environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16...

38

Transcript of environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16...

Page 1: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee
Page 2: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee
Page 3: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee
Page 4: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

i

TOR Compliance

Project Proponent: M/s Popular Chemical Manufacturer and Supplies.

Project Address: Survey No. 380, Karagada village, Belur Tehsil, Hassan District (Karnataka)

S.

No.

TOR points TOR Compliance

1) Executive Summary Given in chapter – 11

2) Introduction

(i) Details of the EIA

Consultant including

NABET accreditation

EIA Consultant- Wolkem India Ltd.

Details of the EIA Consultant including NABET accreditation is

given in chapter 12.

NABET Certificate is enclosed as Annexure XVII.

(ii) Information about

project proponent

Project proponent- Mr. Vedanth Gowda

Designation- Partner

Address- Hastha Hosamane Extension, Chikmagalur 577 101,

(Karnataka).

E-mail:[email protected]; [email protected]

Mr. Vedanth M P has master’s in business administration (Cardiff University, UK) have an experience more than 2

years in the copper sulphate industry.

(iii) Importance and benefits

of the project

Importance and benefits of the project is given in Chapter-I,

Para 1.3, Page no. 3 of the EIA/EMP report.

3) Project Description

(i) Cost of project and time

of completion

Cost of the project is 5.0 Crores.

Project will be completed within 3 year after grant EC

(ii) Products with capacities

for the proposed project

S.No

.

Name of the

product

Total Capacity (TPA)

1. Aluminium

Phosphide

500

2. Zinc Phosphide 250

Total 750 TPA

(iii) If expansion project,

details of existing

products with capacities

and whether adequate

land is available for

expansion, reference of

earlier EC if any.

This is a new project.

Annexure I

Page 5: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

ii

S.

No.

TOR points TOR Compliance

(iv) List of raw material

required and their source

along with mode of

transportation.

Transportation of raw materials will be by railways or

roadways. Details of the raw material required is given in

Chapter-II, Table 2.8, Page No. 23 to 24 of the EIA/EMP

report.

(v) Other chemicals and

materials required with

quantities and storage

capacities.

Finished products will be stored in well-designed warehouse.

Same is elaborated in Chapter 2, Para 2.5, Page 23.

(vi) Details of Emission,

effluents, hazardous

waste generation and

their management.

Details elaborated in Chapter – 2, Para 2.7 and 2.9 Page No.

25 to 33.

(vii) Requirement of water,

power, with source of

supply, status of approval,

water balance diagram,

man-power requirement

(regular and contract)

Total Water Requirement- 19.13 KLD

Source- Tanker

Manpower Requirement- 80 nos.

Details elaborated in Chapter – 2 Para 2.7 to 2.8 Page no.

25 to 27.

(viii

)

Process description along

with major equipment’s and machineries, process

flow sheet (quantative)

from raw material to

products to be provided

Details of plant machineries is elaborated in Chapter – 2,

Table no. 2.2 , page, 15 to 16 of EIA/EMP report.

Process description for existing and proposed product is given

on page no. 18 to 22 of EIA/EMP report.

(ix) Hazard identification and

details of proposed safety

systems.

Details is given in Chapter – 7, para 7.7, Table 7.7.1 to 7.76

page No. 174 to 182 of EIA/EMP report.

(x) Expansion/modernization

proposals:

a. Copy of all the

Environmental

Clearance(s) including

Amendments thereto

obtained for the project

from MOEF/SEIAA shall

be attached as an

Annexure. A certified copy

of the latest Monitoring

Report of the Regional

Office of the Ministry of

Not Applicable

Page 6: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

iii

S.

No.

TOR points TOR Compliance

Environment and Forests

as per circular dated 30th

May, 2012 on the status

of compliance of

conditions stipulated in all

the existing

environmental clearances

including Amendments

shall be provided. In

addition, status of

compliance of Consent to

Operate for the ongoing

existing operation of the

project from SPCB shall

be attached with the EIA-

EMP report.

b. In case the existing

project has not obtained

environmental clearance,

reasons for not taking EC

under the provisions of

the EIA Notification 1994

and/or EIA Notification

2006 shall be provided.

Copies of Consent to

Establish/No Objection

Certificate and Consent to

Operate (in case of units

operating prior to EIA

Notification 2006, CTE

and

CTO of FY 2005-2006)

obtained from the SPCB

shall be submitted.

Further, compliance

report to the conditions

of consents from the

SPCB shall be submitted.

This is a greenfield project.

4) Site Details

Page 7: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

iv

S.

No.

TOR points TOR Compliance

(i) Location of the project

site covering village,

Taluka/Tehsil, District and

State, Justification for

selecting the site, whether

other sites were

considered.

Location of site is tabulated below:

The current site of pesticide manufacturing unit is satisfying

the screening criteria for the proposed activity. The screening

criteria set by the company are economic & social factors.

Therefore, no alternate site was selected for proposed project

activity.

Khasra No. 380

Village Karagada

Tehsil Belur

District Hassan

State Karnataka

(ii) A toposheet of the study

area of radius of 10km

and site location on

1:50,000/1:25,000 scale on

an A3/A2 sheet.

(including all eco-

sensitive areas and

environmentally sensitive

places)

Toposheet of study area is enclosed as Annexure XII.

Details are elaborated in Chapter 2, Para 2.3, Figure- 2.1

Page No. 13-14 of EIA/EMP report.

(iii) Details w.r.t. option

analysis for selection of

site

The current site of pesticide manufacturing unit is satisfying

the screening criteria for the proposed activity. The screening

criteria set by the company are economic & social factors.

Therefore, no alternate site was selected for proposed project

activity.

(iv) Co-ordinates (lat-long) of

all four corners of the site.

Plot is in triangular shape.

S.No. Latitude Longitude

1. 13°14'50.44"N 75°50'51.65"E

2. 13°14'52.07"N 75°50'54.43"E

3. 13°14'44.86"N 75°50'54.33"E

(v) Google map-Earth

downloaded of the

project site.

Given in Chapter– 3, Figure- 3.13, page no. 69

(vi) Layout maps indicating

existing unit as well as

proposed unit indicating

storage area, plant area,

greenbelt area, utilities

etc. If located within an

Layout Plan attached as Annexure II.

Plot is not located in notified industrial area.

Also, Given in Chapter – 2, Figure 2.2, Page No 17 of

EIA/EMP report.

Page 8: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

v

S.

No.

TOR points TOR Compliance

Industrial

area/Estate/Complex,

layout of Industrial Area

indicating location of unit

within the Industrial

area/Estate.

(vii) Photographs of the

proposed and existing (if

applicable) plant site. If

existing, show

photographs of

plantation / greenbelt, in

particular.

Photographs of proposed area is given in Chapter – 1, Figure

1.1, -page No. 6 of EIA/EMP report.

(viii

)

Landuse break-up of total

land of the project site

(identified and acquired),

government/ private -

agricultural, forest,

wasteland, water bodies,

settlements, etc. shall be

included. (not required for

industrial area)

Land use breakup is mentioned in Chapter3, Table No. 3.21,

Page No. 74.

Page 9: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

vi

S.

No.

TOR points TOR Compliance

(ix) A list of major industries

with name and type

within study area (10 km

radius) shall be

incorporated. Land use

details of the study area

Industries in 10 Km radius of project site is as follows:

Type of

Industry

Name of

Industry

Distance Direction

Cement

bricks

Cubics cement

blocks

650 m. South East

Stone

crusher

Ckm crusher 5.16 kms

North East

Cement

bricks

Sri ranga lakshmi

solid blocks

3.48 kms North

Coffee

curing

CNS coffee

curing

3.78

North West

Cement

blocks

Vasuki solid

blocks

4.41 kms

North West

Coffee

curing

CN coffee curing

works

4.4 kms

North West

Biomass

fire

briquettes

CNT briquette

industries

5.3 kms

North West

Coffee

curing

Seven beans

coffee curing

works

5.2 kms

North West

Coffee

curing

Vasavi coffee

curing works

5.9 kms North West

Wood saw

mill

Manjunatha saw

mill

8.07 kms

North West

Plywood

industry

Rushil decor Pvt

ltd

8kms

North West

Poultry

industry

Life line feeds

India Pvt ltd

8.2 kms

North West

Land use details of the project is given in chapter 3, Page 68-

77.

(x) Geological features and Geological features and Geo-hydrological status of the study

Page 10: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

vii

S.

No.

TOR points TOR Compliance

Geo-hydrological status

of the stud y area shall be

included.

area is given Chapter-III, Para 3.9 and 3.10, Page no.77 to

87 of EIA/EMP report.

(xi) Details of Drainage of the

project upto 5 km radius

of study area. If the site is

within 1 km radius of any

major river, peak and lean

season river discharge as

well as flood occurrence

frequency based on peak

rainfall data of the past 30

years. Details of Flood

Level of the project site

and maximum Flood Level

of the river shall also be

provided. (mega green

field projects)

Details is elaborated in Chapter–3, Para 3.8.7, Figure 3.15. -

Page No. 71 to 73 of EIA/EMP report.

(xii) Status of acquisition of

land. If acquisition is not

complete, stage of the

acquisition process and

expected time of

complete possession of

the land.

Land is already acquired.

Land Documents are attached as Annexure I.

(xiii

)

R&R details in respect of

land in line with state

Government policy.

There is no house in plot area therefore R&R plan is not

required.

5) Forest and wildlife

related issues

(if applicable)

Not Applicable

(i) Permission and approval

for the use of forest land

(forestry clearance), if any,

and recommendations of

the State Forest

Department. (if

applicable)

(ii) Landuse map based on

High resolution satellite

Page 11: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

viii

S.

No.

TOR points TOR Compliance

imagery (GPS) of the

proposed site delineating

the forestland (in case of

projects involving forest

land more than 40 ha)

(iii) Status of Application

submitted for obtaining

the stage I forestry

clearance along with

latest status shall be

submitted.

(iv) The projects to be located

within 10 km of the

National Parks,

Sanctuaries, Biosphere

Reserves,

Migratory Corridors of

Wild Animals, the project

proponent shall submit

the map duly

authenticated by Chief

Wildlife Warden showing

these features vis-à-vis

the project location and

the recommendations or

comments of the Chief

Wildlife Warden-thereon.

(v) Wildlife Conservation Plan

duly authenticated by the

Chief Wildlife Warden of

the State Government for

conservation of Schedule

I fauna, if any exists in the

study area.

(vi) Copy of application

submitted for clearance

under the Wildlife

(Protection) Act, 1972, to

the Standing Committee

of the National Board for

Page 12: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

ix

S.

No.

TOR points TOR Compliance

Wildlife.

6) Environmental Status

(i) Determination of

atmospheric inversion

level at the project site

and site-specific

micrometeorological data

using temperature,

relative humidity, hourly

wind speed and direction

and rainfall.

Details are elaborated in Chapter – 3 Para 3.3.1 –Table 3.2,

Page No. 38-40 of EIA/EMP report.

(ii) AAQ data (except

monsoon) at 8 locations

for PM10, PM2.5, SO2,

NOX, CO and other

parameters relevant to

the project shall be

collected. The monitoring

stations shall be based

CPCB guidelines and take

into account the pre-

dominant wind direction,

population zone and

sensitive receptors

including reserved forests.

AAQ data (except monsoon) at 8 locations for PM10, PM2.5,

SO2, NOX, CO is given in Chapter- III, Section 3.4, page no.-

40 to 51 of the EIA report.

(iii) Raw data of all AAQ

measurement for 12

weeks of all stations as

per frequency given in the

NAQQM Notification of

Nov. 2009 along with -

min., max., average and

98% values for each of

the AAQ parameters from

data of all AAQ stations

should be provided as an

annexure to the EIA

Report.

Minimum, Maximum value and 98 percentile is given in

chapter 3, page 43 to 44 of EIA/EMP report.

Raw data for all monitoring stations will be submitted at the

time of EC presentation.

(iv) Surface water quality of

nearby River (100m

Surface water quality of the study area given in is given in

Chapter- III, Para 3.6.2, Page No. 58 o 59 of the EIA report.

Page 13: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

x

S.

No.

TOR points TOR Compliance

upstream and

downstream of discharge

point)

and other surface drains

at eight locations as per

CPCB/MoEF&CC

guidelines.

(v) Whether the site falls near

to polluted stretch of river

identified by the

CPCB/MoEF&CC, if yes

give details.

No

(vi) Ground water monitoring

at minimum at 8 locations

shall be included.

Details of Ground water Monitoring along with monitoring

locations is given in Chapter- III, Section 3.6.1 , page No. 54

to 58 of the EIA report.

(vii) Noise levels monitoring at

8 locations within the

study area.

Details of Noise Monitoring along with monitoring locations is

given in Chapter- III, Section 3.5, Page 51 to 54 of the EIA

report.

(viii

)

Soil Characteristic as per

CPCB guidelines.

Details of Soil Characteristic as per CPCB guidelines is given in

Chapter- III, Para 3.7, Page 59 to 67 of the EIA report.

(ix) Traffic study of the area,

type of vehicles,

frequency of vehicles for

transportation of

materials, additional

traffic due to proposed

project, parking

arrangement etc.

Traffic density report is attached as Annexure XXIV.

( x) Detailed description of

flora and fauna (terrestrial

and aquatic) existing in

the study area shall be

given with special

reference to rare, endemic

and endangered species.

If Schedule- I fauna are

found within the study

area, a Wildlife

Conservation Plan shall be

prepared and furnished.

Detailed description of flora and fauna existing in the study

area is given in Chapter-III, Para 3.11, Page No. 87 to 95 of

the EIA report.

Page 14: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

xi

S.

No.

TOR points TOR Compliance

(xi) Socio-economic status of

the study area.

Detail of Socio-economic status of the study area is given in

Chapter-3 Section 3.12, Page No. 95 to 110 of the EIA/EMP

report.

7) Impact and

Environment

Management Plan

(i) Assessment of ground

level concentration of

pollutants from the stack

emission based on site-

specific meteorological

features. In case the

project is located on a

hilly terrain, the AQIP

Modelling shall be done

using inputs of the

specific terrain

characteristics for

determining the potential

impacts of the project on

the AAQ. Cumulative

impact of all sources of

emissions (including

transportation) on the

AAQ of the area shall be

assessed. Details of

the model used and the

input data used for

modelling shall also be

provided. The air quality

contours shall be plotted

on a location map

showing the location of

project site, habitation

nearby, sensitive

receptors, if any.

Details are given in Chapter 4, Para 4.3., Page No. 114 to

121 of the EIA/EMP report.

(ii) Water Quality modelling -

in case of discharge in

water body

This is Zero Discharge project.

(iii) Impact of the transport of Proper mitigation measures will be taken so, there will be no

Page 15: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

xii

S.

No.

TOR points TOR Compliance

the raw materials and end

products on the

surrounding environment

shall be assessed and

provided. In this regard,

options for transport of

raw materials and finished

products and wastes

(large quantities) by rail or

rail-cum road transport or

conveyorcum- rail

transport shall be

examined.

impact of the transportation of raw materials on surrounding

environment.

Details are given in Chapter – 7, Para 7.8, page No. 182 to

186 of the EIA/EMP report.

(iv) A note on treatment of

wastewater from different

plant operations, extent

recycled and reused for

different purposes shall

be included. Complete

scheme of effluent

treatment. Characteristics

of untreated and treated

effluent to meet the

prescribed standards of

discharge under E(P)

Rules

Details of waste water treatment scheme is elaborated in

Chapter – 2, Para 2.9, Page No. 27 to 28.

Proposed waste water characteristics area tabulated below:

Inlet Characteristics Outlet Characteristics

Particulars Value Particulars Value

pH 6-7 pH More than 7

TDS 1800-2000 TDS Less than 2000

TSS 100-200 TSS Nil

COD 600-500 COD Less than250

BOD 40-45 BOD Less than 30

(v) Details of stack emission

and action plan for

control of emissions to

meet standards.

Multi- cyclone with dry scrubber will be installed at boiler

Details are given in Chapter – 2, Para, 2.9.2., Table 2.12,

Page No. 29.

(vi) Measures for fugitive

emission control

Details are given in Chapter – 2,Para 2.9.2.5, Page No. 32

(vii) Details of hazardous

waste generation and

their storage, utilization

and management. Copies

of MOU regarding

utilization of solid and

hazardous waste in

cement plant shall also be

Details is given in Chapter – 2,Table No.-2.13, Page No. 33

An agreement copy of TSDF is attached as Annexure XXII.

Page 16: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

xiii

S.

No.

TOR points TOR Compliance

included. EMP shall

include the concept of

waste-minimization,

recycle/reuse/recover

techniques, Energy

conservation, and natural

resource conservation.

(viii

)

Proper utilization of fly

ash shall be ensured as

per Fly Ash Notification,

2009. A detailed plan of

action shall be provided.

MOU with cement manufacturer will be obtain after grant of

EC.

(ix) Action plan for the green

belt development plan in

33 % area i.e. land with

not less than 1,500 trees

per ha. Giving details of

species, width of

plantation, planning

schedule etc. shall be

included. The green belt

shall be around the

project boundary and a

scheme for greening of

the roads used for the

project shall also be

incorporated.

Green belt action plan is given in Chapter-10, Para 10.5.8,

Table 10.3 Page No. 227 to 228 of EIA/EMP report.

(x) Action plan for rainwater

harvesting measures at

plant site shall be

submitted to harvest

rainwater from the roof

tops and storm water

drains to recharge the

ground water and also to

use for the various

activities at the project

site to conserve fresh

water and reduce the

water requirement from

Details is given in Chapter – 4, Para 4.5.5 Page no. 126 to

130 of EIA/EMP report.

Page 17: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

xiv

S.

No.

TOR points TOR Compliance

other sources.

(xi) Total capital cost and

recurring cost/annum for

environmental pollution

control measures shall be

included.

Total Capital Cost: 25 lacs/-

Total Recurring Cost-1.5 Lacs /-

Same is mentioned in Chapter No. 10, Table No. 10.1, Page

No. 223.

(xii) Action plan for post-

project environmental

monitoring shall be

submitted.

Action plan for post- project environmental monitoring is

mentioned in Chapter 6, Table No. 6.1 Page No. 145 to 147

of EIA/EMP report.

(xiii

)

Onsite and Offsite

Disaster (natural and

Man-made) Preparedness

and Emergency

Management Plan

including Risk Assessment

and damage control.

Disaster management

plan should be linked

with District Disaster

Management Plan.

Given Chapter – 7 para 7.9 Page No. 187 to 195 of EIA/EMP

report.

8) Occupational Health

(i) Plan and fund allocation

to ensure the

occupational health &

safety of all contract and

casual workers

Action plan for safety and health along with budget is given

Chapter – 7 para 7.10, Page No 195 to 197 of EIA/EMP

report.

(ii) Details of exposure

specific health status

evaluation of worker. If

the workers' health is

being evaluated by pre

designed format, chest x

rays, Audiometry,

Spirometry, Vision testing

(Far & Near vision, colour

vision and any other

ocular defect) ECG, during

pre placement and

periodical examinations

Action plan for safety and health is give Chapter – 7 para

7.11, Page No. 197 to 201 of EIA/EMP report.

Page 18: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

xv

S.

No.

TOR points TOR Compliance

give the details of the

same. Details regarding

last month analysed data

of above mentioned

parameters as per age,

sex, duration of exposure

and department wise.

(iii) Details of existing

Occupational & Safety

Hazards. What are the

exposure levels of hazards

and whether they are

within Permissible

Exposure level (PEL). If

these are not within PEL,

what measures the

company has adopted to

keep them within PEL so

that health of the workers

can be preserved,

Not Applicable

(iv) Annual report of health

status of workers with

special reference to

Occupational Health and

Safety.

Annual report of health status of workers with special

reference to Occupational Health and Safety will be submit at

the time of EC compliance.

9) Corporate Environment

Policy

(i) Does the company have a

well laid down

Environment Policy

approved by its Board of

Directors? If so, it may be

detailed in the EIA report.

Enclosed as Annexure XV.

(ii) Does the Environment

Policy prescribe for

standard operating

process / procedures to

bring into focus any

infringement / deviation /

violation of the

Yes, Incorporated in Chapter – 10, para 10.4, Page No. 225

of EIA/EMP report..

Page 19: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

xvi

S.

No.

TOR points TOR Compliance

environmental or forest

norms / conditions? If so,

it may be detailed in the

EIA.

(iii) What is the hierarchical

system or Administrative

order of the company to

deal with the

environmental issues and

for ensuring compliance

with the environmental

clearance conditions?

Details of this system may

be given.

Following is the hierarchical system or administrative order of

the company to deal with the Environmental issues and for

ensuring compliance with the EC conditions.

(iv) Does the company have

system of reporting of

non-compliances /

violations of

environmental norms to

the Board of Directors of

the company and / or

shareholders or

stakeholders at large?

This reporting mechanism

shall be detailed in the

EIA report

10) Details regarding

infrastructure facilities

such as sanitation, fuel,

restroom etc. to be

provided to the

labour force during

construction as well as to

the casual workers

including truck drivers

during

operation phase.

Local workers will be employed. Proper safe drinking water

facilities, toilets, driver restroom will be provided during

construction period as well as operation period.

Manager

Environment

Officer

Environment

Executive

Environment

Vice President- Operations

Mr. Vedanth M.P

Patner

Page 20: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

xvii

S.

No.

TOR points TOR Compliance

11) Enterprise Social

Commitment (ESC)

i. Adequate funds (at least

2.5 % of the project cost)

shall be earmarked

towards the Enterprise

Social Commitment based

on Public Hearing issues

and item-wise details

along with time bound

action plan shall be

included. Socio-economic

development activities

need to be elaborated

upon.

2 % of the project cost i.e. Rs 10,00000 /- will be spend under

CER as per MoEF&CC OM dated 01.05.2018.

Given in Chapter – 7, Table No 7.6 Page No 214 of EIA/EMP

report.

12) Any litigation pending

against the project and/or

any direction/order

passed by any Court of

Law against the project, if

so, details thereof shall

also be included. Has the

unit received any notice

under the Section 5 of

Environment (Protection)

Act, 1986 or relevant

Sections of Air and Water

Acts? If so, details thereof

and compliance/ATR to

the notice(s) and present

status of the case.

No litigation is pending against the project.

13) A tabular chart with index

for point wise compliance

of above TOR.

Complied

B. SPECIFIC TERMS OF REFERENCE FOR EIASTUDIES FOR PESTICIDES

INDUSTRY AND PESTICIDE SPECIFIC INTERMEDIATES (EXCLUDING

FORMULATIONS)

1. Commitment that no

banned pesticides will be

manufactured.

We as Popular Chemicals Manufacturers and Suppliers commit

that no banned pesticides will be manufactured. An affidavit

regarding this will be submitted at the time of presentation.

Page 21: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

xviii

S.

No.

TOR points TOR Compliance

2. Details on solvents to be

used, measures for

solvent recovery and for

emissions control.

No solvent will be used.

3. Details of process

emissions from the

proposed unit and its

arrangement to control.

Details are given in Chapter – 2,para 2.9.2.3 page 30-31 of

EIA/EMP report.

4. Ambient air quality data

should include VOC, other

process-specific

pollutants* like NH3*,

chlorine*, HCl*, HBr*,

H2S*, HF*,etc.,(*-as

applicable)

No pollutants like NH3, chlorine, HCl, HBr, H2S, HF,etc. will be

released from proposed project manufacturing process.

Details are given in Chapter – 3, Table 3.10, Page 48 to 50 of

EIA/EMP report.

5. Work zone monitoring

arrangements for

hazardous chemicals.

Details is elaborated in Chapter – 7, para 7.12.3 Page no.

203 to 204 of EIA/EMP report.

6. Detailed effluent

treatment scheme

including segregation of

effluent streams for units

adopting

'Zero' liquid discharge.

Details is elaborated in Chapter – 2, Para 2.9, Page No. 27 to

28 of EIA/EMP report.

7. Action plan for odour

control to be submitted.

Details is elaborated in Chapter – 4, Para 4.3.12, Page No.

120 of EIA/EMP report.

8. A copy of the

Memorandum of

Understanding signed

with cement

manufacturers indicating

clearly that they co-

process organic

solid/hazardous waste

generated.

Brick manufacturer agreement for use of fly ash will be

submitted at the time of EC presentation.

9. Authorization/Membershi

p for the disposal of

liquid effluent in CETP

and solid/hazardous

waste in TSDF, if any.

TSDF Agreement is enclosed as Annexure XXII.

Page 22: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

xix

S.

No.

TOR points TOR Compliance

10. Action plan for utilization

of MEE/dryers salts.

The facility does not have MEE, hence not applicable.

11. Authorization/Membershi

p for the disposal of

solid/hazardous waste in

TSDF.

TSDF Agreement is enclosed as Annexure XXII.

12. Details of incinerator if to

be installed.

No incinerator will be installed.

13. Risk assessment for

storage and handling of

hazardous

chemicals/solvents. Action

plan for handling & safety

system to be

incorporated.

Details is given in Chapter -7, Para 7.14 Page No. 207 to

212 o EIA/EMP report.

14. Arrangements for

ensuring health and

safety of workers

engaged in handling of

toxic materials.

Details is given in Chapter -7, Para 7.15 Page No. 212 to 213

of EIA/EMP report.

*********

Page 23: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

Annexure III Annexure II Annexure II

Page 24: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

Type your textType your textType your text

Annexure III

Type your textType your textType your text

Page 25: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

Type your text

I

Khyati Gaur
Typewritten Text
Annexure V
Page 26: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee
Page 27: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee
Page 28: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee
Page 29: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee
Page 30: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee
Page 31: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee
Page 32: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee
Page 33: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee
Page 34: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee
Page 35: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee
Page 36: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

S.No. Name of the product/ raw material

Physical State Product Consumption (MTPA)

Storage Mitigations

1. Aluminum Powder Solid Powder 35 Bags 1) Store away from all sources of heat, sparks and flammable things

2) Do not keep it in open 3) Keep the container tightly closed in a

cool, dry, well ventilated place 4) Proper grounding procedures to be

followed to avoid static electric charges.

5) To safely handle empty containers as residues vapors are flammable

2. White Phosphorous Solid 50.25 Bags 1) Keep the container tightly closed in a well ventilated area

2) Store it away from incompatible materials such as alkaline hydroxides, Halogens, Oxidizing agents as white phosphorous catches fire easily.

3. Groundnut Oil Liquid 0.5 Drums 1) Keep the container tightly closed in a dry, cool, well ventilated area away from incompatible materials such as strong oxidants

2) Store away from all sources of heat, flame and direct contact of sunlight

4. Paraffin Wax Solid 2.9 Bags 1) Keep the container tightly closed in a cool, dry, well ventilated area

2) Keep it away from all sources of heat and ignition as it is a flammable.

3) Ground all the equipments including metals

4) Store away from incompatibles such as oxidizing agents

5) Empty containers may pose a fire so to evaporate the residue under a fume hood

MITIGATION MEASURES DURING TRANSPORTATION

OF RAW MATERIALS

Annexure VI Annexure V

Page 37: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

5. Urea Solid 4.20 Bags 1) Keep the container tightly closed and store in a cool, dry area

2) Store it in a dust free area and away from incompatible materials such as strong oxidizing agents, liquid chlorine, calcium hypochlorite etc

3) Wear personal protective equipments as urea dust is harmful if inhaled.

6. Ammonium Carbamate Solid 19.50 Bags 1) Keep the container tightly closed in a cool, dry well ventilated place

2) To use proper personal protective equipments

3) Store away from all incompatible materials

4) Store away from all sources of ignition as its dust may remain in the empty container and may explode when comes in contact with fire

7. Zinc Stearate Solid 4.5 bags 1) Keep the container tightly closed in a cool, dry, well ventilated area

2) Avoid to store where dust is formed 3) Keep away from all sources of heat

and ignition 4) Store away from incompatibles such

as strong oxidizing agents, alkalis, peroxides, acids

8. Graphite powder Solid 5.80 Bags 1) Keep the container tightly closed in a dry, cool well ventilated area and store away from moisture and direct sunlight

2) Wear Personal protective equipments e.g. dust masks while handling powder to avoid inhaling of graphite dust.

Page 38: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/online/EC/...Ckm crusher 5.16 kms North East Cement bricks Sri ranga lakshmi solid blocks 3.48 kms North Coffee

9. Zinc Dust (powder) Solid 39.90 Bags 1) Keep the container in a well ventilated area

2) Keep away from moisture 3) Keep away from all sources of

ignition 4) Store away from incompatibles such

as strong oxidizing agents, acids and bases

10. Aluminum Phosphide Solid Bags 1) Store away from incompatibles such as water and oxidizing agents

2) Wear proper personal protective equipment’s while handling this chemical as it is highly poisonous & toxic material

3) Store it away from all flammable materials as this material can easily catch fire.

11. Zinc Phosphide Solid bags 1) Keep the container tightly closed in cool, well ventilated place.

2) Use proper PPEs while handling this chemical as it is a toxic powder.

3) Store it away from moisture and all sources of heat and ignition as this is hygroscopic and flammable solid.