Power Plant Components and Engineering Package Offered
�All procured equipment
�Complete design documentation of power block (drawings, specifications,calculations 3D modeling, etc.)
ThisUnit1powerblockisacoal-fire electricgeneratingunitcomprisinganominal600MWGEsteamturbine, tandem-compound4-flow singlereheatunitwiththrottleconditionsof3500psig,1050°F/1100°F.TheAlstomsteam generatorisratedatapproximately4,650,000lbsperhourcapableofburningbituminouscoalonlyoracombination ofbituminouscoalandpetcoke(uptoa70%/30%blend).Coalpulverizershavesignificant designmarginoperating at~70%forMCRfiring.
Theplantdesignheatratewiththispowerblockis8725BTU/kw-hrwithtubinecontrolvalveswideopen(VWO) and average ambient conditions in southeastern U.S. with a circular mechanical forced draft cooling tower, an electrostaticprecipitatior,andawetlimestoneflue gasdesulphurizationsystem.Allcycledesignhasbeen incorporated into the equipment for sale, and cycle information is available for all other normally desired conditions.
Included with the block procurement of the equipment listed for sale is the design documentation of the power block. Thisincludesalldrawings,specifications calculations,3Dmodeling,etc.atthestagethatcurrentlyexists.Forsaleseparately are the continued services of the engineer of record for this design. A summary of the status of design is as follows.
All design associated with the equipment listed is complete as are the foundations and buildings for the boiler, coal silo bay, and turbine building, including all foundations which are of a heavy mat design on piles that can easily transfertootherlocations.TheGeneralArangementofthepowerblockisfairlystandardandcompletelydeveloped forthecriticalpiping,whichisincludedintheequipmentforsale.Balance-of-plantequipmentandfacilitieshaveall beenspecified andarereadyforprocurement.Theplantback-enddesigncanbeadjustedtomatchthebuyersair emissionsrequirements,andthefullydevelopedsitelayoutscanbeadjustedtomeetthebuyer’ssiteconditions. AllP&IDsarecompleteasispreliminarypipingandelectricalphysicaldesign.AcomprehensivePrimaVeralevel3 schedule of procurement, engineering, construction, and start-up is developed based upon the existing site construction plan. Dependent upon the timing of the purchase, the existing engineering and design team can be assignedtothebuyersproject.Thisteamspecifically producedthisdesignandmanywereresponsiblefortwoother recentlyandsuccessfullycompleted600MWunits.Majorequipmentstatusislistedonthebackpage.
�Continued engineeringservices of the Engineer of Record - WorleyParsons
Major Equipment Status
TurbineGeneratorandAccessories 100%delivered
SteamGeneratorEngineerandSupply 100%delivered
Steam Surface Condenser Stainless Steel tube blank plates and wide band coils for tubing fabrication — in storage
CondensatePumps 100%delivered
FeedwaterHeaters StainlessSteeltubestripcoilsandcarbonsteelingotsfor forgings — in storage
BoilerFeedPumps,BFPBoosterPumps, 100%deliveredS/UPUMP
CriticalPiping 100%delivered
HighPressureValves#1 100%delivered
HighPressureValves#2 100%delivered
SevereServiceControlValves 100%delivered