PLEASE BE AWARE OF SUSPENDED LOAD WHILE USING THE CROSS PATH TO LINE 1 OPERATION PLANT DO NOT WALK...

Post on 12-Jan-2016

226 views 2 download

Tags:

Transcript of PLEASE BE AWARE OF SUSPENDED LOAD WHILE USING THE CROSS PATH TO LINE 1 OPERATION PLANT DO NOT WALK...

PAGE 1 0F 4

PLEASE BE AWARE OF SUSPENDED LOAD WHILE USING THE CROSS PATH TO

LINE 1 OPERATION PLANT

DO NOT WALK UNDER SUSPENDED LOAD

PROCEED WITH CAUTION

Important ! Gopeng Plant

PAGE 2 0F 4

Important !

An innovative way to organize and manage the scheduling of venues with a vast amount of scheduling options for multiple locations within the Hume group.

An innovative way to organize and manage the scheduling of venues with a vast amount of scheduling options for multiple locations within the Hume group.

Is an easy to use web based software solution for tracking VIP attendance and current work status.

The provision of MIS services via the Internet. Services covered :-- Software issue such as Epicor, FMS and etc.- Hardware issue such as PABX, internet, networking, servers and etc.

PLANTPAGE 3 0F 4

Every Friday, 11.30 am- 5S FRIDAY

- MORNING ASSEMBLYEveryday, 8.30 am

- ZONE 12 MEETINGEvery Friday

- CEMENT MILL GENBA WALKEvery Friday, 3.30 pm

Morning Assembly

- FORUM22/9/2015, 4.00 pm

- GOTONG ROYONG15/9/2015, 4.30 pm

HO- INTERNAL AUDIT

17/9/2015, 11.00 am

PAGE 4 0F 4

HIB 5S Auditors Training14/9/2015 – 15/9/2015