CONSTRUCTORA TRICAM LTDA.

OBRA: GM CUREPTO

Fecha M3 Transportado M3 Totales Transportados

05-ene-15   8 8

06-ene-15   66 74

07-ene-15   30 104

08-ene-15   24 128

09-ene-15   182 310

10-ene-15   80 390

11-ene-15   0 390

12-ene-15   359,5 749,5

13-ene-15   263 1012,5

14-ene-15   418,5 1431