RECAPP Facility Evaluation Report
Health Unit B4480ASt. Paul
Alberta Health Services-North
Report run on: March 18, 2013 10:22 AM Page 2 of 24
B4480ABuilding Id:
Health Unit Building Name:
St. PaulLocation:5610 - 50 Avenue Address:
1,333.00Gross Area (sq. m): $4,893,504Replacement Cost:0Construction Year:
Evaluation Date: September 4 2012
MAYCON Architectural andEngineering Services
Evaluation Company:
Vic MaybrodaEvaluator Name:
The single storey general purpose office building contains 1333 sq. M in area constructed in 1981. In addition to health care offices the unit contains sound proof rooms to measure hearing impairment and generalpurpose medical research labs.
General Summary:
Structural Summary:Roof is composed of metal deck on OWS joists supported by exterior concrete block walls with concrete foundation wallsand concrete slab on grade. Elements appear to be in acceptable condition.
Envelope Summary:Exterior walls consist of painted concrete block, face brick and prefinished metal siding housing aluminum framedstorefronts, aluminum and steell framed sealed fixed window units and painted utility doors. Overall elements appear to be in acceptable condition.
Interior Summary:Flooring consists of sealed concrete, ceramic tile, sheet vinyl, vinyl asbestos tile and carpeting. Walls are painted gypsum wallboard and ceramic tile with ceilings of acoustical tile and gypsum wallboard with afolding partition located between two offices. Casework consist of painted wood cabinetry with chemical resistant laminated counter tops, plastic laminated vanitycounter tops and wood and plastic laminated finished reception desk. Wash rooms contain prefinished metal toilet partitions. Doors are stained solid core wood with institutional grade hardware. Roller blinds cover aluminum framed window units. Elements appear to be in acceptable condition.
Mechanical Summary:One story strip mall style building with roof top units providing heating and cooling. With ceiling mount exhaust fans inthe washrooms. There is one hot water tank supplying hot water to the washrooms and exam rooms. Buildings mechanical equipment is acceptable.
Electrical Summary:The building has a 600 Amp, 120/208 volt service fed overhead from three pole mounted single phase transformers. The T-12 lamp fluorescent fixtures provide lighting for entire interior; Exterior lighting is provided by HPS pack at eachentrance of the building; Emergency lighting in the building is provided by battery pack emergency lighting fixtures. Exitlighting in the building is provided by LED. The fire alarm and telephone meet current facility requirements. In general the overall condition of the electrical distribution and systems are "Acceptable".
7.25%5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $354,600
St. Paul - Health Unit (B4480A)
Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.
Report run on: March 18, 2013 10:22 AM Page 3 of 24
A1010 Standard Foundations*
A1030 Slab on Grade*
B1010.05 Mezzanine Construction*
B1020.01 Roof Structural Frame*
B1020.03 Roof Decks, Slabs, and Sheathing*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1981
1981
1981
1981
1981
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
St. Paul - Health Unit (B4480A)S1 STRUCTURAL
Concrete foundation walls on strip footings.
Concrete slab on grade throughout.
Wood framed mezzanine located in mechanical/electrical/ storage area accessed by wood stairs.
Metal deck on OWS joists.
Metal deck.
Report run on: March 18, 2013 10:22 AM Page 4 of 24
B2010.01.02.01 Brick Masonry: Ext. Wall Skin*
B2010.01.02.02 Concrete Block: Ext. Wall Skin*
B2010.01.06.03 Metal Siding**
B2010.01.11 Joint Sealers (caulking): Ext. Wall**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1981
1981
1981
1981
Installed
Installed
Installed
Installed
0
0
40
20
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace 140 sq. M Metal Siding
Replace 160 Lin M Caulking
Lifecycle Replacement
Lifecycle Replacement
2021
2016
$43,500
$4,800
Unassigned
Unassigned
St. Paul - Health Unit (B4480A)S2 ENVELOPE
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Face brick located on south side (main facade) of the building with brick returns of the west and east sides of the building.
Painted concrete block on three side of the facility.
Prefinished horizontal metal siding is located above window head level on front elevation.
Applied around exterior wall openings.
Report run on: March 18, 2013 10:22 AM Page 5 of 24
B2010.01.13 Paints (& Stains): Ext. Wall**
B2010.02.03 Masonry Units: Ext. Wall Const.*
B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation*
B2010.05 Parapets*
B2010.09 Exterior Soffits*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1981
1981
1981
1981
1981
Installed
Installed
Installed
Installed
Installed
15
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Replace 580 sq. M Painted Surfaces
Lifecycle Replacement 2016 $17,500 Unassigned
St. Paul - Health Unit (B4480A)
Event:
Type Year Cost Priority
Updated: MAR-13
Painted concrete block and utility doors.
Concrete block.
Not viewable. No concerns observed or reported.
Perimeter roof parapets are low in height and contain isolated scuppers.
Prefinished metal over front facade.
Report run on: March 18, 2013 10:22 AM Page 6 of 24
B2020.01.01.01 Steel Windows (Glass & Frame)**
B2020.01.01.02 Aluminum Windows (Glass & Frame)**
B2020.02 Storefronts: Windows**
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1981
1981
1981
Installed
Installed
Installed
40
40
40
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Replace 20 sq. M Steel Framed Windows
Replace 46 sq.M Aluminum Windows
Replace 12 sq. M Storefront Windows
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2021
2021
2021
$15,000
$46,000
$12,000
Unassigned
Unassigned
Unassigned
St. Paul - Health Unit (B4480A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Sealed fixed glazing units in steel frames with georgian wire located on rear elevation. Sealed fixed glazing units in steel frames located on east elevation.
Sealed fixed glazing in aluminum frames.
Sealed fixed glazing units in aluminum frames at front entry.
Report run on: March 18, 2013 10:22 AM Page 7 of 24
B2030.01.01 Aluminum-Framed Storefronts: Doors**
B2030.01.06 Automatic Entrance Doors**
B2030.02 Exterior Utility Doors**
B3010.01 Deck Vapour Retarder and Insulation*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1981
1981
1981
1981
Installed
Installed
Installed
Installed
30
30
40
0
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace 1 Storefront Door
Replace 2 Double Automatic Entry Doors
Replace 3 Utillity Doors
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2016
2016
2021
$2,500
$27,000
$3,000
Unassigned
Unassigned
Unassigned
St. Paul - Health Unit (B4480A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Fully glazed aluminum framed entry door.
Fully glazed powered entry doors located at main entry.
Painted insulated metal clad doors.
No viewable. No concerns observed or reported.
Report run on: March 18, 2013 10:22 AM Page 8 of 24
B3010.04.04 Modified Bituminous Membrane Roofing (SBS)**
B3020.02 Other Roofing Openings (Hatch, Vent, etc)*
4 - Acceptable
4 - Acceptable
Rating
Rating
2007
1981
Installed
Installed
25
0
Design Life
Design Life
MAR-13
MAR-13
Updated
Updated
Replace 133 sq. M SBS Roofing
Lifecycle Replacement 2032 $22,610 Unassigned
St. Paul - Health Unit (B4480A)
Event:
Type Year Cost Priority
Updated: MAR-13
SBS membrane over roof area. Minor islolated ridging viewed.
Roof hatch, roof drains, plumbing and exhaust vents.
Report run on: March 18, 2013 10:22 AM Page 9 of 24
C1010.01 Interior Fixed Partitions*
C1010.03 Interior Operable Folding Panel Partitions**
C1010.05 Interior Windows*
C1010.08 Other Partitions*
C1020.01 Interior Swinging Doors (& Hardware)*
C1020.03 Interior Fire Doors*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1981
1981
1981
1981
1981
1981
Installed
Installed
Installed
Installed
Installed
Installed
0
30
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Updated
Replace 12 sq. M Folding Partition
Lifecycle Replacement 2016 $13,200 Unassigned
St. Paul - Health Unit (B4480A)S3 INTERIOR
Event:
Type Year Cost Priority
Updated: MAR-13
Metal stud.
Operable folding partition located between two offices.
Opaque glazing units in metal frames between corridors and office spaces.
Sound proof partitions in an area devoted to test hearing impairment.
Stained solid core wood in metal frames with institutional hardware.
Rated door and frame to mechanical/electrical/storage area.
Report run on: March 18, 2013 10:22 AM Page 10 of 24
C1030.02 Fabricated Compartments (Toilets/Showers)**
C1030.12 Storage Shelving*
C1030.14 Toilet, Bath, and Laundry Accessories*
C2010 Stair Construction*
C2020.08 Stair Railings and Balustrades*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1981
1981
1981
1981
1981
Installed
Installed
Installed
Installed
Installed
30
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Replace 6 Fabricated Toilet Compartments
Lifecycle Replacement 2016 $7,500 Unassigned
St. Paul - Health Unit (B4480A)
Event:
Type Year Cost Priority
Updated: MAR-13
Prefinished metal toilet partitions located in wash rooms.
Painted and stained wood.
Toilet paper holders, grab bars, soap and towel dispensers, waste containers and mirrors
Wood stair to mezzanine.
Wood railing and balustrades.
Report run on: March 18, 2013 10:22 AM Page 11 of 24
C3010.06 Tile Wall Finishes**
C3010.11 Interior Wall Painting*
C3020.01.02 Painted Concrete Floor Finishes*
C3020.02 Tile Floor Finishes**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1981
1981
1981
1981
Installed
Installed
Installed
Installed
40
0
0
50
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace 32 sq M Wall Tile
Replace 32 sq. M Floor Tile
Lifecycle Replacement
Lifecycle Replacement
2021
2031
$7,680
$5,500
Unassigned
Unassigned
St. Paul - Health Unit (B4480A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
1.5 M high ceramic tile to walls in wash rooms.
Painted gypsum wallboard.
Located in mechanical/electrical/storage room.
Ceramic tile located in wash rooms.
Report run on: March 18, 2013 10:22 AM Page 12 of 24
C3020.07 Resilient Flooring** - Sheet Flooring
C3020.07 Resilient Flooring** - Tile
C3020.08 Carpet Flooring**
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
2010
1981
2010
Installed
Installed
Installed
20
20
15
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Replace 430 sq. M Resilient Flooring
Replace 40 sq. Resilient Tile Flooring
Replace 730 sq. M Carpeting.
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2030
2016
2025
$38,700
$3,600
$48,000
Unassigned
Unassigned
Unassigned
St. Paul - Health Unit (B4480A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Sheet vinyl flooring is located in entry lobby area, corridors and various office areas.
Vinyl Asbestos Tile (VAT) is located in 3 Lab/Offices. Replacement should be undertaken by encapsulation (new sheet flooring applied directly over VAT). Vinyl Composite Tile (VCT) is located in a storage room.
Carpeting is located in administration area, offices and conference rooms.
Report run on: March 18, 2013 10:22 AM Page 13 of 24
C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)**
C3030.07 Interior Ceiling Painting*
4 - Acceptable
4 - Acceptable
Rating
Rating
1981
1981
Installed
Installed
25
0
Design Life
Design Life
MAR-13
MAR-13
Updated
Updated
Replace 1150 sq. M Acoustical Ceilings
Lifecycle Replacement 2016 $57,500 Unassigned
St. Paul - Health Unit (B4480A)
Event:
Type Year Cost Priority
Updated: MAR-13
Located in corridors and office spaces.
Painted gypsum wallboard located in wash rooms and storage areas.
Report run on: March 18, 2013 10:22 AM Page 14 of 24
D2010.04 Sinks**
D2010.10 Washroom Fixtures (WC, Lav, Urnl)**
D2020.01.01 Pipes and Tubes: Domestic Water*
D2020.01.02 Valves: Domestic Water**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1981
1981
1981
1981
Installed
Installed
Installed
Installed
30
35
0
40
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace 4 sinks
Replace 8 WC, 6 Lav, 2 Urni
Replace 10 vaalves
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2016
2016
2021
$3,200
$15,000
$1,000
Unassigned
Unassigned
Unassigned
St. Paul - Health Unit (B4480A)S4 MECHANICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Single bowl SS sinks with a two handle tap set with handicap handles
Standard tank type WC, Standard Lav with infrared sensors, wall hung flush valve urinals
Copper piping through out the building
Shut off valves at the meter and HW tank, and main branches
Report run on: March 18, 2013 10:22 AM Page 15 of 24
D2020.02.06 Domestic Water Heaters**
D2030.01 Waste and Vent Piping*
D2030.02.04 Floor Drains*
D2040.01 Rain Water Drainage Piping Systems*
D2040.02.04 Roof Drains*
D3010.02 Gas Supply Systems*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
2009
1981
1981
1981
1981
2009
Installed
Installed
Installed
Installed
Installed
Installed
20
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Updated
Replace hot water tank
Lifecycle Replacement 2029 $1,500 Unassigned
St. Paul - Health Unit (B4480A)
Event:
Type Year Cost Priority
Updated: MAR-13
40 gal, 40 MBH hot water taank
Cast iron and PVC piping through out the building.
Standard 4" floor drain by the hot water tank
PVC RWL from roof drains to a storm system in the road.
Standard 4" rood drains on the roof
Sch 40 black steel piping on the roof suppyling the roof top units and dropping into the building for the HWT and unitheater
Report run on: March 18, 2013 10:22 AM Page 16 of 24
D3020.04.03 Fuel-Fired Unit Heaters**
D3020.04.04 Chimney (& Comb. Air): Fuel-Fired Heater*
D3040.01.04 Ducts: Air Distribution*
D3040.01.07 Air Outlets & Inlets: Air Distribution*
D3040.04.01 Fans: Exhaust**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1981
1981
1981
1981
1981
Installed
Installed
Installed
Installed
Installed
30
0
0
0
30
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Replace 1 unit heater
Replace 6 fans
Lifecycle Replacement
Lifecycle Replacement
2016
2016
$4,000
$4,000
Unassigned
Unassigned
St. Paul - Health Unit (B4480A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
An Olson unit heater in the storage room.
Class 'B' chimney run up through the roof
Insulated galvanized steel ductwork throughout the Health center from the air handling units.
Square ceiling diffusers in the open areas, double deflections grilles in the side wall installation and in small rooms, eggcrate return grilles throughout the hospital
Washroom exhaust fans
Report run on: March 18, 2013 10:22 AM Page 17 of 24
D3040.04.03 Ducts: Exhaust*
D3040.04.05 Air Outlets and Inlets: Exhaust*
D3050.01.02 Packaged Rooftop Air Conditioning Units (& Heating Units)**
D3060.02.01 Electric and Electronic Controls**
D4030.01 Fire Extinguisher, Cabinets and Accessories*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1981
1981
2009
2009
1981
Installed
Installed
Installed
Installed
Installed
0
0
30
30
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Replace 7 roof top units
Replace 8 thermostats
Lifecycle Replacement
Lifecycle Replacement
2039
2039
$110,000
$1,500
Unassigned
Unassigned
St. Paul - Health Unit (B4480A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Galvinized steel exhaust ducts running up through the roof with a weather hood.
Egg crate style grilles.
7 roof top units with economizers, serving various areas.
Low voltage thermostats controlling the roof top units and unit heater.
Fire extinquisher by the entrances
Report run on: March 18, 2013 10:22 AM Page 18 of 24
D5010.01.02 Main Electrical Transformers (Utility Owned)*
D5010.03 Main Electrical Switchboards (Main Distribution)**
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**
D5010.07.02 Motor Starters and Accessories**
5 - Good
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
2012
2012
1981
1981
Installed
Installed
Installed
Installed
0
40
30
30
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace Main Electrical Switchboards (MainDistribution)
Replace 4 Electrical Branch Circuit Panelboards
Replace 8 Motor Starters and Accessories
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2052
2016
2016
$32,000
$20,000
$4,000
Unassigned
Unassigned
Unassigned
St. Paul - Health Unit (B4480A)S5 ELECTRICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Three single phase pole mounted transformers are used to provide power to the building.
The main service to the building is 120/208V, 3 phase, 4 wire and rated 600A and is fed overhead from pole mountedtransformers. The main distribution consists 600A main disconnect, CT cabinet, utility meter and 600A main distributionsection.
All the panels were installed with original building and are in full capacity.
The stand alone magnetic starters and load switches are used for major mechanical pump controls
Report run on: March 18, 2013 10:22 AM Page 19 of 24
D5020.01 Electrical Branch Wiring*
D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*
D5020.02.02.02 Interior Fluorescent Fixtures**
D5020.02.03.02 Emergency Lighting Battery Packs**
D5020.02.03.03 Exit Signs*
5 - Good
4 - Acceptable
4 - Acceptable
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
1981
1981
1981
2011
2011
Installed
Installed
Installed
Installed
Installed
0
0
30
20
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Replace 200 Interior Fluorescent Fixtures
Replace 15 Emergency Lighting Battery Packs
Lifecycle Replacement
Lifecycle Replacement
2016
2031
$80,000
$18,000
Unassigned
Unassigned
St. Paul - Health Unit (B4480A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
All the wires are copper and installed in the conduits. The BX wires are used for field wiring
The entire building lighting is controlled by local line voltage switches
All the fixtures are T-12 lamp fluorescents
Fixtures installed in corridors and strategic locations.
All the Exit signs are LED type
Report run on: March 18, 2013 10:22 AM Page 20 of 24
D5020.03.01.04 Exterior H.P. Sodium Fixtures*
D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*
D5030.01 Detection and Fire Alarm**
D5030.04.01 Telephone Systems*
D5030.04.04 Data Systems*
D5030.04.05 Local Area Network Systems*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
1981
1981
1981
1981
2003
2003
Installed
Installed
Installed
Installed
Installed
Installed
0
0
25
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Updated
Replace Detection and Fire Alarm
Lifecycle Replacement 2016 $40,000 Unassigned
St. Paul - Health Unit (B4480A)
Event:
Type Year Cost Priority
Updated: MAR-13
The fixtures are installed under the canopy at building entrances
The outdoor lights are controlled by manual switch
The single zone hardwired Edwards 6601 panel is used for building fire alarm system
The Avaya machine is used for building telephone system and have hand sets installed in all the office.
The data system is tied to local health board through Supernet.
The data outlets are installed through all the offices.
Report run on: March 18, 2013 10:22 AM Page 21 of 24
D5090.01 Uninterruptible Power Supply Systems**
5 - GoodRating
2008Installed
30Design Life
MAR-13Updated
Replace 5 Uninterruptible Power Supply units
Lifecycle Replacement 2038 $20,000 Unassigned
St. Paul - Health Unit (B4480A)
Event:
Type Year Cost Priority
Updated: MAR-13
The Eaton UPS units are used for vaccine coolers
Report run on: March 18, 2013 10:22 AM Page 22 of 24
E1020.08 Medical Equipment*
E1090.04 Residential Equipment*
E2010.02 Fixed Casework**
E2010.03.01 Blinds**
F1040.06 Other Special Facilities*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1981
1981
1981
1981
1981
Installed
Installed
Installed
Installed
Installed
0
0
35
30
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Replace Casework
Replace 78 sq. M Roller Blinds
Lifecycle Replacement
Lifecycle Replacement
2016
2016
$43,000
$7,800
Unassigned
Unassigned
St. Paul - Health Unit (B4480A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Freezer and coolers with miscellaneous counter mounted testing equipment. Hearing impairment area contains testing equipment.
Coffee maker, microwave and dishwasher.
2 Lin M low level cabinetry with plastic laminated counter top located in lobby area. 10 Lin M painted upper and lower cabinetry with acid resistant counter tops located in lab/office areas. 6 Lin M plastic laminated vanity counter tops located in wash rooms. 10 Lin M wood finished reception desk with plastic laminated finish.
Roller blinds applied to window units.
Two sound proof rooms and related testing area for testing hearing impairment.
Report run on: March 18, 2013 10:22 AM Page 23 of 24
K4010.01 Barrier Free Route: Parking to Entrance*
K4010.02 Barrier Free Entrances*
K4010.04 Barrier Free Washrooms*
K4030.01 Asbestos*
K4030.04 Mould*
K4030.09 Other Hazardous Materials*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1981
1981
1981
1981
1981
1981
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Updated
St. Paul - Health Unit (B4480A)S8 SPECIAL ASSESSMENT
Hard surface with concrete ramp.
Power actuated sliding doors at main entry.
BFA equipped wash rooms.
Except for VAT no asbestos observed or reported.
No mould observed or reported.
No other hazardous materials observed or reported.
Report run on: March 18, 2013 10:22 AM Page 24 of 24
K5010.01 Site Documentation*
K5010.02 Building Documentation*
4 - Acceptable
4 - Acceptable
Rating
Rating
2012
2012
Installed
Installed
0
0
Design Life
Design Life
MAR-13
MAR-13
Updated
Updated
St. Paul - Health Unit (B4480A)
Site plan.
On 04 September 2012, Vic Maybroda of MAYCON Architectural and Engineering Services supported by Kevin Smith ofBacz Engineering and Bozka Malanik of Acuity Engineering accompanied by Mr. Les Eldridge of the St. Paul HealthAuthority undertook an onsite review of existing building and site conditions of the St. Paul Health Centre. The single storey general purpose office building contains 1333 sq. M in area constructed in 1981. In addition to health care offices the unit contains sound proof rooms to measure hearing impairment and generalpurpose medical research labs.
B4480A St Paul Health Unit Site Plan.jpg
B4480A Floor Plan .JPG