RIDOT’s Innovative Approaches to EPA Consent Decree CompliancePresented by Annie Bastoni, LEED AP, ENV SPTheresa McGovern, PE

April 25, 2018

Outline

RIDOT Consent Decree background

Tracking of Consent Decree compliance

Drainage infrastructure data management

Stormwater Control Plan (SCP) data management

Overall data integration

RIDOT’s RIPDES AuditConsent Decree

Consent Decree Requirements

Drainage system inventory and inspection

Catch basin and manhole cleaning

Street sweeping

Illicit discharge detection elimination inspections

Stormwater Control Plan (SCP) development

Stormwater Treatment Unit (STU) design and construction

Internal trainings

Annual compliance reports

Ongoing data updates to RIDEM and EPA

Coordination among multiple divisions and consultants

Rhode Island MS4 Permit Areas

Office of Stormwater Management

Other Departments

Asset Management

Drainage infrastructure inventory

Condition inspections

IDDE screening and sampling

Work orders for inspection and maintenance follow-up

Tracking of work complete

Mobile field data collection

RIDOT’s Stormwater Data Management

Dry Weather SamplingElectronic Data Collection

SAM IS?

Stormwater Control Plans

Goal: Develop Stormwater Control Plans for all impaired watersheds over 10 years

Setting treatment targets

Identify potential structural and non-structural BMPs to meet target

Accelerated construction schedule

Developed tracking database

SCP Data Management Challenges

Over 230 watersheds

Multiple consultants completing work

Different consultants each year

Unique tracking needs for each watersheds

Submission to RIDOT, RIDEM, and EPA

Solutions

Centralized cloud-based database to track information

Enterprise database allowing for versioning

Customizable but comprehensive database

ArcGIS Online maps for agency review

RIDOT SCP Data Management

Data Sources

Delineate RIDOT catchments

Use drainage inventory data from VueWorks– Catch basins– Outfalls – Map

interconnections

Complete IDDE screening and sampling

Data Integration with RIDOT Programs

Prioritizing future work from SCP outcomes

Coordination with transportation projects

Coordination with municipal partners

Stormwater program budget and schedule planning

Sharing drainage infrastructure information with project designers

Pulling project updates back into drainage infrastructure database

Taking credit from all stormwater improvements statewide

Keeping reduction targets up to date

Pre-Scoping Project Intake Tool

Project Limits Defined

Review SCP Data to: Identify watersheds Identify TMDLs Identify impaired

receiving waters Determine if STUs

will be required

ScopingPhase

Project Scope and Cost Defined

Provide Design Consultants with: Anticipated STU

needs Existing SCP data

and potential STU data

Drainage system data

Interim Design Phase FinalDesign

Final STU Design

Update Drainage Infrastructure Final STU Data STU WQ Calculations Updates to drainage

infrastructure data

RIDOT Stormwater Process

Watershed dataExisting STU

dataPotential STU

dataRIDOT Drainage

InfrastructureCatchment

Delineations

STU Feasibility Defined

Update SCP Results Confirm Project Area

receiving waterbody Update catchment

delineation Update existing STU

and potential STU dataProvide additional data: Geotech results Wetland delineation

ww

w.v

hb.c

om

Offices located throughout the east coast

Annie Bastoni | abastoni@vhb.com | 617.607.2158