MOX Update July 24, 2012 Kelly Trice, President & COO
Shaw AREVA MOX Services, LLC
![Page 2: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/2.jpg)
2
Design Capacity
• The facility will be able to produce up to 70,000 fuel pellets per day
• The facility is being redesigned to produce both Pressure Water
Reactor (PWR) and Boiling Water Reactor (BWR) fuel assemblies
• Approximately 151 PWR fuel assemblies can be produced annually
– Utilizing 70 metric tons of heavy metal
• The facility will contain 7 Control Rooms
![Page 3: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/3.jpg)
3
Safety & Environmental Performance
• Safety performance remains excellent
– 19 million hours worked since start of construction
– Voluntary Protection Program (VPP) - Awaiting OSHA VPP Star
inspection in July 2012
– Exceeded 10 million work hours without a lost time injury
– Exceeded 800,000 work hours without an OSHA recordable injury
• Environmental performance
– Over 50 active permits and no violations since construction start
– Three support buildings designed for LEED Gold certification
– Awarded SC Environmental Excellence Award
![Page 4: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/4.jpg)
4
Material Quantities Installed
Structural Concrete 119,600 cubic yards
Non-Structural Concrete 51,369 cubic yards
Rebar >19,800 tons (>39,600,000 lbs.)
Process Pipe to be installed ~411,000 ft.
Tanks 69 of 74
Electrical Cable to be installed ~6 million ft.
Process Systems to be installed 294
![Page 5: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/5.jpg)
Near Term Milestones • Complete BMP & BSR Roof Portion of MFFF 12/2012
• Install 5 Modules in Active Gallery 9/2012
• Complete Diesel Generator for Manufacturing 3/2013
• Install Main Transformers 9/2012
• Completed the Technical Support Building 7/2012
• Continue Installation of HVAC, Piping, Fire Systems
and Conduit
• Begin Installation of Overhead Cranes
5
![Page 6: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/6.jpg)
6
![Page 7: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/7.jpg)
7
August 2007
Start of Construction
![Page 8: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/8.jpg)
8
June 2012
Current Construction
PAF
8
Batch Plant
TAC
Craft Bldg
Secured Warehouse
BAD
BTS
MFFF
![Page 9: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/9.jpg)
9
Technical Support Building
![Page 10: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/10.jpg)
Active Gallery Modules Installation
10
![Page 11: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/11.jpg)
11
MFFF Overheads
![Page 12: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/12.jpg)
12
Process Unit Equipment and Gloveboxes
![Page 13: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/13.jpg)
13
Process Unit Equipment and Gloveboxes
![Page 14: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/14.jpg)
14
Process Unit Equipment and Gloveboxes
![Page 15: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/15.jpg)
15
Process Piping
![Page 16: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/16.jpg)
16
HVAC Components
![Page 17: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/17.jpg)
Electrical Components
17
![Page 18: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/18.jpg)
18
Tanks in the MFFF
![Page 19: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/19.jpg)
Rod Storage
19
![Page 20: Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX ... · Kelly Trice, President & COO July 24, 2012 Shaw AREVA MOX Services, LLC . Enclosure 3. 2 . Design Capacity ...](https://reader035.fdocuments.in/reader035/viewer/2022070918/5fb81adfccb2ca110e297334/html5/thumbnails/20.jpg)
Summary of Challenges /
Lessons Learned
• Since 2006, Several Issues Identified
– Rebar - vendor oversight related(enveloping under
program or commercial grade dedication)
– Stainless steel material verification
• CCA not directly verified
– Studs - vendor oversight related(3rd party action)
– Couplers(2 examples) – vendor oversight of receipt
documents(testing by non qualified source)
– Critical Characteristics development and/or change
without a fully documented evaluation
– Work Package Development / Implementation