Post on 15-Sep-2015
description
Site CommentsSite Name : KHB3722No.Site CommentsNo.Action Taken at the Site During PMR1Need Mobily Permission 1Checked the supply voltage 53.9 VDC2With back up supply2Clean the dust in MW/BTS equipment3AC is OK3Tighten the DCDU power supply4Roof Top4Checked the connector on ODU and tighten is bracket5Shelter grounding & Main bus bar missing.5Clean the jumper cable connector and combiner