Site Name : KHB 3718 No. Site Comments No. 1 No access issue 1 2 With back up supply 2 3 AC is OK 3 4 Roof Top 4 5 5 Shelter, Tower grounding & main bus bar missing.

description

comments

Transcript of Site Comments 3718

Site CommentsSite Name : KHB 3718No.Site CommentsNo.Action Taken at the Site During PMR1No access issue1Checked the supply voltage 53.5 VDC2With back up supply2Clean the dust in MW/BTS equipment3AC is OK3Tighten the DCDU power supply4Roof Top4Checked the connector on ODU and tighten is bracket5Shelter, Tower grounding & main bus bar missing.5Clean the jumper cable connector and combiner