Port Houston: UPCOMING DESIGN & CONSTRUCTION PROJECTS

20
UPCOMING DESIGN & CONSTRUCTION PROJECTS (Project & Construction Management) 4 th Quarter 2021 Edition (October 2021 – September 2022) Port Houston:

Transcript of Port Houston: UPCOMING DESIGN & CONSTRUCTION PROJECTS

UPCOMING DESIGN & CONSTRUCTION PROJECTS(Project & Construction Management)

4th Quarter 2021 Edition(October 2021 – September 2022)

Port Houston:

DESIGN PHASE PROJECTS

Analysis and Design of Rehabilitation of Roofs Shed 20-21 at TBT & Care Terminals

To do a structural study of the buildings to determine if a new overlays possible or design another solution for rehabilitation of roofs

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th Qtr. 2021Projected Award - 1st Qtr. 2022

92533907149684792533

Derek [email protected]

Design Time Frame

1st Qtr. 2022- 3rd Qtr. 2022

Facilities Inspection Condition Assessment Program (FICAP)Corrosion Management at Bayport

Inspect corrosion protection systems and evaluate asset conditions at Bayport Terminal

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th Qtr. 2021Projected Award - 1st Qtr. 2022

90783907429614892546992349253391275

Derek [email protected]

Design Time Frame

1st Qtr. 2022 - 4th Qtr. 2022

CONSTRUCTION PHASE PROJECTS

TBN - Replace Dredge Pipe Sleeve Upstream of Wharf 18

Project will consist of the rehabilitation of existing steel casing and a new 110 LF micro tunnel crossing.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 1st Qtr. 2022Projected Award – 1st Qtr. 2022

912239133991355

• Pipe Rehabilitation• Pipe Installation• Surveying

Jessica [email protected]

Construction Time Frame

2nd Qtr. 2022 – 3rd Qtr. 2022

BCT - Construct Maintenance Complex at BCT

Construction of a new Maintenance Complex at Barbours Cut Container Terminal (BCT) including an approximate 128,000 sf maintenance building, fuel and wash areas, associated utilities, and parking.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 1st Qtr. 2022Projected Award – 1st Qtr. 2022

90924 9143890976 9145091316 9146891360 9050591430 91572

• Utility Systems• Electrical Work• Plumbing• HVAC• Building Fixtures & Finishes• Photography

Jessica [email protected]

Construction Time Frame

2nd Qtr. 2022 – 2nd Qtr. 2023

EXISTING BCT M&R BUILDING

BAYPORT M&R BUILDING

Bayport - Maintenance Building Addition and Canopy Enclosure

This project will include enclosing the current open-air canopy and erecting a new canopy addition

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 1st Qtr. 2022Projected Award – 2nd - 3rd Qtr. 2022

90976 9143891316 2850091430 91461

•Canopy Erection•Demolition•Earthwork•Paving

Harvey [email protected]

Construction Time Frame

2nd Qtr. 2022 – 4th Qtr. 2022

Bayport – Construct Container Yard 1 North

Construction of approximately 24 acres of container yard (18” RCC) and associated work at Bayport Container Terminal.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 1st Qtr. 2022Projected Award – 2nd Qtr. 2022

909769122391360914309143891276

96861925869050591572

• Material Testing• Surveying• Security• Electrical• Signs and striping• Photography

Jessica [email protected]

Construction Time Frame

2nd Qtr. 2022 – 2nd Qtr. 2023

Land Development for 30-Acres South of Port Road at Bayport Terminal

The project scope includes surveying, clearing, grubbing, grading, excavation, fill placement, drainage features, placement of topsoil and seeding.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 1st Qtr. 2022Projected Award – 1st Qtr. 2022

909769625290738

• Trucking• Storm Water Erosion Protection• Surveying

Craig [email protected]

Construction Time Frame

2nd Qtr. 2022 – 4th Qtr. 2022

Project Area

Rehabilitation and Repair of Wharf 2 atManchester Terminal

Rehabilitating and repairing of Wharf 2 at Manchester terminal (approximately 600ft long). The work includes demolition of the existing shed building, construction of a new fender, repair of reinforced concrete, fabrication and installation of ~54 steel trusses, installation of ~152 piles, etc.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 1st Qtr. 2022Projected Award – 1st Qtr. 2022

9148491223914389097691430

• Structural Concrete Repair• Fender Replacement• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography

Eddy [email protected]

Construction Time Frame

1st Qtr. 2022 – 4th Qtr. 2022

Turning Basin North - Restrooms Restoration

Demolish 15 existing restroom buildings and replace with 11 pre-cast concrete restroom buildings within the transit sheds and at City Dock 8. Project will also include associated plumbing and electrical work and the rehabilitation of the Amenities Buildings at City Dock 32.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th Qtr. 2021Projected Award – 1st Qtr. 2022

90924 9136091438 9143090976 9145091316 91468

• Electrical Work• Plumbing• HVAC• Building Fixtures & Finishes

Jessica [email protected]

Construction Time Frame

1st Qtr. 2022 – 4th Qtr. 2022

PCC Renovations

Project will consist of the renovations and HVAC modification of the existing Port Coordination Center (PCC) building at the Turning Basin Terminal

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 1st Qtr. 2022Projected Award – 2nd Qtr. 2022

15505 9096090900 9120090921 90924

• Roofing• HVAC• Demolition• Framing• MEP

Harvey [email protected]

Construction Time Frame

2nd Qtr. 2022 - 4th Qtr. 2022

Turning Basin - Rail and Switch Replacement - 2021-2022

This project is the replacement of rail and switches at Turning Basin Terminal.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 1st Qtr. 2022Projected Award – 1st Qtr. 2022

909769122391327

• Concrete Repair• Steel Rebar Repair• Concrete forming• Photography

Barbara H. [email protected]

Construction Time Frame

2nd Qtr. 2022 - 4th Qtr. 2022

Annual Pavement, Drainage and Dust Control at Turning Basin – 2021-2022

This project is the replacement of damaged pavement, drainage improvements and dust control approaches implemented at EIP.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 1st Qtr. 2022Projected Award – 1st Qtr. 2022

909769122391327

• Concrete Repair• Steel Rebar Repair• Concrete forming• Photography

Barbara H. [email protected]

Construction Time Frame2nd Qtr. 2022 - 4th Qtr. 2022

Turning Basin – Rehabilitation and Repair of Wharf 8

Rehabilitation and Repair of Wharf 8 at Turning Basin Terminal will consist of structural concrete repair and fender replacement.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th Qtr. 2021Projected Award – 1st Qtr. 2022

9148491223914389097691430

• Structural Concrete Repair• Fender Replacement• Steel Rebar Repair• Concrete forming• Photography

Eddy [email protected]

Construction Time Frame

1st Qtr. 2022 - 4th Qtr. 2022

Turning Basin South - City Dock 1 West Fender System

Construction of freestanding fender for City Dock 1 West of approximately 600ft.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th Qtr. 2021Projected Award – 4th Qtr. 2021

90976912239143091438914849050591572

• Fender Replacement• Pile Driving• Steel Rebar• Concrete forming• Striping• Photography

Eddy [email protected]

Construction Time Frame

1st Qtr. 2022 - 3rd Qtr. 2022

TBN - Rehabilitation and Repair of Wharves 20 and 21

Rehabilitation and Repair of Wharves 20 and 21 - The scope includes rehabilitation and repair of the sheet piles, deck, under wharf piles, installation of piles and tie back including new fender.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 3rd Qtr. 2022Projected Award – 3rd Qtr. 2022

90976912239143091438914849050591572

• Structural Concrete Repair• Steel Rebar• Concrete forming• Sheet Pile repair• Striping• Photography• Welding

Eddy [email protected]

Construction Time Frame

4th Qtr. 2022 - 3rd Qtr. 2023

TBN - Repair of Wharves 24, 25 and 26

The scope includes repair to Reinforced Concrete sections of the wharf such as deck, under the deck, piles, etc.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 4th Qtr. 2021Projected Award – 1st Qtr. 2022

90976912239143091438914849050591572

• Structural Concrete Repair• Steel Rebar• Concrete forming• Sheet Pile repair• Striping• Photography• Welding

Eddy [email protected]

Construction Time Frame

1st Qtr. 2022 - 4th Qtr. 2022

Turning Basin South – Repair of Wharves 47, 48 and 1East

DeRepair project for Wharf 1E, 47, and 48 (located Turning Basin Terminal - South) - scope includes but is not limited to (reinforced concrete) deck repair, pile repair, timber replacement, fender repair, Dolphin repair and installation, etc.

Procurement Time Frame NIGP Codes Small Business Opportunities PHA Contact

Projected Advertisement – 1st Qtr. 2022Projected Award – 1st Qtr. 2022

9148491223914389097691430

• Structural Concrete Repair• Fender Replacement• Steel Rebar Repair• Concrete forming• Photography

Eddy [email protected]

Construction Time Frame

2nd Qtr. 2022 - 4th Qtr. 2022