Mark Bew MBEChairman – UK BIM Task Group

ICE BIM Conference 2016Mark Bew MBE

Chairman – Digital Built Britain

UK Government – Building A New World

Introduction

► Where did we start?► Where are we now?► Where are we going?

Introduction

► Where did we start?► Where are we now?► Where are we going?

1934 1944 1994 1998 2015

1934

. Rea

chin

g fo

r

the s

kies.

Alfred

Bosso

m.

1944

. Sim

on R

epor

t,

Plac

ing

and

Manag

emen

t of B

uild

ing

Contra

cts.

1994

. The

Lat

ham

Repo

rt, C

onst

ruct

ing

the

Team

. 1998

. The

Ega

n

Repor

t, Re

thin

king

Const

ruct

ion.

201

5. G

eorg

e

Osbo

urne

Fixi

ng

the

foun

datio

ns:

Crea

ting

a m

ore

pros

pero

us n

atio

n

Since 1934 c70 reports have been issued on UK construction efficiency

2011

Constant Search for Improvement

2016

Leve

l 2 -

3

Level 2 BIM – Part of a Bigger Picture

► Benchmarking► Procurement Methods► Government Soft Landings► DfMA / Manufacturing► Intelligent Client► Fiscal Constraint► Increasing Productivity

Level 2 – Beginning of the Journey

Concept Design Build Operate Organisational Business Operation

Function 1

Function 2

Function 3

Function n

Social Outcomes

Organisational Performance Multiplied through portfolios

Social Performance Multiplied through society

Operations/Facilities

Management

Level 2

Level 3

Level 4

Design Build

Push & Pull

1

2

3

4

5

N

N

N

MC

LD

E

S

ME

ME

Tier 1Tier 2Tier 3Tier N

E

S

Portfolio Mgt

PPM

PUSH SIDE – SUPPLY CHAIN PULL SIDE - CLIENT

MAC1

MAC2

E

P

OPS

Push Pull

Level 2 – Beginning of the Journey

Concept Design Build Operate Organisational Business Operation

Function 1

Function 2

Function 3

Function n

Social Outcomes

Organisational Performance Multiplied through portfolios

Social Performance Multiplied through society

Operations/Facilities

Management

Level 2

Level 3

Level 4

Design Build

► PAS1192:2 Capital Delivery► PAS1192:3 Operational Delivery► BS1192:4 Data Structure► Data Classification► Digital Plan of Works (Levels of Data Detail)► PAS1192:5 Security► BIM Contract Protocol► Government Soft Landings

Level 2 - Manufacturing

www.bim-level2.org/en/guidancewww.constructionprducts.org.uk

Level 2 – BIM Toolkit

https://toolkit.thenbs.com/

Level 2 – Going Forward

Level 2 Achievements

Level 2 Achievements

NBS Survey Suggested 48% of respondents said that were aware and using BIM

Everett Rogers’ standard adoption curve. This follows a normal distribution curve where the ‘Innovators’, ‘Early Adopters’ and ‘Early Majority’ rapidly move to a new innovative technology to a point where its use is found within half of the population. Adoption then slows for a while as the ‘Late Majority’ join, followed by the ‘Laggards’.

BIM Uptake

New Building Magazine Survey Now States c54% using BIM

Level 2 Achievements

Level 2 Achievements

“I am, for example, frankly astonished that all Departments got themselves “BIM ready” by this year’s deadline”

“I think the amount of progress made is nothing short of spectacular”

Level 3 – Functional Improvements

http://digital-built-britain.com/

What is BIM?

Level 3 – Functional Improvements

► You cannot change an industry by exhortation and waving your arms around. Instead, change comes from changing the drivers of the businesses that make up the industry – and, even in an industry as reactive as construction, one of those drivers has to be the preferences and demands of customers.

► BIM expands from 3D modelling to genuine collaboration; from design and construction into operations; from individual buildings to cities and their systems; and onto wherever digitising the built environment may take us.

► Lack of a feedback loop by which lessons can be learned on one project and applied on the next, so that user experience is properly represented at the inception of a project.

Level 3 – Measurement & Feedback

Function 1

Function 2

Function 3

Function n

Organisational Performance Multiplied through portfolios

Social Performance Multiplied through society

Operations/Facilities

Management

Level 2

Level 3

Level 4

Design Build

Level 3 – The Next Steps

Concept Desig n Build Operate Organisational Business Operation

Function 1

Function 2

Function 3

Function n

Social Outcomes

Organisational Performance Multiplied through portfolios

Social Performance Multiplied through society

Operations/Facilities

Management

Level 2

Level 3

Level 4

Design Build

Level 3

► Provide more for less► Maximise availability► Reduce whole life cost and carbon► Enable significant domestic and international growth► Ensure the UK remains in the international vanguard► Ensure security

Culture Commercial

Technical

Level 2 – Data Management

Capital Delivery Operational Processing

1 2 3 4 5 N N N

Portfolio Mgt

PPM

IPData

OccData

Dependency Analytics

Building Information Modelling Asset Operations Management

© Bew 2013Open Data - data.gov

Design & Construction Operation & Maintenance

Portfolio Management

Smart City

Strategy

Portfolio Management

Smart Grid

Strategy

Level 2 – Data Management

Level 3 – Data Management

Level 3 – Hard LandingsLevel 3 – Data Management

Dependency Analytics

Asset Operations Management

Open Data - data.gov

Maintenance

Portfolio Management

Smart City

Strategy

Portfolio Management

Smart Grid

Strategy

InteroperableCross Sector Smart Cities &

Grids

Red titles indicate integration with existing sector “Industrial

Strategies”

Open Source & Data toEncourage innovation and

growth in the technology, HPC and Build Environment Markets

Performance Management

Operational Activity

Building Information Modelling

© Bew 2013

Design & Construction

Portfolio Management

Smart City

Strategy

Capital Delivery

5 N N N IPData

OccData

4 3 2 1 0

Asset Performance Management

Operation & Performance

X

Key

Formal Data Exchange

Key Business Driver(Decision)

Level 3 – Smart – BIG?

Applications

Applications

Remote Patient Monitoring Market To Double By 2016

www.Level2BIM.org www.bimtaskgroup.org www.digital-built-britain.com