Swagelining & Pipe Bursting Presentation Murphy Pipelines … · 2018-06-12 · 7uhqfkohvv...

Post on 20-Feb-2020

2 views 0 download

Transcript of Swagelining & Pipe Bursting Presentation Murphy Pipelines … · 2018-06-12 · 7uhqfkohvv...

Pipe Bursting & Compression Fit HDPE Pipe LiningWater & Sewer Replacement

2-inch through 65-inch

AGENDA

Open Cut vs Trenchless Approach

Murphy Pipelines

MPC Trenchless Technologies Compression Fit HDPE Lining System Static Pipe Bursting Manhole to Manhole Gravity Sewer Pipe Bursting

History Infrastructure Replacement

Traditional Open-Cut / Direct Bury

History Infrastructure Replacement

Trenchless Definition

Trenchless technologya type of subsurface construction work that requires few trenches or no continuous trenches. It is a rapidly growing sector of the construction and civil engineeringindustry. It can be defined as "a family of methods, materials, and equipment capable of being used for the installation of new or replacement or rehabilitation of existing underground infrastructure with minimal disruption to surface traffic, business, and other activities."

Open Cut vs. Trenchless

An estimated 75% of infrastructure replacement/rehabilitation is done utilizing open cut vs 25% trenchless technologies.

Digging of open trenches is a common practice for laying of almost all underground utility services

Growing Cities have continued hurdles with vehicular traffic and environmental challenges

Installation Methods Comparison

Open Cut installation• Huge Restoration Cost• Impacts Communities and Business• Extended Construction Time• Adverse Environmental Impact

“Happy Communities Make Happy Politicians”

Trenchless Methods Reduce• Project Cost• Business Interruption Cost• Construction Time• Political Cost

Murphy Pipelines Florida History

HQ in Jacksonville Florida 1999 worked with FDEP on approval of pre-

chlorination 2016 opened South Florida office to support local

municipalties– Richard Crow, South Florida Manager

South Florida Clients Sunrise Fort Lauderdale Tamarac Boynton Beach Hollywood

North Miami Beach FKAA Hallandale Beach Wilton Manors

Team

Andrew Mayer - President Key member of British Gas in the development of pipe

bursting/Swagelining

Over 36 plus years of experience in consulting, design and construction of underground utilities throughout Europe, Asia, Middle East and North America

Board of Directors: International Pipe Bursting Association and NASSCO Water Advisory Panel

AWWA Chairman’s Award winner - 2002

Underground Construction Technology Association “Most Valuable Professional” Award winner - 2010

Over 150 years of combined Trenchless experience

Trenchless Design– Design Build

– Feasibility study

– Cost analysis

– Evaluation of replacement / refurbishment alternatives

– Engineering

Trenchless Construction– Compressed Fit HDPE

Pipe Lining (Swagelining)

– Slip lining

– Static pipe bursting

– Module (MH to MH) pipe bursting

– Pre-chlorinated Pipe bursting

– Pipe splitting

MPC ServicesFor 2” through 65” Water & Sewer Replacement

United Kingdom – British Gas Development of Swagelining & Pipe bursting in 1970’s

Pipe Bursting & Swagelining History

History– Methods developed by British Gas (1970’s) and patented for

gas distribution

– Success led to potable water crossover

– Pipe bursting – 100,000,000 feet installed in past 32 years

– Pre-chlorinated method approved by Florida DEP in conjunction with AWWA in 1999

– Swagelining - 29,800,000 feet installed in the past 32 years

Today– Over 85% of water mains replaced via pre-chlorinated pipe

bursting across Europe

– AWWA M28 approved pre-chlorination process

MPC Technologies

Compression Fit HDPE Pipe lining Process

Compression Fit HDPE Pipe lining Process

Compression Fit HDPE LiningEngineering Value

– Follows path of existing utility

– Maintains or slightly increases flow

– Install HDPE pipe that is Solution to the Problem

Fully structural HDPE (Class IV plus)– Design for both Internal Pressures and External Loading

– Full “Stand-Alone” Capability

Semi structural HDPE

Thin walled HDPE

Compression Fit HDPE LiningConstruction Value

– Insertion lengths up to 5,000 feet

– Pipe sizes of 4” through 65” Static Pipe Bursting most suitable 4” through 16” Water Transmission & Sewer Force Mains most suitable 16”

through 65”

– Negotiates field bends

– Surgical excavations of 92% less than open cut

– Environmentally sensitive

– Undertake projects year round

– Social costs reduced

Compression Fit Installation –Preparation of Host Pipe

Camera/man entry inspection

Cleaning

Proving pig sent through host pipe to ensure free bore path

Compression Fit Installation –Butt Fusion

Sections of HDPE pipe are butt fused together

External bead removed

Compression Fit Installation -Shuttle Rods through host pipe

Compression Fit Installation –Attach pipe once rods reach entry pit

Compression Fit Installation –Reducing Die

HDPE pipe has an OD slightly larger than the ID of the pipe to be renewed

Pipe is pulled through a reduction die which temporarily reduces its diameter

Compression Fit Installation –Rods recovered at exit pit

Rods are removed from the exit pit as pipe is pulled into place

For the next pull the exit pit becomes new entry pit

Compression Fit Installation –HDPE enters receiving pit

Pulling force removed

Natural relaxation of HDPE

90% of reversion occurs in 2 hours

Remaining reversion occurs overnight

Compression Fit Process –Results

No gaps - all annular space is eliminated

Fully structural pipe

Interactive pipe

Thin walled liner

Compression Fit Installation –Final Connections

Advanced Engineered Solution

Follows existing utility path

Provides largest Internal Diameter possible

Long pull lengths

Rapid installation

Cost effective

Solution to problem

Long term design life

Rural areas – environmentally friendly

Urban areas – reduced social costs

Compression Fit Case Study Fully Structural

Gulf Coast Water Authority, Texas 6,800 feet of existing 39”

PCCP Water Transmission Main

Swagelining selected over slip lining due to 4.45” larger ID

DR 17 HDPE PE 4710 selected through liner system design

1,250’ to 2,100’ installations distances

Awarded 2014 Trenchless Project of the Year

Case Study New Orleans Sewerage & Water Board

Case Study New Orleans Sewerage & Water Board

Case Study Fort Lauderdale 30-inch Sewer Force Main Replacement

Emergency Design-Build

Fort Lauderdale, FL Project located

through downtown urban areas

22,400 feet of existing 30” Ductile Iron & Cast Iron Sewer Force Main

60% Swagelining, 30% Directional Drill, 10% open cut

Phase 1 – 3 fast track 6 month schedule

Phase 4 completion Q1 in 2018

Case Study Fort Lauderdale 30-inch Sewer Force Main Replacement

Emergency Design-Build

Case Study Fort Lauderdale 30-inch Sewer Force Main Replacement

Emergency Design-Build

Static Pipe Bursting – Push out rod

Static Pipe Bursting – Push out rod

Pipe Bursting Setup –Attach tooling and pipe

Pipe Bursting Setup – Pull back

Pipe Bursting Process – Pull back

Pre-chlorinated

Pipe

Hydraulic unit pulls rod,

expander and pipe through existing line Ductile Slitter

New service lines bored with piercing tools

Pre-chlorinated Pipe burstingEngineering Value

– Follows path of existing utility Reduces potential for 3rd party utility damage Eliminates identifying new easements Engineering design hours reduced

– Ability to increase pipe diameter – Replacement vs. Rehabilitation

Life Cycle Cost Analysis HDPE has design life of 100 plus years

– Many states do not require permits Classified as line maintenance

Pre-chlorinated Pipe burstingConstruction Value

– Production rate of 300 – 600 feet per day– Crew visible to homeowners for one day– Surgical excavations along project with a reduction in

restoration up to 86% Compact equipment 90% reduction in carbon outputs Environmental sensitive areas not impacted

– Limits change orders– Social costs reduced as process enables better traffic

flow, less intersection closings and less business interruptions

Project Considerations - Upsizing

Size for size or one upsize replacement most common

Feasibility Study to determine risks– surface heave

Analysis:

- Host pipe material

- Existing depth

- Soil conditions

- Flow rates/C-factor

- Location

- Intersecting utilities

Connections:Electro-Fusion or Ductile Iron Fittings

Services: Fused or Mechanical

Squeeze-off Tool

Pre-chlorination

No service disruption required due to the pre-chlorination and testing of the pipe prior to installation

All AWWA C651-14 Guidelines followed

AWWA M28 accepted disinfection procedure

FDEP Acceptance

62-555.520(1)(c)(2) F.A.C.

Pre-chlorination

62-555.520(1)(c)(2) F.A.C.

Case Study Wilton Manors Water & Force Main Replacement

Wilton Manors, FL Typical south Florida urban

residential areas with mix of apartments and businesses

Water Main: 5,700 feet of 4” & 6” Cast Iron replaced with 6” & 8” HDPE by pre-chlorinated pipe bursting

Force Main: 3,000 feet of 8” Cast Iron replaced with 8” HDPE pipe by static pipe bursting

Water Main: 5,900 feet of 4” & 6” Cast Iron/Ductile Iron replaced with 6” & 8” HDPE with pre-chlorinated pipe bursting

Case Study Wilton Manors Water & Force Main Replacement

Water main replacement phases

Case Study Wilton Manors Water & Force Main Replacement

Force main replacement phases

Sunrise, FL Pipe Bursting Case Study

City of Sunrise Escape/Valencia Water Replacement: Low bid open cut

$8,847,253 Murphy Pipelines Pipe Burst

Alternative $5,361,150

31,650 feet of 4-inch, 6-inch, 8-inch WM replaced with 6-inch & 8-inch HDPE by pre-chlorinated pipe bursting

725 service connections

Value with Pre-chlorinated Pipe Burstingto replace water main

– Speed of installation with 400 to 700 feet replaced per day

– Ability to replace size on size or upsize (FDEP requires no permits)

– Services maintained and connected same day

– Follows existing utility path using as-builts for design

– Reduction in social impact as traffic flows freely

– Reduction in environmental impact with 86% less excavation

– Installs new HDPE pipe with 100 plus year design life

Pipe Bursting for Manhole to Manhole Application

PP Short Module Pipe

PP pipe tested to 50 psi

Developed in 1981

Mini static pipe bursting rig

Allows for size on size and upsizing

Pipe Bursting for Manhole to Manhole Application - Video

Pipe Bursting & Compression Fit HDPE Pipe LiningWater & Sewer Replacement

2-inch through 65-inch