TAUTWIRE

SS1SURV CT01

2720

2900

ROVCONTROL CABIN

TIGER 347ROV

CONTROL CABINTIGER 871

ROV

ROV

\ \ \

BUREAU VERITAS Section ....................22432K

VU avec observationsSingapore, 04-May-2017

[Electronic document] The plan approval office Ref : SPO/17/01353

LPO 1257169 :Complement stated as 70 . This to be divided in to maximum number of special personnel and crew.

LPO1259327 (Note) :Document has been reviewed on following modification work scope.- Only additional berth from single to double berth.- Install Bed lights of the additional berth.- Additional LSA(to be reviewed on fire control and life saving plan)

LPO1258153 : a new lightweight estimate report to be submitted for record.