Power Plant Components and Engineering Package Offered

�All procured equipment

�Complete design documentation of power block (drawings, specifications,calculations 3D modeling, etc.)

ThisUnit1powerblockisacoal-fire electricgeneratingunitcomprisinganominal600MWGEsteamturbine, tandem-compound4-flow singlereheatunitwiththrottleconditionsof3500psig,1050°F/1100°F.TheAlstomsteam generatorisratedatapproximately4,650,000lbsperhourcapableofburningbituminouscoalonlyoracombination ofbituminouscoalandpetcoke(uptoa70%/30%blend).Coalpulverizershavesignificant designmarginoperating at~70%forMCRfiring.

Theplantdesignheatratewiththispowerblockis8725BTU/kw-hrwithtubinecontrolvalveswideopen(VWO) and average ambient conditions in southeastern U.S. with a circular mechanical forced draft cooling tower, an electrostaticprecipitatior,andawetlimestoneflue gasdesulphurizationsystem.Allcycledesignhasbeen incorporated into the equipment for sale, and cycle information is available for all other normally desired conditions.

Included with the block procurement of the equipment listed for sale is the design documentation of the power block. Thisincludesalldrawings,specifications calculations,3Dmodeling,etc.atthestagethatcurrentlyexists.Forsaleseparately are the continued services of the engineer of record for this design. A summary of the status of design is as follows.

All design associated with the equipment listed is complete as are the foundations and buildings for the boiler, coal silo bay, and turbine building, including all foundations which are of a heavy mat design on piles that can easily transfertootherlocations.TheGeneralArangementofthepowerblockisfairlystandardandcompletelydeveloped forthecriticalpiping,whichisincludedintheequipmentforsale.Balance-of-plantequipmentandfacilitieshaveall beenspecified andarereadyforprocurement.Theplantback-enddesigncanbeadjustedtomatchthebuyersair emissionsrequirements,andthefullydevelopedsitelayoutscanbeadjustedtomeetthebuyer’ssiteconditions. AllP&IDsarecompleteasispreliminarypipingandelectricalphysicaldesign.AcomprehensivePrimaVeralevel3 schedule of procurement, engineering, construction, and start-up is developed based upon the existing site construction plan. Dependent upon the timing of the purchase, the existing engineering and design team can be assignedtothebuyersproject.Thisteamspecifically producedthisdesignandmanywereresponsiblefortwoother recentlyandsuccessfullycompleted600MWunits.Majorequipmentstatusislistedonthebackpage.

�Continued engineeringservices of the Engineer of Record - WorleyParsons

vccrim
Text Box
SALE #2851 - SALE OF POWER GENERATION ASSETS POWER PLANT COMPONENTS FLYER SCHEDULE 6
vccrim
Stamp

Major Equipment Status

TurbineGeneratorandAccessories 100%delivered

SteamGeneratorEngineerandSupply 100%delivered

Steam Surface Condenser Stainless Steel tube blank plates and wide band coils for tubing fabrication — in storage

CondensatePumps 100%delivered

FeedwaterHeaters StainlessSteeltubestripcoilsandcarbonsteelingotsfor forgings — in storage

BoilerFeedPumps,BFPBoosterPumps, 100%deliveredS/UPUMP

CriticalPiping 100%delivered

HighPressureValves#1 100%delivered

HighPressureValves#2 100%delivered

SevereServiceControlValves 100%delivered

pmfail
Typewritten Text
®
pmfail
Typewritten Text
pmfail
Typewritten Text
pmfail
Typewritten Text
vccox
Cross-Out
vccox
Cross-Out
vccox
Cross-Out
vccox
Cross-Out
vccrim
Text Box
Please note the items crossed out in red are not available.