Technology-Phoenix Project

Progress – IFAS Human Resources/Payroll

Payroll Continuing to add employees and

full time faculty into the IFAS Payroll test runs

Workflows/Reports• Completed the development of

the Position Request workflow

2

Technology-Phoenix Project

Progress – Banner Student System

DegreeWorks Upgraded DegreeWorks

Trained IT Services staff on DegreeWorks

Installed DegreeWorks in production

3

Technology-Phoenix Project

Look ahead to next quarter

IFAS – Human Resources and Payroll

Continue testing IFAS Payroll

Develop training guides for Position Request workflow and plan launch

4

TECHNOLOGY AND INSTRUCTIONAL EQUIPMENT MODERNIZATION

5

Technology and Instructional Equipment

ModernizationTechnology Advisory Committee (TAC) Recommended: 14 projects for close to $430K

– 181 computers for ARC and CE classrooms ($173K)– 8 document cameras for classrooms ($5K)– iSTAN simulation manikin ($78K)– 2 classroom smart podiums ($37K)– Polaris integrated library system ($58.5K)– Wireless lock access control system($57K)

6

7

iSTAN Manikin

Technology and Instructional Equipment

ModernizationLook ahead to next quarter

42 computers for CAD lab Accessibility software & netbooks

for LAP Offset press infrared dryer for

campus graphics

8

VOICE OVER INTERNET PROTOCAL (VOIP) TELEPHONE SYSTEM

9

VOIP Telephone ProjectProgress –

Held 63 meetings to identify the call handling requirements for each area/department

Trained 450 users in 62 classes Cut over 17 buildings to new

phone system

10

VOIP Telephone ProjectLook ahead to next quarter

Cut over remaining buildings to new phone system 7/11: G, K-annex, H, L, N-Annex, R2, S, S2

7/31: A

8/13: B, J, P, Q, R, Z, and PCPA Box Office

Implement remaining services E911, Paging, Speech Recognition, Fax

Server, Call Accounting Reports, Conference Bridge

11

VOIP Telephone Project

• Copper Cable Upgrade• Install new copper wire in exiting

conduit• Install new conduit and copper to

building D• Install new conduit and copper

from L to NE corner of parking lot 8

July 17 – Select contractorDec 2012 – Complete project

12

THANK YOU