Post on 23-Jan-2018
October 2015
Agenda
City Planning01
Progress made so far….02
Smart City Solution0 3
Planned Smart City Projects-Phase 2
04
October 2015
Naya Raipur City Vision
Naya Raipur’ to be developed as a ‘smart and green
city’
For conservation of the environment and existing
landscape, best practices for water harvesting,
waste water recycling and use of non-conventional
energy resources would be adopted
Naya Raipur designed as a citizen friendly and
pedestrian friendly city
City design would promote sense of security and
comfort among its citizens, especially women,
children and the physically challenged.
October 2015
Site Selection for Naya Raipur
The site selection for the new capital based was based on environmental sustainability parameters which are:
5
• Maximum Government land
• Land unsuitable for agriculture, mining and quarrying
• Land having least number of existing human settlements
• Minimum forest cover and wild life
• Water availability and easy drainage
• Soil having good bearing capacity.
• Topography suitable for urban development
October 2015
Connectivity
4
• Connected with two national highways NH30 and NH53
• Connected to Mumbai and Vishakhapatnam through railway
• Connected with all metro cities through air
October 2015
Balanced Land Use
• Conservation of existing water bodies and plantation
• 26 % recreation area
• Distributed commercial centers.
• Green connectivity across the city to promote pedestrian and NMT movement.
• Grid pattern streets
To promote high speed roads on arterial roads
Alternative roads for every destinations
Ease in providing infrastructure.
Suitable for public transport system
Education
Operational Premier InstitutesIIIT, Hidayathullah National Law University, KalingaUniversity, ITM University, Hotel Management Institute
Existing SchoolsKrishna Public School, Radiant Public School, Bharat Mata School ,Agrawal Charitable Trust, Amity School
Upcoming InstitutesIIM Raipur, AYUSH University, AIIMS Extension, IIT Bhilai
IIIT ITM
HNLU
Health
Upcoming health facilities:
• Sankara Eye Care Hospital in
Sector 33
• Vedanta Cancer Research
Institute in Sector 36
• 100 Bedded hospital has been
allotted in Sector 9.
• 100 bedded Super Speciality
Hospital in Sector 24.
Shri Satya SaiSanjeevni Hospital
Residential Sectors
21 residential sectors
Sustainable, self-sufficient and pedestrian
friendly neighbourhood
Investment by reputed private players like
Amrapali Group, Avinash Group and GT
Homes
Recreational Facilities
Asia’s biggest man made Jungle Safari
Botanical Garden developed in 153 ha
Amphitheatre at Central Park
Immersive Dome
Cultural Heritage Site-Purkhauti
Muktangan
International Cricket Stadium with
seating capacity of 50,000
October 2015
8
NRDA PPT for World Bank Workshop • First Integrated Smart City
Smart City Ready Physical Infrastructure – USD 1 Billion has already gone into developing this world class infrastructure
Roads75 km already constructed &
61 km under construction
TelecomCity wide ducts for fibre-optic
communication backbone
Electricity• SCADA compliant• Smart LED Lighting
Water Supply• SCADA compliant• 90% network completed• Zero discharge
Sewerage• SCADA compliant• Decentralized
Social InfrastructureParks, Cricket stadium,
Educational Inst. And Health Centres
October 2015
Naya Raipur Smart City Solution – designed for scalability and flexibility
17
NRDA PPT for World Bank Workshop • First Integrated Smart City
Service Layer
Awareness Layer
Application Layer
Communication Layer
Sensing Layer
Fibre Backbone Wi-FiWired
Broadband
Municipal Functions
Land & Asset Management
Analytics ERP
GIS
Citizen Collaboration
Utilities Management
Surveillance Systems
Transport Management
Centralized City Command and Control
Centre
Public Address System
Crisis / Disaster Management System
October 2015
15
Naya Raipur Smart City Initiative - 2016
Naya RaipurSmart CityInitiative
Smart
Governance
System
Utility
Management
System
City
Surveillance
System
Intelligent
Transport
System
Centralised
Control
Centre &
Data Centre
IBMS & Smart
Network
Our Partners
M/s. ILFS
Technologies
in consortium with
M/s. Schneider
Electric
October 2015
Track 1- Smart Governance
Bridge between the Naya Raipur government departments and its citizen for secure
communication and information exchange. Service delivery through various channels.
Building plan approval & mgmt
Asset Management System
Rehabilitation Module
M-Governance
Finance & Account Mgmt System
GIS based Land and Estate Management
Utilities Billing Module
Sm
art
Go
ver
na
nce
Mo
du
les
Single window access; Dash Board Module, City guide map
Human Resource Mgmt System & Payroll
Grievance Module
October 2015
Track 2 – City Surveillance System
Cit
y S
urv
eill
an
ce S
yst
em
Video Management System •Record and view live video•Monitor alarms•Control cameras•Retrieve recordings
CCTV Dashboard utilised to assess the health and performance information of equipments
Use of Video Analytics such as loitering, left object detection etc.
An integrated surveillance system provides a safe and secure environment for the development
and growth of the city
October 2015
Track 3 - Utility Management System
Comprehensive framework envisioned for real time data acquisition of field parameters from sensing devices for effective monitoring, control and decision making.
Cit
y S
urv
eill
an
ce S
yst
em
SCADA, Outage Management System (OMS) and Distribution Management System (DMS) for Electrical Distribution Network
SCADA, Leakage Management for Water Distribution System
Integration with existing Intelligent Street Lighting System and
Sewerage SCADA
October 2015
Track 4 -Intelligent Transport Management System
Developing a system for restricting unauthorized access into the city and monitoring speed for
preventing accidents.
Inte
llig
ent
Tra
nsp
ort
Ma
na
gem
ent
Sy
stem
Automatic Number Plate Recognition (ANPR) cameras
Speed Violation Detection and Enforcement System
Integration with existing Intelligent Transport System (ITS)
of BRTS
October 2015
Track-5 City Command and Control Centre
Single roof for all the data capturing, processing, consolidation
reporting, monitoring and control.
Cit
y C
om
ma
nd
& C
on
tro
l C
entr
e
Crisis/Emergency Management System
Alerts and Alarms from different subsystems
Action taken by field operators as per SOPs
Video Wall Display
Communications System
Centralized Command & Control System
Integration of All Smart City Sub Systems
Workflow Creation & Management
October 2015
Track-6 Integrated Building Management Systems & NetworkIntegrated Building Management System for controlling and monitoring the building’s mechanical
and electrical equipment such as HVAC, Water Supply, Fire Systems etc
IBM
S &
Net
wo
rk
Communications via fiber backbone or via GPRS
IBMS System for:
• HVAC• Water Leak Detection System• Fire Detection and Alarm System• Electrical system• Access Control• Elevators• Asset Management
Planned Smart City Projects – Phase 2INTELLIGENT TRAFFIC
MANAGEMENT
SOLAR CITY PLAN
PUBLIC WIFI
PLACEMAKING-STREET
FURNITURE & SIGNAGES
SMART HEALTHCARE
CITY COMMON CARD
SMART EVENT
MANAGEMENT
SMART VILLAGE
DEVELOPMENT PLAN
LAST MILE CONNECTIVITY THROUGH
E-IPT
SMART WASTE MANAGEMENT
STRATEGIES
26
Key Learnings
Inspiration
Being inspired from other sources while writing our TOR can meet only 40-50% of our requirements.
Feedback
Continuous feedback from internal & external stakeholders such as departments within & outside the organization, 3rd party vendors, OEMs etc. during finalization of RFP through regular workshops, meetings and discussions.
Involvement
Involvement of stakeholders in all phases including Requirement Analysis, Design, Development, Testing and Go-Live.
Integration
Integration of any existing IT systems into the smart city solution should be meticulously planned and incorporated in the scope of work.
Single Window for the State
Integration with the existing e-governance solutions of other departments of the State such as CHiPS, Town & Country Planning, CSEB , CSIDC should be envisioned and incorporated in the scope of work.