Subconstructions for ventilated rain screen...

Post on 03-Jun-2020

10 views 3 download

Transcript of Subconstructions for ventilated rain screen...

Subconstructions for Subconstructions for ventilated rain screen facades

Eternit NeubeckumEternit, Neubeckum

03 04 200903.04.2009

Dipl Ing Peter ReinwarthDipl-Ing. Peter Reinwarth

Type of construction:

Load bearing wall

I l tiInsulation

Ventilation spaceS b t ti

C

Subconstruction

Cladding

Load bearing walls may consist of:R/C (concrete), steel, brickwork:

•full brick,

f t d b i k•perforated brick,

•light concrete,g

•aerated concrete,

t•etc.

Insulation

Nearly all thicknesses of insulation can be usedused.

Ventilation spaceVentilation space

In Germany: ≥ 20 mm.y

In other countries: National regulations to be complied with!complied with!

Cladding material

A various number of different cladding materials formats and fixing methods can materials, formats and fixing methods can be used.

• Systems for visible fixings

• Systems for hidden fixings

Subconstruction

The subconstruction has to comply with the type of cladding, its fixing method, the load yp g, g ,bearing wall as well as the forces acting on it.

• Therefore BWM invented and designed useful substructure systems y

• (ATK 100 Minor, ATK 103 ...)

In order to enable stress-free changes in length of the sections due to temperature variations, the sections are usually fixed

iusing

1 x fixed point1 x fixed pointn x sliding pointn x sliding point

(n = statically required number of brackets):(n statically required number of brackets):

WIND (pressure / depressure)Fixed point

WIND (pressure / depressure)

vertical facade loadsvertical facade loads(gravity load, snow, ice,

...))

n x Sliding pointWIND (pressure /

depressure)

WIND (pressure / depressure)Fixed point

WIND (pressure / depressure)

vertical facade loadsvertical facade loads

WIND (pressure / depressure) Fixed point

vertical facade loads

Direct panel fixing on vertical subconstruction(visible system)

Panel fixing on horizontal and vertical subconstruction (hidden system)

Panel fixing on vertical+horizontal and vertical subconstruction (hidden combiner system)

Mounting sequence ATK 100 Minor

Mounting sequence ATK 100 Minor

„helping hand“ bracket:bracket:

retainer spring for stressfree stressfree dilatation

Mounting sequence ATK 103+100 Minor

Mounting sequence ATK 103+100 Minor2a: in case of larger panels2a: in case of larger panels using more claps …

Mounting sequence ATK 103+100 Minor

Use of a rivet setting gauge for stress free dilatation on sliding points

or use of special sliding point screws forL-brackets

In a statical calculation all parts of the subconstrction are proved against collapse.p g p

Required material /information:q /

• Type and format of the cladding material• Distance to the wall / insulation thickness• Type and quality of the load bearing wall• Wind loads / building data in order to determine the

wind loadsB ildi l ( i / ti )• Building plans (views / sections)

Mounting plans based on the statical calculation specify the position of the calculation specify the position of the sections and fixings at the building.

Example of a facade in Beograd:

Profile Systems

BWM-Eternit-Project in Beograd

+19,70

+22,80

p. sprat

+24,00Profile Joint

Profile Joint Profile Joint

~300

~120

0~1

200

~300

~300

0

~350

~110

0~3

50~1

800

~325

~875

~300

~150

0

~200

0

~300

~750

~750

~750

~750

~300

~360

0

~300

~700

~700

~700

~700

~300

~340

0

~300

~120

0~1

200

~300

~300

0

~300

~875

~875

~300

~235

0

~350

~110

0~3

50~1

800

~350

~550

~550

~350

~180

0

~300

~900

~300

~150

0

~260

~600

~260 ~1

120

~250

~500

~250 ~1

000

~200

~200

~400

~300

~750

~750

~750

~750

~300

~360

0

~300

~700

~700

~700

~700

~300

~340

0

~300

~120

0~1

200

~300

~300

0

~300

~875

~875

~300

~235

0

~350

~110

0~3

50~1

800

~350

~550

~550

~350

~180

0

~300

~900

~300

~150

0

~260

~600

~260 ~1

120

~250

~500

~250 ~1

000

~200

~200

~400

2. sprat

3. sprat

4. sprat

5. sprat

+7,30

+10,40

+13,50

+16,60Profile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

0.00

+4,20

prizemlje

1. spratProfile Joint

Profile Joint

Profile Joint

Profile Joint

Fixed Points

ONKJI L MDÜBEL + MONTAGETECHNIK GmbH

70771 Leinfelden-EchterdingenErnst-Mey-Straße 1

Datum NameBearb.Gepr.Norm

BV: Bulevar / Belgrade

Maßstab Blatt Bl®

Sliding points

Substructure

~300

~120

0~1

200

300

~300

0

~350

~110

0~3

50~1

800

~325

~875

300 ~1

500

~200

0

Profile Systems

~300

~750

~750

~750

~750

300

~360

0

~300

~700

~700

~700

~700

300

~340

0

~300

~120

0~1

200

300

~300

0

~300

~875

~875

300

~235

0

~350

~110

0~3

50~1

800

~350

~550

~550

~350

~180

0

~300

~900

300 ~1

500

~260

~600

260 ~112

0

~250

~500

250

~100

0

~200

200

00

~300

~750

~750

~750

~750

300

~360

0

~300

~700

~700

~700

~700

300

~340

0

~300

~120

0~1

200

300

~300

0

~300

~875

~875

300

~235

0

~350

~110

0~3

50~1

800

~350

~550

~550

~350

~180

0

~300

~900

300 ~1

500

~260

~600

260 ~112

0

~250

~500

250

~100

0

~200

200

00

5. sprat+16,60

+19,70

+22,80

p. sprat

+24,00Profile Joint

Profile Joint

Profile Joint

~ ~ ~~ ~ ~ ~ ~ ~ ~ ~2 ~2 ~ ~2~4

0 ~ ~ ~ ~ ~ ~ ~ ~2 ~2 ~ ~2~4

0

+4,20 1. sprat

2. sprat

3. sprat

4. sprat

+7,30

+10,40

+13,50Profile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

O IJKLMN

0.00 prizemlje

Profile Joint

Fixed Points

Sliding points

DÜBEL + MONTAGETECHNIK GmbH

70771 Leinfelden-EchterdingenErnst-Mey-Straße 1

Datum Name

Bearb.

Gepr.

Norm

BV: Bulevar / Belgrade

Maßstab Blatt Bl®

Substructure

~300

~120

0~1

200

~300

~300

0

~350

~110

0~3

50~1

800

~325

~875

~300

~150

0

~200

0

Profile Systems

~300

~750

~750

~750

~750

~300

~360

0

~300

~700

~700

~700

~700

~300

~340

0

~300

~120

0~1

200

~300

~300

0

~300

~875

~875

~300

~235

0

~350

~110

0~3

50~1

800

~350

~550

~550

~350

~180

0

~300

~900

~300

~150

0

~260

~600

~260 ~1

120

~250

~500

~250 ~1

000

~200

~200

~400

~300

~750

~750

~750

~750

~300

~360

0

~300

~700

~700

~700

~700

~300

~340

0

~300

~120

0~1

200

~300

~300

0

~300

~875

~875

~300

~235

0

~350

~110

0~3

50~1

800

~350

~550

~550

~350

~180

0

~300

~900

~300

~150

0

~260

~600

~260 ~1

120

~250

~500

~250 ~1

000

~200

~200

~400

Profile JointProfile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

Profile Joint

Maßstab Blatt Bl®

Fixed Points

Sliding points

DÜBEL + MONTAGETECHNIK GmbH

70771 Leinfelden-EchterdingenErnst-Mey-Straße 1

Datum NameBearb.Gepr.Norm

BV: Bulevar / Belgrade

Substructure

22 80

+24,00

~300

~120

0~1

200

~300

~300

0

~350

~110

0~3

50~1

800

~325

~875

~300

~150

0

~200

0

Profile Systems

~300

~750

~750

~750

~750

~300

~360

0

~300

~700

~700

~700

~700

~300

~340

0

~300

~120

0~1

200

~300

~300

0

~300

~875

~875

~300

~235

0

~350

~110

0~3

50~1

800

~350

~550

~550

~350

~180

0

~300

~900

~300

~150

0

~260

~600

~260 ~1

120

~250

~500

~250 ~1

000

~200

~200

~400

~300

~750

~750

~750

~750

~300

~360

0

~300

~700

~700

~700

~700

~300

~340

0

~300

~120

0~1

200

~300

~300

0

~300

~875

~875

~300

~235

0

~350

~110

0~3

50~1

800

~350

~550

~550

~350

~180

0

~300

~900

~300

~150

0

~260

~600

~260 ~1

120

~250

~500

~250 ~1

000

~200

~200

~400

5. sprat +16,60

+19,70

+22,80

p.spratProfile Joint

Profile Joint

Profile JointProfile Joint

Profile Joint

Profile Joint

2. sprat

3. sprat

4. sprat

+7,30

+10,40

+13,50

Profile Joint

Profile Joint

P fil J i t

Profile Joint

Profile Joint

P fil J i t

0.00

+4,20

prizemlje

1. spratProfile Joint

Profile Joint

Profile Joint

Profile Joint

Fixed Points

1 2 3

DÜBEL + MONTAGETECHNIK GmbH

Maßstab Blatt Bl®

Sliding points

70771 Leinfelden-EchterdingenErnst-Mey-Straße 1

Datum NameBearb.Gepr.Norm

BV: Bulevar / Belgrade

Substructure

Profile Joint

Profile Joint

Profile JointProfile Joint

Overspanning and window reveal

Overspanning and lintel (front view)

Suspended ceiling

A functional substructure system, a good planning, statical prove and careful fixing prevents facades from „just hanging ...“

… and leads to fine projects:

Villa,BochumBochum

C t F Ed ti S i Centre For Education, Saxonia

Police Central, Duisburg

Art Gallery, Leipzig

Eternit Headquarters, Leimen near Heidelberg

Th k h f tt tiThank you very much for your attention !