Westerbork Netherlands Dedicated Gbit link Onsala Sweden Gbit link Jodrell Bank UK Dwingeloo DWDM...

Post on 18-Jan-2016

213 views 0 download

Transcript of Westerbork Netherlands Dedicated Gbit link Onsala Sweden Gbit link Jodrell Bank UK Dwingeloo DWDM...

WesterborkNetherlands

Dedicated

Gbit link

OnsalaSweden

Gbit link

Jodrell BankUK

DwingelooDWDM linkCambridge

UK

MERLIN

MedicinaItaly

Chalmers University

of Technolog

y, Gothenbur

g

TorunPoland

Gbit link

3rd EVN-NREN MeetingSteve Parsley, JIVE,

parsley@jive.nl

3rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28th January 2005

Outline

• Proof of Concept Project – Review of Progress• Timeline• Milestones• Connection status

• Next six months• FP6 IST proposal

3rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28th January 2005

Project Timeline

You are

here

Low data rate astronomy

Transatlantic real-time fringes

3rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28th January 2005

eVLBI Milestones (since 2nd EVN-NREN Meeting)

• January 2004: Disk buffered eVLBI session:• Three telescopes at 128Mb/s for first eVLBI image• On – Wb fringes at 256Mb/s

• April 2004: Three-telescope, real-time eVLBI session.• Fringes at 64Mb/s• First real-time EVN image - 32Mb/s.

• September 2004: Four telescope real-time eVLBI• Fringes to Torun and Arecibo• First EVN, eVLBI Science session

• January 2005: First “dedicated light-path” eVLBI• ??Gbyte of data from Huygens descent transferred

from Australia to JIVE• Data rate ~450Mb/s

3rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28th January 2005

3rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28th January 2005

3rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28th January 2005

http://www.jive.nl/ist2004/

3rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28th January 2005

Jodrell BankUK

OnsalaSweden

MedicinaItaly

TorunPoland

EffelsbergGermany

WesterborkNetherlands

Telescopes connections

JIVE

1Gb/s

1Gb/s

1Gb/s

155Mb/s

MERLIN

CambridgeUK

2.5Gb/s

1Gb/s

MERLINe

?????

3rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28th January 2005

Outline

• Proof of Concept Project – Review of Progress• Timeline• Milestones• Connection status

• Next six months• FP6 IST proposal

3rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28th January 2005

Next Six Months• Objectives

• Induction of Jodrell/Cambridge and Medicina when high speed links are ready.

• Expansion of the array to seven telescopes: Ar, Cm, Jb, Mc, On, Tr, Wb

• Higher data rates > PoC target of 512Mb/s.• Correlator/Mark5, eVLBI robustness issues.• eVLBI Logistics: FS and correlator-control

coordination for smooth operations.• Alternative protocol development and testing - viz.

work underway at Jodrell Bank and JIVE• Integration of Haystack e-VLBI products: VSI-E,

network monitoring tools.• Transatlantic eVLBI and dedicated light paths.

3rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28th January 2005

Next Six Months

• Dates for Scheduled e-VLBI tests and demos• 10 Feb - (not Onsala)• 11 March - (science demo)• 24 March• 28 April • 26 May• 7th July (not Onsala)

3rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28th January 2005

Science Demo – 11 March

• Cm, Jb,On, Wb, Tr, (Mc?)• Continuum source• 128Mb/s• First trial of “dynamic scheduling”:

• Test several sources for suitability• Observe brightest

….not possible with standard VLBI

3rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28th January 2005

Outline

• Proof of Concept Project – Review of Progress• Timeline• Milestones• Connection status

• Next six months• FP6 IST proposal (see separate presentation)

3rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28th January 2005

Thank you