TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23

STATUS TRD COOLINGSTATUS TRD COOLING

TRD STATUS MEETING August 2007TRD STATUS MEETING August 2007

TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23

• Pressure sensors/relief valves:•Available•Pre-Assembly needs to be done (end of August?)•Installation needs to be done

• Improvement/modification of the cooling plant•Add an alarm on the total flow. Will be done by the cooling group. 2-3 weeks because of holidays.

• Remote control.• Jorge managed to connect to PLC• A. Agustinus will provide generic framework end of August

TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23

Status of remote controlStatus of remote control

TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23

Status of remote controlStatus of remote control

TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23

• Test with SM-mockup:•Being assembled ( finished end of next week)•Star test @CERN in all sectors on week 34

TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23

PipesPipes

4315 bended pipes ready to be gluedpipes glued for ~2 SM in Muenster+~1.3 in HD

TRD MEETING@CERN August 2007 A. Marín (GSI) 04/18/23

Thermal ScreenThermal Screen

Connections at cooling plant ready