Www.southernplainsenergy.com. Go to: Fill in your username and password (you will be provided with...

Post on 30-Mar-2015

222 views 4 download

Tags:

Transcript of Www.southernplainsenergy.com. Go to: Fill in your username and password (you will be provided with...

SOUTHERN PLAINS ENERGY WELL TESTING SOFTWARE

(WTS)

www.southernplainsenergy.com

WTS Web Sign In

Go to: www.southernplainsenergy.com

Fill in your username and password (you will be provided with one)

Login

Desktop Version vs Web

DESKTOP VERSION WEBSITE VERSION

The desktop software and the web version have many similar features.

Desktop Version vs Web

Desktop Version

Desktop Version vs Web

Web Version

Desktop Version

The following slides depict what is available on the desktop version of WTS

It will be pointed out where it differs from the web version of WTS

“Circle”(Top Left Hand Corner)

Open Database Web To Desktop Sync

Update desktop database with web data

Desktop To Web Sync Sync new tests to web

Fix Desktop to Web Sync When tests are not syncing

properly to web Fix Web to Desktop Sync Login To Web

With provided username and password – need to login to sync to and from web

Web version only displays company databases

Main Tab

Test Date Span: Start Date End Date Enable Span

Well Tools: Search Multiple Tests

Determined based on date span selected

Sort Order Sorts the well tree

order by LSD, SEC, TWN, RNG

Main Tab

Test Data Settings: Column Picker

Can select or deselect columns displayed in main screen

Unit Settings: Display Flow,

Pressure, Diff Pressure, Temperature and Length in either Imperial or US units

Main Tab

Test Data Settings: Exports:

Generic Exports all information

displayed in main screen

Field Sheet Exports to a field sheet

designed by SPE Differs from desktop

and web versions. Web exports are unique to the company and can be added to (reports, csv files, etc)

Main Tab

Total Wells Shows total well

count for selected area/battery in date span set

Wells Tested Shows how many

wells tested Wells Not Tested

Show how many wells not tested

Well Tree Features

Show Tested Wells: Last ___ Day(s) Use Date Span This will mark all

tests in the well tree in green if they have been tested in the last __ days or the Date Span

Well Tree Features

Right Click on Area Name: Add Area Add Battery Rename Area Delete Area

Right Click on Battery Name: Add Well Rename Battery Delete Battery Cut Batter

Well Tree Features

Right Click on Well: Edit Well

LSD, Well Name, Description, Pool, AccCode, Custom Fields 1 4

Delete Well Cut Well Paste Test(s) Manual Test Test Well

Well Tree Features

Filters: Desktop:

Show Latest Test Per Well Displays according to

date span selected

Web: Show Latest Test Per

Well Show Spot Tests Show Unapproved

Tests Show No Tests

Conducting a Test

Find well testing, right click and “Test Well” or “Manual Test”

Manual Test Screen

Manual: Enter all numbers

manually, including flow rate

Calculated: Enter all numbers and

the program will determine the flow rate

No Test: Will zero out all

numbers (option to enter casing pressure still)

Test Well Screen

Test Well Screen

General Tab: Tester Name Test Time (Mins) Max Deviation

Test Well Screen

Flow Computer Settings:

CommPort Orifice Size Pipe Size Temperature: Auto /

Manual Atmospheric Pressure:

Auto / Manual Specific Gravity: Auto /

Manual Unit ID Read From Device Write To Device

Test Well Screen

Roc Calibration: Cold Restart Zero Diff

Test Well Screen

Test Data: Reads actual

numbers after a short delay (if not reading data or starting test, reads last test numbers)

Flow, Static Pressure, Diff Pressure, Temperature, Tubing and Casing Pressure, Comments and Fluid Levels

Test Well Screen

Pool (Gas Composition) Used for auditing

purposes Only enter if

needed

Test Well Screen

Connect Once CommPort has been determined

Read Instant Data Does not save any information

Start Test Save Test Discard Test

Admin Tab

Well Tools: Export

This is where you go to export a well list

Can sort and filter like main screen (described later)

Enabled: This selects tests that have not been tested during the selected date span

This function is not available on web

License Activation Tab

Activation: Time Remaining: __

Days This shows how long

is left with the current license key

Click on Time Remaining to get Computer Product Key and enter new License Key

Tab not used on web

Viewing Test Data

Once area/battery/well has been selected:

Columns – can be moved by clicking on header and dragging Sort by more than one

column by holding shift and clicking headers

∑ - Allows for column Sum, Avg, Max, Min, Count if able

- Allows for filtering for specific information Can specify for equal,

starts with, ends with, contains, less than, greater than, etc

Making Changes to Test Data

Correcting Test Data by right clicking on test (before syncing to web): Edit Pressures Edit Comments Edit Internal

Comments Add/Edit Tubing Fluid

Test Edit Production Hours Cut Test Delete Test

Making Changes to Test Data

Correcting Test Data On Web: This is set by the web administrator through

roles assigned to each username and password

Once data has been synced to the web, changes can only be made on the web

Administration Control

Questions / Comments

Vision We will be the leader in providing the Energy Industry

with Production Testing, and Optimization Services. We provide an excellent working environment for our team, growth and opportunity for ourselves, balance for our families and are proud contributors to our communities.

Mission We will exceed our clients’ expectations through excellence,

learning, and innovation.