer Locator

Tubing Seal

Assembly

Tubing Sliding Sleeve

(closed) Sump Packer

Millout Extension

9-5/8” or 10 3/4“ “Neo” Packer

Locator Tubing

Seal Assembly

Liner

Liner Hanger

Image reference SPE 170981 10

Key drivers:

1) Production more important than efficiency • Ensure each frac as productive as possible

• Allow selective testing of individual zones

2) 48 to 60 hours between stages

Page 10: ! SPE DL_ MVD DL BA

The Dan Field Today

11

Original well

2.5 miles = 4 km

Reference: Danish Energy Agency “Oil and Gas Production in Denmark” (2013)

Western Flank

Central

Platform

Complex

Page 11: ! SPE DL_ MVD DL BA

When, and where, was the first HZ well to use a ball shifted sleeves completion?

First HZ Well Multi-Stage Ball Shifted

Sleeves Completion

12

Page 12: ! SPE DL_ MVD DL BA

Ball shifted sleeves Open Hole Multi-Stage (OHMS)

13 Images courtesy of Halliburton Energy Services

Page 13: ! SPE DL_ MVD DL BA

Joanne Field (1994)

The Challenges • Marginal development

• Variable permeability and fractures

• Supply of stimulation materials

The Solutions • 1st ball drop sleeves completion

• 4 wells, 10 stages each

• Stimulation completed in 8 to 24 hours per well

• Two stimulation vessels, simultaneous operations

Refe

ren

ce S

PE

51177

14

Page 14: ! SPE DL_ MVD DL BA

Stimulating a “3-mile lateral”

Coiled Tubing Shifted Sleeves

and CAJ Technique

18

3 miles = 4.8 km

Page 15: ! SPE DL_ MVD DL BA

Halfdan Field (2000)

The Challenges

• Thin, flat reservoir requiring stimulation in order to produce at economical rates

• Lateral sections up to 6,000 m

• > 50% of laterals outside of coiled tubing reach

19

Reference SPE 71322, 78220, 78318 and SPE 108531

Page 16: ! SPE DL_ MVD DL BA

Halfdan “Hybrid Completion”

• Inner 2,500 m: Coiled Tubing (CT) shifted sleeves

– Stages are fracture stimulated

– 1 week to complete 14-16 stages

• Outer 3,500 m: Controlled Acid Jetting (CAJ)

– Single, long interval is matrix acidized

– 1,500 m3 15% HCl acid

– Typically completed in 12 hours

20

Page 17: ! SPE DL_ MVD DL BA

The Halfdan Field Today

21 Reference SPE 71322, 78220, 78318. and SPE 108531

4-D seismic confirms effective drainage along the full length of the laterals

Page 18: ! SPE DL_ MVD DL BA

Unlocking reserves through horizontal drilling and completion technologies

26

US Energy Information Administration: “Technically Recoverable Shale Oil and Shale Gas Resources:

An Assessment of 137 Shale Formations in 41 Countries Outside the United States” (June 13, 2013)

Page 19: ! SPE DL_ MVD DL BA

Accelerating the learning curve

27

So

urc

e:

EIA

En

erg

y In

fra

str

uc

ture

Su

mm

it, S

ep

tem

be

r 2

01

4

By 2010, 90% of the wells in the Bakken were horizontal with multi-stage fracs and the operators were preparing to ramp up in the Eagle Ford

Page 20: ! SPE DL_ MVD DL BA

Bridging the gap between drilling and completions

What are today’s challenges?

• Time and money

• Laterals are getting longer

• Availability of materials, especially water

• Public perception and environmental regulations

• Selecting the optimum completion for a given area

28

Page 21: ! SPE DL_ MVD DL BA

Brent Oil Spot Price ($/bbl)

31

0

20

40

60

80

100

120

140

1/1/2014 4/1/2014 7/1/2014 10/1/2014 1/1/2015 4/1/2015 7/1/2015

Source: Spears Drilling and Completion Services Cost Index, Q3 2015

The composite cost of wells in the USA has fallen between 10-50%, depending upon the play.

Page 22: ! SPE DL_ MVD DL BA

Drilling and Completion Costs CAPEX per EUR

32

Source: Oil & Gas Financial Journal, November 2015 (Rystad Energy NAS Well Data and Analysis)

Page 23: ! SPE DL_ MVD DL BA

Brief Introduction to the Bakken

33

Gamma Resistivity

BA

KK

EN

THR

EE F

OR

KS

Birdbear

Lodgepole

Upper

Lower

Middle

MBKKN

BA

KK

EN P

ETR

OLE

UM

SY

STEM

2

4

3

1

Page 24: ! SPE DL_ MVD DL BA

Tight Oil Breakeven Prices 2014 “High Grading” Example

34

A

B

E

Source: WoodMackenzie, Barclays Research (November 2014)

C & D

Page 25: ! SPE DL_ MVD DL BA

What will happen in 2016?

Drilled Uncompleted Wells

• 3,600 in U.S. (~ 1 mil BOPD)*

• 998 in Bakken at year end 2015

Important questions:

• Where is the opportunity in this challenge?

• How do we prepare for the recovery when it happens?

37

1,540 1,250

243 324

401 632

* PIRA Energy Group, Midland Reporter Telegram, January 10, 2016

Page 26: ! SPE DL_ MVD DL BA

Drilling vs. Completion Efficiencies

38

Source: US Energy Information Administration Bakken Rig Efficiencies Report August 2015

Enhanced Completions

Pad Drilling

Page 27: ! SPE DL_ MVD DL BA

Bakken Completion Trends

Enhanced Completions

40

Source: Continental Resources November 2015 Investor Presentation

Page 28: ! SPE DL_ MVD DL BA

Challenge: Completion Efficiency

41

Effectiveness

18

0-D

ay T

ota

l Zo

ne

Pro

du

ced

Liq

uid

s (b

bl/

ft2)

Zone Area (ft2)

Bakken and Three Forks Study

(5,327 wells)

Reference SPE 169531 and SPE 171629

Page 29: ! SPE DL_ MVD DL BA

Life Cycle of Unconventional Plays

42

Source: HIS Bakken Playbook (May 2015)

Page 30: ! SPE DL_ MVD DL BA

Water Requirements – Horizontal Wells Drilling vs. Completions

• Significantly more water is used during completion compared to drilling; however,

• The amount is a small percentage of all industrial water usage

43

Source: US Geological Survey Fact Sheet 2014-

3010 (March 2014)

Hydraulic Fracturing < 4%

Source: North Dakota State Water Commission

Page 31: ! SPE DL_ MVD DL BA

Water Recycling: Why or why not?

Considerations:

• Availability of fresh water

• Legislation

• Quality of produced water

• Water transfer options

• Central storage

44

Feas

ibili

ty

Eco

no

mic

s

Source: USGS Article 10.1002/2015, June 2015

Remediating for entrained oil and for solids

Page 32: ! SPE DL_ MVD DL BA

Produced Water Recycling Facility

Components

• Produced water storage

• Flocculation to remove solids

• Treatment to remove organics

• Underground water transfer pipelines

Economic Benefits

• Low OPEX ~ $0.30-$0.50/bbl

• Facilities generate revenue

• Minimizes salt water disposal

• 30% reduction in fresh water consumption

45

50,000 bbl/day Recycling Capacity and 1,500,000 bbl Useable Storage

10,000 bbl/day Recycling Capacity and 500,000 bbl Useable Storage

Note: Temporary recycling facilities are available which do not require CAPEX OPEX is $2.50-$3.60/bbl, depending upon produced water quality and throughput

Reference SPEPOS Panel Session on Water Management for Hydraulic Fracturing, March 2015

Page 33: ! SPE DL_ MVD DL BA

Pushing the limits of lateral length

46

1st horizontal Bakken well

with multiple frac stages

1st 2-mile lateral

1st 3-mile lateral

1.6 km

3.2 km

4.8 km

Page 34: ! SPE DL_ MVD DL BA

Drilling Efficiency Gains with Longer Laterals

47

Challenge: • Economic full field development

• Conventional development – Full township (6 miles x 6 miles)

– 18 units (1 mile x 2 miles)

– Each unit HBP (held by production)

Example data modified from American Association of Drilling Engineers (AADE) Technical Symposium held in Tulsa, OK, February 19, 2014

6 miles = 9.6 km

6 m

iles

= 9

.6 k

m

Page 35: ! SPE DL_ MVD DL BA

Drilling Efficiency Gains with Longer Laterals

48

2-mile development

3-mile development

Potential Benefit

Lateral length 10,000 ft 15,000 ft ~ Neutral

Wells required 141 109 - 32 wells

Number of pads 64 46 - 18 pads

Total footprint 280 acres 179 acres - 101 acres

Solution: Extended lateral development:

• Infill using 14 4-, 6- and 8-well pads

• 18 fewer pads and 32 less wells

• 36% reduction in footprint

Red wells are 3-mile laterals

Example data modified from American Association of Drilling Engineers (AADE) Technical Symposium held in Tulsa, OK, February 19, 2014

Page 36: ! SPE DL_ MVD DL BA

49

Drilling Efficiency Gains with Longer Laterals

Parshall Field

Ft. Berthold Reservation

Challenge: • Accessing “offshore reserves”

• Surface constraints

Page 37: ! SPE DL_ MVD DL BA

50

Drilling Efficiency Gains with Longer Laterals

Parshall Field

Ft. Berthold Reservation

Solution: • Directional drilling

• Extended lateral developments

Pad #2

Pad #1

Page 38: ! SPE DL_ MVD DL BA

Chasing the drilling rig

• Steering the lateral

• Where to perforate

• Stage isolation

–Plug and Perf

–Ball shifted sleeves

–CT shifted sleeves

• Post frac cleanout

51

Page 39: ! SPE DL_ MVD DL BA

Challenge: Steering the lateral

• Geo-steering

• Mud logging

• Cuttings analysis

• Gas analysis

• Biostratigraphy

• Logging while drilling

• Thru-bit logging

• Paleo-environmental analysis

52

Is this what your lateral looks like?

Page 40: ! SPE DL_ MVD DL BA

53

Challenge: Steering the Lateral

Page 41: ! SPE DL_ MVD DL BA

Challenge: Quantifying rock properties

54

Reference SPE 115258, 152704, 164271, 167726, 168763

Is your rock brittle or ductile?

Page 42: ! SPE DL_ MVD DL BA

Challenge: Where to perforate

55

Need to balance • Reservoir quality with

• Completion quality

Various approaches • Thru-bit quad-combo logs

• Projecting pilot hole data via resistivity or density logs

• Specific mechanical energy (SME) from drilling parameters

Image courtesy of Halliburton Energy Services

Page 43: ! SPE DL_ MVD DL BA

Challenge: Stage Isolation

57 Images courtesy of Halliburton Energy Services

Page 44: ! SPE DL_ MVD DL BA

Challenge: Stage Isolation

Mechanical systems • Plug-and-perf

• Ball and sleeves

• Coiled tubing activated

Dynamic systems • Jet assisted

• Proppant plugs

58

Images courtesy of Halliburton Energy Services

Page 45: ! SPE DL_ MVD DL BA

Plug-and-Perf Completions

59

P’n’P; along with “zipper fracturing” reduced completion times significantly

Page 46: ! SPE DL_ MVD DL BA

Zipper Fracturing

60

Page 47: ! SPE DL_ MVD DL BA

Challenge: Frac plug mill-out

61

Solutions: • Larger coiled tubing • Large ID frac plugs • Dissolvable frac plugs

Images courtesy of Halliburton Energy Services, Baker Hughes, Magnum Tools, and Schlumberger

Page 48: ! SPE DL_ MVD DL BA

Ball and Sleeves Systems

62

Historically: open hole with single ports

Today: fully cemented with multiple ports

Images courtesy of Halliburton Energy Services

Page 49: ! SPE DL_ MVD DL BA

Ball and Sleeves Systems

Maximum number of stages Open Hole Cemented

Single entry sleeve systems 50-55 35-40

Multi-port systems, 3-5 ports/stage 48-54 20-25

63

• Exact number of stages possible is dependent upon – Formation characteristics

– Wellbore construction

– Stimulation treatment parameters

• Balls are made of various materials – Generally in 1/8” size increments

– Degradable balls are available

Images courtesy of Schlumberger

Page 50: ! SPE DL_ MVD DL BA

Coiled Tubing Fracturing

64

Sleeves are run in the liner, then shifted with coiled tubing during stimulation operations

Page 51: ! SPE DL_ MVD DL BA

65

Coiled Tubing Fracturing

Coiled tubing inside the work string provides a circulation path for the frac fluid and proppants

Frac is pumped down the annulus between the coiled tubing and the liner then exits out the frac port

Resettable plug grips and shifts the sliding sleeve

Image courtesy of NCS Energy Services

Ports at the bottom allow circulation to cleanout wellbore

Closed Open

Images courtesy of NCS Energy Services

Page 52: ! SPE DL_ MVD DL BA

Full circle in horizontal well completion technologies

66

North Sea: • Directional drilling • Extended reach wells • Horizontal wells with

multi-stage stimulations

Onshore conventional reservoirs: • Tight gas • Mature fields • Horizontal wells

‒ Austin Chalk, Texas ‒ North Slope, Alaska

Unconventionals: • Fracturing technologies • Completion techniques • Completion hardware

Today and Future: Completion technologies developed onshore being applied offshore

1980 - 2000 2000 - 2020

Inspiration credit: Martin Rylance, JPT, April 2015

Page 53: ! SPE DL_ MVD DL BA

Technology sharing

• Collaborate

– All disciplines: geosciences, drilling, completions, production

– With service providers and other operators

• Accelerate learning curve

– Learn from both successes and failures

– Think outside the box when looking for analogs

• Be prepared

– There will be a shortage of skilled people

– Keep focus on being effective not just efficient

69

Page 54: ! SPE DL_ MVD DL BA

In conclusion:

Does completion technology lag behind drilling technology?

• Drilling envelope is pushed first

• Completion technology is a fast follower

71

Page 55: ! SPE DL_ MVD DL BA

Society of Petroleum Engineers

Distinguished Lecturer Program www.spe.org/dl 72

Your Feedback is Important

Enter your section in the DL Evaluation Contest by

completing the evaluation form for this presentation

Visit SPE.org/dl

72

[email protected]