Point class patrol vessel 207

Post on 13-Jul-2015

329 views 0 download

Tags:

Transcript of Point class patrol vessel 207

DRY DOCK PERIOD OF PATROL VESSEL P-207 “28 DE NOVIEMBRE”, BELONG TO SERVICIO NACIONAL AERONAVAL DE PANAMÁ (PANAMANIAN COAST GUARD).LOA : 25.25 MTS (82 FT)BEAM : 5.36 MTS (17 FT)DISPLACEMENT : 69 TONS

PERIOD: DEC 04TH 2013 TO JULY 18TH 2014

DRY DOCK: MEC PANAMÁ, BRANCH VERACRUZ

GENERAL AND PROJECT MANAGER: NELSON AGUIRREASSISTANT : ISMAEL VARELAPRODUCTION SUPERVISOR : TRADIO GONZÁLEZ

IN THE DOCKING MANUEVERING

CONDITION OF THE HULL AT THE ARRIVING

CONDITION OF THE HULL AT THE ARRIVING CONDITION OF THE HULL AT THE ARRIVING

REPLACING THE SHELL PLATE.

FINALLY, WE REPLACED 107.71 MT2 (1,159.4 FT2)

CONDITION OF THE MAIN DECK AT THE ARRIVING

WE REPLACED 100% OF MAIN DECK

MAIN DECK FINISHED

TWO OLD GENERATORS, TO BE REPLACED BY NEW CATERPILLAR C 4.4

INSTALLATION OF NEW GENERATORS

PROPULSION ENGINES, TO BE MADE AN OVERHAUL(CATERPILLAR 3412)

INSTALLATION OF PROPULSION ENGINES OVERHAULED

CONDITION OF STEERING ROOM AT THE ARRIVING

CONDITION OF THE BOW PEAK AT THE ARRIVING

CONDITION OF CO2 ROOM AT THE ARRIVING

INTERNAL SPACES, AFTER TO PAINT

CO2 ROOM CO2 ROOMSTEERING ROOMSTEERING ROOM

BOW PEAK

CONDITON OF THE CREW’S ACOMMODATION

CONDITON OF THE CREW’S BATHRROM

CREW’S ACOMMODATIONS, FINISHED

CONDITION OF THE CREW’S MESS, AT THE ARRIVING

CREW’S MESS, FINISHED

CONDITION OF THE GALLEY AT THE ARIVING

GALLEY, AFTER

CONDITION OF THE BRIDGE (PILOT HOUSE) AT THE ARRIVING

NEW NAVIGATIONS AND COMMUNICATIONS EQUIPMENT INSTALLED

THE PILOT HOUSE IS READY!!!

CONDITION OF THE MAST AND NAVIGATION LIGHTS AT THE ARRIVING

THE MAST AND NAVIGATION LIGHTS FINISHED

CONDITION OF THE CAPTAINS’S CABIN AT THE ARRIVING

CAPTAIN’S CABIN, FINISHED

CONDITION OF THE ENGINES ROOM, AFTER TO REMOVE THE MAIN ENGINES AND GENERATORS

ENGINE ROOM, FINISHED

CONDITION OF SOME PUMP AT THE ARRIVING

AIR COMPRESSOR FIRE PUMP

FRESH WATER PUMP

HYDRAULIC STARTER PUMP

HYDRAULIC STEERING PUMP HYDRAULIC STEERING PUMP

ALIGNING AND MACHINING THE PROPULSION LINE

NEW THORDON BEARING WAS INSTALLED

REPAIRING AND BALANCING THE PROPELLERS

UNDOCKING MANEUVERING, AFTER 7 MONTHS

THE TEAM MANAGER:NELSON AGUIRRE: GENERAL AND PROJECT MANAGER.ISMAEL VARELA : PRODUCTION ASSISTANT.

P-207 “28 DE NOVIEMBRE”, SAILING AGAIN….