PULL OFF TEST- Adhesion testing
Shear Stud Installation
Bearing Pads Pressure Grouting (15!12!10)
Steel Girder Fabrication- Part 2 (Steel Bridge)
Pot Bearing Intsallation Feb 11
Expansion Joint
Charpy v Notch Impact Test
BS 302 -1-1987 Stranded Steel Wire Ropes.pdf
Checklist Floor Finishing
Test Pile 2-1000mm-Bkt Siol Petra Jaya Kuching-ID
Fibre Carbon - Tensile Test (Unidirection)
Fibre Carbon Installation
In-situ Pull Off & Crack Sealing
Shanghai Building Collapes
Indonesian Bridge Collapses
Deck Slab Concreting- Aug 2011
Shrinkage Test- Result 90 Days
Marine Launching
Land Launching (Steel Erection)
Pre Fabricated Vertical Drain (PVD)