Site Comments 3718

Post on 15-Sep-2015

212 views 0 download

description

comments

Transcript of Site Comments 3718

Site CommentsSite Name : KHB 3718No.Site CommentsNo.Action Taken at the Site During PMR1No access issue1Checked the supply voltage 53.5 VDC2With back up supply2Clean the dust in MW/BTS equipment3AC is OK3Tighten the DCDU power supply4Roof Top4Checked the connector on ODU and tighten is bracket5Shelter, Tower grounding & main bus bar missing.5Clean the jumper cable connector and combiner