Tight Gas & Duvernay Growth...Aðta6as lift PM P.Eng_ Northern BC & AB Tight Gas Growth Shale Gas &...

Post on 07-Apr-2020

1 views 0 download

Transcript of Tight Gas & Duvernay Growth...Aðta6as lift PM P.Eng_ Northern BC & AB Tight Gas Growth Shale Gas &...

© Ziff Energy Group / Gas Processing Management Inc., 201212ZG-1501-30

Tight Gas & Duvernay GrowthResource & Infrastructure Analysis

Presented by: Bill Gwozd, P.Eng., VP, Gas Services, Ziff Energy Bill Armstrong, P.Eng., Principal, GPMi

Prepared by: R.N. (Bob) Child, P.Eng., Principal, GPMi

November 14, 2012

1) Processing CH2S, CO2, C2 & NGL2) Duvernay Production to 20203) Operational and Cost4) Transportation

GPAC/PJVA Joint Conference

Slide 2 © Ziff Energy Group / Gas Processing Management Inc., 201212ZG-1501-30

Gas and NGL Studies

• Started Summer 2010

• Strong Client Support

• Huge Industry Savings

• Long Term Planning

Slide 3 © Ziff Energy Group / Gas Processing Management Inc., 2012

NGL Pipeline System

12ZG-1501-30

Slide 4 © Ziff Energy Group / Gas Processing Management Inc., 2012

Small NGL Takeaway Pipelines

12ZG-1501-30

Slide 5 © Ziff Energy Group / Gas Processing Management Inc., 2012

Natural Gas Infrastructure

12ZG-1501-30