UPCOMING DESIGN & CONSTRUCTION PROJECTS(Project & Construction Management)

Port Houston:

4th Quarter 2020

Presenter
Presentation Notes
Welcome, thank you for being here today. Introduce yourself

DESIGN PHASE PROJECTS

Professional Engineering Services for Construction Cost EstimatingPort Wide 2021.

Services will include the review of construction cost estimate, construction schedules and developing high level estimate schedules and conceptual designs.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement - 4th Qtr. 2020Projected Award - 1st Qtr. 2021

Consultants961219111491119

• Construction Estimating Bill Aguirre 713-670-2484baguirre@porthouston.com

Design Time Frame

1st Qtr. 2021 – 4th Qtr. 2021

Professional Services for Construction Materials Testing (CMT) forthe Construction of Wharf 6 and Site Development at Bayport Terminal

The Port of Houston is seeking a consultant or consulting team to perform construction materials testing (CMT) services during the construction of the wharf 6 and site development at the Bayport Container Terminal.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement - 4th Qtr. 2020Projected Award - 1st Qtr. 2021

Consultants90783 9074296148 9127592546 99234

• Concrete testing• Soils testing• Drilled Shaft Inspection

Bill Aguirre713-670-2484baguirre@porthouston.com

Design Time Frame

1st Qtr. 2021- 3rd Qtr. 2023

Facility Inspections and Condition Assessment Program for Bayport and Barbours Cut Container Terminals

The project consists of performing baseline field inspections of all electrical equipment at Bayport and Barbours Cut Container Terminals, calculate asset condition for all asset classes from component to terminal (property) level and convert all data and store into the PHA asset database and GIS systems.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement - 4th Qtr. 2020Projected Award - 1st Qtr. 2021

Consultants925319367799239

• Electrical Inspections• Electrical Engineering

Bill Aguirre 713-670-2484baguirre@porthouston.com

Design Time Frame

1st Qtr. 2021 - 4th Qtr. 2021

Bayport – U Shaped Property Development

This project will include clearing, grubbing, fill and grading of site in preparation for potential tenant development.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 2021

Consultants925179252892533

Contractors90957913459133990976

• Earthwork• Trucking• Environmental

Harvey Ross713-670-2665hross@porthouston.com

Design Time Frame

1st Qtr. 2021 - 2nd Qtr. 2021

Barbours Cut Terminal Restoration and Upgrade Project –Rehabilitation Container Yard 4N, 5N, 6 and 7

This project will include the development of a Mini Master Plan, 30% design of all Container Yards and 100% Design package for the Rehabilitation of existing Container Yards 4 North and 5 North (CY 4N/5N)

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement - 4th Qtr. 2020Projected Award – 1st Qtr. 2021

Consultants9251792519925289253392537

Contractors90957 9139591300 90976913459133991362

• Concrete Paving• Trucking• Environmental• Underground Utilities• Electrical• Demolition

Harvey Ross713-670-2665hross@porthouston.com

Design Time Frame

2nd Qtr. 2021 – 2nd Qtr. 2023

Barbours Cut Terminal Restoration and Upgrade Project –Rehabilitation of Wharves 4, 5 and 6

This project consist of 30% design of wharves 4, 5 and 6, all 2,667 ft and 100% Design package for the Rehabilitation of Wharf 4 (2/3) and Wharf 5 (2/3) for a combine 1,333 feet

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement - 4th Qtr. 2020Projected Award – 1st Qtr. 2021

Consultants9251792519925289253392537

Contractors90957 9139591300 9097691345 91339 91362

• Concrete Paving• Trucking• Environmental• Underground Utilities• Electrical• Demolition

Harvey Ross713-670-2665hross@porthouston.com

Design Time Frame

2nd Qtr. 2021 – 2nd Qtr. 2023

TBN - Replace Dredge Pipe Sleeve Upstream of Wharf 18

Condition assessment of existing pipe sleeve route and trenchless design for replacement of approximately 450 LF of steel pipe sleeve under the rail yard to house dredge pipe.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 2021

Consultants9253392594

Contractors912239133991355

• Surveying• Site Work

Jessica Shambra713-670-2527jshambra@porthouston.com

Design Time Frame

1st Qtr. 2021 – 3rd Qtr. 2021

CONSTRUCTION PHASE PROJECTS

BCT - Construct Maintenance Complex at BCT

Construction of a new Maintenance Complex at Barbours Cut Container Terminal (BCT) including an approximate 128,000 sf maintenance building, fuel and wash areas, associated utilities, and parking.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 1st Qtr. 2021Projected Award – 2nd Qtr. 2021

90924 9143890976 9145091316 9146891360 9050591430 91572

• Utility Systems• Electrical Work• Plumbing• HVAC• Building Fixtures & Finishes• Photography

Jessica Shambra713-670-2527jshambra@porthouston.com

Construction Time Frame

2nd Qtr. 2021 – 3rd Qtr. 2022

EXISTING BCT M&R BUILDING

BAYPORT M&R BUILDING

BCT – Container Yard 3 Reconstruction

The scope of work includes the construction of approximately 9 acres of concrete pavement (18” roller compacted concrete). Also restriping traffic lanes and relocating high mast light poles.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th 2020Projected Award – 1st 2021

Contractors913609132790976

• Demolition• Concrete• Grading• Excavation

Derek Garrett713-670-2837dgarrett@porthouston.com

Construction Time Frame

1st Qtr. 2021 – 4th Qtr. 2021

BCT - Fire Suppression System

The project consists of the construction of a water tank-based fire suppression system on an existing tank including new mechanical and electrical equipment, tank repairs, minor pipe installation, and pumphouse improvements at the Barbours Cut Terminal.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th 2020Projected Award – 4th 2020

7202783034830739254292539

• Concrete Foundation• Plumbing Work• Electrical Installation• Pump House Repairs• Steel Tank Repairs

Bill Aguirre 713-670-2484baguirre@porthouston.com

Construction Time Frame

1st Qtr. 2021 – 2nd Qtr. 2021

Bayport - Construct Wharf 6, SSB #4 and Power

Construct new 1000’ wharf with drilled shafts, Build 1 story precast concrete stevedore support building of 2595 sq. ft. Construct electrical infrastructure for ship-to-shore crane power, dredging of ~470,000 cubic feet of wet and dry excavation. Trucking excavated material to disposal areas. Clearing, grubbing, and placement of fill material for land development.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th 2020Projected Award – 1st 2021

95935909769623991219

913169136191223

• Concrete• Plumbing• HVAC• Hauling and Trucking Services

Derek Garrett713-670-2400dgarrett@poha.comConstruction Time Frame

1st Qtr. 2021 – 3rd Qtr. 2023

Dedicated Right Turn Lanes at Freight Station Rd at Bayport Container Terminal

Construct dedicated right turn lanes, one from Port Rd connecting to the U-turn and the other to providing connection from Freight Station Road to the U-turn underneath the entrance gate bridge and merging onto Port Rd westbound.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 1st 2021Projected Award – 2nd 2021

Contractors9183291846912533

• Concrete reinforcement• Demolition• Earthwork

Harvey Ross713-670-2665hross@porthouston.com

Construction Time Frame

2nd Qtr. 2021 - 4th Qtr. 2021

Bayport and Barbours Cut - Annual Wharf Crane & RTG Crane Painting - 2021

This is an annual project that will consist of blasting, priming and painting the wharf cranes and RTG cranes on an "as needed" basis.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th 2020Projected Award – 1st Qtr. 2021

914849146192900

• Not applicable Barbara H. Smith713-670-2483bhsmith@porthouston.com

Construction Time Frame

2nd Qtr. 2021 – 4th Qtr. 2021

Bayport and Barbours Cut - Annual Pavement Replacement 2021

This is an annual contract for concrete replacement at Bayport and Barbours Cut Terminal. The work will consist of removing damaged and / or deteriorating concrete pavement in 2021.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th 2020Projected Award – 1st Qtr. 2021

91327 • Saw-cutting• Paving• Excavation• Concrete traffic barriers

Barbara H. Smith 713-670-2483bhsmith@porthouston.com

Construction Time Frame

1st Qtr. 2021 – 4th Qtr. 2021

Barbours Cut and Bayport - Annual Fender System Maintenance - 2021

This is an annual project includes surface preparation, repair and replacement of various fender system elements at Barbours Cut and Bayport Terminals in 2021.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th 2020Projected Award – 1st Qtr. 2021

91223 • Metal Fabrication• Storm Water Controls• Photography

Barbara H. Smith 713-670-2483bhsmith@porthouston.com

Construction Time Frame

1st Qtr. 2021 - 4th Qtr. 2021

Industrial Park East - Annual Pavement, Drainage and Dust Control 2020

This is an annual project of paving and repair of asphalt roads, ditch clearing, clearing and grubbing and implementing dust control programs on asphalt roads.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th 2020Projected Award – 4th 2020

9097691327

• Paving• Asphalt• Drainage

Derek Garrett713-670-2837dgarrett@porthouston.com

Construction Time Frame

1st Qtr. 2021

Industrial Park East - Annual Pavement, Drainage and Dust Control 2021

This is an annual project of paving and repair of asphalt roads, ditch clearing and implementing dust control programs on asphalt roads.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th 2020Projected Award – 1st Qtr. 2021

9097691327

• Paving• Asphalt• Drainage

Barbara H. Smith 713-670-2483bhsmith@porthouston.com

Construction Time Frame

2nd Qtr. 2021 - 4th Qtr. 2021

Rehabilitation and Repair of Wharf 2 atManchester Terminal

Rehabilitating and repairing of Wharf 2 at Manchester terminal (approximately 600ft long). The work includes demolition of the existing shed building, construction of a new fender, repair of reinforced concrete, fabrication and installation of ~54 steel trusses, installation of ~152 piles, etc.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 2021

9148491223914389097691430

• Structural Concrete Repair• Fender Replacement• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography

Eddy Kharrazi713-670-2544ekharrazi@porthouston.com

Construction Time Frame

1st Qtr. 2021 - 4th Qtr. 2021

Turning Basin North - Restrooms Restoration

Demolish 15 existing restroom buildings and replace with 11 pre-cast concrete restroom buildings within the transit sheds and at City Dock 8. Project will also include associated plumbing and electrical work and the rehabilitation of the Amenities Buildings at City Dock 32.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 2021

90924 9136091438 9143090976 9145091316 91468

• Electrical Work• Plumbing• HVAC• Building Fixtures & Finishes

Jessica Shambra713-670-2527jshambra@porthouston.com

Construction Time Frame

1st Qtr. 2021 – 3rd Qtr. 2021

Turning Basin North Splash Zone Painting 2021

Painting and resurfacing of Steel Bulkhead walls to prevent corrosion and structural damage at Turning Basin North Terminal

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 2021

91461914848100063159

• Painting• Steel Repair• Water blasting• Painting• Sandblasting

Barbara H. Smith713-670-2483bhsmith@porthouston.com

Construction Time Frame

1st Qtr. 2021 – 4th Qtr. 2021

CARE Splash Zone Painting 2021

Painting and resurfacing of Steel Bulkhead walls to prevent corrosion and structural damage at CARE Terminal

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 2nd Qtr. 2021Projected Award – 3rd Qtr. 2021

91461914848100063159

• Painting• Steel Repair• Water blasting• Painting• Sandblasting

Barbara H. Smith713-670-2483bhsmith@porthouston.com

Construction Time Frame

3rd Qtr. 2021 – 4th Qtr. 2021

Turning Basin North - Guardhouse and Arms Change (RR8 Speed Gate)

This project will remove existing Speed Gates and replace them with a Manned Guardhouse with Gate arms

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 1st Qtr. 2021Projected Award – 1st Qtr. 2021

Contractors914739097692678

• Electrical• Fiber Optics• Demolition• Paving

Harvey Ross713-670-2665hross@porthouston.comConstruction Time Frame

2nd Qtr. 2021 - 3rd Qtr. 2021

Turning Basin Transit Sheds 30-31

This project is approximately 238k square feet of roof repair at transit sheds 30/31 at the Turning Basin Terminal.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 2nd Qtr. 2021Projected Award – 3rd Qtr. 2021

Contractors914739097692678

• Roofing Repair• Surveying

Harvey Ross713-670-2665hross@porthouston.com

Construction Time Frame

3rd Qtr. 2021 – 4th Qtr. 2021

Turning Basin – Rehabilitation and Repair of Wharf 8

Rehabilitation and Repair of Wharf 8 at Turning Basin Terminal will consist of structural concrete repair and fender replacement.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 2nd Qtr. 2021Projected Award – 3rd Qtr. 2021

9148491223914389097691430

• Structural Concrete Repair• Fender Replacement• Steel Rebar Repair• Concrete forming• Photography

Eddy Kharrazi713-670-2544ekharrazi@porthouston.com

Construction Time Frame

3rd Qtr. 2021 - 3rd Qtr. 2022

Turning Basin South - City Dock 1 West Fender System

Construction of freestanding fender for City Dock 1 West of approximately 600ft.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 2021

Contractors90976912239143091438914849050591572

• Fender Replacement• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography

Eddy Kharrazi713-670-2544ekharrazi@porthouston.com

Construction Time Frame

2nd Qtr. 2021 - 1st Qtr. 2022

Turning Basin Terminal North – Repair of Wharves 20, 21, 24, 25 and 26

Repair of wharves 20, 21, 24, 25, and 26 (each approximately 600ft long) located at Turning Basin Terminal. The work includes (reinforced concrete) deck repair, pile repair, sheet pile repair, timber replacement, fender repair, steel sheet / beam repair etc.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 2021

Contractors90976912239143091438914849050591572

• Structural Concrete Repair• Steel Rebar• Concrete forming• Sheet Pile repair• Striping• Photography• Welding

Eddy Kharrazi713-670-2544ekharrazi@porthouston.com

Construction Time Frame

2nd Qtr. 2021 – 2nd Qtr. 2022

Turning Basin - Annual Concrete Replacement 2021

This is an annual contract for concrete replacement at Turning Basin Terminal. The work will consist of removing damaged and or deteriorating concrete pavement in 2020.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th Qtr. 2020Projected Award – 1st Qtr. 2021

91327 • Concrete• Excavation• Saw-cutting• Concrete Traffic Barriers

Barbara H. Smith 713-670-2483bhsmith@porthouston.com

Construction Time Frame

1st Qtr. 2021 – 4th Qtr. 2021

Turning Basin South – Repair of Wharves 47, 48 and 1East

DeRepair project for Wharf 1E, 47, and 48 (located Turning Basin Terminal - South) - scope includes but is not limited to (reinforced concrete) deck repair, pile repair, timber replacement, fender repair, etc.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement - 3rd Qtr. 2021Projected Award - 4th Qtr. 2021

Contractors9148491223914389097691430

• Structural Concrete Repair• Fender Replacement• Steel Rebar Repair• Concrete forming• Photography

Eddy Kharrazi713-670-2544ekharrazi@porthouston.com

Construction Time Frame

4th Qtr. 2021 - 2nd Qtr. 2021