B. O. T.
BOT: Build
Set-up the facility and infrastructure, staff the development center, and establish knowledge transfer
Operate Manage the offshore organization: Program
Management, Development, QA, maintenance, enhancements, and product support
Transfer Register a new offshore subsidiary for the
customer, transfer assets, and handover operations
B. O. T.
Comparative Advantage
BPO/KPO Sectors
Public Private Partnership
Reduction of Risk
Built - Operate - Transfer
S.W.O.T Analysis
STRENGTHS
INTERNAL
Easing Budgetary Constraints
Speedy Working
Reliability & Efficiency
Access to International Finance
Technology Transfer
Training & Innovation
Raising quality of life
STRENGTHS Optimal Risk Allocation.
WEAKNESSES
INTERNAL
Based on Probabilities
Company selection is by its past performance
OPPORTUNITIES
EXTERNAL
Currently only Airports & Highways
BOT can be used in:
Railways – Track lines and Trains
Power & Energy Plants
Research and Development
Hospitals and Educational Institutes.
THREATS
EXTERNAL
Continues failure of past B-O-T projects.
Extreme economic Recession or Depression.
Unstable Government or Leftist Govt. Policies.
Importance
Popularity
Stages
Benefits
Alternative
Examples
☛ ITS system
☛ Margaon extension
☛ Pune metro-DMRC
PHYSICAL EVIDENCE
Process
People
Building of working force.
Take care of administration.
Provide resources and facilities.
After a period transfer it.
Internal marketing.
PRICE
Total Cost of Project
Traffic
Time Period
Maintenance and Service Expenses
PROMOTION
PRODUCT
Construction
Operation
Engineering
PLACE
Why Noida ?
Quick Connectivity
Physical Infrastructure
Resources Mobilization
H R Catchments
Destination Malls
EXAMPLES
Some Existing BOT Projects
GMR - DIAL
GMR- 50.1% , AAI – 26%
Modernize – Operate – Develop – Transfer
Fraport (Ger) (10%) - Airport Operator
Eraman Malaysia (10%) – Retail Investors
IDF (3.9%) – Financial Investor
GMR - DIAL
Upgrade existing terminals
New Domestic terminal – T 1D (10m Pasgr)
4 level in line baggage handling system
Spacious , F&B and Retail Facilities, Special Contact Zones
GMR - DIALIntegrated Passenger Terminal – 3
Common Use Terminal Equipment (CUTE)
• 5 level in-line baggage handling system
• 160 + check-in counters
• 90 desk for immigration procedures
• By 31st Mar 2010 - Common Wealth Games
GMR - HIAL
GMR-63%, AAI – 13%,
Malaysian Airport holding 11%,
Govt. of AP – 13%
Greenfield Project
GMR - HIAL 12m Passengers per Annum. Max 40m
1m tones of cargo per annum
12 boarding bridges & 30 remote stands
16 self check-in kiosks
46 immigration
Counters.
130 (CUTE)
check-in desks
AMBALA – CHANDIGARH
Location - NH22-21, Haryana-Punjab
Project Distance - 35 km.
Widening (4 – Lane)
AMBALA – CHANDIGARH
GMR Projects Private Limited(GPPL) Engineering, Procurement & Construction (EPC)
Concession Period - 20 years
Reduce Travel Time
Farukh nagar – Jadcherla
Location - NH 7, Bangalore-Hyderabad
Project Distance - 58 km. Made in 2.5yrs
4 Lane. Improvement, maintenance, strengthening of existing road.
Farukh nagar – Jadcherla 6 lane improved toll plaza
Ease traffic congestion
Boost trade and commerce
HASSEL FREE experience
Delhi-Noida Direct (DND) Toll Bridge
4-6 lane, 1.5 km
Halcrow Consulting India Pvt Ltd.
Silver Lane Facilities
Noida – Gr. Noida Expressway
8 lane, 23.64 km.
Silver Lane Facilities
Delhi – Gurgaon Expressway
6-8 lane, NH – 8, 28 km.
D S Constructions Ltd.
Gives fastest access to IGI Airport.
Future B-O-T Projects
Golden Quadrilateral
ADAG – DMRC High Speed Airport Metro ExpressAIRPORT Express Line
From Ajmeri Gate - IGI Airport (22km).
30 yrs (BOT basis)
NDRS - City Airport Terminal (CAT)
Non Stop - High Speed journey
JUST 20 mins.
High Speed Airport Metro Express
FACILITIES Provided:
Buy Air tickets, Check timings etc.
Check-in baggage
Get boarding pass
Shopping – Duty Free Shops
Multi Level Parking
Conveniences of an Airport terminal