Post on 07-Apr-2020
© Ziff Energy Group / Gas Processing Management Inc., 201212ZG-1501-30
Tight Gas & Duvernay GrowthResource & Infrastructure Analysis
Presented by: Bill Gwozd, P.Eng., VP, Gas Services, Ziff Energy Bill Armstrong, P.Eng., Principal, GPMi
Prepared by: R.N. (Bob) Child, P.Eng., Principal, GPMi
November 14, 2012
1) Processing CH2S, CO2, C2 & NGL2) Duvernay Production to 20203) Operational and Cost4) Transportation
GPAC/PJVA Joint Conference
Slide 2 © Ziff Energy Group / Gas Processing Management Inc., 201212ZG-1501-30
Gas and NGL Studies
• Started Summer 2010
• Strong Client Support
• Huge Industry Savings
• Long Term Planning
Slide 3 © Ziff Energy Group / Gas Processing Management Inc., 2012
NGL Pipeline System
12ZG-1501-30
Slide 4 © Ziff Energy Group / Gas Processing Management Inc., 2012
Small NGL Takeaway Pipelines
12ZG-1501-30
Slide 5 © Ziff Energy Group / Gas Processing Management Inc., 2012
Natural Gas Infrastructure
12ZG-1501-30