2

Introduction to JANET

• The Education Internet in the UK• HE, FE, Schools (via LEA networks) Research

Institutes, and others• Over 1000 institutions• Complete Internet connectivity

• SuperJANET4 • 10 Gbit/s SDH backbone• Delivers service to 20 regional networks• Regional networks connect individual

institutions

SuperJANET5 HEAnet National Networking Conference 2006

3

The Requirement: Key issues

• Network reliability and resilience• RNs connected by single link remained a concern

• Demand for bandwidth• Power users• Pent up demand from FE• Enlarging the user base• The usual growth

• Protect the interests of diverse communities• Flexible provisioning• Enhance network monitoring services

SuperJANET5 HEAnet National Networking Conference 2006

4

SJ5 must deliver

• RELIABILITY

• SCALABILITY

• SEPARABILITY

• FLEXIBILITY

• VISIBILITY

END-TO-END

Achievable with a flexible transmission platform built on optical fibre

SuperJANET5 HEAnet National Networking Conference 2006

5

Infrastructure procurement

• Negotiated Procedure • We know what we want

• Flexible transmission system– Fibre and WDM equipment

• Dedicated to SuperJANET• We didn’t know how we wanted it provided

• Lease dark fibre & light it ourselves• Managed service from a Telco

• We didn’t know if the market would deliver

SuperJANET5 HEAnet National Networking Conference 2006

6

Infrastructure procurement

• Pre-qualification Q4 2004• Six suppliers short-listed• Negotiate form of ITT with all six Q1/2 of

2005

• Launch ITT June 2005• Only to short-listed suppliers

• Contract awarded to Verizon (MCI) end of 2005

SuperJANET5 HEAnet National Networking Conference 2006

7

Router procurement

• Met with MCI in mid 2003• Avici, Axiowave, Caspian, Chiaro, Hyperchip,

Procket• Informal talks with suppliers in Q3/4 2003

• RFI document issued in early 2004• Evaluate features of carrier class routers

• Hands-on testing of• Chiaro Enstara, Cisco CRS-1, Juniper T-640,

Procket PRO 8000

SuperJANET5 HEAnet National Networking Conference 2006

8

Router procurement

• Open procurement launched in Sept 2005 • Awarded to Lucent Technology January 2006• Juniper T-640 routers

• Carrier Class• >1000 in service world wide• 40 Gbit/s demonstrated by Juniper and Verizon

• Available as a product now

• Very good deal, Driving down the cost of ownership

SuperJANET5 HEAnet National Networking Conference 2006

9

Router marketplace

• To date• Axiowave, Chiaro & Hyperchip have ceased

trading• Procket bought up by Cisco

• A week before RFI test

• Caspian has moved out of the carrier space

SuperJANET5 HEAnet National Networking Conference 2006

10

Core Infrastructure

• Six C-PoPs• Like SJ4 without Cosham and Edinburgh

• Fibre network dedicated to SuperJANET5• Single pair of fibres

• Protection at the IP layer

• Dedicated WDM transmission equipment• Operated by Verizon initially

• UKERNA may manage circuit provision later in the project

SuperJANET5 HEAnet National Networking Conference 2006

11

Core Infrastructure

• Ciena Corestream DWDM equipment• 80 wavelenghts per fibre• 10Gbit/s now, 40 Gbit/s in 2008

• Pilot on SJ5 core in 2007

• Core circuits grouped into ten bands of eight• Bands add/dropped at C-PoPs or at OADM

sites

SuperJANET5 HEAnet National Networking Conference 2006

12

Core Network Design

• Core Terminal sites – Six blue locations

• Flexible OADM sites (Optical Add Drop) – Eight white locations

• Optical Amplification sites –Eleven locations, not shown

• Core Network consists of three basic components:

SuperJANET5 HEAnet National Networking Conference 2006

13

Core Traffic Provision

• 10Gbit/s circuits are provisioned using two transponders only

• No Regeneration needed • Each circuit would have to be

regenerated separately• Expensive

• Optical amplification still needed every 80 KM or so

• Telehouse & Telecity part of the core• Peerings to UK and Global

Internet

SuperJANET5 HEAnet National Networking Conference 2006

14

Connecting Regional Networks• Two IP production circuits delivered to each

RN• Delivery to diverse locations in the RN

• One 10 Gbit/s research circuit• Connected to UKLight SDH mux

• Two connection methods• Collector Arc

• Point-point fibre through RNEPs linking C-PoPs

• Single point-to-point fibre• Fibre from RNEP into the core

SuperJANET5 HEAnet National Networking Conference 2006

15

Point to point fibre

Glasgow C-PoP

Leeds C-PoP

University of Newcastle

NORMAN

University of Northumbria

VerizonEdinburgh

VerizonNewcastle

VerizonMiddlesbrough

SuperJANET5 HEAnet National Networking Conference 2006

16

Point to point fibre

Regional Network Carried over collector arc

Production 2.5 Gbit/s circuit presented on muxponder cards at NewcastleCircuit is aggregated onto a 10 Gbit/s wavelength using an aggregation card The 10 Gbit/s wavelength is added into to the core network at the Verizon node in Newcastle and transported to the Glasgow C-PoP over the Corestream equipment. It is dropped out of the Glasgow Corestram into another 4200 at the Glasgow C-PoP The 2.5 Gbit/s circuit is de-muxed by a muxponder card and presented to the core router

10 Gbit/s research circuit

Newcastle UniversityVerizon NewcastleVerizon Glasgow

Core network

SuperJANET5 HEAnet National Networking Conference 2006

17

Point to point fibre

Regional Network Carried over collector arcNewcastle UniversityVerizon NewcastleGlasgow C-PoP

Core network

Verizon Middlesbrough Northumbria UniversityLeeds C-PoP

Core network

SuperJANET5 HEAnet National Networking Conference 2006

18

Collector Arc

YHMAN Leeds

Network North West

YHMAN Leeds Met

VerizonPreston

NNWPreston

NNWManchester

LeedsC-PoP

YHMAN

Warrington C-PoP

SuperJANET5 HEAnet National Networking Conference 2006

19

Collector Arc

Warrington C-PoP Manchester Leeds Met Leeds Uni

Leeds C-PoP

Leeds Uni 10 Gbit/s Production and Research on 10 Gbit/s transponders to Leeds C-PoP

Leeds Met 10 Gbit/s Production on 10 Gbit/s transponders passing through Manchester to drop off at Warrington. Note pink amplifier cards at Leeds Uni and Manchester and there-use of the green wavelength towards Warrington from Leeds Met.

Manchester 10 Gbit/s Production and Research circuits on 10 Gbit/s transponders to drop off at Warrington.

SuperJANET5 HEAnet National Networking Conference 2006

20

NIRAN & HEAnet

Regional Network N Type A: Ciena CN4200 Author: Tom Sims

Version: 18.10.06

Ukerna Network N: Primary RNEP

NTL Kennedy Way

Verizon Glasgow

FAN

FAN400 W DC

POWER400 W DC POWER

Queens 1

NTL Shore Road

FAN

FAN400 W DC

POWER400 W DC POWER

9km/2.52dB

12km/3.36dB

M6-F

FAN

FAN400 W DC

POWER400 W DC POWER

Queens 2

M6-F

116km/29dB

FAN

FAN400 W DC

POWER400 W DC POWER

OAV-00

OAV-00

LHDC-120

LHDC-120

Newry

92km/23dB

CN2150 CN2150

OAF-00

OAF-00

LHDC-40

OAV-00

OAF-00

CN2150

F10-A (ch35)Network Tribs

F10-A (ch35)Network Tribs

F10-T (ch39)

F10-A (ch35)Network Tribs

F10-A (ch35)Network Tribs

3km / 1.5dB

CoreStream (Subsea Festoon)

SPAN 1

203Km(41dB)

FAN

FAN400 W DC

POWER400 W DC POWER

F10-A (Tune)Network Tribs

M6-F

1550nmHandoff of ch40

To CS

1 Router band (upto 8 Channels) extended to Queens 2 using the CoreStream Remote Shelf Application

Newry NTL Kennedy Way Queens 2Queens 1

NTL Shore road

Verizon Glasgow

Core StreamSubsea Span

203 KM(41 dB)

SuperJANET5 HEAnet National Networking Conference 2006

21

NIRAN & HEAnet

Regional Network N Type A: Ciena CN4200 Author: Tom Sims

Version: 18.10.06

Ukerna Warrington

Ukerna Network N: Primary RNEP

CoreStream (Subsea Festoon)

SPAN 4235Km(49dB)

Verizon Dublin

FAN

FAN400 W DC

POWER400 W DC POWER

FAN

FAN400 W DC

POWER400 W DC POWER

M6-F

HeaNet

89km/23.25dB

F10-A (ch35)Network Tribs

F10-T (ch39)

FAN

FAN400 W DC

POWER400 W DC POWER

M6-F

CN2150

F10-A (ch35)Network Tribs

FAN

FAN400 W DC

POWER400 W DC POWER

OAV-00

OAV-00

44km/12dB

Manchester

LHDC-40 LHDC-60Lytham

F10-T (ch39)

FAN

FAN400 W DC

POWER400 W DC POWER

CN2150

F10-T (ch35)Network Tribs

1550nm/1310nmHandoff of ch40, ch41

To Ukerna

F10-T (ch39)

CN2150

F10-A (ch35)Network Tribs

FAN

FAN400 W DC

POWER400 W DC POWER

CN2150

CN-BS5

Clonshaugh

11km/4.5dB

60km/15dB

OAF-00

OAV-00

LHDC-50

Clonshaugh

HEAnet

Verizon Dublin

Core StreamSubsea Span

235 KM(49 dB)

Lytham

Manchester

Warrington

SuperJANET5 HEAnet National Networking Conference 2006

22

HEAnet

• Replacement of existing connection to JANET• GE circuit presented at ESAT-X• HEAnet provisioned dark fibre between

ESAT-X and the HEAnet PoP at Erne Street

• Delivery due by 24th November• UKERNA/HEAnet acceptance testing

SuperJANET5 HEAnet National Networking Conference 2006

23

Potential research collaboration

• CERN Large Hadron Collider Project• HEP access to the UK Tier 1 centre

• Network research• Future service development • Automated path provisioning• Control plane experiments

SuperJANET5 HEAnet National Networking Conference 2006

24

Migration

• 1st Regional Networks migrated on 31st November

• Aggressive timetable• Tuesdays and Thursday mornings

• Due to complete before Christmas 2006

• SuperJANET4 to continue until March 2007• Contingency• Migrate research projects

SuperJANET5 HEAnet National Networking Conference 2006

25

Meeting the requirement: Reliability

• Reduce single points of failure• Diverse fibre routing in the core• Dual connection of Regional Networks• Carrier class optical and routing equipment

• SDH technology • In the core and out to the regional networks• Rapid failure detection and recovery• Detect latent problems

SuperJANET5 HEAnet National Networking Conference 2006

26

Meeting the requirement: Scalability

• Ability to expand capacity• Where it’s needed• When it’s needed

• 40 Gbit/s trial in early 2007• Predictable cost

• Marginal cost for transmission channels• Significant discount for router equipment

• Not clawed back in maintenance charges

SuperJANET5 HEAnet National Networking Conference 2006

27

Meeting the requirement: Separability

• Hard multiplexing of bandwidth channels• Production services firewalled from research

infrastructures

SuperJANET5 HEAnet National Networking Conference 2006

28

Meeting the requirement: Flexibility

• Deliver bandwidth quickly• In weeks rather than months

• With a variety of interfaces and bandwidths• 10 and 2.5 Gbit/s SDH• 10 and 1 GE (LAN-PHY and WAN-PHY)

• Temporary arrangements may become practical

SuperJANET5 HEAnet National Networking Conference 2006

29

Meeting the requirement: Visibility

• Ability to monitor network in more detail• Operational monitoring• Research projects

• Optical taps • Monitor all router interfaces at Reading and

London• Issues of confidentiality have been addressed