Suspended Concrete Floor Slab Formwork System
Suspended concrete slab formwork - moladi In-situ floor Suspended slab formwork
system
moladi designer of a unique patented plastic formwork system has recently design a new
Suspended slab formwork system for casting reinforced Suspended concrete slabs -
Floor slabs to enable the construction of multi-level structures to be built faster better
stronger for less. This requires formwork technology to be able to carry the dead loads
and impact when casting slabs in-situ
The photo below depicts the completed suspended concrete roof slab
The 20 square meter slab was constructed with 2 cubic meters of 25 mpa concrete and
100 kg of steel
The cost for the slab is drastically reduced because of the formwork configuration that
allows for multiple permutations as can be seen below – Less than the cost associated
with rib and block precast system
The moladi Slab System allows for beams to be increased or decreased in numbers,
thickness, depth and width allowing for 100 % optimization - and most importantly only
one prop per room 9depending on size) for early stripping/removing of formwork
moladi slab formwork system
For more information visit our website - www.moladi.net
Tags: - Slab, beams, bearing, building, buildings, concrete, decking, double, floor,
formwork, load, loads, moladi, multistorey, multilevel, propping props, slab, span, story
system, system, plastic formwork, concrete slab, suspended concrete slabs, concrete
formwork, concrete slab formwork, suspended concrete slab formwork, moladi, plastic
shutter system, concrete, Alternative Building Technologies, concrete roof slab system,
precast concrete slabs, concrete roof slab, Rib and Block, slabs, Lattice Beam, Girder,
rebar, polystyrene