Welcome to Ten at the Tops Upstate Professional …...2015/06/04  · GPATS 2035 LRTP Update |...

Post on 23-Jun-2020

0 views 0 download

Transcript of Welcome to Ten at the Tops Upstate Professional …...2015/06/04  · GPATS 2035 LRTP Update |...

Welcome to Ten at the Top’s

Upstate Professional Planners Meeting

Thursday, June 4th, 2015

www.tenatthetop.org twitter: @tenatthetop_sc #tattchat

Highway 123 & Highway 76

Interested Counties:

Anderson

Greenville

Oconee

Pickens

www.tenatthetop.org twitter: @tenatthetop_sc #tattchat

Keith Brockington

Greenville CountyGreenville-Pickens Area Transportation Study

www.tenatthetop.org twitter: @tenatthetop_sc #tattchat

US-123

Greenville to

SenecaKeith Brockington, AICP

Transportation Planning Manager

Greenville County | GPATS

US-123

US-123 Features

Heavy Urban Sections Academy St. – Greenville

123 Bypass – Easley

Calhoun Memorial Hwy – Clemson

Hwy 76/123 – Seneca

Rural Sections Greenville to Easley

Clemson to Seneca

Limited Access Highway Easley to Clemson

US-123 Traffic Concerns

Greenville and Easley Heavily built out Curb and Gutter with little/no shoulder Close land uses Unlikely to be widened without significant changes to

traffic flow GPATS project for US-123 in Easley on indefinite hold –

needs Access Management and Connectivity Plan/Implementation

Clemson and Seneca Less Traffic Concerns – Clemson to be assessed in next

GPATS LRTP

US-123

Land Use Concerns

Greenville

Downtown traffic getting worse

City focusing on Intersection Opperation

Almost fully built out west of Downtown, older residential

Redevelopment potential in future

Easley/Clemson/Seneca

US-123 bypasses Downtowns.

Big Box/Strip Commercial, many curb cuts

US-123

Next Steps

Continuously revaluated

GPATS LRTP

ACOG LRTP (Seneca)

Comprehensive Plans

Potential Future Coordination

GTA-Clemson Commuter Transit System

Clemson Area Transit Expansion

Land use changes as a result of urbanization

Michael Forman

Anderson County Planning & Community Development Manager

www.tenatthetop.org twitter: @tenatthetop_sc #tattchat

Art Holbrooks & Josh Stephens

Oconee County

www.tenatthetop.org twitter: @tenatthetop_sc #tattchat

Oconee County

Christopher Brink

Pickens County

www.tenatthetop.org twitter: @tenatthetop_sc #tattchat

Ten at the Top

Upstate Professional Planners MeetingJune 4, 2015

Pickens County

Department of Community Development

Chris Brink, AICP

Director

GPATS 2035 LRTP Update | Regional Travel Demand Model, Kimley-Horn & Associates, 2013

Contact Information

Chris Brink, AICP

chrisb@co.pickens.sc.us

(864) 898-5989

Jennifer Folz

City of Clemsonplanner

www.tenatthetop.org twitter: @tenatthetop_sc #tattchat

City of Clemson: US 123 & SC 76 Corridors

JENNIFER FOLZ, PLANNER

JUNE 4, 2015

34CITY OF CLEMSON: TEN AT THE TOP 2015

CITY OF CLEMSON: TEN AT THE TOP 2015 35

US 123 Corridor: Pedestrian Bridges

CITY OF CLEMSON: TEN AT THE TOP 2015 36

US 123 Corridor: Mid 1990s

CITY OF CLEMSON: TEN AT THE TOP 2015 37

CITY OF CLEMSON: TEN AT THE TOP 2015 38

US 123 & SC 76 Corridor: Architectural Review #3

Architectural Review Board

◦ Maximum 40ft Height

◦ Maximum 35ft Front Setbacks

◦ No parking in front of the buildings

◦ Monument signs required

◦ Extensive landscaping requirements

◦ Ingress/egress specifications

◦ Fenestration Requirements

◦ Material, color, articulation regulations

◦ Night Sky Lighting

◦ Shared parking

CITY OF CLEMSON: TEN AT THE TOP 2015 39

CITY OF CLEMSON: TEN AT THE TOP 2015 40

City of Clemson & Clemson University: Unprecedented Growth

2003-2014 Clemson University’s student body has grown 30%. ◦ High demand for high-density residential

close to CU Campus

◦ 2014 and 2024 Comprehensive Plan emphasize compact, mixed-use vertical development located along corridors.

◦ Protection of single-family neighborhoods

CITY OF CLEMSON: TEN AT THE TOP 2015 41

Source: Greenville News Online

US 123 Corridor: Today

Major renovations of existing structures: ◦ The Athletic Department

◦ Wendy's

◦ BB&T Bank/ Skins Hot Dogs

◦ Huddle House/Clemson Cleaners

◦ Smoothie King

◦ University Inn

◦ Tillman Place Hotel

New construction: ◦ AnMed Health

◦ Gateway Village (Publix)

CITY OF CLEMSON: TEN AT THE TOP 2015 42

US 123 Corridor: Landscape & Pedestrian Improvements

CITY OF CLEMSON: TEN AT THE TOP 2015 43

US 123 Corridor: Today

CITY OF CLEMSON: TEN AT THE TOP 2015 44

US 123 Corridor: Today

CITY OF CLEMSON: TEN AT THE TOP 2015 45

City of Clemson Streetscaping◦ Off-site signage is prohibited (no billboards)

◦ Tree plantings

◦ Street lights

◦ Way-finding signage

◦ Wider sidewalks

◦ Preferred planting garden

◦ More visible & more pedestrian friendly intersections

◦ Mast Arm Signals

Norfolk Southern Railroad Trestle Redesigned

CITY OF CLEMSON: TEN AT THE TOP 2015 46

US 123 Corridor: Today

US 123 Corridor: Tomorrow2024 Comprehensive Plan: ◦ Increase height on the north side of

US 123 to 65ft

◦ Work with SCDOT to resolve access management issues

◦ Emphasize shared ingress/egress and shared parking

◦ Multi-modal transit emphasis: Bicycle parking requirements, visible pedestrian routes, permanent bus stops

Update Architectural Review Guidelines

◦ Specific design manual

◦ Reduce Maximum Building Setback (35ft today)

Street Tree Bank

Updating Land Development Regulations

Eliminating Rear Setback for Railroad

Double frontage for property on Corp of Engineer (Lake Hartwell)

CITY OF CLEMSON: TEN AT THE TOP 2015 47

CITY OF CLEMSON: TEN AT THE TOP 2015 48

SC 76 Corridor

CITY OF CLEMSON: TEN AT THE TOP 2015 49

SC 76 Corridor: Today Major Construction: ◦ Clemson Center / Grandmarc at Clemson

◦ University Inn

CITY OF CLEMSON: TEN AT THE TOP 2015 50

SC 76 Corridor: Pacolet Milliken Plan

CITY OF CLEMSON: TEN AT THE TOP 2015 51

Group Discussion

www.tenatthetop.org twitter: @tenatthetop_sc #tattchat

Interstate 85

Interested Counties:

Anderson

Cherokee

Greenville

Oconee

Pickens

Spartanburg

www.tenatthetop.org twitter: @tenatthetop_sc #tattchat

Keith Brockington

Greenville CountyGreenville-Pickens Area Transportation Study

www.tenatthetop.org twitter: @tenatthetop_sc #tattchat

I-85 Congestion

Management

Study UpdateKeith Brockington, AICP

Transportation Planning Manager

Greenville County | GPATS

I-85 Congestion Management

Study Update

Joint Study between GPATS, SPATS, and SCDOT

Use of allocated funding for I-85 Improvements

MAP-21 Highway Authorization allows for use of Interstate Funds to be spend on identified “Parallel Relief Corridors”

US-29 identified as I-85 reliever

US-146/296 as alternative reliever

I-85 Congestion Management

Study Update

US-29

SC-146/296

I-85

I-85 Congestion Management

Study Update Stakeholder meetings have occurred since late

2014 Greenville County/City

Spartanburg County/City

Greer

GPATS/SPATS

ACOG

GTA/SPARTA

Upstate Forever

SCDOT

RFP Underway to site/design specific infrastructure improvements

I-85 Congestion Management

Study Update

Funding: $223,880,000 in GPATS TIP

I-85 Widening from US-25 to SC-129

Includes funding for Congestion Management on I-85 and US-29

Signal Timing/Upgrades for US-29

Congestion Relief

Park and Ride Lots for I-85 and US-29

Carpool/Vanpool and Transit Support

Truck Parking Facility

Safety and Air Qualify Improvements

I-85 Congestion Management

Study Update

Next Steps

Selection of Consultant

Completion of Study with Stakeholders support.

Implementation with approved funding.

Potential Future Coordination

Integration with Greenville TIGER Project

Expansion of Transit Systems

Southeast High-Speed Rail

Group Discussion

www.tenatthetop.org twitter: @tenatthetop_sc #tattchat

Thank you for attending the

Upstate Professional Planners Meeting

Thursday, June 4th, 2015

www.tenatthetop.org twitter: @tenatthetop_sc #tattchat