© 2012 Autodesk
“Clash of The Design Teams” using Autodesk BIM 360 Glue & RevitJason Jones Jason WaddellPES Structural Engineers The Beck GroupBIM Program Manager BIM Manager
© 2012 Autodesk
Class Summary
In this case study we will provide insight into a web based workflow where the entire design team took responsibility in identifying, reporting, and resolving clashes against their discipline’s major systems. The team utilized Autodesk BIM 360 Glue and Autodesk Revit to achieve continuous clash reporting throughout the design process. This effort was affective in mitigating the mountain of clashes that can occur at the end of CD’s had the process not been implemented early and on a consistent schedule with all design disciplines. We will identify lessons learned including both pros & cons experienced with this workflow.
© 2012 Autodesk
Learning Objectives
At the end of this class, you will be able to: Obtain design team buy-in for this proactive workflow Understand key strategies for project setup in both Autodesk Revit & BIM
360 Glue Implement a Model Coordination process that involves the entire design
team Understand the roundtrip workflow of creating Clash reports in Autodesk
BIM 360 Glue & resolving the clash in Autodesk Revit.
© 2012 Autodesk
Design Team Buy-in
© 2012 Autodesk
Design Team Buy-in
Design Fee
Licensing
Training
Process Map
© 2012 Autodesk
Project Set Up
© 2012 Autodesk
Project Set Up
• File Naming Conventions• Revit Project and Shared Coordinates• Autodesk BIM 360 Glue
© 2012 Autodesk
Revit Coordinate System• Project Internal Coordinate• Shared Coordinate or Survey Point• Relative Coordinate
State Plane Coordinate SystemNAD 83
© 2012 Autodesk
Project Set Up: File Naming
© 2012 Autodesk
Project Set Up: Coordinate System
© 2012 Autodesk
Model Coordination Process
© 2012 Autodesk
Model Coordination Process
© 2012 Autodesk
Model Coordination Process
Authoring Model
Autodesk Revit 2013
Upload Revit Model to BIM 360
Glue via add in
Perform Clash Detection in BIM
360 Glue
Send Notification to Specific Design Team Discipline
Resolve Clash in
Autodesk Revit 2013
© 2012 Autodesk
Model Coordination Process - REVIT
Coordinate System
Send Model
3D View Set Up
BIM 360 Glue Add In
© 2012 Autodesk
Model Coordination Process – BIM 360 GLUE
Merge Models
Transform Coordinate System
Visually Inspect Model
Perform Clash Detection
Send Notification
© 2012 Autodesk
Model Coordination Process - REVIT
BIM 360 Glue Add In
View Filters for Efficiency
Resolve Clash
Upload to BIM 360 Glue
© 2012 Autodesk
Workflow Demonstration
© 2012 Autodesk
Workflow Demonstration
Run a Clash Report in BIM 360 Glue
Send a Notification From BIM 360 Glue
© 2012 Autodesk
Workflow Demonstration
Utilize View Filters in Revit to Isolate Clashing Elements
Resolve the Clash
© 2012 Autodesk
• Team Buy-in• BIM Execution Plan• Proper Coordinate System• Transform Models in BIM 360 Glue• Team Communication• Revit Filters
Take Aways / Lessons Learned
© 2012 Autodesk
Autodesk, AutoCAD* [*if/when mentioned in the pertinent material, followed by an alphabetical list of all other trademarks mentioned in the material] are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document. © 2012 Autodesk, Inc. All rights reserved.
Jason [email protected]
Jason [email protected]