South Ayrshire Council Local DevelopmentPlan Action Programme: IntroductionThe Action Programme is in three parts: -
Part 1: SPG PROGRAMME Outlines all supplementary guidance. The planning guidance contains existing
and proposed supplementary guidance with all actions relating to whether that supplementary guidance is
linked to LDP policies, or whether it is free-standing guidance. The actions are prioritised on the basis of
when the action requires to be carried out. The prioritisation is not an indication of the strategic importance
of the guidance, but an indication of when the action requires to be completed, relative to the production of
the LDP. As such, low priority items do not require to be completed on or shortly after LDP adoption. Higher
priority items may require action (i.e. production of guidance to draft stage) by examination, to identify how
a policy within the LDP may be delivered. The action programme also contains a risk log, which indicates the
risk of failure to deliver the action, likelihood of risk occurrence, and the required remedial action.
Part 2: LDP ACTIONS Contains actions for each LDP policy. This part of the programme also contains risk log
and prioritisation of actions, again, based on when the action needs to be completed; not strategic
significance of the action. A large portion of policies have no specific completion date, as they will be enacted
through the application of LDP policies. These have been identified as ongoing items, and have generally
been allocated as the responsible of the Council, due to its role as planning authority. Other policies and
masterplans have specific actions identified.
Part 3: SITE ACTIONSContains actions for each LDP housing site. This part of the programme also contains
risk log and prioritisation of actions, again, based on when the action needs to be completed; not strategic
significance of the action. Many sites have no specific action, other than delivery of site. These actions have,
therefore, been left without fixed completion dates, as it is largely at the control of the developer as to when
a site is delivered. Timescales were indicated as being delivered in up to 10 years from LDP adoption –
although the Council has confidence that any site identified in the programme can assist to maintain an
effective 5-year supply of housing land. Site constraints have been programmed in, with actions directly
related to overcoming constraints. Responsible persons are not necessarily expected to deliver the entire
site, but may be named because they play a significance consultative role in respect of a particular part of
the action. Additional clarification on stakeholder roles is contained within this part, if necessary.
Action
Ref.
Relevant LDP
Policy LDP Action Priority
Responsible
Person(s) Notes Draft Stage Consultation Adoption Progress at June 2011
Progress at May
2012 Implications of risk occurence
Likelihood
of risk
occurence
Risk contingency/ remedial
action
1
N/A - no direct link
to LDP
Review of dormer windows
SG Low SAC Planning
Dependant on revised permitted
development rights. Post LDP adoption N/A N/A N/A N/A None Low
Review timescales and produce at
earliest opportunity. Review
whether existing guidance is out-
of-date, and requires increased
emphasis and higher priority.
2
LDP Policy: Rural
Housing
Review of housing in
countryside SG High SAC Planning
Summer/Autumn
2012 Autumn 2012
Immediately
following LDP
adoption
(expected
Spring 2014)
Not scheduled to start yet.
No progress. Not Started.
If up-to-date guidance is not
available at or soon after LDP
adoption, this will compromise
the effectiveness and operation
of rural housing policies. Moderate
Review timescales and produce at
earliest opportunity. Review
whether existing guidance is out-
of-date, and requires increased
emphasis and higher priority.
Existing policies and SALP rural
housing guidance note should be
used as a last option.
3
N/A - no direct link
to LDP
Review of velux roof lights
SG Low SAC Planning
Dependant on revised permitted
development rights. Post LDP adoption N/A N/A N/A N/A None Low
Review timescales and produce at
earliest opportunity. Review
whether existing guidance is out-
of-date, and requires increased
emphasis and higher priority.
4
LDP Policy: Historic
Environment
Review of historic
environment SG High
SAC Planning;
consultation with HS
Summer/Autumn
2012 Autumn 2012
Immediately
following LDP
adoption
(expected
Spring 2014)
Not scheduled to start yet.
No progress. Not Started.
If up-to-date guidance is not
available at or soon after LDP
adoption, this will compromise
the effectiveness and operation
of historic environment policies. Moderate
Review timescales and produce at
earliest opportunity. Review
whether existing guidance is out-
of-date, and requires increased
emphasis and higher priority.
Existing policiesshould be used as
a last option.
5
LDP Policy: Historic
Environment
Review of replacement
windows in LB's/CA's SG High
SAC Planning;
consultation with HS
Policy content broadly to remain as
existing; SG to be updated to reflect
procedures.
Summer/Autumn
2012 Autumn 2012
Immediately
following LDP
adoption
(expected
Spring 2014)
Not scheduled to start yet.
No progress. Not Started.
If up-to-date guidance is not
available at or soon after LDP
adoption, this will compromise
the effectiveness and operation
of historic environment policies. Moderate
Review timescales and produce at
earliest opportunity. Review
whether existing guidance is out-
of-date, and requires increased
emphasis and higher priority.
SHEP should be used as a last
option.
6
N/A - no direct link
to LDP
Review of Supplementary
Guidance: Satellite Receiver
Dishes Low SAC Planning
Existing guidance in place. May
benefit from review. Post LDP adoption N/A N/A N/A N/A None Low
Review timescales and produce at
earliest opportunity. Review
whether existing guidance is out-
of-date, and requires increased
emphasis and higher priority.
7
N/A - no direct link
to LDP Review of HMO SG Low SAC Planning Complete Post LDP adoption N/A N/A N/A N/A None Low
Review timescales and produce at
earliest opportunity. Review
whether existing guidance is out-
of-date, and requires increased
emphasis and higher priority.
8
N/A - no direct link
to LDP
Review of control of
sunshades and canopies on
commercial frontages SG Low SAC Planning Post LDP adoption N/A N/A N/A N/A None Low
Review timescales and produce at
earliest opportunity. Review
whether existing guidance is out-
of-date, and requires increased
emphasis and higher priority.
Milestones
LDP Action Programme: Supplementary Guidance Actions
Risk Log
9
N/A - no direct link
to LDP
Supplementary Guidance:
Shopfront Security Low SAC Planning Post LDP adoption N/A N/A N/A N/A None Low
Review timescales and produce at
earliest opportunity. Review
whether existing guidance is out-
of-date, and requires increased
emphasis and higher priority.
10
LDP Policy: Historic
Environment
Review of window
alterations policy guidelines
leaflet High
SAC Planning;
consultation with HS
Future of leaflet to be considered as
part of formal SPG (as above).
Summer/Autumn
2012 Autumn 2012
Immediately
following LDP
adoption
(expected
Spring 2014)
Not scheduled to start yet.
No progress. Not Started.
If up-to-date guidance is not
available at or soon after LDP
adoption, this will compromise
the effectiveness and operation
of historic environment policies. Moderate
Review timescales and produce at
earliest opportunity. Review
whether existing guidance is out-
of-date, and requires increased
emphasis and higher priority.
SHEP should be used as a last
option.
11
LDP Policy:
Development
Opportunities
Review of development
opportunities High SAC Planning
Future development opportunities
to be identified for inclusion in LDP
For proposed LDP
Consultation
Alongside LDP
Consultation
Alongside LDP
Consultation
(expected
August 2012)
Significant amount of work
has been completed, under
the site selection process
for LDP. Due for completion
before Autumn 2011. Not Started.
If development opportunity sites
are not identified by consultation
on proposed LDP, proposed uses
may be challenged at
examination
Use existing development
opportunities brochure, for
remaining opportunities.
12
N/A - no direct link
to LDP
Supplementary Guidance:
Wildlife Strategy Low AJPU Spring 2012 Summer 2012 Autumn 2012
Not scheduled to start yet.
No progress. ? ?
13
LDP Policy: Wind
Energy
Supplementary Guidance:
Wind Farms: Addendum to
Ayrshire Joint Structure Plan
Technical Report High
SAC Planning and
AJPU
A review of the document is
necessary prior to the publication of
the Proposed LDP, to determine if
further, more significant changes
require to be made to that
document.
SEPA consultation advses that
review should consider SEPA
guidance on impact on peat
resources.
Summer/Autumn
2012 TBC TBC
Not scheduled to start yet.
No progress. Not Started.
If up-to-date guidance is not
available at or soon after LDP
adoption, this will compromise
the effectiveness and operation
of wind energy policy. Moderate
Review timescales and produce at
earliest opportunity. Review
whether existing guidance is out-
of-date, and requires increased
emphasis and higher priority.
Existing standards should be used
as a last option.
14
LDP Policy:
Affordable Housing
and LDP Policy:
Delivering
Infrastructure
Review affordable housing
SG High
SAC Planning and
Housing
Existing policy to be updated as set
out in existing MIR. It should be
noted that the inclusion of an
education infrastructure SG does
not imply that education faciltiies
are not the only infrastructure
services required for a site. The
programme indicated that work on
an education SG requires to be
undertaken because, currently, no
such SG exists.
Summer/Autumn
2012 Jan-12
Immediately
following LDP
adoption
(expected
Spring 2014)
Not scheduled to start yet.
No progress. Not Started.
If up-to-date guidance is not
available at or soon after LDP
adoption, this will compromise
the effectiveness and operation
of housing policies and collection
methods for contributions. Moderate
Review timescales and produce at
earliest opportunity. Review
whether existing guidance is out-
of-date, and requires increased
emphasis and higher priority.
Existing standards should be used
as a last option.
15
LDP Policy:
Residential
Development
within Settlements,
Release sites and
Windfall Sites.
Prepare residential amenity
standards SG High SAC Planning
Summer/Autumn
2012 Autumn 2012
Immediately
following LDP
adoption
(expected
Spring 2014)
Not scheduled to start yet.
No progress. Not Started.
If up-to-date guidance is not
available at or soon after LDP
adoption, this will compromise
the assessment of applications
for residential and householder
development. Low
Existing standards should be used
as a last option.
16
LDP Policy: Open
Space Review open space SG Low
SAC Planning,
Sustainable
Development and
Parks Complete N/A N/A N/A Complete Complete N/A Low
Review timescales and produce at
earliest opportunity. Review
whether existing guidance is out-
of-date, and requires increased
emphasis and higher priority.
17
LDP Policy:
Delivering
Infrastructure
Preparation of Education
Contributions SG High
SAC Planning and
Education
Required by LDP adoption to avoid
policy void. Strategic Direction must
be set prior to proposed plan.
Summer/Autumn
2012 Jan-12
Immediately
following LDP
adoption
(expected
Spring 2014)
Minimal progress. Inital
consultation meeting with
Education Service;
however, the Proposed LDP
must precede the
preparation of this SPG. Not Started.
If policy is not drafted by
adoption, there will be no
standard method of collecting
contributions. Moderate
Policies must at least be
implementable as a draft.
Low: SPG
completion to
draft or adoption
does not need to
follow imminently
after LDP
adoption.
Medium: SPG
should be adopted
shortly after LDP
adoption. Should
at least be
completed to
draft.High: SPG ideally
to be progressed
to draft before the
LDP can be
submitted to
DPEA for
Action Ref. Relevant LDP Policy LDP Action Priority
Responsible
Person(s) Notes
Progress at
June 2011
Progress at May
2012
Implications of risk
occurence
Likelihood of
risk occurence
Risk contingency/
remedial action
Strategic Policy
18
LDP Policy: Spatial
Strategy
Multiple actions as expressed
more fully in LDP policies Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A Failure of LDP strategy Low
Planning
applications
determined in line
with policy. Policy
reviews.
19
LDP Policy:
Greenbelt
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Failure of greenbelt policy,
which could result in harm
to the high value rural
landsacpe and the growth
stratgey for the main
urban area within South
Ayrshire. Low
Planning
applications
determined in line
with policy. Policy
reviews.
20
LDP Policy: The
Coast
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Harmful impacts to the
coast and prominent
adverse impacts on the
coastal areas of South
Ayrshire. Potential harm to
the CSGN implementation. Low
Planning
applications
determined in line
with policy. Policy
reviews.
21
LDP Policy:
Sustainable
Development
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
harmful impacts on the
character and amenity of
the natural and built
environment. Low
Planning
applications
determined in line
with policy. Policy
reviews.
N/A
LDP Policy:
Delivering
Infrastructure
Produce a SG on Developer
contributions - Education,
Affordable Housing and Open
SpaceEconomic
Development
22 LDP Policy: Tourism
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Failure to capitalise on
tourism opportunities.
New tourism development
being directed to
inaprpopraite locations. Low
Planning
applications
determined in line
with policy. Policy
reviews.
23
LDP Policy: Business
& Industry
Preparation of Industrial and
Employment Land Supply
Report and maintenance of
industrial land supply. High
South Ayrshire
Council Complete study N/A
Draft land supply
complete. Requires
editorial work.
If supply is not accurate
and up-to-date, land
supply and allocations may
be challenged at
examination stage.
Direction of policy may be
affected by challenge if not
complete. High
Planning
applications
determined in line
with policy. Policy
reviews.
Identification of
additional
industrial land.
24
LDP Policy: Glasgow
Prestwick Airport
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Failure of policy would
undermine the airport,
which is one of the key
economic assets for South
Ayrshire. Low
Planning
applications
determined in line
with policy. Policy
reviews.
LDP Action Programme: LDP Policy Actions
Risk Log
SEE SPG ACTIONS 14, 16 & 17
Ongoing action.
Due date for completion
Complete by August 2012; review
annually.
Ongoing action.
Ongoing action.
Ongoing action.
Ongoing action.
Ongoing action.
25
LDP Policy: Newton-
on-Ayr
Prepare masterplan for
Newton-on-Ayr. Moderate
SAC/ Port
Authority
Masterplan for Ayr Port
completed N/A None.
Risk that before
masterplan completion,
development of the area is
not co-ordinated to ensure
best fit for varying uses,
and implications for
amenity impact. Moderate
26
LDP Policy:
Heathfield
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Risk that industrial
development at Heathfield
is displaced or lost. Risk
that Heathfield becomes
open out-of-centre retail
operation, undermining
town centre. Moderate
27
LDP Policy: Office
Development
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Risk that office
development isn't
effectively guided to
preferred areas. Low
Planning
applications
determined in line
with policy. Policy
reviews.
28 LDP Policy: Ports
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Risk that role of ports is
undermined: the major
ports in terms of their
economic role, and the
existence of smaller ports. Low
Planning
applications
determined in line
with policy. Policy
reviews.
N/A
LDP Policy:
Development
Opportunities
Preparation of list of
development opportunities,
indicating preferred uses for
opp. sites.
29
LDP Policy: Galloway
and Southern
Ayrshire Biosphere
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Risk that inappropraite
development harms the
environmental quality of
biospehere. Low
Planning
applications
determined in line
with policy. Policy
reviews.
Communities
30
LDP Policy: General
Retail
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Risk that town centre is
undermined and declines
as retail centre. Growth of
out-of-centre retailing. Moderate
Planning
applications
determined in line
with policy. Policy
reviews.
31
LDP Policy: Town
Centres
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Risk that town centre is
undermined and declines
as retail centre. Growth of
out-of-centre retailing. Moderate
Planning
applications
determined in line
with policy. Policy
reviews.
32
LDP Policy: Local
Centres & Small
Settlement Town
Centres
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Risk of loss of local retail
amenities. Moderate
Planning
applications
determined in line
with policy. Policy
reviews.
33
LDP Policy:
Maintenance and
Protection of an
Effective Housing
Land Supply
Maintain an effective 5 year
residential land supply and
annually review effective
supply High
SAC/ Private
Sector
Site allocated are developed
out over plan period N/A
2011 & 2012
reviews currently
underway
Risk that if 2011 and 2012
figures do not match,
housing supply could be
too high or low; and
therefore LDP may be
challengable at
examination. High
Urgent review of
policy, monitoring
of appeal decisions
and effectiveness
of housing sites.
Potentially allocate
additional sites to
make up any
SEE SPG ACTION 11
Ongoing action.
For LDP adoption, or soon after.
Estimated December 2013.
Continuous; annual review.
Ongoing action.
Ongoing action.
Ongoing action.
Ongoing action.
Ongoing action.
Ongoing action.
34
LDP Policy:
Residential Policy
within Settlements,
Release Sites and
Windfall Sites
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Risk that new residential
development is not of an
adequate amenity or
design standard. Low
Planning
applications
determined in line
with policy. Policy
reviews.
N/A
LDP Policy: Rural
Housing Prepare SG on Rural Housing
N/A
LDP Policy:
Affordable Housing Prepare new SG
35
LDP Policy: Gypsy
and traveller
Accommodation
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Risk of lack of provision of
sites, and use of non-
planned sites. Low
Planning
applications
determined in line
with policy. Policy
reviews.
36
LDP Policy:
Telecommunications
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A Minimal risk. Low
Planning
applications
determined in line
with policy. Policy
reviews.
37
LDP Policy: Open
Space
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Impact could include loss
of valued open spaces and
associated facilities. Low
Planning
applications
determined in line
with policy. Policy
reviews.
38
LDP Policy: Belleisle
& Rozelle Prepare Masterplan Moderate
SAC - Children
& Community
Directorate;
planning;
roads;parks
services
Regeneration of Belleisle
Park and Restoration of
Listed Buildings Completion
of Masterplan and adoption
as SG N/A N/A
Potential deterioration of
open space and historic
building, particularly at
Belleisle. Moderate
Review timescales
for production of
masterplan;
continue to apply
relevant LDP
policies.
39
LDP Policy: Craigie
Estate Prepare Masterplan Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Risk to the project of the
relocation of Ayr Academy. Low
Planning
applications
determined in line
with policy. Policy
reviews.
40
LDP Policy:
Community Facilities
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Potential loss of important
community facilities. Low
Planning
applications
determined in line
with policy. Policy
reviews.
41TO BE
COMPLETE
D
FOLLOWIN
G
CONSULTAT
ION Girvan Harbour side
Development Brief to be
prepared to Project to include
multi-faceted community
facility.
Moderate
SAC/ Children
& Community
Directorate/
Local
Community
Preparation of a
development brief N/A
Girvan community
charrette held,
outcome report
prepared
If masterplan not
completed, there could be
land-use difficulties at
planning application stage;
development may not be
co-ordinated. Moderate
Planning
applications
determined in line
with policy. Policy
reviews.
Environment &
Climate Change N/A
SEE SPG ACTION 2
SEE SPG ACTION 14
Ongoing action.
Construction to begin on multi-
faceted facility in December 2012
For LDP adoption, or soon after.
Estimated December 2013.
Ongoing action.
Ongoing action.
Ongoing action.
Ongoing action.
42
LDP Policy:
Landscape Quality
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Risk that landscape
character and quality of
South Ayrshire is harmed
by development. Low
Planning
applications
determined in line
with policy. Policy
reviews.
43
LDP Policy:
Landscape
Protection
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Risk that landscape
character and quality of
South Ayrshire is harmed
by development. Low
Planning
applications
determined in line
with policy. Policy
reviews.
44
LDP Policy:
Woodland &
Forestry
Adoption of Ayrshire & Arran
Woodland Strategy Low AJPU
1. Visual improvement of
commercial forest from out
with 2. Improvement in
biodiversity N/A
? - seek update from
AJPU ? - seek input from AJPU Moderate
45
LDP Policy: Tree
Preservation
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Risk of loss of important
trees/ treebelts. Low
Planning
applications
determined in line
with policy. Policy
reviews.
46
LDP Policy: Central
Scotland Green
Networks
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A Low
Planning
applications
determined in line
with policy. Policy
reviews.
47
LDP Policy: Water
Environment
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Harmful impacts of water
environment. Low
Planning
applications
determined in line
with policy. Policy
reviews.
48
LDP Policy: Flooding
& Development
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Risk that flooding is not
properly accounted for in
new development. Low
Planning
applications
determined in line
with policy. Policy
reviews.
49
LDP Policy:
Agricultural Land
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Loss of prime quality
agricultural land. Low
Planning
applications
determined in line
with policy. Policy
reviews.
50
LDP Policy: Air,
Noise and Light
Pollution
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Adverse impact on
amenity. Low
Planning
applications
determined in line
with policy. Policy
reviews.
51
LDP Policy: Minerals
& Aggregates
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Innappropraite extratcion
of minerals, resulting in
landsacpe harm and
adverse impact on
communities. Low
Planning
applications
determined in line
with policy. Policy
reviews.
52
LDP Policy: Low and
Zero Carbon
Buildings
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
New building will not be as
energy efficient as
possible. Low
Planning
applications
determined in line
with policy. Policy
reviews.
Ongoing action.
Ongoing action.
Ongoing action.
Ongoing action.
Ongoing action.
Ongoing action.
Ongoing action.
Ongoing action.
? - seek update from AJPU
Ongoing action.
Ongoing action.
53
LDP Policy:
Renewable Energy
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
renewable energy
proposals will be more
difficult to control, in
terms of landsacpe impact. Low
Planning
applications
determined in line
with policy. Policy
reviews.
N/A
LDP Policy: Wind
Energy
Review current AJSP technical
appendix; undertake
landscape character
assessment.
N/A
LDP Policy: Historic
Environment Preparation of SG.
56
LDP Policy:
Archaeology
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Loss of archaeological
resources. Low
Planning
applications
determined in line
with policy. Policy
reviews.
57 LDP Policy: Estates
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
The quality of estates
declines or development
within grounds has
unacceptable impact. Low
Planning
applications
determined in line
with policy. Policy
reviews.
58
LDP Policy: Natural
Heritage
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Harm to natural heritage
resources. Low
Planning
applications
determined in line
with policy. Policy
reviews.
59
LDP Policy: Waste
Management
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Lack of guidance on
location of waste
management facilities. Low
Planning
applications
determined in line
with policy. Policy
reviews.
60
LDP Policy: Dark
Skies
Prepare guidance for lighting
within Dark Sky area and
periphery Low
SAC/EAC/D&GC
/FC
Prepare Guidance (non-
statutorily linked to LDP) on
acceptable lighting
standards within Dark Sky
Park. N/A N/A
Lack of consistency in
dealing with planning
applications for
development in dark sky
park, if guidance is not in
place. Low
Transportation N/A
61
LDP Policy: Land Use
and Transportation
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Wide ranging adverse
transport impacts. Low
Planning
applications
determined in line
with policy. Policy
reviews.
62
LDP Policy: Rail
Investment
Upgrading of rail stations and
improved and increased rail
infrastructure Moderate
SAC/ Network
Rail/ Prestwick
Airport/Transp
ort Scotland, as
consultee
1. Renovation of Prestwick
airport station, 2)
Completion of railway
platform elongation
programme N/A
Network Rail has
increased the length
of platforms to allow
for the use of longer
trains to service
customer demand.
No indication of
upgrading of GPA
station.
If GPA station is not
improved, it may hinder
aiport growth aspirations. Low
Ongoing action.
SEE SPG ACTIONS 4, 5 & 10
For LDP adoption, or soon after.
Estimated December 2013.
Completion date to be agreed with
Transport Scotland, Network Rail and
Infratil (or future aiport operator).
Ongoing action.
Ongoing action.
Ongoing action.
Ongoing action.
Ongoing action.
SEE SPG ACTION 13
63
LDP Policy: Strategic
Road Development
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Lack of strategic approach
to trunk road network. Low
Planning
applications
determined in line
with policy. Policy
reviews.
64
LDP Policy: Public
Transport
Deliver park and ride at Dutch
House Low
SPT/ SAC/
Stagecoach/
Transport
Scotland (as
consultee only)
Delivery dependant on
external agencies. N/A
Park and Ride
scheme at Dutch
House has planning
permission. No
development
commenced.
If park and ride is not
improved, it may hinder
LDP spatial strategy
objectives of good range of
public transport nodes to
increase central belt
connectivity. Low
65
LDP Policy: Freight
Transport
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
Lack of strategic approach
to freight transport
network.
Planning
applications
determined in line
with policy. Policy
reviews.
66
LDP Policy: Town
Centre Traffic
Management
Introduction of measures to
facilitate accessibility, giving
priority to walking, cycling and
public transport. Application
maximum parking standards. Low
South Ayrshire
Council Roads
Service None. N/A N/A
Lack of sustainable
transport modes,
congestion within town
centre.
Planning
applications
determined in line
with policy. Policy
reviews.
67
LDP Policy: Outdoor
Public Access and
Core Paths
Planning decisions must be
taken in line with this policy Low
Head of
Planning/
Regulatory
Panel/LRB None. N/A N/A
failure to meet statutory
requirement to produce
core paths plan. Lack of
development of routes.
Planning
applications
determined in line
with policy. Policy
reviews.
Low: Actions
are not
required to
adopt LDP -
action is
ongoing
through policy
implementati
on
Medium: Not
required to
adopt LDP,
but as a
specific
delivery date.High: Require
an action to
be delivered
before the
LDP can be
submitted to
DPEA for
examination.
Ongoing action.
Ongoing action.
TBC
Ongoing action.
Completion date to be agreed with
SPT.
DIA may be required.
Action Ref. Settlement Map Ref. Site Constraints* Site Actions Responsible Person(s)
Person(s)/Authorities with a
Signiciant Consultative Role Timescale for Completion Priority Risk Log•Landscaping and transport proposals
to be submitted with planning
application. •Developer
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Site should incorporate access linkages
for vehilces, pededstrian and cycling. •Developer
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Development Impact Assessment will
be required to assess impact on drainage
and sewerage system.
•Developer •South Ayrshire Council (Head of
Planning)
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low •Developer should identify any
archaeological remains on site, in
consultation with WoSAS, prior to any
permission being issued.
•Developer
•South Ayrshire Council (Head of
Planning)
•WoSAS
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Developer should ensure proposals
include the sensitive re-use of the
existing buildings. •Developer
•South Ayrshire Council (Head of
Planning) (Supervisory Planner
Environment).
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•A DIA may be required to show Nil
Impact from Brownfield site •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Transport Scotland indicate transport
appraisal should be undertaken for site. •Developer
•South Ayrshire Council (Head of
Planning)
•Transport Scotland
Prior to submission of LDP to DPEA
for examination. Expected by
December 2012. High
71 AYR 3(Peebles Street)
Separate system of
drainage required, if
possible. A DIA may
be required to show
Nil Impact from
Brownfield site
•A DIA may be required to show Nil
Impact from Brownfield site •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
72 BAL1
Separate system of
drainage required for
the development.
Development Impact
Assessment will be
required. There is a 6"
water main crossing
western area of site.
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
Implications of
risk
occurence/
Likelihood of
risk
occurence/
Risk
contingency/
remedial
action all
shown in
Action 33.70 AYR1
Requirement for
transport appriasal for
site to determine
impact of
development on
Whitletts
r'about.Separate
system of drainage
required, if possible.
A DIA may be required
to show Nil Impact
from Brownfield site
LDP Action Porgramme: Site Actions
Potential drainage and
sewerage issues.
Depending on the
proposed demand and
infrastructure
capacity, a flow and
pressure test may be
required. Surface
water to be kept out
of combined
sewer.DIA may be
required.ANN168
The building is listed.
DIA may be required.
AYR 2 (Holmston
House)69
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Transport appraisal to be undertaken
to determine impact of development on
A77 at Holmston Roundabout •Developer
•South Ayrshire Council(Head of
Planning)
•Transport Scotland
Prior to submission of LDP to DPEA
for examination. Expected by
December 2012. High
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Transport Assessment to be
undertaken to determine impact of
development on A77 at Holmston
Roundabout •Developer
•South Ayrshire Council (Head of
Planning)
•Transport Scotland
Prior to submission of LDP to DPEA
for examination. Expected by
December 2012. High
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Transport Assessment to be
undertaken to determine impact of
development on A77 at Holmston
Roundabout •Developer
•South Ayrshire Council (Head of
Planning)
•Transport Scotland
Prior to submission of LDP to DPEA
for examination. Expected by
December 2012. High
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low •Transport Assessment to be
undertaken to determine impact of
development on A77 at Holmston
Roundabout •Developer
•Developer
•South Ayrshire Council(Head of
Planning)
•Transport Scotland
Prior to submission of LDP to DPEA
for examination. Expected by
December 2012. High
•Site investigations to be undertaken for
consultation with SEPA to establish if
culvert runs beneath site and whether a
no-development zone is required. •Developer
•Developer
•South Ayrshire Council(Head of
Planning)
•SEPA
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Transport appraisal to be undertaken
to determine impact of development on
A77 at Holmston Roundabout •Developer
•South Ayrshire Council(Head of
Planning)
•Transport Scotland
Prior to submission of LDP to DPEA
for examination. Expected by
December 2012. High
•Development will require to
demonstrate to SEPA that the
wtercourse has been taken account of.
FRA may be required to demonstrate
flood plain has been avoided. •Developer
•South Ayrshire Council(Head of
Planning)
•SEPA
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
COY3 As above
As aboveCOY477
76
73 COY1
Whether land is
released for housing
depends on the effect
housing will have on
the Coylton road
network, particularly
the cumulative impact
of development on
Holmston R'about.
74 COY2 As above
75 COY5 As above
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Site investigations to be undertaken for
consultation with SEPA to establish if
culvert runs beneath site and whether a
no-development zone is required. •Developer
•SEPA
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Develop site •Developer
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
80 DUN1 DIA may be required.
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
81 DUN2 DIA may be required.
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Site investigations to be undertaken for
consultation with SEPA to establish if
culvert runs beneath site and whether a
no-development zone is required. •Developer • SEPA
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
83 GIR1 DIA may be required.
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Separate system of drainage required
for the development. Development
Impact Assessment may be required to
show nil impact from brownfield site. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Site investigations and remedial works
required for any site contamination •Developer •Environmental Health
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
85 GIR2 DIA may be required.
•Separate system of drainage required
for the development. Development
Impact Assessment may be required to
show nil impact from brownfield site. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
KIRKM1 DIA may be required.
DIA may be required.DUN382
84 GIR3 DIA may be required.
DIA may be required.CRO178
79 DAI1 DIA may be required.
•Site investigations to be undertaken for
consultation with SEPA to establish if
culvert runs beneath site and whether a
no-development zone is required. •Developer •SEPA
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
87 KIR1 DIA may be required.
•Separate system of drainage required
for the development. Development
Impact Assessment will be required.
Capacity of the various PS between
Kirkoswald and Girvan WWTW's will
require to be checked. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Transport appraisal to be undertaken
to determine impact of development on
A77 at existing junctions on south of
A77. •Developer
•South Ayrshire Council(Head of
Planning)
•Transport Scotland
Prior to submission of LDP to DPEA
for examination. Expected by
December 2012. High
•Development will require to
demonstrate to SEPA that the
wtercourse has been taken account of.
FRA may be required to demonstrate •Developer
•South Ayrshire Council(Head of
Planning)
•SEPA
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low •Transport Assessment to be
undertaken to determine impact of
development on A77 at existing
junctions on south of A77. •Developer
•South Ayrshire Council(Head of
Planning)
•Transport Scotland
Prior to submission of LDP to DPEA
for examination. Expected by
December 2012. High
•Development will require to
demonstrate to SEPA that the
wtercourse has been taken account of.
FRA may be required to demonstrate •Developer
•Developer
•South Ayrshire Council(Head of
Planning)
•SEPA
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low •Transport Assessment to be
undertaken to determine impact of
development on A77 at existing
junctions on south of A77. •Developer
•Developer
•South Ayrshire Council(Head of
Planning)
•Transport Scotland
Prior to submission of LDP to DPEA
for examination. Expected by
December 2012. High
•Development will require to
demonstrate to SEPA that the
wtercourse has been taken account of.
FRA may be required to demonstrate •Developer
•South Ayrshire Council(Head of
Planning)
•SEPA
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
MAYB2 As above.
89 MAYB3 As above.
90 MAYB1 As above.
86 KIRKM1 DIA may be required.
88 MAYB4
Whether land is
released depends on
the effect housing will
have on the Maybole
road network and the
cumulative impacts of
development on the
existing junctions on
the south side of A77,
through Maybole.DIA
may be required.
•Transport appraisal to be undertaken
to determine impact of development on
A77 at existing junctions on south of
A77. •Developer
•South Ayrshire Council(Head of
Planning)
•Transport Scotland
Prior to submission of LDP to DPEA
for examination. Expected by
December 2012. High
•Development will require to
demonstrate to SEPA that the
wtercourse has been taken account of.
FRA may be required to demonstrate
flood plain has been avoided. •Developer
•South Ayrshire Council(Head of
Planning)
•SEPA
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
92 MIN1 DIA may be required.
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
93 MIN2 DIA may be required.
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Separate system of drainage required
for the development. Development
Impact Assessment will be required; and
that brownfield site will have Nil impact. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low Masterplan to be prepared for the site
to
•ensure built heritage resources are not
harmed by any development;
•to ensure transport implications of site
development can be dealt with;
•and to ensure integration of the site
with the existing settlement can be
achieved.
•A transport appraisal must be
undertaken to determine implications of
development on trunk road network,
and, where necessary, transport
interventions must be provided by the
developer. •Developer
•South Ayrshire Council(Head of
Planning)
•Transport Scotland
•Historic Scotland High
•Depending on numbers of units a WIA
may be required. No Drainage in close
proximity to this development site. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low •Develop site
•consideration should be taken to how
this watercourse is treated within the
development proposals. •Developer •SEPA
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
95 STA1 DIA may be required.
SYM1
This site will not be
developed until
Transport Scotland is
satisfied that the
planned
improvements to the
A77 between Bogend
Toll and Dutch House
roundabout have
been completed. DIA
may be required.
91 MAYB2 As above.
94 MON1
Whether land is
released depends on
the effect housing will
have on the road
network (particularly
Dutch House R'about),
and a master plan
being prepared for the
site showing that its
development will not
harm heritage
resources within the
site or the quality of
the landscape or value
of the area, while
making sure the
development can fit in
with the existing
settlement.DIA may
be required.
•Site cannot be developed until A77
(between Bogend Toll and Dutch House)
as been upgraded by TS
•Developer
•Transport Scotland Completed by 2014 Medium
•Separate system of drainage required
for the development. Development
Impact Assessment will be required. •Developer
•South Ayrshire Council (Head of
Planning)
•Scottish Water
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low •Develop site
•a basic Flood Risk Assessment should
identify the areas which are suitable for
development •Developer •SEPA
At stage of planning application.
Within years 1 - 10 of plan
adoption. Low
* Site constraints can
include issues with
sewerage and water
capacity, as identified
by Scottish Water;
even though Scottish
Water does not
consider lack of
capacity to be a
development
constraint.
Low: Actions
associated with
delivery of the
site are not
required to
adopt LDP Medium: Not
required to
adopt LDP, but
as a specific
delivery date.
High: Require an
action to be
delivered before
the LDP can be
submitted to
DPEA for
examination.
97 TAR1
FRA required.DIA may
be required.
96 SYM1
This site will not be
developed until
Transport Scotland is
satisfied that the
planned
improvements to the
A77 between Bogend
Toll and Dutch House
roundabout have
been completed. DIA
may be required.