Project Cost ControlProject Cost ControlProject Cost ControlProject Cost ControlProf. A.L. AgarwalProf. A.L. Agarwal
8/7/2019 Project Cost Controeditedl
2/32
2
Related TermsRelated TermsRelated TermsRelated Terms
-- Cost PlanningCost Planning
-- Cost ControlCost Control-- Cost ReductionCost Reduction-- ValuationValuation-- EstimationEstimation-- Value Analysis / Value EngineeringValue Analysis / Value Engineering
8/7/2019 Project Cost Controeditedl
3/32
3
OBJ ECTIVES OF CO ST C ON T RO LEnsuring Estimated ProfitOv erall F inancial Control by Matching Costs &Value of Work Done
Locate Areas of Inefficient/ efficientF unctioningProv ide data for Cost ReductionSer v e As Database for Estimating
Identify Scope for Rev ision in Sub-contractRatesIdentify Areas for Recov ery from O wners
8/7/2019 Project Cost Controeditedl
4/32
4
PRO CESS OF CO ST C ON T RO LEstimate/ Budget
ControlAccumulateReporting
Correcti v e Action
8/7/2019 Project Cost Controeditedl
5/32
5
ESTIMATI ON / BU DGETIN GPre-tender Planning Site Survey Resources Availability,
Rates Time Limit Schedule Method of Execution Cash FlowPost-tender Planning
Execution Methodology Organisation Mobilisation Sub -contracting Schedules Cash -flow
8/7/2019 Project Cost Controeditedl
6/32
6
CON
T RO
L Execution Methodology Delegation Vendor/ Sub -contractor Selection Negotiations Quantity Survey Quality Security Internal Audit
8/7/2019 Project Cost Controeditedl
7/32
7
ACCU
MU
LATE Accounting Methods Cost Codes Integration with Other Departments
8/7/2019 Project Cost Controeditedl
8/32
8
REPOR TI N G Physical Progress Performance Against Budget Variance Analysis Productivity Reporting
8/7/2019 Project Cost Controeditedl
9/32
9
8/7/2019 Project Cost Controeditedl
10/32
10
Progress Report SamplesProgress Report SamplesProgress Report SamplesProgress Report Samples
8/7/2019 Project Cost Controeditedl
11/32
11
HOTELDAILY PROGRESS REPORT
Sl.No Description Target Date Total Qty. Previous day Qty
A Basement (Grid F-C) / 20-28
1 Excavation 05-04-05 5200 5200
2 Excavation for footings 05-04-05 600 600
3 PCC 08-04-05 17 17
4 RCC for Footings/Padestals
18-04-05 142 125
5 RCC for total columns 22-04-05 75 32
Client: pqr Pvt. Ltd. Start Date 10/03/05Consultants: X&Y End Date 15/02/06Contractor : ABC Division Date 28/05/05
8/7/2019 Project Cost Controeditedl
12/32
12
Progressas on date
CumulativeQty
%Achieved Remarks
5200 100% Qty increased due to hard rock near 26 th grid (reqd 1v1 581.00
600 100% Completed
17 100% Started on 12/04/05, complete on 11/05/05
125 88% Started on 13/04/05 Footings completed on 19/05/05
32 43% Started on 16/04/05
8/7/2019 Project Cost Controeditedl
13/32
13
ABC LimitedECC DivisionPhysical Weekly Progress Report Supply (Major Items)Zone: South & East (Domestic)Region: HYRO / B&F AAName of the Project: Hotel At ABCJob No.:HBBH3537Report NO:6 dated: 28/05/05Period From: 2/05/2005 To: 28/05/05
Original Contract Value : 100.5 LRevised Contract Value: 100.5 LContract Start Date : 10/3/2005Contractual Completion Date:15/2/2006Expected Completion : 15/2/2006
Sl.No. Description UnitQty in Stock Required at Site by
1 Cement Bags 106287 31-12-05
2 ReinforcementSteel MT 975 31-08-05
3 Structural Steel MT 18.42 31-09-05
8/7/2019 Project Cost Controeditedl
14/32
14
Qty Balance QtyRemar ks
TotalQty (asper Contract)
ActualTotalQtyReqd.for theProject
Order Placed(Qty)
Order PlacedOn
Exptdreceiptat site by
Actualreceiptat site
Balanceto besupplied
Committed Datefor supply of balanceitems
Actiontaken
106287 106287 5664 02-04-05
27-05-05 4900 764 Order placingonmonthly
975.00 975 1030 26-05-05
30-05-05 800.00 230.00 Order placing
onmonthly
18.42 18.42 0 NA NA NA 18.42 16-06-05
8/7/2019 Project Cost Controeditedl
15/32
15
ECC DIVISIONPHYSICAL WEEKLY PROGRESS REPORT SITE EXECUTION
Zone: South & East (Domestic)
Region: HYRO / B&F (I&CB) Sector / BUName of the project: Hotel at Cyerbabad Convention CentreJob No.: HBBH3537Report No.6 dated 28/05/05Period From: 22/05/05 To: 28-05-05
Original Contract value: 100.5 LRevised Contract value 100.5 LContract Start date: 10/03/2005Contractual Completion date: 15/02/2005Expected completion: 15/02/2005
Total Qty Upto last Month (cumm)
S.No Activity Unit
Exptdqty asper
drgs /site
cond
Execution
period(Mths)
Askingrate/mo
nth
Planned
Achieved
% ageachieve
d
Planned FTM
Askingrate/we
ek
1 Basement(Grid D-F)
a Excavation Cum 5700 0.83 6840 5700 5700 100% 0.0 0.0
b PCC Cum 17 0.7 24 17 14.1 83% 0.0 0.0
cRCC for
Footings/pedestals
Cum 142 0.93 152 120 33.21 28% 22.0 5.5
8/7/2019 Project Cost Controeditedl
16/32
16
For the month of
Week # 4(from 22/05 to
28/05
Cumulative FTM tilldate
Cumulative tilldate Cumm-
Excess/Shortfall
Asking rate
for balance/Mt
h
Planfor
nextMont
h
ActionPlan
torecov
er Shortf
all
Actiontaken
&Statu
s
Remarks
planned
achvd
planned
achieved
%achvd
planned
Achieved
0.0 0.0 0.0 0.0 0% 5700.05700.
0 0.0 0.0 0.0 - -Completed
0.0 0.0 0.0 2.9 0% 17.0 17.0 0.0 0.0 0.0Completed
5.5 2.5 5.5 91.8 1669% 142.0 125.0 -17.0 17.0 17.0Nextweek
Delaycaused dueto latereceiving of drawings
8/7/2019 Project Cost Controeditedl
17/32
17
JOB COST REPORT(Figures in Rs.
Name of the job: Site Code Mont
h
Contractual date of commencement:Contractual date of completion:Original Contract value:
CostCode
Description
UOM
Job Status Date Estimate To
Complete
Revised Estimate ACE Varia
nce
L=J-H
Quantity(A)
Totalcost(B)
Unitcost=(B/A)
Quantity(D)
Totalcost(E)
UnitcostF =(E/D)
QuantityG=(A+D)
TotalcostH=(B+E)
Unitcost I=(H+G)
J
8/7/2019 Project Cost Controeditedl
18/32
18
ABC PROJECTDAILY PROGRESS REPORT
Date
Itemdescription
UnitBlock A Block B
TQ P A CA TQ P A CA
Main
Building
Internal
Earth workexcavation NOS 46 46 53 53
PCC NOS 46 46 53 53
RCC for foothings
M 25NOS 46 46 53 53
8/7/2019 Project Cost Controeditedl
19/32
19
19.04.05 Format No.14
Block C Mechanical cub Electrical cub Total
TQ P A CA TQ P A CA TQ P A CA TQ P A CA
46 46 24 24 20 20 189 0 0 189
46 46 24 24 20 20 189 0 0 189
46 46 24 24 20 20 189 0 0 189
8/7/2019 Project Cost Controeditedl
20/32
20
ABC PROJECTWEEKLY PROGRESS REPORT FOR THE WEEK ENDING ON 19 TH APR 2005
ItemDescription
Unit TotalQty
Current WeekProgress
(12/04/05-19/04/05
Cumulative up toweek ending on
19.4.05
Plannedthis
week
Plannedfor the
next twoweeksfrom
Remarks
Planned Achieved PlannedAchieve
d19.4.05-26.4.05
19.4.05-03.5.05
BLOCK-SHELL& CORE
R R MASONRY RMT 148 148 148
PLINTH BEAM bays 84 84 84
BACK FILLING Nos 46 46 46
SOLING LVL-01
SQM
2500 2500 2500
GRADE SLAB(LVL-01)
SQM 2700 2700 2700
BLOCK WORK
LVL-01
BAY
S32 30 30
8/7/2019 Project Cost Controeditedl
21/32
21
Progress Reporting Units of Work Completed Incremental Milestones
Spool in Place: 20% of Work i.e. 20%
cumulative Ends welded: 4 0% of work i.e. 6 0% cumulative
Hangars and Trim complete: 3 0% of Work
i.e.9
0% cum Hydro tested & complete: 10% of Work i.e.100% .
Cost Ratio
8/7/2019 Project Cost Controeditedl
22/32
22
Estimate Total Cost to Complete Suppose that we wish to estimate the total cost
to complete piping construction activities on aproject. The piping construction involves 1,000 linear feet of piping which has been divided into5
0 sections for management convenience. Atthis time, 4 00 linear feet of piping has beeninstalled at a cost of $ 4 0 ,000 and 5 00 man-hours of labor. The original budget estimatewas $9 0 ,000 with a productivity of one footper man-hour, a unit cost of $ 6 0 per man hourand a total material cost of $ 3 0 ,000 . Firmcommitments of material delivery for the$3 0 ,000 estimated cost have been received.
8/7/2019 Project Cost Controeditedl
23/32
23
units of work completed :The first task
is to estimate the proportion of workcompleted. Two estimates are readilyavailable. First, 4 00 linear feet of pipe isin place out of a total of 1000 linear feet,so the proportion of work completed is4 00 / 1000 = 0 .4 or 4 0%.the cost ratio method : estimate thework complete as the cost -to -datedivided by the cost estimate or$ 4 0 ,000 /$ 9 0 ,000 = 0 .44 or 44 %.
8/7/2019 Project Cost Controeditedl
24/32
24
incremental milestones method For example, suppose the following quantities of pipingfell into four categories of completeness: complete ( 100%)
38 0 fthangars and trim complete ( 9 0%)20
ends welded ( 6 0%)5 ft spool in place ( 20%) 0 ft Then using the incremental milestones shown above, theestimate of completed work would be 3 8 0 + (20) (0 .9 ) +(5 )(0 .6 ) +0 = 4 01 ft and the proportion complete wouldbe 4 01 ft/ 1,000 ft = 0 .4 01 or 4 0% after rounding.
8/7/2019 Project Cost Controeditedl
25/32
25
Estimated Cost First, a simple linear extrapolation of costresults in an estimate of $ 4 0 ,000 / 0 .4 =
$100 ,000 . for the piping construction using the4 0% estimate of work completed. This estimateprojects a cost overrun of 100 ,000 - 9 0 ,000 =$10,000 .
Second, a linear extrapolation of productivityresults in an estimate of ( 1000 ft. )(5 00 hrs/ 4 00 ft. )($6 0 /hr ) + 30 ,000 = $105 ,000 . forcompletion of the piping construction. Thisestimate suggests a variance of 105 ,000 -9 0 ,000 = $15 ,000 above the activity estimate
8/7/2019 Project Cost Controeditedl
26/32
26
PROJ ECT CO ST C ON T RO L
CON T RO L ESTIMATES PE RFOR MAN CEProject Progress ( %) =BCWP x100
BC of Total ProjectCO ST VA RIA N CE
Budgeted Cost of Work Performed (BCWP ) Actual cost of Work Performed (ACWP )
SCHEDU LED VARIA N CE =Budgeted Cost of Work Performed (BCWP ) -Budgeted Cost of Work Scheduled (BCWS ).CO ST T REN DS/ FOR ECASTS
8/7/2019 Project Cost Controeditedl
27/32
27
8/7/2019 Project Cost Controeditedl
28/32
28
8/7/2019 Project Cost Controeditedl
29/32
29
COST PERFORMANCE INDEX = BCWP/ACWP
SCHEDULE PERFORMANCE INDEX =BCWP/BCWS
" 1.0 IS FAVOURABLE.
1.0 IS UNFAVOURABLE
8/7/2019 Project Cost Controeditedl
30/32
30
Table Status of Road Work Items
Sl.No. Major Item ofWork Unit Total Qty(H+R) Done upto31-8 -99 BalQtyRemaining
period(months)
Requiredrate
1 Survey /Settingout KmNot billing
item87 39 .6 20 2 .0
2 Clearing / grubbing Ha 210 120 .5 89 .5 20 4 .5
3 Earth works m 3 279 0000 11 34 02 4 16559
7620 8 2798
4 Cross Drainage M 254 0 1322 121 8 20 6 1
5 Major Structuresteel Ton 1
5 10 5 24 986 20 49
6 Concrete m3 175 00 84 32 9 068 20 45 3
7 G SB m3 6 11300 2 755 17 33548
320 16774
8 WMM m3 575 300 22 9 05 3 34594
7 20 17 297
9 PCC m3 6 0000 1 5 328 4467 2 20 222 3
10 DBM m3 275 000 1212 32 15 376
8 20 7688
11 AC m3 100000 1 65 23 8 3477 20 4 178
8/7/2019 Project Cost Controeditedl
31/32
31
Table EAC Calculation
Work ItemPhysical Progress BOQValue Physical
Progress%
Value ToDate
(Rs. InLakhs)
(ACWP)Unit Total Done Rs. (Lakh) BAC
Site Clearance Ha 210 10 5 .5 149 .48 5 0 .24 54
Earth work m3279 0 .00
01089 .12
4 25 18 .28 39 .09 1166
Cross Drainage m3 254 0 1274 2579 .7 2 5 0 .16 199 0
Base & Sub-Base m3 11
86 000 47 098 2 64 11.84 39 .11 2744
BituminousWork m3
4 35 000 1 39 106 104 00 .45 31.98 36 29
220 59 .77 958 3
8/7/2019 Project Cost Controeditedl
32/32
32
Table EAC Calculation
Work ItemPhysical Progress BOQValue Physical
Progress%
Value ToDate
(Rs. InLakhs) (ACWP)
BCWPRs. InLakhs
EAC(Rs. InLakhs)Unit Total Done Rs. (Lakh) BAC
Site Clearance Ha 210 10 5 .5 149 .48 5 0 .24 54 75 .10 128 .38
Earth work m3279 0 .00
01089 .12
4 25 18 .28 39 .09 1166 98 3.14 2699 .88
Cross Drainage m3 254 0 1274 2579 .7 2 5 0 .16 199 0 129 3.99 3275 .7 3
Base & Sub-Base m3 11
86 000 47 098 2 64 11.84 39 .11 2744 2546 .14 6648 .17
BituminousWork m34 35 000 1 39 106 104 00 .45 31.98 36 29 3326 .06 107 03.39
220 59 .77 958 38 22 4 .3
7 23455 .55