GSM RNP Work Flow Introduction 1 Introduction This article was compiled according to NTS GSM RNP project. This workflow is from client requirements to site on air. 2 RNP Work Flow

description

s

Transcript of Training001- RNP Workflow

GSM RNP Work Flow Introduction1 Introduction

This article was compiled according to NTS GSM RNP project. This workflow is from client requirements to site on air. 2 RNP Work Flow

3 Work Flow detail introduction001 Client Requirements Analysis

Purpose:

Comprehend the demands from client (include work content&division, output standards, ATP, networks performents, etc)

002 Population Information Collect& 003 Geography Information Collect

Purpose:Collect the population division map and know about the clutter of different area. Collect the coverage target and the radio environments.004 Market Analysis

Purpose:

According to the analysis of the tele-communication developments, know about the market information005 Traffic PredictionPurpose:

Forecast the number of subscribers in certain period and the traffic model and output polygon definition based on 002 & 004.006 Coverage Target and Polygon Define/Check

Purpose:

Divide the coverage area to different polygon such as CBD, Denseurban, urban, highway and rural based on 003 & 004. And check the definition by survey some area(or google earth)007 Traffic Distribution Prediction

008 Potential Site Survey

Purpose:

Select the potential PROPERTY from friend company or operation as much as possible to lower the cost of CME. (This property maybe our final candidate.)009 Downlink Background Noise Test & 010 Downlink Interfere InspectPurpose:

To clean the frequency of client,011 CW Test

Purpose:

To get proper propagation model of every type of area.

012 Key Area Survey

013 Ling Budget

Purpose:

To calculate the coverage radium in different area014 Nominal Sites Planning

Purpose:

Base on 007 012 & 013 , design the nominal site location and configure.

015 Capacity Configuration Analysis

Purpose:

Check the site configure with 007 by simulation software

016 Economy Analysis & 017 Compile Feasibility ReportPurpose:

Check the designs feasibility from economy aspect

018 Simulation

019 Nominal Site Pre-Survey

020 Confirm Search Ring

Purpose:

Decompose the networks to single site, to make survey engineer easy to select suitable candidateWhat does Client want GCI do?

Will be used to check the capacity

_1227625039.vsd

GSM New Radio Networks Planning General Work Flow

Nominal Planning

RF Networks Plan

001 Client Requirements Analysis

002 Population Information Collect

003 Geography Information Collect

004 Market Analysis

005 Traffic Prediction

006 Coverage TargetPolygon Define/Check

007 Traffic Distribution Prediction

008 Potential Site Survey

009 Downlink Background Noise Test

011 CW Test

010 Downlink Interfere Detect

012 Key Area Survey

013 Link Budget

014 Nominal Sites Planning

015 Capacity Configuration Analysis

016 Economy Analysis

017 Compile Feasibility Report

018 Simulation

019 Nominal Site Pre-Survey

iterative

020 Confirm Search Ring

021 Compile Preliminary RNP Report

026 Nominal Sites Re-planning

Candidate Negotiation(Sitac Team)

022 Candidate Validation in field

023 Candidate Uplink Interfere Test

024 Uplink Interfere Detect

025 Candidate Integrative Estimatation

027 difficult site simulation & DT

Qualified Candidate Tenancy(Sitac Team)

Candidate Re-select

028 Site Construction Survey&Design

029 BSC Switch Center Construction Survey

030 Drawing

031 Frequency Planning and RF Parameter Design

032 Compile Construction Design Report

Construction & Launch(CME)

033 Schedule of Startup

Site on air