VU avec observations - Miclyn Express Offshore€¦ · 2017-07-11 · CONTROL CABIN TIGER 871 ROV...

1
TAUT WIRE SS1 SURV CT01 2720 2900 ROV CONTROL CABIN TIGER 347 ROV CONTROL CABIN TIGER 871 ROV ROV ? ? ? BUREAU VERITAS Section .................... 22432K VU avec observations Singapore, 04-May-2017 [Electronic document] The plan approval office Ref : SPO/17/01353 LPO 1257169 :Complement stated as 70 . This to be divided in to maximum number of special personnel and crew. LPO1259327 (Note) : Document has been reviewed on following modification work scope. - Only additional berth from single to double berth. - Install Bed lights of the additional berth. - Additional LSA(to be reviewed on fire control and life saving plan) LPO1258153 : a new lightweight estimate report to be submitted for record.

Transcript of VU avec observations - Miclyn Express Offshore€¦ · 2017-07-11 · CONTROL CABIN TIGER 871 ROV...

Page 1: VU avec observations - Miclyn Express Offshore€¦ · 2017-07-11 · CONTROL CABIN TIGER 871 ROV ROV? ?? BUREAU VERITAS Section .....22432K VU avec observations Singapore, 04-May-2017

TAUTWIRE

SS1SURV CT01

2720

2900

ROVCONTROL CABIN

TIGER 347ROV

CONTROL CABINTIGER 871

ROV

ROV

\ \ \

BUREAU VERITAS Section ....................22432K

VU avec observationsSingapore, 04-May-2017

[Electronic document] The plan approval office Ref : SPO/17/01353

LPO 1257169 :Complement stated as 70 . This to be divided in to maximum number of special personnel and crew.

LPO1259327 (Note) :Document has been reviewed on following modification work scope.- Only additional berth from single to double berth.- Install Bed lights of the additional berth.- Additional LSA(to be reviewed on fire control and life saving plan)

LPO1258153 : a new lightweight estimate report to be submitted for record.