GSM RNP Work Flow Introduction1 Introduction
This article was compiled according to NTS GSM RNP project. This workflow is from client requirements to site on air. 2 RNP Work Flow
3 Work Flow detail introduction001 Client Requirements Analysis
Purpose:
Comprehend the demands from client (include work content&division, output standards, ATP, networks performents, etc)
002 Population Information Collect& 003 Geography Information Collect
Purpose:Collect the population division map and know about the clutter of different area. Collect the coverage target and the radio environments.004 Market Analysis
Purpose:
According to the analysis of the tele-communication developments, know about the market information005 Traffic PredictionPurpose:
Forecast the number of subscribers in certain period and the traffic model and output polygon definition based on 002 & 004.006 Coverage Target and Polygon Define/Check
Purpose:
Divide the coverage area to different polygon such as CBD, Denseurban, urban, highway and rural based on 003 & 004. And check the definition by survey some area(or google earth)007 Traffic Distribution Prediction
008 Potential Site Survey
Purpose:
Select the potential PROPERTY from friend company or operation as much as possible to lower the cost of CME. (This property maybe our final candidate.)009 Downlink Background Noise Test & 010 Downlink Interfere InspectPurpose:
To clean the frequency of client,011 CW Test
Purpose:
To get proper propagation model of every type of area.
012 Key Area Survey
013 Ling Budget
Purpose:
To calculate the coverage radium in different area014 Nominal Sites Planning
Purpose:
Base on 007 012 & 013 , design the nominal site location and configure.
015 Capacity Configuration Analysis
Purpose:
Check the site configure with 007 by simulation software
016 Economy Analysis & 017 Compile Feasibility ReportPurpose:
Check the designs feasibility from economy aspect
018 Simulation
019 Nominal Site Pre-Survey
020 Confirm Search Ring
Purpose:
Decompose the networks to single site, to make survey engineer easy to select suitable candidateWhat does Client want GCI do?
Will be used to check the capacity
_1227625039.vsd
GSM New Radio Networks Planning General Work Flow
Nominal Planning
RF Networks Plan
001 Client Requirements Analysis
002 Population Information Collect
003 Geography Information Collect
004 Market Analysis
005 Traffic Prediction
006 Coverage TargetPolygon Define/Check
007 Traffic Distribution Prediction
008 Potential Site Survey
009 Downlink Background Noise Test
011 CW Test
010 Downlink Interfere Detect
012 Key Area Survey
013 Link Budget
014 Nominal Sites Planning
015 Capacity Configuration Analysis
016 Economy Analysis
017 Compile Feasibility Report
018 Simulation
019 Nominal Site Pre-Survey
iterative
020 Confirm Search Ring
021 Compile Preliminary RNP Report
026 Nominal Sites Re-planning
Candidate Negotiation(Sitac Team)
022 Candidate Validation in field
023 Candidate Uplink Interfere Test
024 Uplink Interfere Detect
025 Candidate Integrative Estimatation
027 difficult site simulation & DT
Qualified Candidate Tenancy(Sitac Team)
Candidate Re-select
028 Site Construction Survey&Design
029 BSC Switch Center Construction Survey
030 Drawing
031 Frequency Planning and RF Parameter Design
032 Compile Construction Design Report
Construction & Launch(CME)
033 Schedule of Startup
Site on air