SMED
What is SMED?SMED stands for Single Minute Exchange of Die. The
SMED system is theory and set of techniques that make it
possible to perform equipment set up and changeover
operations in under 1 minutes ! in others "ords# in thesingle minute range. SMED "as originally developed to
improve die press and machine tool set$ups# but its
principles apply to changeovers in all types of process.
%t is important to point out that if may not be possible to
reach single minute range for all Set ups# but SMED does
dramatically reduce Set up times in almost every case.
8/10/2019 SMED Stands for Single Minute Exchange of Die
2/28
Why SMED is important for companies?
&ustomers today "ant a variety of
products in 'ust the quantities they need.
They expect high quality# a good price#
and speedy delivery SMED helps meetthese customer needs "ith less "aste by
making it cost ! effective to produce
things in smaller quantities# or lots.
8/10/2019 SMED Stands for Single Minute Exchange of Die
3/28
The trouble "ith large lot production()arge lot production has several disadvantages(
Inventory waste( storing "hat is not sold costs moneyand ties up company resources "ithout adding any
value to the product.
Delay( &ustomers must "ait for the company to
produce entire lots rather than 'ust the quantities acustomer needs.
Declining quality( Storing unsold inventory increase
the chance that it "ill have to be scrapped or
re"orked# "hich adds cost to the product.
8/10/2019 SMED Stands for Single Minute Exchange of Die
4/28
The Benefits of SMED:SMED changes the assumption that set ups can be done
quickly# they can be done as often as needed. Thismeans companies can make products in smaller lots#
"hich has many advantages(
le!i"ility: companies can meet changing customer
needs "ithout the expense excess inventory.#uic$er %elivery: small lot production means fe"er
customers "aiting time.
Better #uality: less inventory storage means fe"er
storage related defects. SMED also lo"ers defects byreducing Set up errors and eliminating trial runs of
the ne" products.
8/10/2019 SMED Stands for Single Minute Exchange of Die
5/28
&igher pro%uctivity: Shorter changeovers reduce
do"n time# "hich means a higher equipment
productivity rate.
8/10/2019 SMED Stands for Single Minute Exchange of Die
6/28
The "enefits of SMED for you
SMED also benefit you and also company
employee. *irst quicker set up support 'ob security
by strengthening the companies competitiveness.
%n addition SMED make daily production "ork go
smoother because(
Simpler set up results in safer change over "ith
less physical strain or risk of in'ury.
)ess inventory means less clutter in the "ork
place# "hich makes production easier and safer.Set up tools are standardise and combined "hich
means fe"er tools to keep track of.
8/10/2019 SMED Stands for Single Minute Exchange of Die
7/28
Basic Steps In a Set up 'peration()+reparation# after process ad'ustments# checking of
material and tools
*)Mounting and removing tools and parts
+)Measurements# settings and calibrations,)Trial runs and ad'ustments
8/10/2019 SMED Stands for Single Minute Exchange of Die
8/28
()-reparation. after process a%/ustments.
chec$ing of material an% toolsThis step ensures that all part and tools are "here they
should be and that they are functioning properly. ,lso
included in this step is the period after processing
"hen these items are removed and returned to storage#machinery clean and so forth.
%n a traditional set up# parts of the preparation step
are done after the machine is stopped. This step should
be done as external set up# "hile the equipment is still
running.
8/10/2019 SMED Stands for Single Minute Exchange of Die
9/28
*)Mounting an% removing tools an% parts
This step includes the removal of parts and tools afterone product is processed# and the attachment of the
parts and tools for next product.
-enerally the machine must be stopped to do this
step# so it is internal set up. This internal set up step
the actual changing over takes very little time
compared to the other steps.
8/10/2019 SMED Stands for Single Minute Exchange of Die
10/28
+)Measurements. settings an% cali"rations
This step refers to all the measurements andcalibrations that must be made in order to perform a
production operation# such as centring# dimensioning#
measuring temperature or pressure and so forth.
,lthough the equipment must be stopped for thisstep# the SMED system teaches "ays to do these tasks
quickly by preparing the equipment is running.
8/10/2019 SMED Stands for Single Minute Exchange of Die
11/28
,)Trial runs an% a%/ustments
%n the final steps of the traditional set up operation#ad'ustments are made after a test piece is machined.
The more accurate your measurements and
calibrations are in the previous step the easier these
ad'ustment "ill be.&orrect ad'ustment of the equipment is one of the
most difficult tasks in a set up operation. %n traditional
set up# the time needed for trial runs and ad'ustments
depends on personal skill.
%n a traditional set up the machine is not making
good products until this step is finished# it is
8/10/2019 SMED Stands for Single Minute Exchange of Die
12/28
considered part of internal set up. SMED teaches "ays
to eliminate this step completely# so that the machine
makes good products right after it is started up.
Steps in set up +roportion of set up time
before SMED improvements
()+reparation# after process ad'ustments# checking
of material and tools
*)Mounting and removing tools and parts
+)Measurements# settings and calibrations
,)Trial runs and ad'ustments
/
0/
10/
0/
8/10/2019 SMED Stands for Single Minute Exchange of Die
13/28
0nalysing your Set up operationsThe main reason traditional Set up operations takes
so long is that internal external Set ups areconfused. Many tasks that could be done "hile the
machine is still running aren2t done until the machine
is stopped.
The three stages of SMED are described
designed to simplify and shorten changeovers. 3ut
before you start applying SMED# you need a clear idea
of ho" you currently perform Set up operations and
ho" long each steps takes.
8/10/2019 SMED Stands for Single Minute Exchange of Die
14/28
The preliminary step# called a Set up analysis# "ill
help you ho" to implement SMED improvement on
your equipment. Set up analysis has three main steps(1$4ideotape the entire Set up operation focusing on
the hand# eye# and body movements of the person
doing the Set up. 5se the camera2s time and date
function if there is one.
6$Sho" the video to the Set up person and other
people involved "ith the equipment. ,sk the Set up
person to describe "hat he is sho"n doing. 7ave the
group share their thoughts about the operation.
$Study the video in detail# noting the time andmotions involved in each step of the Set up. 5se the
8/10/2019 SMED Stands for Single Minute Exchange of Die
15/28
video players pause and re"ind functions as needed.
,lso use a stop "atch if necessary.
8/10/2019 SMED Stands for Single Minute Exchange of Die
16/28
The three stages of SMED:
Stage (:separating internal 1 e!ternal Set upThe most important step in implementing SMED is
distinguishing bet"een internal and external Set up.
3y doing obvious things preparation and transport
"hile the machine is running# the time needed forinternal Set up# "ith the machine stopped# can usually
cut by as much as to 0 percent.
8/10/2019 SMED Stands for Single Minute Exchange of Die
17/28
Stage *:2onverting internal set up to
e!ternal Set up
*urther reducing Set up times to"ard the singleminuet range involves t"o important activities( 18 re$
examining operations to see "hether any steps are
"rongly assumed to be internal Set up# and 68 finding
"ays to convert these steps to external Set up.9peration can often be converted to external Set up by
looking at the true function.
8/10/2019 SMED Stands for Single Minute Exchange of Die
18/28
Stage +:Streemlining all aspects of the Set up
operation
To further reduce Set up time# the basic elements ofeach Set up are analysed in detail. Specific principles
are applied to shorten the time needed# especially for
steps that must be done as internal Set up# "ith the
machine stopped.
8/10/2019 SMED Stands for Single Minute Exchange of Die
19/28
Description of stage (:There are three techniques help us separate internal
external Set up tasks. These techniques are( usingchecklists# performing function checks# and improving
transport of die and other parts.
2hec$lists:
, checklist lists everything required to set up and runthe next operation. The list includes such items as(
Tools# specifications# and "orkers required.
+roper values for operating conditions such as
temperature# pressure etc. &orrect measurement and dimensions required for
each operation
8/10/2019 SMED Stands for Single Minute Exchange of Die
20/28
&hecking item of the list before the m:c is stopped
helps prevent mistakes that come up after internal set
up begun.
unction chec$s(*unction checks should be done "ell before Set
up begins so that repair can be made ifsomething does not "ork right. %f broken dies#
moulds# or 'igs are not discovered until test runs
are done# a delay "ill occur in internal Set up.
Making sure such items are in "orking order before
they are mounted "ill cut do"n set up time a greatdeal.
8/10/2019 SMED Stands for Single Minute Exchange of Die
21/28
Improve% transport of parts an%
Tools:
Dies# tools# 'igs# gauges# and other items needed foran operation must be moved bet"een storage areas
and machines# then back to storage once a lot is
finished. To shorten the time the machine is shut
do"n# transport of these items should be done duringexternal set up. %n other "ords# ne" parts and tools
should be transported to the machine before the
machine is shutdo"n for changeover.
8/10/2019 SMED Stands for Single Minute Exchange of Die
22/28
Stage *: 2onverting internal set up to
e!ternal Set up
%$,dvance preparation of conditions(,dvance preparation of conditions means getting
necessary parts tools and conditions ready before
internal set up begins. &onditions like temperature#
pressure# or position of material can be preparedexternally "hile the machine is running.;Ex. +re$heating of Mould or Material8
8/10/2019 SMED Stands for Single Minute Exchange of Die
23/28
8/10/2019 SMED Stands for Single Minute Exchange of Die
24/28
%mplementing *unction standardisation( involves t"o
steps(1$ )ook closely at each individual function in your
set up process and decide "hich functions if any
can be standardise.
6$ )ook again at the functions and think about
"hich can be made more efficient by replacingthe fe"est possible parts.
;Exp.clamping *unction standardisation8
8/10/2019 SMED Stands for Single Minute Exchange of Die
25/28
Streamlining e!ternal set up:External set up improvement include streamlining
the storage and transport of parts and tools. %ndealing "ith small tools# dies# 'igs# and gauges# it is
vital to address issue of tool and die management.
=ou need to ask yourself questions such as(
>hat is the best "ay to organise these items?
7o" can "e keep these items maintained in
perfect condition and ready for the next
operation?
7o" many of these items should "e keep instock?
8/10/2019 SMED Stands for Single Minute Exchange of Die
26/28
Improving storage an% transport:
9peration for storing and transporting dies can be verytime consuming# especially "hen your company keeps a
large no. of dies on hand. Storage and transport can be
improved by marking the dies "ith colour codes# and the
location numbers of the shelves "here they are stored# the
shelves are also marked.
8/10/2019 SMED Stands for Single Minute Exchange of Die
27/28
Streamlining internal set up:Through improvement in internal setup operations are
next. These include implementing parallel operations#using functional clamps# eliminating ad'ustments# and
mechani
8/10/2019 SMED Stands for Single Minute Exchange of Die
28/28
+arallel operations divide the set up operation bet"een
t"o people# one at each end of the machine.
>hen set up is done using parallel operations# it isimportant to maintain reliable and safe operations and
minimi