PRE-BID ADDENDUM #2
PROJECT NAME: Junction House PROJECT LOCATION: 1311 Lodora Drive, Wentzville, MO 63385 PROJECT #: 19023 Date: March 16, 2020
BID Due Date/Deadline • The due date for submitting bids for this project remains unchanged: Wednesday, 3/18/20
@ 2:00 p.m. CT • Please submit all bids electronically to LCS’ bids email address bids@lcsconstruct.com
CLARIFICATIONS / REQUEST FOR INFORMATION • The purpose of this addenda is to address incoming RFI’s/Questions as it pertains to the
bidding documents. Please note the following responses for Questions/Clarifications
Q: Please supply a room finish schedule / finish plan for the project A: Interior Finish plans/schedule will be issued at later date. This bid request pertains to the shell package/structure only. Please include all exterior walls and interior partitions as shown within the plans in your proposal for this bid package. Factor in level 4 finish on all exposed drywall, fire taped above ceilings. Interior of kitchens to be prepped to receive smooth FRP floor to ceiling. Restrooms to receive ceramic wall tile full height on plumbing walls and 4’0” tile wainscot on all other restroom walls. For all other wall type or partition specifics, refer to architectural & structural plans for more information.
Q: Please specify glass types for this project. A: Exterior: 1” insulated – Low E glass units with ¼” solarban 60 exterior lite, ½” airspace and ¼ clear interior lite. For interior borrow lites, include ¼” clear tempered. Q: The note on 1/A303 states “equipment by kitchen designer.” Does this include the P6 type partitions with the owner’s equipment? A: The P6 partition type shall be included in the framing/drywall contractor’s proposal. It will not be supplied with the owner equipment. Please price the die wall partition types P6 & P6a as a separate line item using the specified Krowne modular Die-Wall stud. In addition, please propose a value engineering alternative to frame these partitions out of cold formed heavy gauge steel studs or wood framing. The intent here with the die-wall is to provide a rigid, floor braced short wall with MEP access through the wall cavities. It will be at the framing contractor’s option to propose a value engineering alternate, however the wall shall remain rigid and not prohibit MEP access throughout. Q: Will there be a drywall lid above the ACT? A: Please refer to the partition types on sheet A-003 and the wall section details on A-301 & A-302 for more information. Q: What are the ceilings in the main dining, private room, reception, vestibule, future tenant, stairwell, storage, corridors, circulation and elevator supposed to receive.
1/A504, shows no ceiling in shaft of elevator but didn’t know if one would be required to maintain 2hr rating. A: Refer to the reflected ceiling plans for information on ceiling configurations. Areas shown to receive gypsum board or ACT are hatched accordingly. Areas without hatching will be open to structure above. As it pertains to the elevator shaft, please construct per structural details 50 & 51 on S411. Q: Would it be acceptable to use 093X in lieu of making drywall rips behind the normal 093 control joint. Notes say to refer to GA600-900 fire resistance design manual which says to use the rips. Attached is the 093X data sheet. A: Include in your base bid, the specified approach and include a bid alternate line item to utilize the 093X fire rated control joints. Product data sheet attached. Q: When is the estimated start and finish date for this project? A: Start Date is March 9, 2020 & Finish Date is August 1, 2020
Q: Is the landscaping scope available to bid? A: Currently, No Landscaping/Planting scopes of work are included in this bid package Q: What is the ACT Type for this project? A: Interior Finishes will be issued under a separate bid package. Q: Could you point me in the right direction? I see on the scope of work there is Ceramic tile and base, but nothing specific. A: Interior Finishes will be issued under a separate bid package. Q: I cannot find the header schedule for the Junction House. Please advise. A: The head schedules can be found on structural plan sheets S300, S400, & S401
Q: Who will be providing the kitchen equipment? Are there kitchen equipment drawings available? A: Currently, the owner is specified to furnish and install the kitchen equipment to include the kitchen hoods. Subcontractors are too furnish and install all rough-in connections to the owner supplied kitchen equipment and provide final connections within their scope. Owner’s kitchen equipment supplier will deliver, unload and unpack all supplied equipment and slide in place for respective trades to make final connections. Plumber to set/plumb all sinks provided by owner. Kitchen hoods to be furnished and installed complete by owner. Connection to Ansul system and fire alarm for hoods will require coordination from the HVAC and Fire Suppression trades. The Make-up Air and all HVAC conditioning equipment is to be furnished and installed by the contractor. Kitchen Equipment drawings are attached to this addenda. Specifications to each piece of equipment can be found via the link below to LCS’ website as the file size is too large to email. https://lcsconstruct.com/bid_package/the-junction-house-building-package/ Q: What do you want covered in the bid for the roof plan M3? RTUs indicate future but do you want curbs or gas piping in this bid? A: Do not include RTU’s 4 & 5 in your base bid proposal for project. Provide and add alternate to furnish and install these complete with curbs, drops, units and gas piping as an add alternate. Q: M1 indicates to refer to kitchen equipment plans. Are there any yet? A: Refer to previous answer above as it pertains to the kitchen equipment layout and equipment specs.
Q: I cannot find the kitchen equipment drawings. Also, is the owner providing the equipment or are we to purchase everything? A: Refer to previous answer above as it pertains to the kitchen equipment layout and equipment specs. Q: Lastly, Are we to price the future tenant spaces separately? A: Include all work shown on the plans for the future tenant spaces, however do not include RTU’s 4 & 5 in your base bid proposal for the project. Provide and add alternate to furnish and install these complete with curbs, drops, units and gas piping as an add alternate. Q: Are there any FP plans for the junction house or is it design build ? One of the plans references MEPFP plans. A: The fire protection/suppression scope of work is intended to be design build, as needed to furnish a complete system based on the building construction code data and construction plans/details.
Q: I just had a quick question regarding the Site Lighting. I haven’t been able to find anything. Is there existing lighting being reutilized or is it something coming later? Please advise. A: No existing site lighting will be utilized for this project, all will be new. Please include within your bid proposal a $25,000 allowance to address future site lighting revisions. Q: Please specify weights for the rooftop equipment. A: RTU #1 – 2,700lbs, RTU #2 – 2,900lbs, RTU #3 – 900lbs, RTU #4 & 5 – 900lbs, MUA-1 – 1,600lbs, MUA-2 – 1,900lbs, MUA-3 – 1,600lbs, the 3 Condensers on roof – 300lbs each. Q: The plan calls out floor trusses that are exposed to the outdoors that have a rubber membrane on top of them and then mechanicals on top of that. This area would probably be better suited for roof trusses because we need to load for snow. However, because of upset beams there isn't enough depth for webs around the beams. A: Floor vs Roof designation doesn’t really matter to me as long as the trusses can carry the loads indicated. We are pretty set with the details we have, if they have suggestions, we can look at these on a case by case basis. Q: There is a section of the building that calls out for floor trusses that are 3'-2" tall. This exceeds our capabilities. The maximum floor truss depth we can build is 24". A: Floor vs Roof designation doesn’t really matter to me as long as the trusses can carry the loads indicated. We are pretty set with the details we have, if they have suggestions, we can look at these on a case by case basis. Q: At the canopy, the upset beam (noted on detail S71/S510) creates an issue with the depth our truss at the bearing point. We would potentially need to raise the depth of the roof trusses to make the upset beam situation work. Or, can the beam possibly not be upset into our trusses? A: Let us know what you need to make this work. The beam will need to be within the truss depth to create the look needed.
PROJECT SPECIFICATION REVISIONS UNDER THIS ADDENDA: • Please refer to the attached product data sheet for the 093X fire rated control joints as it
pertains to the drywall rips bid alternate requested for this project.
CONSTRUCTION DRAWING REVISIONS UNDER THIS ADDENDA: • Please see kitchen equipment layout drawings dated 12/2/19 attached • Please see kitchen hood drawings dated 1/6/20 attached • Please refer to attached MEP redlines dated 3/17/20 from the mechanical engineer as it
pertains to the plumbing and HVAC bidding for this project. Formal updated drawings will follow.
END OF ADDENDUM
FAS-093X Fire Rated Control JointDrywall or veneer plaster fire rated control joint
A composite control joint with intumescent tape factory applied to one side of the back of the control joint. The FAS-093X has been tested according to UL-2079 “Test For Fire Resistance of Building Joint Systems” and is used to relieve stresses of expan-sion and contraction of drywall interior partitions or ceilings run-ning in a horizontal or vertical direction. The opening is protected by an orange plastic tape to indicate the fire rating this tape is removed after joint compound has been applied and the finish is completed. The section is fabricated from hot-dipped galvanized steel complying with ASTM A653, and ASTM A1003.
Product Data & Ordering Information: Material: Grade 33 Type H (33ksi)Coating: G40Thickness: 0.015”Grounds: 3/32” (2.4mm)Length: 10’-0” longPackaging: (20) pieces per carton – (25) cartons per pallet
ASTM & Code Standards: • ASTM C1047, A653 & A1003 • ASTM E1966: Standard Test Method of Fire Tests of Firestop
Systems for 1 and 2 hour wall assemblies• UL 2079 Tests for Fire Resistance of Building Joints• ASTM E-119: Standard Test Methods of Fire Tests of Building
Construction and Material• UL WW-D-0172 1 & 2 Hour Ratings• Sound Tested in accordance with ASTM E90-09• Air leakage tests conduced for compliance with Section 713.6
of IBC and CBC• SDS & Product Certification Information
is available at www.clarkdietrich.com/SupportDocs.
Installation: • FAS-093X can be used on metal or wood framing on one side
or both sides of the wall.• Can be installed with drywall fasteners or staples before the
flanges are coated with tape and joint compound.
• No Drywall Rips Required• No Sealant Required• No Mineral Wool Required• UL Listed Joint System• US Patent 8,671,632
Fire
Rat
ed C
ontr
ol J
oint
2.00”
.478”.693”
.478
”
1 Hour Fire Rating (1) 5/8” Type “X” Drywall on each side
2 Hour Fire Rating (2) 5/8” Type “X” Drywall on each side
09.22.16 (Non-Structural Metal Framing)
Product Submittal Sheet Tech Support: 888-437-3244 Sales: 800-543-7140
Engineering Services: 877-832-3206 clarkdietrich.com
Project Information Contractor Information Architect InformationName: Name: Name:Address: Contact: Contact:
Phone: Phone:Fax: Fax:
FAS-093X © 11/2018 ClarkDietrich Building Systems
QF003
FOODSERVICE SCHEDULES
NTS
DATE:
SCALE:
DRAWN BY:
SHEET TITLE:
SHEET NUMBER:
DATE NO. DESCRIPTION
APPROVED BY:
REVISIONS
THIS DOCUMENT WAS ORIGINALLY PRINTED ON A 24" x 36" SIZE
SHEET
PROJECT NUMBER:
MW ---
12/2/2019
JU
NC
TIO
N H
OU
SE
WE
NT
ZV
ILLE
, M
O
NE
W C
ON
ST
RU
CT
IO
N
902800
Midwest : Marlinn
6100 W. 73rd Street, Suite 1
Bedford Park, IL 60638
p. 708-496-1700
This document contains confidential
information, is an instrument of a
professional service, and the property of
TriMark. It shall not be used on other
projects or for the extension of this project
without TriMark's written approval.
trimarkusa.com
Owner and all Contractors to check
and verify existing dimensions and
conditions in the field before starting
construction and to notify TriMark of
any material or detail changes.
3'-5
"
WALK-IN
COOLER
DISH
MACHINE
DIRTY
DISH
DROP
3'-2
"
3'-0
"
MUG
FROSTER
MUG FROSTER
MUG
FROSTER
WINE
4'-8"
3'-3"
48
24
-T
( ")
72
4
48
24
-T
( ")
72
4
48
24
-T
( ")
72
4
48
24
-T
( ")
72
4
24
18
-T
( ")
72
4
48
24
-T
( ")
72
4
48
24
-T
( ")
72
4
48
24
-T
( ")
72
4
36
24
-T
( ")
72
4
36
24
-T
( ")
72
4
4824
-T
( ")
845
4824
-T
( ")
845
4824
-T
( ")
845
4824
-T
( ")
845
3024
-T
( ")
845
2424
-T
( ")
845
36
24
-T
( ")
84
5
36
24
-T
( ")
84
5
36
24
-T
( ")
84
5
36
24
-T
( ")
84
3
3024
-T( ")845
3024
-T( ")845
3'-6
"
R
H
H
3'-7"
DISH
PREP
3'-1"
3'-9"
2'-9
1
2
"
40
R R R
RR
F
F
RR
3839 36 37 34 35 33 32
24
3'-9
"
19 11 98 10 67
8685 88 87 8915
25737270 716968
42
54 27
41
43
44
55
67
R
R
65
66
64
26
56
51
57
53
52
58
75 8077 747778 80 76
79
80
80
103
104
105 101 106 107 108
95
96
9798
99
115
116
16
41
115
115
115
126
102 100
115 115 115 115
125 127 127126122121
120
68
68
130131 13112913212741 127
5
5
5
5
42
5
5
5
5
5
1
5
170 172 173175 170171 174
151
150
152 153 154 155 68 156 68
157
158
159
160 161 162 163
16968 168
164
165
166
167
200
203
201
202
204
205
206
68
207
208
209
210
211
170
216
219
214
215
218
170
217
68 213 212
50
123
2'-4"4'-7"
3
'
-
0
"
8'-4" CLEAR
8'-1"
218
ISSUES PENDING
ARCHITECT
· ADA SECTIONS AT BARS?
· NOTE NEW MILLWORK AT BARS. MILLWORK WILL NEED TO BE ADJUSTED
FROM CURRENT ARCHITECTURAL BACKGROUNDS TO MATCH CURRENT
DRAWINGS.
· NOTE NEW & ADJUSTED WALLS
· CAN DOOR ON 2ND FLOOR SWING INTO THE CORRIDOR AS SHOWN?
· 2ND DOOR OUT OF BACK OF HOUSE ON 2ND FLOOR FOR EGRESS?
· CEILING HEIGHTS ON FIRST & 2ND FLOORS?
· LOCATION OF REMOTE COMPRESSORS?
· LOCATION OF EXHAUST FANS? MUA FANS?
OWNER
· CONFIRM BEVERAGE PROGRAM EQUIPMENT. THIS WILL ALLOW US TO
PROPERLY DESIGN THE BEVERAGE COUNTER.
· EQUIPMENT PACKAGE BUDGET
· PROJECT TIME FRAME; WHEN DO WE PLAN TO BE OPEN
· WORKTOP REFRIGERATOR VS. WORK TABLE ON CHEF'S LINE?
· TRASH ON LINE? ONLY ONE SMALL SLIM JIM CURRENTLY BEING SHOWN?
· STORE RED WINE IN WINE UNIT AND STORE WHITE WINE IN THE BACKBAR
COOLER IN 2ND FLOOR BAR?
· CONFIRM SIZE OF BRAISING PAN IS SUFFICIENT. CONFIRM IF BOTH ARE
NEEDED.
· ITEM #108 - CONFIRM IF VENDOR IS TO PROVIDE ICE MACHINE FOR LARGE
SODA DISPENSER.
NEED INSIGHT ON THE FOLLOWING:
· BEVERAGE PROGRAM; NEED ALL SPECS TO CONFIRM SPACE IS
SUFFICIENT (TYPICALLY OWNER GETS THE EQUIPMENT SUPPLIED BY THE
VENDORS)
· ICE PROGRAM; DOES EVERYONE GET A GLASS OF ICE WATER? REQUEST
ONLY. CARAFE PER TABLE WITHOUT ICE, BUT CHILLED? SPECIALITY ICE
REQUIRED AT BAR FOR MIXED DRINKS? THIS AFFECTS THE SIZE OF ICE
HEAD AND BIN, AND THE QUANTITY SHOULD THERE BE MORE THAN ONE ICE
REQUIRED.
· SIZE OF WALK-IN COOLER AND FREEZER ON 1ST FLOOR; THESE ARE BOTH
UNDERSIZED FOR FOR 300 SEATS. EITHER WE LOOK FOR ADDITIONAL
SPACE ON THE SAME LEVEL, ADD MORE UPSTAIRS, AND/OR YOU ALTER
YOUR DELIVERY SCHEDULES. (MULTIPLE TIMES A WEEK) HOW YOU ORDER
YOUR FOOD WILL ALSO MAKE A DIFFERENCE. BULK PRE-PREPPED VS.
WHOLE, ETC.
REMOTE COMPRESSOR
TO BE LOCATED BY ARCHITECT
3
EXHAUST FANS & MUA FAN (BY HVAC)
TO BE LOCATED BY ARCHITECT
17
31
29
18
28
30
124
QF100
FOODSERVICE EQUIPMENT
PLAN
1/4" = 1'-0"
DATE:
SCALE:
DRAWN BY:
SHEET TITLE:
SHEET NUMBER:
DATE NO. DESCRIPTION
APPROVED BY:
REVISIONS
THIS DOCUMENT WAS ORIGINALLY PRINTED ON A 24" x 36" SIZE
SHEET
PROJECT NUMBER:
MW ---
12/2/2019
JU
NC
TIO
N H
OU
SE
WE
NT
ZV
ILLE
, M
O
NE
W C
ON
ST
RU
CT
IO
N
902800
Midwest : Marlinn
6100 W. 73rd Street, Suite 1
Bedford Park, IL 60638
p. 708-496-1700
This document contains confidential
information, is an instrument of a
professional service, and the property of
TriMark. It shall not be used on other
projects or for the extension of this project
without TriMark's written approval.
trimarkusa.com
Owner and all Contractors to check
and verify existing dimensions and
conditions in the field before starting
construction and to notify TriMark of
any material or detail changes.
FIRST FLOOR PLAN
1/4" = 1'-0"
OFFICE
MUG
FROSTER
WINE
48
24
-T
( ")
84
5
48
24
-T
( ")
84
5
36
24
-T
( ")
84
5
3624
-T( ")845
48
24
-T
( ")
84
5
4818
-T( ")845
4218
-T( ")845
3618
-T( ")845
4224
-T( ")
724
WALK-IN
FREEZER
WALK-IN
BEER COOLER
48
24
-T
( ")
72
"4
42
24
-T
( ")
72
"4
30
24
-T
( ")
72
"4
4224
-T( ")845
3624
-T( ")845
3024
-T( ")845
3'-1
"
BACKBAR
REF.
MUG
FROSTER
LIQ
UO
R D
IS
PLA
Y C
OU
NT
ER
WINE
258
250
256
256 251 255
256
256
257 257
257257257 253
259259259
263
262
260
261
264
265
259259
259
259
259 259 259
275 278 279
280
281 282 283
285
284
286
287
288
284
296 295 294 293 292 291 284 290 289
276 277
298
297
300
299299
249
3'-0
"
15'-1" CLEAR
14'-11"
3
'
-
1
"
REMOTE COMPRESSORS
TO BE LOCATED BY ARCHITECT
252 254
QF110
FOODSERVICE EQUIPMENT
PLAN
1/4" = 1'-0"
DATE:
SCALE:
DRAWN BY:
SHEET TITLE:
SHEET NUMBER:
DATE NO. DESCRIPTION
APPROVED BY:
REVISIONS
THIS DOCUMENT WAS ORIGINALLY PRINTED ON A 24" x 36" SIZE
SHEET
PROJECT NUMBER:
MW ---
12/2/2019
JU
NC
TIO
N H
OU
SE
WE
NT
ZV
ILLE
, M
O
NE
W C
ON
ST
RU
CT
IO
N
902800
Midwest : Marlinn
6100 W. 73rd Street, Suite 1
Bedford Park, IL 60638
p. 708-496-1700
This document contains confidential
information, is an instrument of a
professional service, and the property of
TriMark. It shall not be used on other
projects or for the extension of this project
without TriMark's written approval.
trimarkusa.com
Owner and all Contractors to check
and verify existing dimensions and
conditions in the field before starting
construction and to notify TriMark of
any material or detail changes.
SECOND FLOOR PLAN
1/4" = 1'-0"
1500500
FLOW RATE (cfm)1000
0.000
0.50
PRE
SSU
RE D
ROP
(in. H
20)
PRESSURE DROP VS. FLOW RATE
FRA
CTIO
NA
L E
FFIC
IEN
CY (%
)
00.1
20
40
1.0
PARTICLE DIAMETER (um)10.0
EFFICIENCY VS. PARTICLE DIAMETER
60
80
100
1.00
1.50
2.00
2.50
3.00
3.50
SHEET NO.
SCALE:
DWG.#:
DRAWN
DATE:
BY:
REVISIONS
ww
w.c
aptiv
eaire
.com
MASTER DRAWING
Chi
cago
Foo
dser
vice
Div
isio
n
1652
E M
ain
St.,
Sui
te 2
0, S
t. C
harle
s, IL
, 601
74 P
HO
NE
: (63
0) 3
77-2
611
FAX
: (91
9) 5
16-8
738
EM
AIL
: reg
55@
capt
ivea
ire.c
om
SHEET NO.
SCALE:
DWG.#:
DRAWN
DATE:
BY:
REVISIONS
ww
w.c
aptiv
eaire
.com
MASTER DRAWING
Chi
cago
Foo
dser
vice
Div
isio
n
1652
E M
ain
St.,
Sui
te 2
0, S
t. C
harle
s, IL
, 601
74 P
HO
NE
: (63
0) 3
77-2
611
FAX
: (91
9) 5
16-8
738
EM
AIL
: reg
55@
capt
ivea
ire.c
om
SHEET NO.
SCALE:
DWG.#:
DRAWN
DATE:
BY:
REVISIONS
ww
w.c
aptiv
eaire
.com
MASTER DRAWING
Chi
cago
Foo
dser
vice
Div
isio
n
1652
E M
ain
St.,
Sui
te 2
0, S
t. C
harle
s, IL
, 601
74 P
HO
NE
: (63
0) 3
77-2
611
FAX
: (91
9) 5
16-8
738
EM
AIL
: reg
55@
capt
ivea
ire.c
om
SHEET NO.
SCALE:
DWG.#:
DRAWN
DATE:
BY:
REVISIONS
ww
w.c
aptiv
eaire
.com
MASTER DRAWING
Chi
cago
Foo
dser
vice
Div
isio
n
1652
E M
ain
St.,
Sui
te 2
0, S
t. C
harle
s, IL
, 601
74 P
HO
NE
: (63
0) 3
77-2
611
FAX
: (91
9) 5
16-8
738
EM
AIL
: reg
55@
capt
ivea
ire.c
om
ɸ