Pipe Bursting & Compression Fit HDPE Pipe LiningWater & Sewer Replacement
2-inch through 65-inch
AGENDA
Open Cut vs Trenchless Approach
Murphy Pipelines
MPC Trenchless Technologies Compression Fit HDPE Lining System Static Pipe Bursting Manhole to Manhole Gravity Sewer Pipe Bursting
History Infrastructure Replacement
Traditional Open-Cut / Direct Bury
History Infrastructure Replacement
Trenchless Definition
Trenchless technologya type of subsurface construction work that requires few trenches or no continuous trenches. It is a rapidly growing sector of the construction and civil engineeringindustry. It can be defined as "a family of methods, materials, and equipment capable of being used for the installation of new or replacement or rehabilitation of existing underground infrastructure with minimal disruption to surface traffic, business, and other activities."
Open Cut vs. Trenchless
An estimated 75% of infrastructure replacement/rehabilitation is done utilizing open cut vs 25% trenchless technologies.
Digging of open trenches is a common practice for laying of almost all underground utility services
Growing Cities have continued hurdles with vehicular traffic and environmental challenges
Installation Methods Comparison
Open Cut installation• Huge Restoration Cost• Impacts Communities and Business• Extended Construction Time• Adverse Environmental Impact
“Happy Communities Make Happy Politicians”
Trenchless Methods Reduce• Project Cost• Business Interruption Cost• Construction Time• Political Cost
Murphy Pipelines Florida History
HQ in Jacksonville Florida 1999 worked with FDEP on approval of pre-
chlorination 2016 opened South Florida office to support local
municipalties– Richard Crow, South Florida Manager
South Florida Clients Sunrise Fort Lauderdale Tamarac Boynton Beach Hollywood
North Miami Beach FKAA Hallandale Beach Wilton Manors
Team
Andrew Mayer - President Key member of British Gas in the development of pipe
bursting/Swagelining
Over 36 plus years of experience in consulting, design and construction of underground utilities throughout Europe, Asia, Middle East and North America
Board of Directors: International Pipe Bursting Association and NASSCO Water Advisory Panel
AWWA Chairman’s Award winner - 2002
Underground Construction Technology Association “Most Valuable Professional” Award winner - 2010
Over 150 years of combined Trenchless experience
Trenchless Design– Design Build
– Feasibility study
– Cost analysis
– Evaluation of replacement / refurbishment alternatives
– Engineering
Trenchless Construction– Compressed Fit HDPE
Pipe Lining (Swagelining)
– Slip lining
– Static pipe bursting
– Module (MH to MH) pipe bursting
– Pre-chlorinated Pipe bursting
– Pipe splitting
MPC ServicesFor 2” through 65” Water & Sewer Replacement
United Kingdom – British Gas Development of Swagelining & Pipe bursting in 1970’s
Pipe Bursting & Swagelining History
History– Methods developed by British Gas (1970’s) and patented for
gas distribution
– Success led to potable water crossover
– Pipe bursting – 100,000,000 feet installed in past 32 years
– Pre-chlorinated method approved by Florida DEP in conjunction with AWWA in 1999
– Swagelining - 29,800,000 feet installed in the past 32 years
Today– Over 85% of water mains replaced via pre-chlorinated pipe
bursting across Europe
– AWWA M28 approved pre-chlorination process
MPC Technologies
Compression Fit HDPE Pipe lining Process
Compression Fit HDPE Pipe lining Process
Compression Fit HDPE LiningEngineering Value
– Follows path of existing utility
– Maintains or slightly increases flow
– Install HDPE pipe that is Solution to the Problem
Fully structural HDPE (Class IV plus)– Design for both Internal Pressures and External Loading
– Full “Stand-Alone” Capability
Semi structural HDPE
Thin walled HDPE
Compression Fit HDPE LiningConstruction Value
– Insertion lengths up to 5,000 feet
– Pipe sizes of 4” through 65” Static Pipe Bursting most suitable 4” through 16” Water Transmission & Sewer Force Mains most suitable 16”
through 65”
– Negotiates field bends
– Surgical excavations of 92% less than open cut
– Environmentally sensitive
– Undertake projects year round
– Social costs reduced
Compression Fit Installation –Preparation of Host Pipe
Camera/man entry inspection
Cleaning
Proving pig sent through host pipe to ensure free bore path
Compression Fit Installation –Butt Fusion
Sections of HDPE pipe are butt fused together
External bead removed
Compression Fit Installation -Shuttle Rods through host pipe
Compression Fit Installation –Attach pipe once rods reach entry pit
Compression Fit Installation –Reducing Die
HDPE pipe has an OD slightly larger than the ID of the pipe to be renewed
Pipe is pulled through a reduction die which temporarily reduces its diameter
Compression Fit Installation –Rods recovered at exit pit
Rods are removed from the exit pit as pipe is pulled into place
For the next pull the exit pit becomes new entry pit
Compression Fit Installation –HDPE enters receiving pit
Pulling force removed
Natural relaxation of HDPE
90% of reversion occurs in 2 hours
Remaining reversion occurs overnight
Compression Fit Process –Results
No gaps - all annular space is eliminated
Fully structural pipe
Interactive pipe
Thin walled liner
Compression Fit Installation –Final Connections
Advanced Engineered Solution
Follows existing utility path
Provides largest Internal Diameter possible
Long pull lengths
Rapid installation
Cost effective
Solution to problem
Long term design life
Rural areas – environmentally friendly
Urban areas – reduced social costs
Compression Fit Case Study Fully Structural
Gulf Coast Water Authority, Texas 6,800 feet of existing 39”
PCCP Water Transmission Main
Swagelining selected over slip lining due to 4.45” larger ID
DR 17 HDPE PE 4710 selected through liner system design
1,250’ to 2,100’ installations distances
Awarded 2014 Trenchless Project of the Year
Case Study New Orleans Sewerage & Water Board
Case Study New Orleans Sewerage & Water Board
Case Study Fort Lauderdale 30-inch Sewer Force Main Replacement
Emergency Design-Build
Fort Lauderdale, FL Project located
through downtown urban areas
22,400 feet of existing 30” Ductile Iron & Cast Iron Sewer Force Main
60% Swagelining, 30% Directional Drill, 10% open cut
Phase 1 – 3 fast track 6 month schedule
Phase 4 completion Q1 in 2018
Case Study Fort Lauderdale 30-inch Sewer Force Main Replacement
Emergency Design-Build
Case Study Fort Lauderdale 30-inch Sewer Force Main Replacement
Emergency Design-Build
Static Pipe Bursting – Push out rod
Static Pipe Bursting – Push out rod
Pipe Bursting Setup –Attach tooling and pipe
Pipe Bursting Setup – Pull back
Pipe Bursting Process – Pull back
Pre-chlorinated
Pipe
Hydraulic unit pulls rod,
expander and pipe through existing line Ductile Slitter
New service lines bored with piercing tools
Pre-chlorinated Pipe burstingEngineering Value
– Follows path of existing utility Reduces potential for 3rd party utility damage Eliminates identifying new easements Engineering design hours reduced
– Ability to increase pipe diameter – Replacement vs. Rehabilitation
Life Cycle Cost Analysis HDPE has design life of 100 plus years
– Many states do not require permits Classified as line maintenance
Pre-chlorinated Pipe burstingConstruction Value
– Production rate of 300 – 600 feet per day– Crew visible to homeowners for one day– Surgical excavations along project with a reduction in
restoration up to 86% Compact equipment 90% reduction in carbon outputs Environmental sensitive areas not impacted
– Limits change orders– Social costs reduced as process enables better traffic
flow, less intersection closings and less business interruptions
Project Considerations - Upsizing
Size for size or one upsize replacement most common
Feasibility Study to determine risks– surface heave
Analysis:
- Host pipe material
- Existing depth
- Soil conditions
- Flow rates/C-factor
- Location
- Intersecting utilities
Connections:Electro-Fusion or Ductile Iron Fittings
Services: Fused or Mechanical
Squeeze-off Tool
Pre-chlorination
No service disruption required due to the pre-chlorination and testing of the pipe prior to installation
All AWWA C651-14 Guidelines followed
AWWA M28 accepted disinfection procedure
FDEP Acceptance
62-555.520(1)(c)(2) F.A.C.
Pre-chlorination
62-555.520(1)(c)(2) F.A.C.
Case Study Wilton Manors Water & Force Main Replacement
Wilton Manors, FL Typical south Florida urban
residential areas with mix of apartments and businesses
Water Main: 5,700 feet of 4” & 6” Cast Iron replaced with 6” & 8” HDPE by pre-chlorinated pipe bursting
Force Main: 3,000 feet of 8” Cast Iron replaced with 8” HDPE pipe by static pipe bursting
Water Main: 5,900 feet of 4” & 6” Cast Iron/Ductile Iron replaced with 6” & 8” HDPE with pre-chlorinated pipe bursting
Case Study Wilton Manors Water & Force Main Replacement
Water main replacement phases
Case Study Wilton Manors Water & Force Main Replacement
Force main replacement phases
Sunrise, FL Pipe Bursting Case Study
City of Sunrise Escape/Valencia Water Replacement: Low bid open cut
$8,847,253 Murphy Pipelines Pipe Burst
Alternative $5,361,150
31,650 feet of 4-inch, 6-inch, 8-inch WM replaced with 6-inch & 8-inch HDPE by pre-chlorinated pipe bursting
725 service connections
Value with Pre-chlorinated Pipe Burstingto replace water main
– Speed of installation with 400 to 700 feet replaced per day
– Ability to replace size on size or upsize (FDEP requires no permits)
– Services maintained and connected same day
– Follows existing utility path using as-builts for design
– Reduction in social impact as traffic flows freely
– Reduction in environmental impact with 86% less excavation
– Installs new HDPE pipe with 100 plus year design life
Pipe Bursting for Manhole to Manhole Application
PP Short Module Pipe
PP pipe tested to 50 psi
Developed in 1981
Mini static pipe bursting rig
Allows for size on size and upsizing
Pipe Bursting for Manhole to Manhole Application - Video