→SPACE SITUATIONAL AWARENESS
PRECURSOR PROGRAMME
CO-VIII & DC-II Industry Day
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 2
European Space Agency
- The SSA Precursor Programme
- Precursor Services Objectives
- Past and Present Activities
- Link between CO-VIII and DC-II
- CO-VIII ITT
- Objectives
- Content
- Key issues
- Questions and Answers
OUTLINE
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 3
European Space Agency
BACKGROUND
Image: Dan Durda – FIAAA
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 4
European Space Agency
2009 – 2012
• Preparatory Programme
– Governance Definition
– Data Policy
– Architecture
– Federation
– Precursor Services
– Radar Breadboard
– Pilot Data Centres
2013 – 2020
• Development/
Operational Phase
– Development of essential components
– SSA Exploitation
INTRODUCTIONCurrent Objectives
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 5
European Space Agency
1. Core Element
SSA Architecture
Governance
Data Policy
Security
Space Surveillance and Tracking Segment
2. Space Weather Element
(including NEO activities)
3. Radar Element
Prototype Development
4. Pilot Data Element
Transversal support for all segments
INTRODUCTIONSSA Programme Structure
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 6
European Space Agency
• Austria
• Belgium
• Finland
• France
• Germany
• Greece
• Italy
• Luxembourg
• Norway
• Portugal
• Spain
• Switzerland
• United Kingdom
Canada (in discussion)
INTRODUCTIONSSA Participating States
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 7
European Space Agency
INTRODUCTIONSSA Programme Structure
Tasking Centre
SWESpace Weather
Centre
NEONear Earth
Objects Centre
SSTSpace
Surveillance & Tracking Centre
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 8
European Space Agency
DC-II ITT
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 9
European Space Agency
SST PRECURSOR SERVICE OBJECTIVES
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 10
European Space Agency
OVERALL SYSTEM
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 11
European Space Agency
SSA Preparatory Programme parallel stream
goal is to be able to perform representative
testing of proposed solutions through
precursor services:
– Scaleable solutions
– Representative of full systems
– Provide measurable results with
reduced data set
– Characterise current European
resources
– Enable evaluation of performance
using of available European assets
– Provide test-bed for innovative
solutions
SST PRECURSOR SERVICES GOAL
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 12
European Space Agency
PRECURSOR SERVICES
1. Catalogue of man-made objects
2. Collision Avoidance
3. Fragmen-tations
4. Re-entry predictions
5. Mission characterisation
6. Mission Support
7. Small objects
OperatorsOperatorsGeneral
publicGeneral
publicScience
specialistsScience
specialistsState
authoritiesState
authorities
Search and initialisation
Warning bulletins
Attitude motion
Warning bulletins
Orbits and covariances
TIP messages
Debris detections
Internat. ID, classification
Mass, area
Orbits and covariances
Orbits and covariances
Man-euvers
Segment Cervices
Data policy control filters
Expected User Community
Maneuvers
Products
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 13
European Space Agency
SST PRECURSOR SERVICES SELECTION
• Catalogue of Man-Made Objects
• Core of the SST service
• Provides one additional service directly through the correlation process
• Collision Avoidance
• Drives the precision requirements for the catalogue
• Drives the coverage requirements for the sensor network
• Drives both surveillance and tracking systems
• Re-entry Prediction
• Requires active filtering of the catalogue to produce sub-set of target objects
• Will drive some limiting needs of a tracking system
• Introduces new disciplines into the SST segment
• Fragmentation Detection
• Initiated by correlation process in catalogue maintenance
• Requires rapid tasking, recalculation and prediction to support other services
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 14
European Space Agency
PAST AND PRESENT ACTIVITIES
Image: Dan Durda – FIAAA
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 15
European Space Agency
PAST ACTIVITIES
CO-I part I Optical System to complement traditional radar sensors
Catalogue/Collision avoidance requirement driven
NEO component
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 16
European Space Agency
CURRENT ACTIVITIES
CO-I part II Overall requirements and architecture
Provides definition to the service requirements
CO-V Telescope analysis and design
CO-VI SST Precursor Services Deployment
Install current ESA conjunction prediction tool (CRASS)
Create web-based front-end to CRASS
Develop data model for SST
Characterise current European SST assets
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 17
European Space Agency
CO-VIII and DC-II LINKAGE
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 18
European Space Agency
LINK BETWEEN CO-VIII and DC-II
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 19
European Space Agency
CO-VIII OBJECTIVES
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 20
European Space Agency
CO-VIII OBJECTIVES
– Create future collision avoidance framework
– Provide re-entry service baseline
– Generate representative data for test and validation
exercises
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 21
European Space Agency
• Provide core conjunction prediction
• Develop future baseline code for development
• Expand upon earlier capabilities
– Interface with an SQL database (input and output)
– Perform all-on-all conjunction analysis
• Retain single-object/catalogue capability
– Allow parallel processing on large datasets
– Automated input/output
– Interface with current web-based front-end
CONJUNCTION PREDICTION
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 22
European Space Agency
• New precursor service
• Predict uncontrolled re-entries
• Use SQL database for data source
• Provide multiple outputs:
– Number of candidate objects
– Impact ellipsoid plot
• Automatic input/output
• Interface with web-based front-end
RE-ENTRY PREDICTION
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 23
European Space Agency
• Real data required to:
– DC-II [test SST process pipeline]
• Track management
• Orbit determination
• Correlation
– CO-VIII [conjunction prediction & re-entry prediction]
• Conjunction algorithms
• Possible filtering techniques
• Re-entry coordination
• Two classes
– Surveillance data
– Tracking data
• Two tasks
– Data planning
– Data execution
TEST AND VALIDATION DATA GENERATION
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 24
European Space Agency
•WP-1 Conjunction Prediction System
– WP-1.1 Conjunction Prediction System Design
– WP-1.2 Conjunction Prediction System Implementation
– WP-1.3 Conjunction Prediction System Deployment
– WP-1.4 Conjunction Prediction System Maintenance
•WP-2 Re-entry Prediction System
– WP-2.1 Re-entry Prediction System Design
– WP-2.2 Re-entry Prediction System Implementation
– WP-2.3 Re-entry Prediction System Deployment
– WP-2.4 Re-entry Prediction System Maintenance
•WP-3 Test and Validation Data Generation
– WP-3.1 Test and Validation Data Requirements Planning
– WP-3.2 Test and Validation Data Acquisition Management
WORK PACKAGE ORGANISATION
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 25
European Space Agency
WORK PACKAGES
Function
Work Package
ConjunctionPrediction
Re-entryPrediction
Test and Validation Data Generation
Design 1.1 2.1 3.1Requirements
Planning
Implementation 1.2 2.2 3.2Data Acquisition
Management
Deployment 1.3 2.3
Maintenance 1.4 2.4
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 26
European Space Agency
WORK PACKAGES
FATIRE
Planning Design 3.1
Re-entry PredictionDesign 2.1
Operational EoC
Planning Implementation 3.2
Re-entry PredictionImplementation 2.2
RePDeployment 2.3
ReP Maintenance 2.4
Conjunction PredictionDesign 1.1
Conjunction PredictionImplementation 1.2
CPDeployment 1.3
CP Maintenance 1.4
Planning Design 3.1
Planning Implementation 3.2Planning
Design 3.1Planning Implementation 3.2Planning
Design 3.1Planning Implementation 3.2
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 27
European Space Agency
CO-VIII: OPTIONS
• As with DC-II, bidders are asked to provide an offer for the annual
maintenance of the systems for at least three years after the end of
the contract
• The option will not be valid until the end of the contract; ESA unlikely
to take this option until FAT completion (at earliest).
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 28
European Space Agency
CO-VIII KEY ISSUES: IPR AND SW REUSE
• As with DC-II:
• “SSA needs to own the IPR of all non-COTS software that it will eventually operate. This is needed to allow SSA to license the SW in future contracts (development, maintenance, and operations) and eventually transfer the SSA system to a third party for operations.”
• As a result:
– All software developed will be considered as “operational software” in the contract
– “When offers are based on re-using software where ESA does not already own the IPR, the bidders are expected to transfer to ESA the IPR in the form of a written agreement at no cost or provide - as an option - the cost of transferring the IPR for these systems to ESA for use in SSA.”
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 29
European Space Agency
CO-VIII KEY ISSUES: IPR AND SW REUSE
• The right to exercise the transfer of IPR options need to be valid for at least 3 years from KO.
• These IPR transfer option costs (if any) will not be considered within the ITT envelope but must be quoted.
• ESA is unlikely to take the IPR options at KO; instead this will be a decision taken later based on the success of the development and the likelihood to use it a basis for the full programme implementation.
• Any IPR offered to ESA shall be subject to “due diligence” procedures from ESA before the transfer can be completed.
• Any IPR transfer to ESA does not exclude the bidder from continuing to use the offered software. ESA will normally grant the bidder a licence.
• In all cases (with or without IPR transfer) the bidder needs to provide a license to ESA for the indefinite continued use of the software. The ESA draft contract attached to the ITT will specify the complete terms and conditions with regard to Operational Software and re-use of existing/third party products.
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 30
European Space Agency
CO-VIII KEY ISSUES: ESA CFI
• SST Pilot Data Centre site infrastructure (ESAC)
• SST Test and Validation Centre site infrastructure (ESAC)
• SST Pilot Data Centre ICT infrastructure (ESAC)
• SST Test and Validation Centre (ESAC) ICT infrastructure
• Outputs from on-going precursor implementation activities (e.g. CO-
VI) when relevant
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 31
European Space Agency
CO-VIII KEY ISSUES: NON CFI
• development infrastructure;
• Contractor needs to provide a “representative” environment
• COTS linked to bidders software re-use
• algorithm specifications
• test data
• initial object catalogue
Emmet Fletcher | SSA Precursor Programme | SSA Industry Day | CO-VIII & DC-IIPage: 32
European Space Agency
QUESTIONS?
Ariane 5 V198 Launch (Hylas-1 & Intelsat-17) 16th November 2010