Professional Work | PETER WILSON
p o r t f o l i o
ENTRANCE
FFE-2.1
FIRST FLOORFURNITURE, FIXTURES AND EQUIPMENT PLAN
12
Project No. 04-105
NORTH
0 4 8 16
No. Date Description
REVISIONS
01 06.13.05 FOR PERMIT
copyright date: 01.01.05
All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Studio. This sheet must be returned upon the request of the Architect.
No. Date Description
27 Castle RoadTown of Orangetown, NY10968
Yager Residence
BAMBAM Studio, PLLCThird Floor 116 West Houston St. New York, NY 10012T: 646.522.5550 F: 646.658.0001 www.bam-studio.com
02 07.05.05 CLIENT REVIEW03 07.07.05 RE-ISSUE FOR PERMIT04 07.14.05 FOR ACABOR APPROVAL05 08.10.05 FOR INITIAL PRICING/PERMIT06 08.29.05 FOR WINDOW PRICING07 09.08.05 FOR CLIENT REVIEW08 09.12.05 FOR PERMIT - STRUCTURAL09 10.11.05 FOR CONSTRUCTION
FIRST FLOOR FURNITURE,FIXTURE AND EQUIPMENT PLANA-2.11
SCALE:1/4"=1'-0"
GUESTBATHROOM
WETBAR
PATIO
9'-0"
-12'-4"
FFE-2.0
BASEMENTFURNITURE, FIXTURES AND EQUIPMENT PLAN
12
Project No. 04-105
NORTH
0 4 8 16
No. Date Description
REVISIONS
01 06.13.05 FOR PERMIT
copyright date: 01.01.05
All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Studio. This sheet must be returned upon the request of the Architect.
No. Date Description
27 Castle RoadTown of Orangetown, NY10968
Yager Residence
BAMBAM Studio, PLLCThird Floor 116 West Houston St. New York, NY 10012T: 646.522.5550 F: 646.658.0001 www.bam-studio.com
02 07.05.05 CLIENT REVIEW03 07.07.05 RE-ISSUE FOR PERMIT04 07.14.05 FOR ACABOR APPROVAL05 08.10.05 FOR INITIAL PRICING/PERMIT06 08.29.05 FOR WINDOW PRICING07 09.08.05 FOR CLIENT REVIEW08 09.12.05 FOR PERMIT - STRUCTURAL09 10.11.05 FOR CONSTRUCTION
FURNITURE, FIXTURE, EQUIPMENT PLANFFE-2.0
1SCALE:1/4"=1'-0"
6'-4"3'-10" 3'-10"6'-8
"10
'-7"
OPEN TO BELOW
FFE-2.2
SECOND FLOORFURNITURE, FIXTURES AND EQUIPMENT PLAN
12
Project No. 04-105
NORTH
0 4 8 16
No. Date Description
REVISIONS
01 06.13.05 FOR PERMIT
copyright date: 01.01.05
All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Studio. This sheet must be returned upon the request of the Architect.
No. Date Description
27 Castle RoadTown of Orangetown, NY10968
Yager Residence
BAMBAM Studio, PLLCThird Floor 116 West Houston St. New York, NY 10012T: 646.522.5550 F: 646.658.0001 www.bam-studio.com
02 07.05.05 CLIENT REVIEW03 07.07.05 RE-ISSUE FOR PERMIT04 07.14.05 FOR ACABOR APPROVAL05 08.10.05 FOR INITIAL PRICING/PERMIT06 08.29.05 FOR WINDOW PRICING07 09.08.05 FOR CLIENT REVIEW08 09.12.05 FOR PERMIT - STRUCTURAL09 10.11.05 FOR CONSTRUCTION
SECOND FLOOR FURNITURE, FIXTURES AND EQUIPMENT PLANA-2.21
SCALE:1/4"=1'-0"
PROVIDE ADD ALTERNATE FOR ALL WORK ON STORAGE SHED.
KEYED NOTES
CONFIRM DIMENSIONS WITH ARCHITECT, TYP.
SETBACK LINE
DRIVEWAY
EXISTING STONE WALL
STONE WALL
--
--
DIAMETER
SITE LEGEND
TYPE
PROPERTY LINE
STONE WALL
ROAD
CONTOUR LINE
EXISTING CONTOUR LINE
LINE TYPES
SYMBOL DESCRIPTION
M MAPLE
O OAK
A ASH
B BIRCH
TU TULIP
--- ---
SPOT GRADE
---
---
---
---
---
---
---
---
+119.7
HOLETEST
30'-0"
50'-2"
20'-0"
A-1.0
SITE PLAN
SITE PLANA-1.01
SCALE:1/32"=1'-0"
12
Project No. 04-105
NORTH
0 4 8 16
No. Date Description
REVISIONS
01 06.13.05 FOR PERMIT
copyright date: 01.01.05
All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Studio. This sheet must be returned upon the request of the Architect.
No. Date Description
27 Castle RoadTown of Orangetown, NY10968
Yager Residence
BAMBAM Studio, PLLCThird Floor 116 West Houston St. New York, NY 10012T: 646.522.5550 F: 646.658.0001 www.bam-studio.com
02 07.05.05 CLIENT REVIEW03 07.07.05 RE-ISSUE FOR PERMIT04 07.14.05 FOR ACABOR APPROVAL05 08.10.05 FOR INITIAL PRICING/PERMIT06 08.29.05 FOR WINDOW PRICING07 09.08.05 FOR CLIENT REVIEW08 09.12.05 FOR PERMIT - STRUCTURAL09 10.11.05 FOR CONSTRUCTION
Provided By: Jay A. Greenwell, PLSLand Planning-Land Surveying85 Lafayette AvenueSuffern, New York 10901T: 845.357.0830F: 845.357.0756
basement floor plan
basswood study models 3d study models
first floor plan second floor plan
vicinity map
south facing elevation
west facing elevation
north facing elevation
east facing elevation
YAGER RESIDENCEcompleted:2006
site location:Piermont, NY
A-4.2
EXTERIORELEVATIONS & SECTIONS
SECTION ELEVATION - NORTHA-4.0.2
23/16"-1'-0"
12
Project No. 04-105
NORTH
0 4 8 16
No. Date Description
REVISIONS
01 06.13.05 FOR PERMIT
copyright date: 01.01.05
All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Studio. This sheet must be returned upon the request of the Architect.
No. Date Description
27 Castle RoadTown of Orangetown, NY10968
Yager Residence
BAMBAM Studio, PLLCThird Floor 116 West Houston St. New York, NY 10012T: 646.522.5550 F: 646.658.0001 www.bam-studio.com
02 07.05.05 CLIENT REVIEW03 07.07.05 RE-ISSUE FOR PERMIT04 07.14.05 FOR ACABOR APPROVAL05 08.10.05 FOR INITIAL PRICING/PERMIT06 08.29.05 FOR WINDOW PRICING07 09.08.05 FOR CLIENT REVIEW08 09.12.05 FOR PERMIT - STRUCTURAL09 10.11.05 FOR CONSTRUCTION
SECTION ELEVATION - EASTA-4.0.2
13/16"-1'-0"
6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING
STUCCO STUCCO
6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING
STUCCO
STUCCO6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING
CULTUREDFIELDSTONE
CULTUREDFIELDSTONE
6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING
CULTUREDFIELDSTONEAND LOW WALL
COPPERFLASHING
4" GAP BETWEEN BOTTOM OF CULTURED STONE WALL AND GRAVEL, TYP. @CULTURED STONE WALLS
GRAVEL
STONE EDGING AND GRAVEL @ CULTURED STONE WALLS
LINE OF WATER
STEEL AND CABLERAILING W/WOOD HANDRAIL,TYP.
LINE OF FINISHED FLOOR AT LIVING ROOM
LINE OF FINISHED FLOOR OF SECOND FLOOR
LINE OF FINISHED FLOOR AT BASEMENT
6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING
6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING
6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING
4" WOOD TRIM
4" WOOD TRIM
4" WOOD TRIM
4" WOOD TRIM
4" WOOD TRIM
4" WOOD TRIM
4" WOOD TRIM
4" WOOD TRIM
4" WOOD TRIM
4" WOOD TRIM
STEEL AND CABLERAILING W/WOOD HANDRAIL,TYP.
STEEL AND CABLERAILING W/WOOD HANDRAIL,TYP.
SECTION ELEVATION - WESTA-4.0.1
13/16"-1'-0"
12
Project No. 04-105
NORTH
0 4 8 16
No. Date Description
REVISIONS
01 06.13.05 FOR PERMIT
copyright date: 01.01.05
All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Studio. This sheet must be returned upon the request of the Architect.
No. Date Description
27 Castle RoadTown of Orangetown, NY10968
Yager Residence
BAMBAM Studio, PLLCThird Floor 116 West Houston St. New York, NY 10012T: 646.522.5550 F: 646.658.0001 www.bam-studio.com
02 07.05.05 CLIENT REVIEW03 07.07.05 RE-ISSUE FOR PERMIT04 07.14.05 FOR ACABOR APPROVAL05 08.10.05 FOR INITIAL PRICING/PERMIT06 08.29.05 FOR WINDOW PRICING07 09.08.05 FOR CLIENT REVIEW08 09.12.05 FOR PERMIT - STRUCTURAL09 10.11.05 FOR CONSTRUCTION
SECTION ELEVATION - SOUTHA-4.0.1
23/16"-1'-0"
EXTERIORELEVATIONS & SECTIONS
A-4.1
6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING
STUCCO
STUCCO
6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING
STUCCO
DECORATIVE LEADERTO DRAIN
CULTUREDFIELDSTONE
AC
EPDM MEMBRANE
STANDING SEAMCOPPER ROOF
COPPER SIDING
EPDM MEMBRANE
EPDM MEMBRANE
WROUGHTIRON RAILING,TYP.
6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING
TO UNDERGROUNDPERFORATED DRAINPIPE, TYP.
6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING
6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING
4" WOOD TRIM
4" WOOD TRIM 4" WOOD TRIM
4" WOOD TRIM
6" TONGUE AND GROOVEWOOD SIDING WITH BEVELEDEDGES AND BLIND NAILING
4" WOOD TRIM
4" WOOD TRIM
4" WOOD TRIM
4" WOOD TRIM
4" WOOD TRIM
4" WOOD TRIM
A-4.3
SECTION ELEVATIONS
12
Project No. 04-105
NORTH
0 4 8 16
No. Date Description
REVISIONS
01 06.13.05 FOR PERMIT
copyright date: 01.01.05
All drawings and written materials represented on this sheet constitute the copyrighted work and are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in part, nor may any of the drawings or written materials appearing within, be incorporated into another work for any reason without the written consent of BAM Studio. This sheet must be returned upon the request of the Architect.
No. Date Description
27 Castle RoadTown of Orangetown, NY10968
Yager Residence
BAMBAM Studio, PLLCThird Floor 116 West Houston St. New York, NY 10012T: 646.522.5550 F: 646.658.0001 www.bam-studio.com
02 07.05.05 CLIENT REVIEW03 07.07.05 RE-ISSUE FOR PERMIT04 07.14.05 FOR ACABOR APPROVAL05 08.10.05 FOR INITIAL PRICING/PERMIT06 08.29.05 FOR WINDOW PRICING07 09.08.05 FOR CLIENT REVIEW08 09.12.05 FOR PERMIT - STRUCTURAL09 10.11.05 FOR CONSTRUCTION
SECTION ELEVATION - WESTA-4.31
1/8"-1'-0"
SECTION ELEVATION - WESTA-4.3
31/8"-1'-0"
SECTION ELEVATION - WESTA-4.3
51/8"-1'-0"
SECTION ELEVATION - WESTA-4.3
71/8"-1'-0"
SECTION ELEVATION - WESTA-4.3
81/8"-1'-0"
SECTION ELEVATION - WESTA-4.3
61/8"-1'-0"
SECTION ELEVATION - WESTA-4.3
41/8"-1'-0"
SECTION ELEVATION - WESTA-4.32
1/8"-1'-0"
INTERIOR ELEVATIONS SHOWN FOR COORDINATION ONLY AND SHALL BE REVIEWED BY ARCHITECT AND GENERAL CONTRACTOR PRIOR TO CONSTRUCTION.
Project Manager / Lead Designer BAM STUDIO ARCHITECTS
RECEPTION
SUPPLY
DW
ELEC.
JANITOR
SUPPLY
CLOSET
MAILROOM
OFFICE
OFFICE
COPY
COAT
CLOSET
ELEVATOR
DRY
CLEANING
OFFICE
EQUIPMENT
STORAGE
ROOM
COAT
CLOSET
PRAYER ROOM /
PHONE BOOTH
WOMEN'S
VESTIBULE
SOFT SEATING
MEETING
RESTROOM
SOFT
SEATING
MEETING
10
SEATING
MEETING /
SCREENING
ROOM
CLOSET
ATM
11
12
9
3
2
1
4
MICRO MICRO
5 6 7 8
REF
COFFEE
MIC
RO
SPRINKLER
WATER
COFFEE
42
" FL
AT
SC
RE
EN
42" FLAT SCREEN
42
" F
LA
T S
CR
EE
N
42
" F
LA
T S
CR
EE
N
42
" F
LA
T S
CR
EE
N
42
" F
LA
T S
CR
EE
N
42
" F
LA
T S
CR
EE
N
42
" FL
AT
SC
RE
EN
42
" F
LA
T S
CR
EE
N
54
" F
LA
T S
CR
EE
N5
4"
FL
AT
SC
RE
EN
42
" F
LA
T S
CR
EE
N4
2"
FL
AT
SC
RE
EN
OFFICE109
SEATING
MEETING110
OFFICE111
OPEN AREA1-A
OPEN AREA1-B
OPEN AREA1-C
OPEN AREA1-D
OPEN AREA1-E
OPEN AREA1-F
OPEN AREA1-G
OPEN AREA1-H
OPEN AREA1-I
OPEN AREA1-J
OFFICE112
OFFICE113
MEETING114 115
VESTIBULE116
OFFICE117 118
MEETING119
SOFT103
MEETING101
OFFICE105 OFFICE
104
MEETINGSEATING
SOFT102
MEETINGOFFICE106
VESTIBULE185
OFFICE107
OFFICE108
180
IDF ROOM
181
COPY
182
SOFT
183
186
JANITOR187
WOMENS
188
LACTATION189VESTIBULE
WOMEN190
MEN177
PANTRY175
MEN'S
176CLOSET
177
STAIR179
SUPPLY191
166
PHONE
165 ADA
163
PHONE
173
CONFERENCE161
PHONE171
PHONE172
RESTROOM
ADA
164
COAT
174
CLOSET
155
156 157
CAFE140
LOUNGE
158
PANTRY/STORAGE141
QA LAB143
QA LAB142
MEETING144
OFFICE145
MEETING146
147148
149
150
151
152
153
154
120
121
122
123
124
125124A
127128
130
131
STAIR
133
134
VESTIBULE100
SOFT
SEATING
MEETING
SOFT
SEATING
MEETING
WOMEN132
MEN136
COPY138
137
IDF139
162
167
FLASHCAM168
COPY169
ELEC.184
VESTIBULE
135MEN'S
VESTIBULE
42
" FL
AT
SC
RE
EN
VESTIBULE126
60
" F
LA
T S
CR
EE
N
VESTIBULE159
CLOSET
170CLOSETCLOSET
CLOSET
CLOSET CLOSET
CLOSET ELEC.
FD
FD
FD FD
FD
FD
A-4.1.3
ELEVATIONS
Project No. 04-104.13
NORTH
No. Date Description
REVISIONS
01 06.11.07 RCP CLARIFICATION
copyright date: 12.01.06
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM StudioSecond Floor415 West BroadwayNew York, NY
10012T: 646.522.5550
F: 646.349.5556www.bam-studio.com
North Building
1st and 2nd Floor
904 Sylvan Avenue
Englewood Cliffs, NJ
07632
NBC UNIVERSAL
DIGITAL MEDIA CAMPUS
33 04.13.07 FOR END USER RECORD
34 04.16.07 FOR CODE REVIEW
34 04.18.07 FOR CLIENT REVIEW
(FOR 1-32 SEE PREVIOUSLY ISSUED SET )
35 04.18.07 FOR STRUCTURAL ENGINEER
36 04.25.07 FOR FURNITURE COORDINATION
37 04.30.07 FOR STAIR COORDINATION
38 05.03.07 50% PROGRESS
39 05.08.07 FOR CLIENT REVIEW
40 05.11.07 FOR CLIENT REVIEW
41 05.18.07 FOR HR COORDINATION
42 05.22.07 ROOM NUMBERING + MATV
COORDINATION
43 05.22.07 FOR BID
44 05.23.07 FOR BID BULLETIN
45 06.01.07 FOR BID BULLETIN #2 -
PARTITION TYPES
46 06.01.07 FOR BID BULLETIN #3 -
BATHROOOM ELEVATIONS
47 06.06.07 FOR BID BULLETIN #4 -
EXIT LIGHTS
48 06.08.07 FOR BID BULLETIN #5 -
BATHROOM SPECS
49 06.08.07 FOR BID BULLETIN #6 -
SECURITY DOOR COORD.
50 06.08.07 FOR BID BULLETIN #7 -
MILLWORK DETAILS
52 06.11.07 FOR BID BULLETIN #9 -
RCP CLARIFICATION
51 06.08.07 FOR BID BULLETIN #8 -
RFI RESPONSE #2
53 06.12.07 FOR TV WIRING COORDINATION
54 06.12.07 FOR BID BULLETIN #10 -
FLOOR DRAIN ADD
55 06.13.07 FOR BID BULLETIN #11 -
VESTIBULE ELEVATIONS
56 06.15.07 FOR PERMIT
02 06.22.07 VALUE ENGINEERING
03 06.26.07 VALUE ENGINEERING
57 06.28.07 ROOM NUMBERING AND MATV
COORDINATION
58 06.28.07 FOR BUILDING DEPTARTMENT-
EGRESS PLAN
59 07.07.07 FOR IT+PVD COORDINATION
60 07.16.07 FOR CONTRACT / CONSTRUCTION
1
A-4.1.3
KEY PLANA-4.1.3
3NOT TO SCALE
2
A-4.1.3
SECTION ELEVATIONA-4.1.2
1.11/4" - 1-0'
SECTION ELEVATIONA-4.1.2
1.21/4" - 1-0'
SECTION ELEVATIONA-4.1.2
1.31/4" - 1-0'
SECTION ELEVATIONA-4.1.2
2.11/4" - 1-0'
SECTION ELEVATIONA-4.1.2
2.21/4" - 1-0'
SECTION ELEVATIONA-4.1.2
2.31/4" - 1-0'
FREE STANDING SINK4" RUBBER BASE, TYP.
GWB LIGHT COVE GWB LIGHT COVE
MILLWORK SCREEN ENCLOSURECURVED GWB DROP CEILING
GLASS PARTITION
GLASS RAIL TERRAZZO STAIRS
MILLWORK SCREEN
ENCLOSURE
MILLWORK RECEPTION DESK
GWB LIGHT COVE
PROJECTION SCREEN
RECESSED PROJECTOR
METAL LOCKERS
P. LAM PIPE SHROUD
GLASS RAIL TERRAZZO STAIRS
GWB LIGHT COVE
FURNITURE CREDENZA
STAINLESS STEEL
RESTROOM PARTITIONSHOLLOW METAL FRAME DOOR
WITH SIDELITE6" HIGH TILE BASE 4" RUBBER BASE, TYP.
4" RUBBER BASE, TYP.
HOLLOW METAL FRAME
DOOR WITH SIDELITE
HOLLOW METAL FRAME
DOOR WITH SIDELITE ACOUSTICAL CEILING TILE ACOUSTICAL CEILING TILE
ACOUSTICAL CEILING TILE
ACOUSTICAL CEILING TILE GWB CEILING ACOUSTICAL CEILING TILE
SOLID SURFACE COUNTER
ADA MIRROR
4" RUBBER BASE, TYP.
HOLLOW METAL FRAME
DOOR WITH SIDELITE
ACOUSTICAL CEILING TILE
GWB CEILING
STAINLESS STEEL
RESTROOM PARTITIONS
HOLLOW METAL FRAME
DOOR WITH SIDELITE
HOLLOW METAL FRAME
DOOR WITH SIDELITE
ACOUSTICAL CEILING TILE
4" RUBBER BASE, TYP.
HOLLOW METAL
FRAME DOORACOUSTICAL CEILING TILE HOLLOW METAL
FRAME DOOR
FREE STANDING SINK
HOLLOW METAL
FRAME DOOR
FRAMELESS TEMP. ACID ETCHED
GLASS DOOR WITH SIDELITE
HOLLOW METAL FRAME
DOOR WITH SIDELITE
4" RUBBER BASE, TYP.
HOLLOW METAL
FRAME DOOR
ACOUSTICAL CEILING TILE
GWB CEILINGRECEPTION DESK
MILLWORK
ACOUSTICAL CEILING TILE
ACOUSTICAL CEILING TILE
EXISTING SKYLIGHT
RECEPTION
SUPPLY
DW
ELEC.
MAILROOM
ELEVATOR
ENCODING ENCODING
ENCODING
EQUIPMENT
STORAGE
ROOM
COAT
CLOSET
PRAYER RO
PHONE BOO
RESTROOM
SEATING
MEETING /
SCREENING
ROOM
CLOSET
ENCODINGASST
A10
A11
A12
A7
A8
A9
A4
A5
A6
A1
A2
A3
6'-0"
8'-0"
8'-0"
6'-0"6'-0"
6'-0"
CR
ED
EN
ZA
CR
ED
EN
ZA
LOCKERS
TVTV TV TV TV
TV90
TV90
TV90
TV90
9090909090
DATA
RACK
DATA
RACK
TV 60
TV
TV
60
60
TV 90
TV 90
TV 90
TV90TV90
TV90
TV90
TV90 TV90
TV90TV90
TV90
TV90
TV90
REF
COFFEE
MIC
RO
TV 90
UM
BR
ELLA
NIC
HE
WATER
1
2
3
4
7
8
9
10
5
6
11
12
13
14
15
16
17
18
19
20
21
22
23
24
27
28
29
30
25
26
31
32
33
34
35
36
39
40
41
42
37
38
43
44
TV60
42" F
LA
T S
CR
EE
NAV
CA
RT
TV
60
42" FLAT SCREEN
AV CREDENZA
TV60
42"
FLA
T S
CR
EE
NA
V C
AR
T
TV60
42"
FLA
T S
CR
EE
NA
V C
AR
T
TV 60
42"
FLA
T S
CR
EE
NA
V C
AR
T
TV60
42"
FLA
T S
CR
EE
NA
V C
AR
T
TV60
42"
FLA
T S
CR
EE
NA
V C
AR
T
TV 60
TV 60
54"
FLA
T S
CR
EE
N
TV 60
54"
FLA
T S
CR
EE
N
OFFICE109
SEATING
MEETING110
OFFICE111
OPEN AREA1-A
OPEN AREA1-B
OPEN AREA1-C
OPEN AREA1-D
OPEN AREA1-E
OPEN AREA1-F
OFFICE112
OFFICE113
MEETING114 115
VESTIBULE116
SOFT103
MEETING101
OFFICE105 OFFICE
104
MEETINGSEATING
SOFT102
MEETINGOFFICE106
VESTIBULE185
OFFICE107
OFFICE108
180
IDF ROOM181
COPY182
SOFT
183
186
JANITOR187
WOMENS
188
LACTATION189VESTIBULE
WOMEN190
MEN177
PANTRY175
MEN'S
176CLOSET
177
STAIR179
SUPPLY191
166
PHONE
165 ADA
163
PHONE173
CONFERENCE161
PHONE171
PHONE172
RESTROOMADA
164
COAT
174
CLOSET
148
149
150
151
152
154
VESTIBULE100
SOFT
SEATING
MEETING
162
167
FLASHCAM168
COPY169
ELEC.184
VESTIBULE
2
60"
FLA
T S
CR
EE
N
CLOSET
170CLOSETCLOSET
CLOSET
FD
FD
FD FD
27'-0" TYP
27'-0
" T
YP
RECEPTION
SUPPLY
DW
ELEC.
JANITOR
SUPPLY
CLOSET
MAILROOM
OFFICE
OFFICE
COPY
COAT
CLOSET
ELEVATOR
GAMING
DRY
CLEANING
OFFICE
COAT
CLOSET
PRAYER ROOM /
PHONE BOOTHWOMEN'S
VESTIBULE
SOFT SEATING
MEETING
SOFT
SEATING
MEETING
10
ATM
RECYCLE BINS
(BELOW)
11
12
9
3
2
1
4
BAR
COUNTER
MICRO MICRO
COUNTER
TRASH BINS
(BELOW)
TRASH BINS
(BELOW)
5 6 7 8
COUNTER
SPRINKLER
COFFEE
42"
FLA
T S
CR
EE
NA
V C
AR
T
42"
FLA
T S
CR
EE
NA
V C
AR
T
42"
FLA
T S
CR
EE
NA
V C
AR
T
AV CART
42" F
LA
T S
CR
EE
N
AV CART
42"
FLA
T S
CR
EE
NA
V C
AR
T
42"
FLA
T S
CR
EE
NA
V C
AR
T4
2"
FLA
T S
CR
EE
N AV
CA
RT
AV
CA
RT
OPEN AREA1-G
OPEN AREA1-H
OPEN AREA1-I
OPEN AREA1-J
5
VESTIBULE116
OFFICE117 118
MEETING119
MEETING101
COAT
174
CLOSET
155
156 157
CAFE140
LOUNGE158
PANTRY/STORAGE141
QA LAB143
QA LAB142
MEETING144
OFFICE145
MEETING146
147148
149
150
151
152
153
154
120
121
122
123
124
125124A
127128
130
131
STAIR133
134
VESTIBULE100
FT
ING
ING
SOFT
SEATING
MEETING
WOMEN132
MEN136
COPY138
137
IDF139
162
135MEN'S
VESTIBULE
2 23 3
42" F
LA
T S
CR
EE
N
VESTIBULE126
60"
FLA
T S
CR
EE
N
VESTIBULE159
CLOSET CLOSET
CLOSET ELEC.
FD
FD
RECEPTION
SUPPLY
DW
ELEC.
JANITOR
SUPPLY
CLOSET
MAILROOM
OFFICE
OFFICE
COPY
COAT
CLOSET
ELEVATOR
ENCODING ENCODING
ENCODING
GAMING
DRY
CLEANING
OFFICE
EQUIPMENT
STORAGE
ROOM
COAT
CLOSET
PRAYER ROOM /
PHONE BOOTHWOMEN'S
VESTIBULE
SOFT SEATING
MEETING
RESTROOM
SOFT
SEATING
MEETING
10
SEATING
MEETING /
SCREENING
ROOM
CLOSET
ENCODINGASST
ATM
RECYCLE BINS
(BELOW)
A10
A11
A12
A7
A8
A9
A4
A5
A6
A1
A2
A3
6'-0"
8'-0
"
8'-0
"
6'-0"6'-0"
6'-0
"
11
12
9
3
2
1
4
BAR
COUNTER
MICRO MICRO
COUNTER
TRASH BINS
(BELOW)
TRASH BINS
(BELOW)
5 6 7 8
CR
ED
EN
ZA
CR
ED
EN
ZA
COUNTER
LOCKERS
DATARACK
DATARACK
REF
COFFEE
MIC
RO
SPRINKLER
UM
BR
ELLA
NIC
HE
WATER
COFFEE
1
2
3
4
7
8
9
10
5
6
11
12
13
14
15
16
17
18
19
20
21
22
23
24
27
28
29
30
25
26
31
32
33
34
35
36
39
40
41
42
37
38
43
44
42
" FL
AT
SC
RE
ENA
V C
AR
T
42" FLAT SCREEN
AV CREDENZA
42
" F
LA
T S
CR
EE
NA
V C
AR
T
42
" F
LA
T S
CR
EE
NA
V C
AR
T
42
" F
LA
T S
CR
EE
NA
V C
AR
T
42
" F
LA
T S
CR
EE
NA
V C
AR
T
42
" F
LA
T S
CR
EE
NA
V C
AR
T
AV CART
42
" FL
AT
SC
RE
EN
AV CART
42
" F
LA
T S
CR
EE
NA
V C
AR
T
54
" F
LA
T S
CR
EE
N5
4"
FL
AT
SC
RE
EN
42
" F
LA
T S
CR
EE
NA
V C
AR
T4
2"
FL
AT
SC
RE
EN A
V C
AR
T
AV
CA
RT
OFFICE109
SEATING
MEETING110
OFFICE111
OPEN AREA
1-A
OPEN AREA1-B
OPEN AREA1-C
OPEN AREA1-D
OPEN AREA1-E
OPEN AREA1-F
OPEN AREA1-G
OPEN AREA1-H
OPEN AREA1-I
OPEN AREA1-J
OFFICE112
OFFICE113
MEETING114 115
VESTIBULE116
OFFICE117 118
MEETING119
SOFT103
MEETING101
OFFICE105 OFFICE
104
MEETINGSEATING
SOFT102
MEETINGOFFICE106
VESTIBULE
185
OFFICE107
OFFICE108
180
IDF ROOM181
COPY182
SOFT
183
186
JANITOR187
WOMENS
188
LACTATION
189VESTIBULE
WOMEN190
MEN
177
PANTRY175
MEN'S
176CLOSET
177
STAIR179
SUPPLY191
166
PHONE
165 ADA
163
PHONE
173
CONFERENCE161
PHONE171
PHONE172
RESTROOMADA
164
COAT
174
CLOSET
155
156 157
CAFE140
LOUNGE158
PANTRY/STORAGE141
QA LAB143
QA LAB142
MEETING
144OFFICE
145MEETING
146147148
149
150
151
152
153
154
120
121
122
123
124
125124A
127128
130
131
STAIR133
134
VESTIBULE100
SOFT
SEATING
MEETING
SOFT
SEATING
MEETING
WOMEN132
MEN
136
COPY
138
137
IDF139
162
167
FLASHCAM
168
COPY
169
ELEC.184
VESTIBULE
135MEN'S
VESTIBULE
2 23 3
42
" FL
AT
SC
RE
EN
VESTIBULE126
60
" F
LA
T S
CR
EE
N
VESTIBULE159
CLOSET
170CLOSETCLOSET
CLOSET
CLOSET CLOSET
CLOSET ELEC.
128S 130S
128S2130S2
128S3130S3
128S4 130S4
128S5 130S5
127S4
127S3
126S4
126S3
127S
125S
131S2
131S3
131S4
124S4
124S3
131S5
132S
132S1
132S2
132S3
132S4
123S4
123S3
123S1
123S
122S1
122S
122S3
122S4
133S4
133S3
133S2
133S1
133S134S
134S1
134S2
134S3
134S4
120S4
120S3
121S1
121S
120S1
120S119S
119S1 118S1
118S
117S1
117S
116S1
116S
136S
136S1
137S
137S1 138S1
137S3
137S5
118S5
116S3
115S3
114S3
240S2
252S2
140S141S
141S1
142S
142S1
143S
143S1
143S2
143S3
143S4
143S5
112S5
112S4
112S3
114S
113S1
113S
112S1
112S
144S
144S1
144S2
144S3
144S4
144S5
111S4
111S3
111S1
111S110S
110S1
110S3
110S4
146S5
146S4
146S3
146S2
145S1
145S 146S
146S1
147S2
147S3
147S4
147S5
108S4
108S3
111S
111S
108S1
108S
147S
147S1
107S104S
104S3
107S3
107S4
148S4
151S2
148S151S
103S
100S
103S3 101S3
101S4
154S4
153S2 154S2
152S 155S
155N
153N1
101N1
103N3
103N5
153N4
104N
104N1
104N2 105N2
105N1
105N
104N3
106N3
148N
107N3
106N2 107N2
106N1 107N1
106N 107N 108N
108N1
108N2 109N2
109N1
109N 110N
110N1
110N2 111N2
111N1
111N
109N3
110N3
146N5
144N
114N
115N2
112N3 113N3
141N5
142N
138N
138N1
137N 136N
137N1 136N1
138N2137N2
140N4
115N4 118N3 119N3
118N2
116N
118N1
118N
119N1
119N
140N5
135N
135N1
134N
134N1
133N 132N
133N1
132N1
134N3
134N4
121N4
121N3
120N1
120N
121N1
121N
132-3 131-3
132-4 131-4
132-5 131-5
122N5 123N5
122N4 123N4
122N3 123N3
122N
122N1 123N1
123N
131N
131N
130N
130N1 128N
131-3 130-3 129-3 128-3
131-4 130-4 129-4 128-4
129-5 128-5
126N5 127N5
124N4 125N4 126N4 127N4
124N3 125N3 126N3 127N3
124N2
124N
125N2
125N
127N
0
1
2
3
4
5
5
4
3
2
1
0
0
1
2
3
4
5
5
4
3
2
1
0
28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
50 51 52 53 54 55 55 53 52 51
50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28
54
27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
0 0 2 3 41
5 6 7 8 9 10 11
12 13 14 15
16 17 18 19 20 21 22 23 24 25 26 27
FD
FD
FD FD
FD
FD
27'-0" TYP
27'-0"
TY
P
FURNITURE LEGEND
GENERAL NOTES
ELECTRIC PROJECTION SCREEN (DA-LITE BOARDROOM ELECTROL HDTV OR EQ.
52"x92" VIEWING AREA). PROVIDE BLOCKING FOR MOUNTING AS NECESSARY.
ELKAY DOUBLE BASIN STAINLESS STEEL SINK WITH OFFSET DRAIN, AND ELKAY
ALLURE 6360 FAUCET WITH PULL-OUT RETRACTABLE SPRAYER. SEE PLUMBING
DRAWINGS.
SOLID SURFACE UNDERMOUNT SINK WITH ADA FAUCET, TYP.
1. ELECTRIC AND DATA RECEPTACLES SHOWN FOR COORDINATION PURPOSES.
SEE ELECTRICAL DRAWINGS FOR CIRCUITING.
2. CONTRACTOR SHALL PROVIDE AND INSTALL ROLL-DOWN SOLAR SHADES ON ALL
PERIMETER WINDOWS. ARCHITECT TO CONFIRM COLOR PRIOR TO ORDER AND
INSTALLATION. SEE DETAIL SHEETS FOR MOUNTING DETAILS AND POWER PLAN
FOR POWER REQUIREMENTS. CONTRACTOR TO COORDINATE WITH LANDLORD'S
INSTALLER.
3. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY FURNITURE VENDOR AND
INSTALLER PRIOR TO ORDER. CONTACT ARCHITECT PRIOR TO FURNITURE ORDER
FOR ANY DISCREPANCIES. CLIENT AND ARCHITECT SHALL NOT BE RESPONSIBLE
FOR ANY COSTS ASSOCIATED WITH MODIFYING FURNITURE TO FIT FIELD
CONDITIONS.
4. ALL WHIP LOCATIONS TO BE CONFIRMED AND CLEARLY NOTED IN PLANS
PROVIDED BY FURNITURE VENDOR. CONTACT ARCHITECT FOR ANY
DISCREPANCIES.
5. ALL ELECTRICAL AND DATA LOCATIONS SHALL BE CONFIRMED IN THE FIELD BY
THE FURNITURE VENDOR PRIOR TO WIRING AND INSTALLATION.
6. FURNITURE VENDOR SHALL PROVIDE SPECIFICATIONS OF THE PROPOSED
WIRING CONFIGURATIONS AND COORDINATE WITH ELECTRICAL ENGINEER. CLIENT
AND ARCHITECT SHALL NOT BE RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH
MODIFYING ELECTRICAL COMPONENTS TO FIT FIELD CONDITIONS.
7. FURNITURE VENDOR SHALL PROVIDE AXONOMETRIC AND PLAN DRAWINGS, IN
.DWG AND .PDF FORMAT, WITH ALL QUOTES. ARCHITECT WILL NOT REVIEW
FURNITURE QUOTE UNTIL AXONOMETRIC AND PLAN DRAWINGS ARE RECEIVED.
ADA COMPLIANT WALL HUNG TOILET AND FLUSH VALVE, TYP. U.O.N.
ADA COMPLIANT GRAB BARS
ADA COMPLIANT TANK TOILET
STAINLESS STEEL BATHROOM ACCESSORIES - BOBRICK TRIMLINE SERIES RECESSED:
(2) PAPER TOWEL DISPENSER AND WASTE RECEPTACLES B-39003
(1) SANITARY NAPKIN/TAMPON VENDOR B-3500 (WOMEN'S RESTROOMS ONLY)
(1) SOAP DISPENSER B-306 PER EVERY (2) SINKS
(1) CLASSIC SERIES PARTITION MOUNTED SEAT COVER DISPENSER, SANITARY NAPKIN
DISPOSAL AND TOILET TISSUE DISPENSER B-357 PER STALL (WOMENS RESTROOM ONLY)
(1) CLASSIC SERIES PARTITION MOUNTED SEAT COVER DISPENSER AND TOILET TISSUE
DISPENSER B-3471 PER STALL (MENS RESTROOM ONLY)
(1) HAT AND COAT HOOK B-682 PER STALL
MIRROR - FULL-WIDTH OF COUNTER, FULL HEIGHT TO CEILING. PROVIDE CUTOUTS FOR
SCONCES.
ADA COMPLIANT URINAL
ELKAY GECR2521R1 ADA COMPLIANT SINGLE BASIN STAINLESS STEEL SINK WITH
OFFSET DRAIN, AND ELKAY ALLURE 6360 FAUCET WITH PULL-OUT RETRACTABLE
SPRAYER. SEE PLUMBING DRAWINGS.
STAINLESS STEEL BATHROOM ACCESSORIES - BOBRICK TRIMLINE SERIES RECESSED:
(1) PAPER TOWEL DISPENSER AND WASTE RECEPTACLES B-39003
(1) SOAP DISPENSER B-306
(1) CLASSIC SERIES PARTITION MOUNTED SEAT COVER DISPENSER, SANITARY NAPKIN
DISPOSAL AND TOILET TISSUE DISPENSER B-357
(1) HAT AND COAT HOOK B-682
(1) FIXED POSITION TILT MIRROR B-293 1836
ADA COMPLIANT HANDICAPPED SINK, ADA COMPLIANT FAUCET WITH PADDLE HANDLES
JANITOR MOP SINK
PANTRY EQUIPMENT:
(1) FULL-SIZE GE MONOGRAM STAINLESS STEEL REFRIGERATOR
(1) GE MONOGRAM MICROWAVE
COFFEE MACHINE (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)
WATER DISPENSER (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)
CAFE EQUIPMENT:
(1) FULL-SIZE GE MONOGRAM STAINLESS STEEL REFRIGERATOR
(2) GE MONOGRAM MICROWAVE
(1) COFFEE MACHINE (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)
(1) WATER DISPENSER (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)
VENDING MACHINES (BY OTHERS)
FLAT PANEL TELEVISION (BY OTHERS)
PAPER TOWEL/WASTE, SOAP, COATHOOK, MIRROR (WALL MOUNTED, FULL HEIGHT AND
WIDTH).
FURNITURE, FIXTURES
AND EQUIPMENT PLAN
FIRST FLOOR
FFE-2.1
FURNITURE, FIXTURES AND EQUIPMENT PLAN - FIRST FLOOR SOUTH ENDFFE-2.1
1SCALE:1/8"=1'-0"
FURNITURE, FIXTURES AND EQUIPMENT PLAN - FIRST FLOOR NORTH ENDFFE-2.1
2SCALE:1/8"=1'-0"
KEY PLANFFE-2.1
3SCALE:3/32"=1'-0"
SOUTH END NORTH END
Project No. 04-104.13
NORTH
No. Date Description
REVISIONS
01 06.11.07 RCP CLARIFICATION
copyright date: 12.01.06
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM StudioSecond Floor415 West Broadway
New York, NY10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
North Building1st and 2nd Floor
904 Sylvan Avenue
Englewood Cliffs, NJ07632
NBC UNIVERSAL
DIGITAL MEDIA CAMPUS
33 04.13.07 FOR END USER RECORD
34 04.16.07 FOR CODE REVIEW
34 04.18.07 FOR CLIENT REVIEW
(FOR 1-32 SEE PREVIOUSLY ISSUED SET )
35 04.18.07 FOR STRUCTURAL ENGINEER
36 04.25.07 FOR FURNITURE COORDINATION
37 04.30.07 FOR STAIR COORDINATION
38 05.03.07 50% PROGRESS
39 05.08.07 FOR CLIENT REVIEW
40 05.11.07 FOR CLIENT REVIEW
41 05.18.07 FOR HR COORDINATION
42 05.22.07 ROOM NUMBERING + MATV
COORDINATION
43 05.22.07 FOR BID
44 05.23.07 FOR BID BULLETIN
45 06.01.07 FOR BID BULLETIN #2 -
PARTITION TYPES
46 06.01.07 FOR BID BULLETIN #3 -
BATHROOOM ELEVATIONS
47 06.06.07 FOR BID BULLETIN #4 -
EXIT LIGHTS
48 06.08.07 FOR BID BULLETIN #5 -
BATHROOM SPECS
49 06.08.07 FOR BID BULLETIN #6 -
SECURITY DOOR COORD.
50 06.08.07 FOR BID BULLETIN #7 -
MILLWORK DETAILS
52 06.11.07 FOR BID BULLETIN #9 -
RCP CLARIFICATION
51 06.08.07 FOR BID BULLETIN #8 -
RFI RESPONSE #2
53 06.12.07 FOR TV WIRING COORDINATION
54 06.12.07 FOR BID BULLETIN #10 -
FLOOR DRAIN ADD
55 06.13.07 FOR BID BULLETIN #11 -
VESTIBULE ELEVATIONS
56 06.15.07 FOR PERMIT
02 06.22.07 VALUE ENGINEERING
03 06.26.07 VALUE ENGINEERING
57 06.28.07 ROOM NUMBERING AND MATV
COORDINATION
58 06.28.07 FOR BUILDING DEPTARTMENT-
EGRESS PLAN
59 07.07.07 FOR IT+PVD COORDINATION
60 07.16.07 FOR CONTRACT / CONSTRUCTION
RECEPTION
SUPPLY
DW
ELEC.
MAILROOM
ELEVATOR
ENCODING ENCODING
ENCODING
EQUIPMENT
STORAGE
ROOM
COAT
CLOSET
PRAYER RO
PHONE BOO
RESTROOM
SEATING
MEETING /
SCREENING
ROOM
CLOSET
ENCODINGASST
A10
A11
A12
A7
A8
A9
A4
A5
A6
A1
A2
A3
6'-0"
8'-0"
8'-0"
6'-0"6'-0"
6'-0"
CR
ED
EN
ZA
CR
ED
EN
ZA
LOCKERS
TVTV TV TV TV
TV90
TV90
TV90
TV90
9090909090
DATA
RACK
DATA
RACK
TV 60
TV
TV
60
60
TV 90
TV 90
TV 90
TV90TV90
TV90
TV90
TV90 TV90
TV90TV90
TV90
TV90
TV90
REF
COFFEE
MIC
RO
TV 90
UM
BR
ELLA
NIC
HE
WATER
1
2
3
4
7
8
9
10
5
6
11
12
13
14
15
16
17
18
19
20
21
22
23
24
27
28
29
30
25
26
31
32
33
34
35
36
39
40
41
42
37
38
43
44
TV60
42" F
LA
T S
CR
EE
NAV
CA
RT
TV
60
42" FLAT SCREEN
AV CREDENZA
TV60
42"
FLA
T S
CR
EE
NA
V C
AR
T
TV60
42"
FLA
T S
CR
EE
NA
V C
AR
T
TV 60
42"
FLA
T S
CR
EE
NA
V C
AR
T
TV60
42"
FLA
T S
CR
EE
NA
V C
AR
T
TV60
42"
FLA
T S
CR
EE
NA
V C
AR
T
TV 60
TV 60
54"
FLA
T S
CR
EE
N
TV 60
54"
FLA
T S
CR
EE
N
OFFICE109
SEATING
MEETING110
OFFICE111
OPEN AREA1-A
OPEN AREA1-B
OPEN AREA1-C
OPEN AREA1-D
OPEN AREA1-E
OPEN AREA1-F
OFFICE112
OFFICE113
MEETING114 115
VESTIBULE116
SOFT103
MEETING101
OFFICE105 OFFICE
104
MEETINGSEATING
SOFT102
MEETINGOFFICE106
VESTIBULE185
OFFICE107
OFFICE108
180
IDF ROOM181
COPY182
SOFT
183
186
JANITOR187
WOMENS
188
LACTATION189VESTIBULE
WOMEN190
MEN177
PANTRY175
MEN'S
176CLOSET
177
STAIR179
SUPPLY191
166
PHONE
165 ADA
163
PHONE173
CONFERENCE161
PHONE171
PHONE172
RESTROOMADA
164
COAT
174
CLOSET
148
149
150
151
152
154
VESTIBULE100
SOFT
SEATING
MEETING
162
167
FLASHCAM168
COPY169
ELEC.184
VESTIBULE
2
60"
FLA
T S
CR
EE
N
CLOSET
170CLOSETCLOSET
CLOSET
FD
FD
FD FD
27'-0" TYP
27'-0
" T
YP
RECEPTION
SUPPLY
DW
ELEC.
JANITOR
SUPPLY
CLOSET
MAILROOM
OFFICE
OFFICE
COPY
COAT
CLOSET
ELEVATOR
GAMING
DRY
CLEANING
OFFICE
COAT
CLOSET
PRAYER ROOM /
PHONE BOOTHWOMEN'S
VESTIBULE
SOFT SEATING
MEETING
SOFT
SEATING
MEETING
10
ATM
RECYCLE BINS
(BELOW)
11
12
9
3
2
1
4
BAR
COUNTER
MICRO MICRO
COUNTER
TRASH BINS
(BELOW)
TRASH BINS
(BELOW)
5 6 7 8
COUNTER
SPRINKLER
COFFEE
42"
FLA
T S
CR
EE
NA
V C
AR
T
42"
FLA
T S
CR
EE
NA
V C
AR
T
42"
FLA
T S
CR
EE
NA
V C
AR
T
AV CART
42" F
LA
T S
CR
EE
N
AV CART
42"
FLA
T S
CR
EE
NA
V C
AR
T
42"
FLA
T S
CR
EE
NA
V C
AR
T4
2"
FLA
T S
CR
EE
N AV
CA
RT
AV
CA
RT
OPEN AREA1-G
OPEN AREA1-H
OPEN AREA1-I
OPEN AREA1-J
5
VESTIBULE116
OFFICE117 118
MEETING119
MEETING101
COAT
174
CLOSET
155
156 157
CAFE140
LOUNGE158
PANTRY/STORAGE141
QA LAB143
QA LAB142
MEETING144
OFFICE145
MEETING146
147148
149
150
151
152
153
154
120
121
122
123
124
125124A
127128
130
131
STAIR133
134
VESTIBULE100
FT
ING
ING
SOFT
SEATING
MEETING
WOMEN132
MEN136
COPY138
137
IDF139
162
135MEN'S
VESTIBULE
2 23 3
42" F
LA
T S
CR
EE
N
VESTIBULE126
60"
FLA
T S
CR
EE
N
VESTIBULE159
CLOSET CLOSET
CLOSET ELEC.
FD
FD
RECEPTION
SUPPLY
DW
ELEC.
JANITOR
SUPPLY
CLOSET
MAILROOM
OFFICE
OFFICE
COPY
COAT
CLOSET
ELEVATOR
ENCODING ENCODING
ENCODING
GAMING
DRY
CLEANING
OFFICE
EQUIPMENT
STORAGE
ROOM
COAT
CLOSET
PRAYER ROOM /
PHONE BOOTHWOMEN'S
VESTIBULE
SOFT SEATING
MEETING
RESTROOM
SOFT
SEATING
MEETING
10
SEATING
MEETING /
SCREENING
ROOM
CLOSET
ENCODINGASST
ATM
RECYCLE BINS
(BELOW)
A10
A11
A12
A7
A8
A9
A4
A5
A6
A1
A2
A3
6'-0"
8'-0
"
8'-0
"
6'-0"6'-0"
6'-0
"
11
12
9
3
2
1
4
BAR
COUNTER
MICRO MICRO
COUNTER
TRASH BINS
(BELOW)
TRASH BINS
(BELOW)
5 6 7 8
CR
ED
EN
ZA
CR
ED
EN
ZA
COUNTER
LOCKERS
DATARACK
DATARACK
REF
COFFEE
MIC
RO
SPRINKLER
UM
BR
ELLA
NIC
HE
WATER
COFFEE
1
2
3
4
7
8
9
10
5
6
11
12
13
14
15
16
17
18
19
20
21
22
23
24
27
28
29
30
25
26
31
32
33
34
35
36
39
40
41
42
37
38
43
44
42
" FL
AT
SC
RE
ENA
V C
AR
T
42" FLAT SCREEN
AV CREDENZA
42
" F
LA
T S
CR
EE
NA
V C
AR
T
42
" F
LA
T S
CR
EE
NA
V C
AR
T
42
" F
LA
T S
CR
EE
NA
V C
AR
T
42
" F
LA
T S
CR
EE
NA
V C
AR
T
42
" F
LA
T S
CR
EE
NA
V C
AR
T
AV CART
42
" FL
AT
SC
RE
EN
AV CART
42
" F
LA
T S
CR
EE
NA
V C
AR
T
54
" F
LA
T S
CR
EE
N5
4"
FL
AT
SC
RE
EN
42
" F
LA
T S
CR
EE
NA
V C
AR
T4
2"
FL
AT
SC
RE
EN A
V C
AR
T
AV
CA
RT
OFFICE109
SEATING
MEETING110
OFFICE111
OPEN AREA
1-A
OPEN AREA1-B
OPEN AREA1-C
OPEN AREA1-D
OPEN AREA1-E
OPEN AREA1-F
OPEN AREA1-G
OPEN AREA1-H
OPEN AREA1-I
OPEN AREA1-J
OFFICE112
OFFICE113
MEETING114 115
VESTIBULE116
OFFICE117 118
MEETING119
SOFT103
MEETING101
OFFICE105 OFFICE
104
MEETINGSEATING
SOFT102
MEETINGOFFICE106
VESTIBULE
185
OFFICE107
OFFICE108
180
IDF ROOM181
COPY182
SOFT
183
186
JANITOR187
WOMENS
188
LACTATION
189VESTIBULE
WOMEN190
MEN
177
PANTRY175
MEN'S
176CLOSET
177
STAIR179
SUPPLY191
166
PHONE
165 ADA
163
PHONE
173
CONFERENCE161
PHONE171
PHONE172
RESTROOMADA
164
COAT
174
CLOSET
155
156 157
CAFE140
LOUNGE158
PANTRY/STORAGE141
QA LAB143
QA LAB142
MEETING
144OFFICE
145MEETING
146147148
149
150
151
152
153
154
120
121
122
123
124
125124A
127128
130
131
STAIR133
134
VESTIBULE100
SOFT
SEATING
MEETING
SOFT
SEATING
MEETING
WOMEN132
MEN
136
COPY
138
137
IDF139
162
167
FLASHCAM
168
COPY
169
ELEC.184
VESTIBULE
135MEN'S
VESTIBULE
2 23 3
42
" FL
AT
SC
RE
EN
VESTIBULE126
60
" F
LA
T S
CR
EE
N
VESTIBULE159
CLOSET
170CLOSETCLOSET
CLOSET
CLOSET CLOSET
CLOSET ELEC.
128S 130S
128S2130S2
128S3130S3
128S4 130S4
128S5 130S5
127S4
127S3
126S4
126S3
127S
125S
131S2
131S3
131S4
124S4
124S3
131S5
132S
132S1
132S2
132S3
132S4
123S4
123S3
123S1
123S
122S1
122S
122S3
122S4
133S4
133S3
133S2
133S1
133S134S
134S1
134S2
134S3
134S4
120S4
120S3
121S1
121S
120S1
120S119S
119S1 118S1
118S
117S1
117S
116S1
116S
136S
136S1
137S
137S1 138S1
137S3
137S5
118S5
116S3
115S3
114S3
240S2
252S2
140S141S
141S1
142S
142S1
143S
143S1
143S2
143S3
143S4
143S5
112S5
112S4
112S3
114S
113S1
113S
112S1
112S
144S
144S1
144S2
144S3
144S4
144S5
111S4
111S3
111S1
111S110S
110S1
110S3
110S4
146S5
146S4
146S3
146S2
145S1
145S 146S
146S1
147S2
147S3
147S4
147S5
108S4
108S3
111S
111S
108S1
108S
147S
147S1
107S104S
104S3
107S3
107S4
148S4
151S2
148S151S
103S
100S
103S3 101S3
101S4
154S4
153S2 154S2
152S 155S
155N
153N1
101N1
103N3
103N5
153N4
104N
104N1
104N2 105N2
105N1
105N
104N3
106N3
148N
107N3
106N2 107N2
106N1 107N1
106N 107N 108N
108N1
108N2 109N2
109N1
109N 110N
110N1
110N2 111N2
111N1
111N
109N3
110N3
146N5
144N
114N
115N2
112N3 113N3
141N5
142N
138N
138N1
137N 136N
137N1 136N1
138N2137N2
140N4
115N4 118N3 119N3
118N2
116N
118N1
118N
119N1
119N
140N5
135N
135N1
134N
134N1
133N 132N
133N1
132N1
134N3
134N4
121N4
121N3
120N1
120N
121N1
121N
132-3 131-3
132-4 131-4
132-5 131-5
122N5 123N5
122N4 123N4
122N3 123N3
122N
122N1 123N1
123N
131N
131N
130N
130N1 128N
131-3 130-3 129-3 128-3
131-4 130-4 129-4 128-4
129-5 128-5
126N5 127N5
124N4 125N4 126N4 127N4
124N3 125N3 126N3 127N3
124N2
124N
125N2
125N
127N
0
1
2
3
4
5
5
4
3
2
1
0
0
1
2
3
4
5
5
4
3
2
1
0
28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
50 51 52 53 54 55 55 53 52 51
50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28
54
27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
0 0 2 3 41
5 6 7 8 9 10 11
12 13 14 15
16 17 18 19 20 21 22 23 24 25 26 27
FD
FD
FD FD
FD
FD
27'-0" TYP
27'-0"
TY
P
FURNITURE LEGEND
GENERAL NOTES
ELECTRIC PROJECTION SCREEN (DA-LITE BOARDROOM ELECTROL HDTV OR EQ.
52"x92" VIEWING AREA). PROVIDE BLOCKING FOR MOUNTING AS NECESSARY.
ELKAY DOUBLE BASIN STAINLESS STEEL SINK WITH OFFSET DRAIN, AND ELKAY
ALLURE 6360 FAUCET WITH PULL-OUT RETRACTABLE SPRAYER. SEE PLUMBING
DRAWINGS.
SOLID SURFACE UNDERMOUNT SINK WITH ADA FAUCET, TYP.
1. ELECTRIC AND DATA RECEPTACLES SHOWN FOR COORDINATION PURPOSES.
SEE ELECTRICAL DRAWINGS FOR CIRCUITING.
2. CONTRACTOR SHALL PROVIDE AND INSTALL ROLL-DOWN SOLAR SHADES ON ALL
PERIMETER WINDOWS. ARCHITECT TO CONFIRM COLOR PRIOR TO ORDER AND
INSTALLATION. SEE DETAIL SHEETS FOR MOUNTING DETAILS AND POWER PLAN
FOR POWER REQUIREMENTS. CONTRACTOR TO COORDINATE WITH LANDLORD'S
INSTALLER.
3. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY FURNITURE VENDOR AND
INSTALLER PRIOR TO ORDER. CONTACT ARCHITECT PRIOR TO FURNITURE ORDER
FOR ANY DISCREPANCIES. CLIENT AND ARCHITECT SHALL NOT BE RESPONSIBLE
FOR ANY COSTS ASSOCIATED WITH MODIFYING FURNITURE TO FIT FIELD
CONDITIONS.
4. ALL WHIP LOCATIONS TO BE CONFIRMED AND CLEARLY NOTED IN PLANS
PROVIDED BY FURNITURE VENDOR. CONTACT ARCHITECT FOR ANY
DISCREPANCIES.
5. ALL ELECTRICAL AND DATA LOCATIONS SHALL BE CONFIRMED IN THE FIELD BY
THE FURNITURE VENDOR PRIOR TO WIRING AND INSTALLATION.
6. FURNITURE VENDOR SHALL PROVIDE SPECIFICATIONS OF THE PROPOSED
WIRING CONFIGURATIONS AND COORDINATE WITH ELECTRICAL ENGINEER. CLIENT
AND ARCHITECT SHALL NOT BE RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH
MODIFYING ELECTRICAL COMPONENTS TO FIT FIELD CONDITIONS.
7. FURNITURE VENDOR SHALL PROVIDE AXONOMETRIC AND PLAN DRAWINGS, IN
.DWG AND .PDF FORMAT, WITH ALL QUOTES. ARCHITECT WILL NOT REVIEW
FURNITURE QUOTE UNTIL AXONOMETRIC AND PLAN DRAWINGS ARE RECEIVED.
ADA COMPLIANT WALL HUNG TOILET AND FLUSH VALVE, TYP. U.O.N.
ADA COMPLIANT GRAB BARS
ADA COMPLIANT TANK TOILET
STAINLESS STEEL BATHROOM ACCESSORIES - BOBRICK TRIMLINE SERIES RECESSED:
(2) PAPER TOWEL DISPENSER AND WASTE RECEPTACLES B-39003
(1) SANITARY NAPKIN/TAMPON VENDOR B-3500 (WOMEN'S RESTROOMS ONLY)
(1) SOAP DISPENSER B-306 PER EVERY (2) SINKS
(1) CLASSIC SERIES PARTITION MOUNTED SEAT COVER DISPENSER, SANITARY NAPKIN
DISPOSAL AND TOILET TISSUE DISPENSER B-357 PER STALL (WOMENS RESTROOM ONLY)
(1) CLASSIC SERIES PARTITION MOUNTED SEAT COVER DISPENSER AND TOILET TISSUE
DISPENSER B-3471 PER STALL (MENS RESTROOM ONLY)
(1) HAT AND COAT HOOK B-682 PER STALL
MIRROR - FULL-WIDTH OF COUNTER, FULL HEIGHT TO CEILING. PROVIDE CUTOUTS FOR
SCONCES.
ADA COMPLIANT URINAL
ELKAY GECR2521R1 ADA COMPLIANT SINGLE BASIN STAINLESS STEEL SINK WITH
OFFSET DRAIN, AND ELKAY ALLURE 6360 FAUCET WITH PULL-OUT RETRACTABLE
SPRAYER. SEE PLUMBING DRAWINGS.
STAINLESS STEEL BATHROOM ACCESSORIES - BOBRICK TRIMLINE SERIES RECESSED:
(1) PAPER TOWEL DISPENSER AND WASTE RECEPTACLES B-39003
(1) SOAP DISPENSER B-306
(1) CLASSIC SERIES PARTITION MOUNTED SEAT COVER DISPENSER, SANITARY NAPKIN
DISPOSAL AND TOILET TISSUE DISPENSER B-357
(1) HAT AND COAT HOOK B-682
(1) FIXED POSITION TILT MIRROR B-293 1836
ADA COMPLIANT HANDICAPPED SINK, ADA COMPLIANT FAUCET WITH PADDLE HANDLES
JANITOR MOP SINK
PANTRY EQUIPMENT:
(1) FULL-SIZE GE MONOGRAM STAINLESS STEEL REFRIGERATOR
(1) GE MONOGRAM MICROWAVE
COFFEE MACHINE (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)
WATER DISPENSER (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)
CAFE EQUIPMENT:
(1) FULL-SIZE GE MONOGRAM STAINLESS STEEL REFRIGERATOR
(2) GE MONOGRAM MICROWAVE
(1) COFFEE MACHINE (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)
(1) WATER DISPENSER (FURNISHED BY OTHERS, GC TO PROVIDE 14" COPPER WATER LINE)
VENDING MACHINES (BY OTHERS)
FLAT PANEL TELEVISION (BY OTHERS)
PAPER TOWEL/WASTE, SOAP, COATHOOK, MIRROR (WALL MOUNTED, FULL HEIGHT AND
WIDTH).
FURNITURE, FIXTURES
AND EQUIPMENT PLAN
FIRST FLOOR
FFE-2.1
FURNITURE, FIXTURES AND EQUIPMENT PLAN - FIRST FLOOR SOUTH ENDFFE-2.1
1SCALE:1/8"=1'-0"
FURNITURE, FIXTURES AND EQUIPMENT PLAN - FIRST FLOOR NORTH ENDFFE-2.1
2SCALE:1/8"=1'-0"
KEY PLANFFE-2.1
3SCALE:3/32"=1'-0"
SOUTH END NORTH END
Project No. 04-104.13
NORTH
No. Date Description
REVISIONS
01 06.11.07 RCP CLARIFICATION
copyright date: 12.01.06
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM StudioSecond Floor415 West Broadway
New York, NY10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
North Building1st and 2nd Floor
904 Sylvan Avenue
Englewood Cliffs, NJ07632
NBC UNIVERSAL
DIGITAL MEDIA CAMPUS
33 04.13.07 FOR END USER RECORD
34 04.16.07 FOR CODE REVIEW
34 04.18.07 FOR CLIENT REVIEW
(FOR 1-32 SEE PREVIOUSLY ISSUED SET )
35 04.18.07 FOR STRUCTURAL ENGINEER
36 04.25.07 FOR FURNITURE COORDINATION
37 04.30.07 FOR STAIR COORDINATION
38 05.03.07 50% PROGRESS
39 05.08.07 FOR CLIENT REVIEW
40 05.11.07 FOR CLIENT REVIEW
41 05.18.07 FOR HR COORDINATION
42 05.22.07 ROOM NUMBERING + MATV
COORDINATION
43 05.22.07 FOR BID
44 05.23.07 FOR BID BULLETIN
45 06.01.07 FOR BID BULLETIN #2 -
PARTITION TYPES
46 06.01.07 FOR BID BULLETIN #3 -
BATHROOOM ELEVATIONS
47 06.06.07 FOR BID BULLETIN #4 -
EXIT LIGHTS
48 06.08.07 FOR BID BULLETIN #5 -
BATHROOM SPECS
49 06.08.07 FOR BID BULLETIN #6 -
SECURITY DOOR COORD.
50 06.08.07 FOR BID BULLETIN #7 -
MILLWORK DETAILS
52 06.11.07 FOR BID BULLETIN #9 -
RCP CLARIFICATION
51 06.08.07 FOR BID BULLETIN #8 -
RFI RESPONSE #2
53 06.12.07 FOR TV WIRING COORDINATION
54 06.12.07 FOR BID BULLETIN #10 -
FLOOR DRAIN ADD
55 06.13.07 FOR BID BULLETIN #11 -
VESTIBULE ELEVATIONS
56 06.15.07 FOR PERMIT
02 06.22.07 VALUE ENGINEERING
03 06.26.07 VALUE ENGINEERING
57 06.28.07 ROOM NUMBERING AND MATV
COORDINATION
58 06.28.07 FOR BUILDING DEPTARTMENT-
EGRESS PLAN
59 07.07.07 FOR IT+PVD COORDINATION
60 07.16.07 FOR CONTRACT / CONSTRUCTION
RECEPTION
SUPPLY
DW
ELEC.
JANITOR
SUPPLYCLOSET
MAILROOM
OFFICE
OFFICE
COPY
COAT
CLOSET
ELEVATOR
DRY
CLEANING
OFFICE
EQUIPMENT
STORAGEROOM
COAT
CLOSET
PRAYER ROOM /
PHONE BOOTHWOMEN'S
VESTIBULE
SOFT SEATING
MEETING
RESTROOM
SOFT
SEATING
MEETING
SEATING
MEETING /
SCREENING
ROOM
CLOSET
ATMSPRINKLER
OFFICE109
SEATING
MEETING110
OFFICE111
OPEN AREA1-A
OPEN AREA1-B
OPEN AREA1-C
OPEN AREA1-D
OPEN AREA1-E
OPEN AREA1-F
OPEN AREA1-G
OPEN AREA1-H
OPEN AREA1-I
OPEN AREA1-J
OFFICE112
OFFICE113
MEETING114 115
VESTIBULE116
OFFICE117 118
MEETING119
SOFT103
MEETING101
OFFICE105 OFFICE
104
MEETINGSEATING
SOFT102
MEETINGOFFICE106
VESTIBULE185
OFFICE107
OFFICE108
180
IDF ROOM181
COPY182
SOFT
183
186
JANITOR187
WOMENS
188
LACTATION189VESTIBULE
WOMEN190
MEN177
PANTRY175
MEN'S
176CLOSET
177
STAIR179
SUPPLY191
166
PHONE
165 ADA
163
PHONE173
CONFERENCE161
PHONE171
PHONE172
RESTROOMADA
164
COAT
174
CLOSET
155
156 157
CAFE140
LOUNGE158
PANTRY/STORAGE141
QA LAB143
QA LAB142
MEETING144
OFFICE145
MEETING146
147148
149
150
151
152
153
154
120
121
122
123
124
125124A
127128
130
131
STAIR133
134
VESTIBULE100
SOFT
SEATING
MEETING
SOFT
SEATING
MEETING
WOMEN132
MEN136
COPY138
137
IDF139
162
167
FLASHCAM168
COPY169
ELEC.184
VESTIBULE
135MEN'S
VESTIBULE
VESTIBULE126
VESTIBULE159
CLOSET
170CLOSETCLOSET
CLOSET
CLOSET CLOSET
CLOSET ELEC.
FD
FD
FD FD
FD
FD
RECEPTION
NT
E
CLOSETRESTROOMPHONE
ADA
PHONE173
CONFERENCE161
PHONE171
PHONE172
RESTROOMADA
AM
FD FD
A-5.1.5
MILLWORK DETAILS
Project No. 04-104.13
NORTH
No. Date Description
REVISIONS
01 06.11.07 RCP CLARIFICATION
copyright date: 12.01.06
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM StudioSecond Floor415 West Broadway
New York, NY10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
North Building1st and 2nd Floor
904 Sylvan Avenue
Englewood Cliffs, NJ07632
NBC UNIVERSAL
DIGITAL MEDIA CAMPUS
33 04.13.07 FOR END USER RECORD
34 04.16.07 FOR CODE REVIEW
34 04.18.07 FOR CLIENT REVIEW
(FOR 1-32 SEE PREVIOUSLY ISSUED SET )
35 04.18.07 FOR STRUCTURAL ENGINEER
36 04.25.07 FOR FURNITURE COORDINATION
37 04.30.07 FOR STAIR COORDINATION
38 05.03.07 50% PROGRESS
39 05.08.07 FOR CLIENT REVIEW
40 05.11.07 FOR CLIENT REVIEW
41 05.18.07 FOR HR COORDINATION
42 05.22.07 ROOM NUMBERING + MATV
COORDINATION
43 05.22.07 FOR BID
44 05.23.07 FOR BID BULLETIN
45 06.01.07 FOR BID BULLETIN #2 -
PARTITION TYPES
46 06.01.07 FOR BID BULLETIN #3 -
BATHROOOM ELEVATIONS
47 06.06.07 FOR BID BULLETIN #4 -
EXIT LIGHTS
48 06.08.07 FOR BID BULLETIN #5 -
BATHROOM SPECS
49 06.08.07 FOR BID BULLETIN #6 -
SECURITY DOOR COORD.
50 06.08.07 FOR BID BULLETIN #7 -
MILLWORK DETAILS
52 06.11.07 FOR BID BULLETIN #9 -
RCP CLARIFICATION
51 06.08.07 FOR BID BULLETIN #8 -
RFI RESPONSE #2
53 06.12.07 FOR TV WIRING COORDINATION
54 06.12.07 FOR BID BULLETIN #10 -
FLOOR DRAIN ADD
55 06.13.07 FOR BID BULLETIN #11 -
VESTIBULE ELEVATIONS
56 06.15.07 FOR PERMIT
02 06.22.07 VALUE ENGINEERING
03 06.26.07 VALUE ENGINEERING
57 06.28.07 ROOM NUMBERING AND MATV
COORDINATION
58 06.28.07 FOR BUILDING DEPTARTMENT-
EGRESS PLAN
59 07.07.07 FOR IT+PVD COORDINATION
60 07.16.07 FOR CONTRACT / CONSTRUCTION
KEY PLANA-5.1.5
6NOT TO SCALE
SECTION ELEVATIONA-5.1.5
11/2" - 1-0'
SECTION ELEVATIONA-5.1.5
21/2" - 1-0'
MILLWORK DETAILSA-5.1.5
33/4" - 1-0'
MILLWORK DETAILSA-5.1.5
43/4" - 1-0'
MODERNFOLD MOVEABLE
PARTITION PANELS, SEE
DOOR SCHEDULE.
PROJECTION SCREEN.PROJECTOR
MILLWORK
SECURITY DESK
WHITEBOARD
FLATSCREENTV
FLATSCREENTV
FLATSCREENTV
FLATSCREEN
TV
CUTOUT IN GWB FOR
PROJECTION SCREEN.
CUTOUT IN GWB FOR
PROJECTION SCREEN.
WOOD VENEER
CABINETS
WOOD VENEER
CABINETS
DOORS BY
MODERNFOLD.
MODERNFOLD MOVEABLE
PARTITION PANELS, SEE
DOOR SCHEDULE.
PROJECTOR PROJECTOR
WHITEBOARD
FLATSCREEN
TV
FURNITURE PROVIDED
BY OTHERS.
3
A-5.1.6
7
A-5.1.6
7
A-5.1.6
3
A-5.1.6
AREA OF DETAIL
ENLARGED KEY PLANA-5.1.5
5NOT TO SCALE
2
A-5.1.5
1
A-5.1.5
4
A-5.1.5
3
A-5.1.5
MONITOR NICHE MONITOR NICHE
1/4" REVEAL ON ALL SIDES 1/4" REVEAL ON ALL SIDES
1/4" REVEAL ON ALL SIDES
vicinity map
nbc universal digital media campus completed:
2008
site location:Englewood Cliffs, NJ
EXISTING METAL FENCE AND GATES TO REMAIN.
DEMOLITION KEYED NOTES
EXISTING DOOR TO REMAIN
EXISTING DOOR TO BE DEMOLISHED
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE DEMOLISHED
DEMOLITION PLAN LEGEND
EXISTING CONCRETE PATHWAY TO REMAIN.
EXISTING GUARD STATION TO REMAIN.
EXISTING CONCRETE STAIRS AND LANDING TO REMAIN. PATCH AND REPAIR CRACKS
AND CHIPS.
EXISTING AREAWAY TO REMAIN. PATCH AND REPAIR CRACKS AND CHIPS.
PARKING
PARKING
PARKING
PALISADES INTERSTATE PKWY
SYLVAN AVENUE (RTE. 9W)
SOUTHBUILDING
A-1.1
SITE PLAN
DEMOLITION SITE PLAND-1.1
1SCALE:1/16"=1'-0"
KEY PLAND-1.1
2NOT TO SCALE
Project No. 04-104.13
NORTH
No. Date Description
REVISIONS
01 06.11.07 RCP CLARIFICATION
copyright date: 12.01.06
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM StudioSecond Floor
415 West BroadwayNew York, NY
10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
North Building
1st and 2nd Floor
904 Sylvan Avenue
Englewood Cliffs, NJ
07632
NBC UNIVERSAL
DIGITAL MEDIA CAMPUS
33 04.13.07 FOR END USER RECORD
34 04.16.07 FOR CODE REVIEW
34 04.18.07 FOR CLIENT REVIEW
(FOR 1-32 SEE PREVIOUSLY ISSUED SET )
35 04.18.07 FOR STRUCTURAL ENGINEER
36 04.25.07 FOR FURNITURE COORDINATION
37 04.30.07 FOR STAIR COORDINATION
38 05.03.07 50% PROGRESS
39 05.08.07 FOR CLIENT REVIEW
40 05.11.07 FOR CLIENT REVIEW
41 05.18.07 FOR HR COORDINATION
42 05.22.07 ROOM NUMBERING + MATV
COORDINATION
43 05.22.07 FOR BID
44 05.23.07 FOR BID BULLETIN
45 06.01.07 FOR BID BULLETIN #2 -
PARTITION TYPES
46 06.01.07 FOR BID BULLETIN #3 -
BATHROOOM ELEVATIONS
47 06.06.07 FOR BID BULLETIN #4 -
EXIT LIGHTS
48 06.08.07 FOR BID BULLETIN #5 -
BATHROOM SPECS
49 06.08.07 FOR BID BULLETIN #6 -
SECURITY DOOR COORD.
50 06.08.07 FOR BID BULLETIN #7 -
MILLWORK DETAILS
52 06.11.07 FOR BID BULLETIN #9 -
RCP CLARIFICATION
51 06.08.07 FOR BID BULLETIN #8 -
RFI RESPONSE #2
53 06.12.07 FOR TV WIRING COORDINATION
54 06.12.07 FOR BID BULLETIN #10 -
FLOOR DRAIN ADD
55 06.13.07 FOR BID BULLETIN #11 -
VESTIBULE ELEVATIONS
56 06.15.07 FOR PERMIT
02 06.22.07 VALUE ENGINEERING
03 06.26.07 VALUE ENGINEERING
57 06.28.07 ROOM NUMBERING AND MATV
COORDINATION
58 06.28.07 FOR BUILDING DEPTARTMENT-
EGRESS PLAN
59 07.07.07 FOR IT+PVD COORDINATION
60 07.16.07 FOR CONTRACT / CONSTRUCTION
Project No. 04-104.13
NORTH
No. Date Description
REVISIONS
01 06.11.07 RCP CLARIFICATION
copyright date: 12.01.06
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM StudioSecond Floor
415 West BroadwayNew York, NY
10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
North Building
1st and 2nd Floor
904 Sylvan Avenue
Englewood Cliffs, NJ
07632
NBC UNIVERSAL
DIGITAL MEDIA CAMPUS
33 04.13.07 FOR END USER RECORD
34 04.16.07 FOR CODE REVIEW
34 04.18.07 FOR CLIENT REVIEW
(FOR 1-32 SEE PREVIOUSLY ISSUED SET )
35 04.18.07 FOR STRUCTURAL ENGINEER
36 04.25.07 FOR FURNITURE COORDINATION
37 04.30.07 FOR STAIR COORDINATION
38 05.03.07 50% PROGRESS
39 05.08.07 FOR CLIENT REVIEW
40 05.11.07 FOR CLIENT REVIEW
41 05.18.07 FOR HR COORDINATION
42 05.22.07 ROOM NUMBERING + MATV
COORDINATION
43 05.22.07 FOR BID
44 05.23.07 FOR BID BULLETIN
45 06.01.07 FOR BID BULLETIN #2 -
PARTITION TYPES
46 06.01.07 FOR BID BULLETIN #3 -
BATHROOOM ELEVATIONS
47 06.06.07 FOR BID BULLETIN #4 -
EXIT LIGHTS
48 06.08.07 FOR BID BULLETIN #5 -
BATHROOM SPECS
49 06.08.07 FOR BID BULLETIN #6 -
SECURITY DOOR COORD.
50 06.08.07 FOR BID BULLETIN #7 -
MILLWORK DETAILS
52 06.11.07 FOR BID BULLETIN #9 -
RCP CLARIFICATION
51 06.08.07 FOR BID BULLETIN #8 -
RFI RESPONSE #2
53 06.12.07 FOR TV WIRING COORDINATION
54 06.12.07 FOR BID BULLETIN #10 -
FLOOR DRAIN ADD
55 06.13.07 FOR BID BULLETIN #11 -
VESTIBULE ELEVATIONS
56 06.15.07 FOR PERMIT
02 06.22.07 VALUE ENGINEERING
03 06.26.07 VALUE ENGINEERING
57 06.28.07 ROOM NUMBERING AND MATV
COORDINATION
58 06.28.07 FOR BUILDING DEPTARTMENT-
EGRESS PLAN
59 07.07.07 FOR IT+PVD COORDINATION
60 07.16.07 FOR CONTRACT / CONSTRUCTION
Project No. 04-104.13
NORTH
No. Date Description
REVISIONS
01 06.11.07 RCP CLARIFICATION
copyright date: 12.01.06
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM StudioSecond Floor
415 West BroadwayNew York, NY
10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
North Building
1st and 2nd Floor
904 Sylvan Avenue
Englewood Cliffs, NJ
07632
NBC UNIVERSAL
DIGITAL MEDIA CAMPUS
33 04.13.07 FOR END USER RECORD
34 04.16.07 FOR CODE REVIEW
34 04.18.07 FOR CLIENT REVIEW
(FOR 1-32 SEE PREVIOUSLY ISSUED SET )
35 04.18.07 FOR STRUCTURAL ENGINEER
36 04.25.07 FOR FURNITURE COORDINATION
37 04.30.07 FOR STAIR COORDINATION
38 05.03.07 50% PROGRESS
39 05.08.07 FOR CLIENT REVIEW
40 05.11.07 FOR CLIENT REVIEW
41 05.18.07 FOR HR COORDINATION
42 05.22.07 ROOM NUMBERING + MATV
COORDINATION
43 05.22.07 FOR BID
44 05.23.07 FOR BID BULLETIN
45 06.01.07 FOR BID BULLETIN #2 -
PARTITION TYPES
46 06.01.07 FOR BID BULLETIN #3 -
BATHROOOM ELEVATIONS
47 06.06.07 FOR BID BULLETIN #4 -
EXIT LIGHTS
48 06.08.07 FOR BID BULLETIN #5 -
BATHROOM SPECS
49 06.08.07 FOR BID BULLETIN #6 -
SECURITY DOOR COORD.
50 06.08.07 FOR BID BULLETIN #7 -
MILLWORK DETAILS
52 06.11.07 FOR BID BULLETIN #9 -
RCP CLARIFICATION
51 06.08.07 FOR BID BULLETIN #8 -
RFI RESPONSE #2
53 06.12.07 FOR TV WIRING COORDINATION
54 06.12.07 FOR BID BULLETIN #10 -
FLOOR DRAIN ADD
55 06.13.07 FOR BID BULLETIN #11 -
VESTIBULE ELEVATIONS
56 06.15.07 FOR PERMIT
02 06.22.07 VALUE ENGINEERING
03 06.26.07 VALUE ENGINEERING
57 06.28.07 ROOM NUMBERING AND MATV
COORDINATION
58 06.28.07 FOR BUILDING DEPTARTMENT-
EGRESS PLAN
59 07.07.07 FOR IT+PVD COORDINATION
60 07.16.07 FOR CONTRACT / CONSTRUCTION
Project No. 04-104.13
NORTH
No. Date Description
REVISIONS
01 06.11.07 RCP CLARIFICATION
copyright date: 12.01.06
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM StudioSecond Floor
415 West BroadwayNew York, NY
10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
North Building
1st and 2nd Floor
904 Sylvan Avenue
Englewood Cliffs, NJ
07632
NBC UNIVERSAL
DIGITAL MEDIA CAMPUS
33 04.13.07 FOR END USER RECORD
34 04.16.07 FOR CODE REVIEW
34 04.18.07 FOR CLIENT REVIEW
(FOR 1-32 SEE PREVIOUSLY ISSUED SET )
35 04.18.07 FOR STRUCTURAL ENGINEER
36 04.25.07 FOR FURNITURE COORDINATION
37 04.30.07 FOR STAIR COORDINATION
38 05.03.07 50% PROGRESS
39 05.08.07 FOR CLIENT REVIEW
40 05.11.07 FOR CLIENT REVIEW
41 05.18.07 FOR HR COORDINATION
42 05.22.07 ROOM NUMBERING + MATV
COORDINATION
43 05.22.07 FOR BID
44 05.23.07 FOR BID BULLETIN
45 06.01.07 FOR BID BULLETIN #2 -
PARTITION TYPES
46 06.01.07 FOR BID BULLETIN #3 -
BATHROOOM ELEVATIONS
47 06.06.07 FOR BID BULLETIN #4 -
EXIT LIGHTS
48 06.08.07 FOR BID BULLETIN #5 -
BATHROOM SPECS
49 06.08.07 FOR BID BULLETIN #6 -
SECURITY DOOR COORD.
50 06.08.07 FOR BID BULLETIN #7 -
MILLWORK DETAILS
52 06.11.07 FOR BID BULLETIN #9 -
RCP CLARIFICATION
51 06.08.07 FOR BID BULLETIN #8 -
RFI RESPONSE #2
53 06.12.07 FOR TV WIRING COORDINATION
54 06.12.07 FOR BID BULLETIN #10 -
FLOOR DRAIN ADD
55 06.13.07 FOR BID BULLETIN #11 -
VESTIBULE ELEVATIONS
56 06.15.07 FOR PERMIT
02 06.22.07 VALUE ENGINEERING
03 06.26.07 VALUE ENGINEERING
57 06.28.07 ROOM NUMBERING AND MATV
COORDINATION
58 06.28.07 FOR BUILDING DEPTARTMENT-
EGRESS PLAN
59 07.07.07 FOR IT+PVD COORDINATION
60 07.16.07 FOR CONTRACT / CONSTRUCTION
Project No. 04-104.13
NORTH
No. Date Description
REVISIONS
01 06.11.07 RCP CLARIFICATION
copyright date: 12.01.06
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM StudioSecond Floor
415 West BroadwayNew York, NY
10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
North Building
1st and 2nd Floor
904 Sylvan Avenue
Englewood Cliffs, NJ
07632
NBC UNIVERSAL
DIGITAL MEDIA CAMPUS
33 04.13.07 FOR END USER RECORD
34 04.16.07 FOR CODE REVIEW
34 04.18.07 FOR CLIENT REVIEW
(FOR 1-32 SEE PREVIOUSLY ISSUED SET )
35 04.18.07 FOR STRUCTURAL ENGINEER
36 04.25.07 FOR FURNITURE COORDINATION
37 04.30.07 FOR STAIR COORDINATION
38 05.03.07 50% PROGRESS
39 05.08.07 FOR CLIENT REVIEW
40 05.11.07 FOR CLIENT REVIEW
41 05.18.07 FOR HR COORDINATION
42 05.22.07 ROOM NUMBERING + MATV
COORDINATION
43 05.22.07 FOR BID
44 05.23.07 FOR BID BULLETIN
45 06.01.07 FOR BID BULLETIN #2 -
PARTITION TYPES
46 06.01.07 FOR BID BULLETIN #3 -
BATHROOOM ELEVATIONS
47 06.06.07 FOR BID BULLETIN #4 -
EXIT LIGHTS
48 06.08.07 FOR BID BULLETIN #5 -
BATHROOM SPECS
49 06.08.07 FOR BID BULLETIN #6 -
SECURITY DOOR COORD.
50 06.08.07 FOR BID BULLETIN #7 -
MILLWORK DETAILS
52 06.11.07 FOR BID BULLETIN #9 -
RCP CLARIFICATION
51 06.08.07 FOR BID BULLETIN #8 -
RFI RESPONSE #2
53 06.12.07 FOR TV WIRING COORDINATION
54 06.12.07 FOR BID BULLETIN #10 -
FLOOR DRAIN ADD
55 06.13.07 FOR BID BULLETIN #11 -
VESTIBULE ELEVATIONS
56 06.15.07 FOR PERMIT
02 06.22.07 VALUE ENGINEERING
03 06.26.07 VALUE ENGINEERING
57 06.28.07 ROOM NUMBERING AND MATV
COORDINATION
58 06.28.07 FOR BUILDING DEPTARTMENT-
EGRESS PLAN
59 07.07.07 FOR IT+PVD COORDINATION
60 07.16.07 FOR CONTRACT / CONSTRUCTION
Project No. 04-104.13
NORTH
No. Date Description
REVISIONS
01 06.11.07 RCP CLARIFICATION
copyright date: 12.01.06
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM StudioSecond Floor
415 West BroadwayNew York, NY
10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
North Building
1st and 2nd Floor
904 Sylvan Avenue
Englewood Cliffs, NJ
07632
NBC UNIVERSAL
DIGITAL MEDIA CAMPUS
33 04.13.07 FOR END USER RECORD
34 04.16.07 FOR CODE REVIEW
34 04.18.07 FOR CLIENT REVIEW
(FOR 1-32 SEE PREVIOUSLY ISSUED SET )
35 04.18.07 FOR STRUCTURAL ENGINEER
36 04.25.07 FOR FURNITURE COORDINATION
37 04.30.07 FOR STAIR COORDINATION
38 05.03.07 50% PROGRESS
39 05.08.07 FOR CLIENT REVIEW
40 05.11.07 FOR CLIENT REVIEW
41 05.18.07 FOR HR COORDINATION
42 05.22.07 ROOM NUMBERING + MATV
COORDINATION
43 05.22.07 FOR BID
44 05.23.07 FOR BID BULLETIN
45 06.01.07 FOR BID BULLETIN #2 -
PARTITION TYPES
46 06.01.07 FOR BID BULLETIN #3 -
BATHROOOM ELEVATIONS
47 06.06.07 FOR BID BULLETIN #4 -
EXIT LIGHTS
48 06.08.07 FOR BID BULLETIN #5 -
BATHROOM SPECS
49 06.08.07 FOR BID BULLETIN #6 -
SECURITY DOOR COORD.
50 06.08.07 FOR BID BULLETIN #7 -
MILLWORK DETAILS
52 06.11.07 FOR BID BULLETIN #9 -
RCP CLARIFICATION
51 06.08.07 FOR BID BULLETIN #8 -
RFI RESPONSE #2
53 06.12.07 FOR TV WIRING COORDINATION
54 06.12.07 FOR BID BULLETIN #10 -
FLOOR DRAIN ADD
55 06.13.07 FOR BID BULLETIN #11 -
VESTIBULE ELEVATIONS
56 06.15.07 FOR PERMIT
02 06.22.07 VALUE ENGINEERING
03 06.26.07 VALUE ENGINEERING
57 06.28.07 ROOM NUMBERING AND MATV
COORDINATION
58 06.28.07 FOR BUILDING DEPTARTMENT-
EGRESS PLAN
59 07.07.07 FOR IT+PVD COORDINATION
60 07.16.07 FOR CONTRACT / CONSTRUCTION
Project No. 04-104.13
NORTH
No. Date Description
REVISIONS
01 06.11.07 RCP CLARIFICATION
copyright date: 12.01.06
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM StudioSecond Floor
415 West BroadwayNew York, NY
10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
North Building
1st and 2nd Floor
904 Sylvan Avenue
Englewood Cliffs, NJ
07632
NBC UNIVERSAL
DIGITAL MEDIA CAMPUS
33 04.13.07 FOR END USER RECORD
34 04.16.07 FOR CODE REVIEW
34 04.18.07 FOR CLIENT REVIEW
(FOR 1-32 SEE PREVIOUSLY ISSUED SET )
35 04.18.07 FOR STRUCTURAL ENGINEER
36 04.25.07 FOR FURNITURE COORDINATION
37 04.30.07 FOR STAIR COORDINATION
38 05.03.07 50% PROGRESS
39 05.08.07 FOR CLIENT REVIEW
40 05.11.07 FOR CLIENT REVIEW
41 05.18.07 FOR HR COORDINATION
42 05.22.07 ROOM NUMBERING + MATV
COORDINATION
43 05.22.07 FOR BID
44 05.23.07 FOR BID BULLETIN
45 06.01.07 FOR BID BULLETIN #2 -
PARTITION TYPES
46 06.01.07 FOR BID BULLETIN #3 -
BATHROOOM ELEVATIONS
47 06.06.07 FOR BID BULLETIN #4 -
EXIT LIGHTS
48 06.08.07 FOR BID BULLETIN #5 -
BATHROOM SPECS
49 06.08.07 FOR BID BULLETIN #6 -
SECURITY DOOR COORD.
50 06.08.07 FOR BID BULLETIN #7 -
MILLWORK DETAILS
52 06.11.07 FOR BID BULLETIN #9 -
RCP CLARIFICATION
51 06.08.07 FOR BID BULLETIN #8 -
RFI RESPONSE #2
53 06.12.07 FOR TV WIRING COORDINATION
54 06.12.07 FOR BID BULLETIN #10 -
FLOOR DRAIN ADD
55 06.13.07 FOR BID BULLETIN #11 -
VESTIBULE ELEVATIONS
56 06.15.07 FOR PERMIT
02 06.22.07 VALUE ENGINEERING
03 06.26.07 VALUE ENGINEERING
57 06.28.07 ROOM NUMBERING AND MATV
COORDINATION
58 06.28.07 FOR BUILDING DEPTARTMENT-
EGRESS PLAN
59 07.07.07 FOR IT+PVD COORDINATION
60 07.16.07 FOR CONTRACT / CONSTRUCTION
vicinity mapnyc
Project Manager / Lead Designer BAM STUDIO ARCHITECTS
Issues:Five different user groups, each with distinct needs, were being consoli-dated into one building to foster collaboration, acess to research material and use of advanced digital technology.
Action:BAM worked closely with senior management, Facilities, and the five user groups to accommodate and merge common needs, and guide compromise on secondary needs, in order to achieve the goal of creat-
Results:A beautiful environment was created which accommodates library stor-age, individual work areas, small group meetings and large presentation spaces, with a layout that encourages cross pollination of ideas and se-
↑ Ground Floor Plan ↑ Sections and Elevations
↑ Central stair and atrium from 2nd Floor. ↑ Central stair and reception area from Ground Floor. ↑ Soft seating meeting room and atrium corridor 2nd Floor. ↑ Large conference room(s) with folding partition - Ground Floor.
↑ Custom digital workstation. ↑ Custom digital workstation area. ↑ Soft seating meeting area.
nbc universal artworksProject Manager / Lead Designer BAM STUDIO ARCHITECTS
completed:2008
site location:30 Rockefeller CenterNew York, NY
vicinity mapvicinity map
↑ Main entry from corridor. ↑ Main entry concept rendering. ↑ Workstation area conept rendering.
↑ Corridor conept rendering.
Issues:NBC staff needed to see and experience visual content from multiple sources while working in an environment that reflected their strong design ideals and accomodated their ergonomic needs.
Action:BAM created fresh, dynamic environments that allowed for flexibility and ease of use, while at the same time implementing the latest technol-ogy and modern design aesthetic.
Results:Strong design, superior technical quality and user friendly spaces made for creative and productive work environments which won positive reviews from NBC Universal staff.
↑ 3D concept rendering, birdseye view.
nbc universal conference centerProject Manager / Lead Designer BAM STUDIO ARCHITECTS
completed:2008
site location:30 Rockefeller CenterNew York, NY
vicinity mapvicinity map
Issues:NBC Universal needed a number of flexible high profile conference room spaces at 30 Rockefeller Center which would serve as training and meeting facilities for NBC corporate staff from across the country.
Action:BAM created fresh, dynamic environments that allowed for flexibility and ease of use, while at the same time implementing the latest technology and modern design aesthetic.
Results:Strong design, superior technical quality and user friendly spaces made for creative and productive work environments which won positive re-views from NBC Universal staff.
↑ Concept models. ↑ Space planning study. ↑ Space planning study.
↑ Reception and elevatior lobby. ↑ Video presentation wall - Conference Room ‘A’. ↑ Conference Rooms ‘A’ and ‘B’ open plan. ↑ Women’s Restroom. ↑ Conference Room ‘A’ and ‘B’.
↑ Corridor, public gathering area outside of conference rooms.
↑ View of interior and exterior wall of Studio B. ↑ Studio B interior. ↑ View to Studio A with dual oversized custon ‘barn’ doors.
Urban Studiodigital imaging studio | entertainment venue
Project Manager / Lead Designer BAM STUDIO ARCHITECTS
completed:2008
site location:ChelseaNew York York, NY
vicinity map
Action:BAM understood the business imperative, the equipment needs, and how to work with highly creative people. An integrated de-sign on two floors of a Chelsea loft were fully renovated, main-taining the core business functions that had propelled Urban Stu-dio to the top.
Results:The new studio space was unveiled to rave re-views by photographers, clients and staff.
↑ Main entry and common areas. ↑ Bar and seating area. View ahead to photography studio. ↑ Perspective birdseye view. ↑ Perspective plan view.
↑ Main entry with view to reception area. ↑ Bar and common area.
↓ Concept models.
Issues:Urban Studio is a creative imaging studio whose core services included print retouching, color cor-rection and advertising production. The client was in the process of broadening their services to also include robust 2D and 3D Computer Generated Imaging (CGI), Motion Graphics, and Motion Edito-rial. In addition, they have developed the latest technology for custom, cloud-based, Digital Asset Management. The program called for digital workstations, photoshoot studios, offices and common areas which could double as an entertainment venues for their clients.
biomed realty trust Corporate Campus Fitness CenterProject Manager / Lead Designer BAM STUDIO ARCHITECTS
completed:2010
site location:Tarrytown, NY
Issues:The Landmark at Eastview is a biomedical re-search campus comprised of 8 buildings total-ing 1.1 million rsf. Efforts to retain and attract tenants are on-going to solidify their market position as a cutting edge research facility.
Action:Working closely with BMR, the campus own-er, BAM developed a Campus Plan focused on creating a centralized focal point which would cater to the wide variety of people using the facilities throughout the day. The design solution adhered to the tight budget. Added amenties included a cafeteria, fitness center and conference space to accommo-date large and small groups.
Results:The new facilities have generated significant excitement and high usage by the tenants, positioning the campus for employee satis-faction and morale. Creation of a Campus Center marked a major milestone in BMR’s commitment to providing state-of-the-art facilities and amenities for tenants.
↑ Main equipment room.
↑ Main exercise room and stretching area.
SYMBOL LEGEND
PROJECT DATA
VICINITY MAP
1
A-4.0
A-4.0
1
A-5.0
1
OFFICE2001
X
ELEVATION
SECTION
ENLARGED PLAN
COLUMN LINE
ROOM NAME/NUMBER
AREA NOT IN CONTRACT
CLIENT:
COMBE INCORPORATED
765 OLD SAW MILL RIVER ROAD
TARRYTOWN, NY
10591
CONTACT: MARK WOFFORD
EMAIL: mwofford@combe.com
TEL: 914.461.4117
FAX: 914.694.6320
ARCHITECT:
BAM STUDIO, PLLC
SECOND FLOOR
415 WEST BROADWAY
NEW YORK, NY 10012
CONTACT: PETER WILSON
EMAIL: PWILSON@BAM-STUDIO.COM
TEL: 646.522.5502
FAX: 646.349.5556
PROJECT DESCRIPTION:
DEMOLITION OF EXISTING PARTITIONS AND
CEILING AS NOTED; RECONFIGURATION OF
SPACE AS PROPOSED IN DESIGN
NO CHANGE IN USE, OCCUPANCY, OR EGRESS
A-001.00
A-002.00
A-003.00
A-004.00
A-005.00
A-101.00
DM-201.00
DM-301.00
A-201.00
A-202.00
A-301.00
A-401.00
A-402.00
A-403.00
A-404.00
A-405.00
A-501.00
A-502.00
A-601.00
A-701.00
A-801.00
PROJECT DIRECTORY DRAWING LIST
ARCHITECTURE
COVER
GENERAL NOTES
GENERAL NOTES
GENERAL NOTES
TYPICAL MOUNTING HEIGHTS
SITE PLAN / PHASING PLANS
DEMOLITION PLAN
DEMOLITION REFLECTED CEILING
PARTITION PLAN
PARTITION PLAN WITH DIMENSIONS
REFLECTED CEILING PLAN
ELEVATIONS & SECTIONS
ELEVATIONS & SECTIONS
ELEVATIONS & SECTIONS
ELEVATIONS & SECTIONS
ELEVATIONS & SECTIONS
MILLWORK SECTIONS AND DETAILS
MILLWORK SECTIONS AND DETAILS
FINISH PLAN
FURNITURE, FIXTURES AND EQUIPMENT PLAN
POWER & COMMUNICATION PLAN
MECHANICAL LEGEND AND NOTES
MECHANICAL SCHEDULES
CATWALK LEVEL MECHANICAL DEMOLITION PLAN
FIRST FLOOR MECHANICAL DEMOLITION PLAN
CATWALK LEVEL MECHANICAL CONSTRUCTION PLAN
FIRST FLOOR MECHANICAL CONSTRUCTION PLAN
MECHANICAL DETAILS SHEET I
MECHANICAL DETAILS SHEET II
MECHANICAL DETAILS SHEET III
MECHANICAL DETAILS SHEET IV
MECHANICAL BMS DETAILS
ELECTRICAL LEGEND SCHEDULES AND DETAILS
ELECTRICAL DEMOLITION PLAN
ELECTRICAL CONSTRUCTION PLAN
ELECTRICAL CONSTRUCTION PLAN - PENTHOUSE
ELECTRICAL LIGHTING PLAN
FIRE ALARM CONSTRUCTION PLAN
FIRE ALARM RISER DIAGRAM AND NOTES
PLUMBING LEGEND AND RISER
FIRST FLOOR PLUMBING DEMOLITION PLAN
CATWALK LEVEL PLUMBING CONSTRUCTION PLAN
FIRST FLOOR PLUMBING CONSTRUCTION PLAN
PLUMBING DETAILS
MEP/FP
M-000.00
M-010.00
M-100.00
M-110.00
M-200.00
M-210.00
M-500.00
M-501.00
M-502.00
M-503.00
M-504.00
E-000.00
E-101.00
E-201.00
E-202.00
E-301.00
FA-201.00
FA-400.00
P-000.00
P-101.00
P-200.00
P-201.00
P-500.00
ABBREVIATIONS
AMERICANS WITH DISABILITIES ACT
ADJUSTABLE
ABOVE FINISHED FLOOR
ALUMINUM
ACOUSTICAL CEILING TILE
BUILDING
BUILDING STANDARD
CENTER LINE
CEILING
CONCRETE MASONRY UNIT
COLUMN
CONCRETE
DEPTH
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIMENSION
DOWN
DETAIL
EXISTING
EACH
ELECTRIC/ELECTRICAL
ELEVATION/ELEVATOR
EMERGENCY
EQUAL
EXISTING TO REMAIN
EXISTING
FIRE ALARM
FIRE EXTINGUISHER CABINET
FLOOR DRAIN
FLUORESCENT
FINISH
FOOT/FEET
FURNISH AND INSTALL
GAUGE
GYPSUM
GYPSUM WALLBOARD
HEIGHT
HIGH INTENSITY DISCHARGE
HOLLOW METAL
HEATING, VENTING AND AIR CONDITIONING
HARDWARE
JUNCTION BOX
LENGTH
LAVATORY
LINEAR FEET
A.D.A.
ADJ.
A.F.F.
ALUM.
A.C.T.
BLDG.
BLDG. STD.
C.L.
CLG.
C.M.U.
COL.
CONC.
D
D.F.
DIA.
DIAG.
DIM.
DN
DTL.
E
EA.
ELEC.
ELEV.
EM.
EQ.
E.T.R.
E/EXIST
F.A.
F.E.C.
F.D.
FLUOR.
FNSH.
FT
F / I
GA.
GYP.
G.W.B
H
H.I.D.
H.M.
HVAC
HW.
J.B.
L
LAV.
L.F.
MAXIMUM
MEDIUM DENSITY FIBERBOARD
MECHANICAL
MANUFACTURER
MINIMUM, MINUTES
METAL
NOT APPLICABLE
NOT IN CONTRACT
NUMBER
PLASTIC LAMINATE
PLYWOOD
PANEL
PROJECTION SCREEN
PRESSURE TREATED
QUANTITY
RELOCATED
RADIUS
REFLECTED CEILING PLAN
ROOF DRAIN
REFRIGERATOR
ROOM
ROUGH OPENING
RENTABLE SQUARE FEET
ROOF TOP UNIT
SQUARE FEET
STAINLESS STEEL
STANDARD
STEEL
TELEPHONE
THICKNESS
TOP OF
TYPICAL
UNDER CUT
UNLESS OTHERWISE NOTED
USABLE SQUARE FOOTAGE
VERIFY IN FIELD
VINYL COMPOSITION TILE
WIDTH
WITH
WITHOUT
WALLCOVERING
WOOD
WATER FOUNTAIN
WATER HEATER
WORKING POINT
WEIGHT
MAX.
MDF
MECH.
MFR.
MIN.
MTL.
N/A
N.I.C.
NO.
P.LAM
PLYWD
PNL.
PROJ.
P.T.
QTY.
R
RAD.
R.C.P.
R.D.
REF.
RM.
R.O.
R.S.F.
R.T.U.
S.F.
S.S.
STD.
STL.
TEL.
THK.
T.O.
TYP.
U.C.
U.O.N.
U.S.F.
V.I.F.
V.C.T.
W
W/
W/O
WC
WD.
WF
W.H.
WP.
WT.
BUILDING DESIGN:
TOTAL AREA:
OCCUPANCY TYPE:
3,352 USF
TYPE B - BUSINESS
ENGINEER:
M-E ENGINEERS
417 FIFTH AVENUE
FIFTH FLOOR
NEW YORK, NY 10016
CONTACT: CHARLES WARNER
EMAIL: CWARNER@ME-ENGINEERS.COM
TEL: 212.447.6770 x19
FAX: 212.447.6615
LANDLORD/BUILDING MANAGER:
BIOMED REALTY TRUST, INC.
777 OLD SAW MILL RIVER ROAD
TARRYTOWN, NY
10591
CONTACT: TIMOTHY STOLL
EMAIL:
TIMOTHY.STOLL@BIOMEDREALTY.COM
TEL: 617.225.2440
FAX: 617.225.0847
SPECIAL INSPECTIONS:
FIRESTOP, DRAFTSTOP, AND FIREBLOCK SYSTEMS BC 1704.25
PROGRESS INSPECTIONS:
FINAL 28-116.2.4.2; BC-109.5; DIRECTIVE 14, 1975
A-201.0.0
SHEET NAMING
DISCIPLINE DEMOLITION
ARCHITECTURE
ELECTRICAL
FIRE ALARM
FIRE PROTECTION
MECHANICAL
PLUMBING
PUBLIC ASSEMBLY
STRUCTURAL
SPRINKLER
DM
A
E
FA
FP
M
P
PA
S
SP
COVER, SCHEDULES, GENERAL NOTES
SITE PLAN/ PHASING PLANS/ LIFE SAFETY PLAN
FLOOR PARTITION PLAN
REFLECTED CEILING PLAN
ELEVATIONS AND SECTIONS
CONSTRUCTION AND MILLWORK DETAILS
FINISH PLAN
FURNITURE, FIXTURE AND EQUIPMENT PLAN
POWER AND COMMUNICATION PLAN
0
1
2
3
4
5
6
7
8
SERIES
SUFFIX IDENTIFIES MULTIPLE DRAWINGS WITHIN A SERIES
DRAWING REVISION NUMBER
DETAIL BLOW OUT NUMBER
IF REQUIRED, A LOWERCASE LETTER
IDENTIFIES DETAILED BLOWOUT OF
ORIGINAL DRAWING.
APPLICABLE CODES:
BUILDING:
FIRE SAFETY:
ELECTRICAL:
MECHANICAL:
PLUMBING:
HANDICAPPED:
ENERGY:
NEW YORK STATE BUILDING CODE
NEW YORK STATE BUILDING CODE
NEW YORK STATE ELECTRICAL CODE
NEW YORK STATE BUILDING CODE
NEW YORK STATE BUILDING CODE
ANSI A117.1
NEW YORK STATE ENERGY CODE
SITE:
COMBE
01-Level
Building 777
Landmark at Eastview
BioMed Realty Trust, Inc.
777 Old Saw Mill River Road
Tarrytown, NY
10591
BULDING771
A-001.00
COVER SHEET
NORTH
No. Date Description
REVISIONS
01 10.22.10 FOR PERMIT AND BID
xx 00.00.00 xxx xxxxx xxxxx
copyright date: 01.01.10
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM Studio, PLLCSecond Floor415 West BroadwayNew York, NY
10012T: 646.522.5550
F: 646.349.5556www.bam-studio.com
BAM
Project No. 08-104.004k
01-LevelBuilding 777Landmark at EastviewBioMed Realty Trust, Inc.
777 Old Saw Mill River RoadTarrytown, NY10591
Combe
02 12.22.10 FOR CONSTRUCTION
FURNITURE AND EQUIPMENT LEGEND
6'-6" X 7'-6" WORKSTATION COMBINATION, (1) 1'-6" WIDE VERTICAL LATERAL FILE, (1)
3'-6" LATERAL FILE, 4'-6" X 2'-6" DESK, 1'-6" X 3'-6" RETURN, TASK CHAIR, (2) GUEST
CHAIR (ALL BY OTHERS). SYSTEM SHALL BE WIRED 3+1. PROVIDE (1) CIRCUIT FOR
RECEPTACLES NOTED 'CPU', (1) CIRCUIT FOR RECEPTACLES NOTED 'PRINTER'.
REMAINING CIRCUITS SHALL BE FOR TASK LIGHTING AND CONVENIENCE
RECEPTACLES. SEE PC PLAN
4'-0" X 7'-0" WORKSTATION, 4'-0" X 4'-0" CORNER DESK, 2'-0" X 4'-0" RETURN, TASK
CHAIR (ALL BY OTHERS).
LARGE COPY MACHINE WITH COLLATOR (BY COMBE): TO BE DISCONNECTED, RELOCATED
AND RE-INSTALLED BY GC.
STORAGE UNITS (EXISTING): TO BE RELOCATED BY GC.
1'-4" DIA. SIDE TABLE (BY OTHERS)
18-1/2" X 28-3/4" LATERAL FILE (BY OTHERS)
2'-6" X 2'-6" TABLE - BREAK ROOM (BY OTHERS).
TASK CHAIR (BY OTHERS)
GUEST CHAIR #1 - RECEPTION WAITING AREA (BY OTHERS).
GUEST CHAIR #2 - OFFICE AREAS (BY OTHERS).
COPIER
DRYER
CHAIR
DRYER CHAIR - SALON AREA (BY COMBE): TO BE DISCONNECTED, RELOCATED AND
RE-INSTALLED BY GC.
LIGHT
BOOTH LIGHT BOOTH (EXISTING): TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.
BREAK AREA, 2'-6" X 2'-6" TABLE AND (4) GUEST CHAIR (BY OTHERS)
REF
FAD
ALKALI
ACIDS
OVEN
MICRO
H
SAFETYGEAR
ACIDS (EXISTING): TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.
FEC
MILLWORK LEGEND
- MILLWORK RECEPTION DESK WITH 3FORM RESIN TRANSACTION
COUNTERTOP AND VERTICAL FACE(S), SEE DETAILS.
CASEWORK LEGEND
DW
MIXER
RECYC
WATER
TRASH
MIXER (EXISTING): TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.
INTEGRAL SEAMLESS STAINLESS STEEL SINK (MIXING AREA):
30"Lx16"Wx12"D - 14 GA. STAINLESS STEEL SINK WITH INTEGRAL STAINLESS STEEL COUNTERTOP.
FORM BACKSPLASH, SINK REAR, BOTTOM AND FRONT FROM SINGLE SHEET OF STAINLESS STEEL.
SQUARE EDGE SEALED TO BASE CABINET.
FAUCET: KOHLER TRITON FAUCET WITH STANDARD WATER-GUARD AERATOR AND WRISTBLADE
LEVER HANDLES K-7304-K AND K-16012-5
- GC TO PROVIDE DEDUCT ALTERNATE FOR: ELKAY GOURMET UNDERMOUNT SINGLE BOWL SINK;
MODEL ELU281612; PULL OUT SPRAYER.
VANITY SINK FIXTURE (SALON):
SINK: KOHLER BOLERO K-2610.
FAUCET: KOHLER STILLNESS WIDESPREAD LAVATORY FAUCET MODEL NUMBER K-942-4.
VA
V
A
VA
DW
EM SH
EMERGENCY SHOWER (LAB):
VWR INTERNATIONAL SPEAKMAN WALL-MOUNT SHOWER; MODEL NUMBER: VF-0227-SE.
GUEST CHAIR #3 - BREAK AREA (BY OTHERS).
HAIR SALON SPECIALITY CHAIR (BY OTHERS)
MILLWORK CABINETRY BEHIND RECEPTION DESK:
- MILLWORK CABINETRY AND COAT CLOSET WITH LATERAL FILES.
- (2) SETS OF 42" WIDE 5-HIGH LATERAL FILES WITH METAL FILE
CABINETS ABOVE.
- MILLWORK /WOOD DOORS WITH CONCEALED HINGES, POCKET SLIDE
CASSETTE ROLLER AND PUSH/PULL HARDWARE.
- SEE SECTION/ELEVATIONS.COAT CLOSET
WITH HANGAR
ROD.
LATERAL FILES.
MILLWORK CABINETRY AT HAIRSTYLING STATION:
- MILLWORK/WOOD CABINETRY WITH MIRRORS MOUNTED
ON STAINLESS STEEL BRACKETS
- SEE SECTION/ELEVATIONS.
- MILLWORK /P-LAM DRAWERS AND CABINET DOORS WITH
CONCEALED HINGES.
BENCH
TO
WE
LS
TRASH
DIS
PE
NS
ER
BIN
DIS
PE
NS
ER
BIN
DIS
PE
NS
ER
BIN
DIS
PE
NS
ER
BIN
EY
EW
AS
H
FREESTANDING METAL LAB CASEWORK, UMBILICAL, END STORAGE CABINET AND
REAGENT RACK. PHENOLIC RESIN COUNTER AND BACKSPLASH. INSET DOORS WITH
RECESSED DRAWER AND CABINET PULLS. SEE ELEVATIONS.
FREESTANDING METAL LAB CASEWORK, UMBILICAL, END SINK CABINET AND REAGENT
RACK. PHENOLIC RESIN COUNTER AND BACKSPLASH. INSET DOORS WITH RECESSED
DRAWER AND CABINET PULLS. SEE ELEVATIONS.
METAL LAB CASEWORK. PHENOLIC RESIN COUNTER AND BACKSPLASH. INSET DOORS
WITH RECESSED DRAWER AND CABINET PULLS. SEE ELEVATIONS.
METAL LAB CASEWORK. PHENOLIC RESIN COUNTER AND BACKSPLASH. INSET DOORS
WITH RECESSED DRAWER AND CABINET PULLS. SEE ELEVATIONS.
-3 FORM: READY TO GO SOLUTIONS, 200 PARTITIONS, 200.21.03. WITH
STRUTTURA DUO PANELS CUSTOM SIZE .
-CUSTOM STAINLESS STEEL CURTAIN ROD AND MOUNTING BRACKETS
-CUSTOM CURTAIN WITH STAINLESS STEEL GROMMETS.
-MILLWORK BENCH.
-COAT HOOK.
-SEE ELEVATIONS AND FINISH LEGEND.
-MILLWORK P-LAM UPPER AND BASE CABINETS WITH STAINLESS STEEL
COUNTER AND FULL HEIGHT BACK SPLASH.
-MILLWORK / WOOD UPPER AND BASE CABINETS WITH STAINLESS
STEEL COUNTER AND FULL HEIGHT BACKSPLASH.
- MILLWORK /WOOD OPEN SHELVING.
- MILLWORK /WOOD DOORS WITH CONCEALED HINGES AND PUSH/PULL
HARDWARE.
-SEE ELEVATIONS.
OVEN (EXISTING): TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.
FAD (EXISTING): TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.
MICROWAVE: TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.
DISHWASHER: TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.
REFRIGERATOR: TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.
SAFETY GEAR CABINET: TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.
FIRE EXTINGUISHER CABINET
FLAM
FUME HOOD (EXISTING): TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.
FLAMMABLE CABINET (EXISTING): TO BE DISCONNECTED, RELOCATED AND RE-INSTALLED BY GC.
ALKALI CABINET (EXISTING): TO BE RELOCATED BY GC.
WATER COOLER, SEE ENGINEERING DRAWINGS FOR SPECIFICATIONS. GC TO PROVIDE COLD
WATER SUPPLY.
RECYCLING BIN.
LARGE TRASH BIN.
STORAGE
SHELVES
STORAGE
SHELVES
STORAGE
SHELVES
STORAGE
SHELVES
METAL LAB CASEWORK, LAB SINK, DISHWASHER, DI WATER, EYEWASH. PHENOLIC RESIN
COUNTER AND BACKSPLASH. INSET DOORS WITH RECESSED DRAWER AND CABINET
PULLS. SEE ELEVATIONS.
MILLWORK CABINETRY AT MIXING AREA:
RESIN PANEL PARTITIONS AT CHANGING ROOM:
RECEPTION DESK:
STAINLESS STEEL LAY-IN PANTRY SINK AND FAUCET (BREAKROOM):
SINK; ELKAY LR2521 SINGLE BASIN STAINLESS STEEL SINK WITH DRAIN.
FAUCET; DELTA PANTRY FAUCET; SINGLE HANDLE DECK MOUNT, MODEL 100 W/ PULL OUT
SPRAYER.
P-2
P-5
P-6
P-1
STAINLESS-STEEL LAY-IN LAB SINK, FAUCET, DI FAUCET AND EMERGENCY EYEWASH:
SINK: STYLIST GROUP SLXD-2225-A-GR.
FAUCET; B-WH4 4" WRIST ACTION HANDLES, RIGID GOOSENECK WITH B-0103 ROSESPRAY
DI FAUCET; GRAY PVC SINGLE LEDGE FAUCET WITH RIGID GOOSENECK.
EMERGENCY EYEWASH: VWR INTERNATIONAL SPEAKMAN DECK-MOUNT EYEWASH MODEL NUMBER:
VF-0572-SE.
SHAMPOO BASIN:
TAKARA BELMONT - SARA SHAMPOO UNIT MODEL SH-495.
FAUCET: 500 DIAL-FLO.
P-4
P-3
42 W
IDE
(5) H
IGH
42 W
IDE
(5) H
IGH
P
LINE OF MILLWORK
ABOVE.
P-LAM MILLWORK
CABINETS.
GENERAL NOTES
1. ELECTRIC AND DATA RECEPTACLES SHOWN FOR COORDINATION PURPOSES. SEE ELECTRICAL
DRAWINGS FOR CIRCUITING.
2. LANDLORD SHALL PROVIDE AND INSTALL MECCO SHADES ON ALL PERIMETER WINDOWS. ARCHITECT
TO CONFIRM COLOR PRIOR TO ORDER AND INSTALLATION. SEE DETAIL SHEETS FOR MOUNTING DETAILS
AND POWER PLAN FOR POWER REQUIREMENTS. CONTRACTOR TO COORDINATE WITH LANDLORD'S
INSTALLER.
3. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY FURNITURE VENDOR AND INSTALLER PRIOR TO ORDER.
CONTACT ARCHITECT PRIOR TO FURNITURE ORDER FOR ANY DISCREPANCIES. CLIENT AND ARCHITECT
SHALL NOT BE RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH MODIFYING FURNITURE TO FIT FIELD
CONDITIONS.
4. ALL WHIP LOCATIONS TO BE CONFIRMED AND CLEARLY NOTED IN PLANS PROVIDED BY FURNITURE
VENDOR. CONTACT ARCHITECT FOR ANY DISCREPANCIES.
5. ALL ELECTRICAL AND DATA LOCATIONS SHALL BE CONFIRMED IN THE FIELD BY THE FURNITURE
VENDOR PRIOR TO WIRING AND INSTALLATION.
6. FURNITURE VENDOR SHALL PROVIDE SPECIFICATIONS OF THE PROPOSED WIRING CONFIGURATIONS
AND COORDINATE WITH ELECTRICAL ENGINEER. CLIENT AND ARCHITECT SHALL NOT BE RESPONSIBLE
FOR ANY COSTS ASSOCIATED WITH MODIFYING ELECTRICAL COMPONENTS TO FIT FIELD CONDITIONS.
7. FURNITURE VENDOR SHALL PROVIDE AXONOMETRIC AND INSTALLATION PLAN DRAWINGS, IN .DWG
AND .PDF FORMAT, WITH ALL QUOTES. ARCHITECT WILL NOT REVIEW FURNITURE QUOTE UNTIL
AXONOMETRIC AND PLAN DRAWINGS ARE RECEIVED. PROPOSAL APPROVAL IS CONTINGENT ON VENDOR
PROVIDING INSTALLATION PLAN DRAWINGS.
KEYED NOTES
MIRROR. COORDINATE INSTALLATION WITH ADJACENT TYPE 'N' LIGHT FIXTURES.
PARTIAL HEIGHT CUSTOM RESIN PANELS AND HARDWARE.
MIRROR.
GC TO COORDINATE THE DISCONNECTION, RELOCATION AND RE-INSTALLATION OF ALL EXISTING EQUIPMENT, FIXTURES
AND FURNITURE WITH COMBE. GC TO CONFIRM AND COORDINATE ALL MEP REQUIREMENTS FOR THESE ITEMS WITH
COMBE PRIOR TO START OF CONSTRUCTION.
GC TO PROVIDE COLD WATER SUPPLY TO WATER COOLER.
P-LAM CABINETS ABOVE.
CUSTOM STAINLESS STEEL CURTAIN ROD AND MOUNTING BRACKETS WITH CUSTOM CURTAIN AND STAINLESS
STEEL GROMMETS.
COORDINATE MOUNTING OF PENDANT LIGHTS ABOVE WITH LOCATION AND INSTALLATION OF MILLWORK AND
MIRRORS.
VERTICAL LIGHT COVE.
FULL HEIGHT MIRROR.
---
COAT HOOK.
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
REF
MIXER
FAD
FLAM
HH
STAIR---
OFFICE---
OFFICE---
V V
A
VA
DI EY
EW
AS
H
EYEWASH
EM
SH
FE
C
FEC
TRASH
RECYC
TO
WE
LS
TRASH
CORRIDOR006
MIXING
005
CHANGING
004
SALON002
RECEPTION001
MICRO
REF
WATER
OFFICE009
OFFICE010
OFFICE011
SUPPLY013
IT CLOSET015
SAFETYGEAR
A
COPY008
DRYER
CHAIR
LIGHT
BOOTH
OVENALKALI
ACIDS
BENCH
DI
C
C
DW
S
OVEN
COPIER
CORRIDOR101
BREAKROOM007
LAB012
DRYER/
003
LIGHT RM
DIS
PE
NS
ER
BIN
DIS
PE
NS
ER
BIN
DIS
PE
NS
ER
BIN
DIS
PE
NS
ER
BIN
42 W
IDE
(5) H
IGH
42 W
IDE
(5) H
IGH
P
ELECT.014
CLOSET
OFFICE
---
OFFICE
---
CONFERENCE
---
OFFICE
---
OFFICE
---
CONFERENCE
---
FILES/STORAGE
---
COPY/PRINT
---
CONFERENCE
---
OFFICE
---
ELEVATOR100
LOBBY
STORAGE
SHELVES
ST
OR
AG
E
SH
EL
VE
S
ST
OR
AG
E
SH
EL
VE
S
ST
OR
AG
E
SH
EL
VE
S
FURNITURE, FIXTURES
AND EQUIPMENT PLAN
A-701.00
FURNITURE, FIXTURES AND EQUIPMENT PLANA-701
1SCALE: 1/8"=1'-0"
NORTH
No. Date Description
REVISIONS
01 10.22.10 FOR PERMIT AND BID
xx 00.00.00 xxx xxxxx xxxxx
copyright date: 01.01.10
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM Studio, PLLCSecond Floor415 West BroadwayNew York, NY
10012T: 646.522.5550
F: 646.349.5556www.bam-studio.com
BAM
Project No. 08-104.004k
01-LevelBuilding 777Landmark at EastviewBioMed Realty Trust, Inc.
777 Old Saw Mill River RoadTarrytown, NY10591
Combe
02 12.22.10 FOR CONSTRUCTION
OFFICE---
FE
C
TRASH
RECYC
TO
WE
LS
TRASH
CORRIDOR006
MIXING
005
CHANGING
004
002
RECEPTION001
MICRO
REF
WATER
OFFICE009
OFFICE010
OFFICE011
DRYER
CHAIR
LIGHT
BOOTH
BENCH
007
DRYER/
003
LIGHT RM
DIS
PE
NS
ER
BIN
DIS
PE
NS
ER
BIN
DIS
PE
NS
ER
BIN
DIS
PE
NS
ER
BIN
P
1'-8"2'-2"
6"
3'-2"
4"
4'-0"
3'-0" 1'-0"
2"
4"4"
2'-41
2"
8"
1'-4" 1'-4"
A-501.00
MILLWORK SECTIONS AND
DETAILS
KEY PLAN A-501 NOT TO SCALE
NORTH
No. Date Description
REVISIONS
01 10.22.10 FOR PERMIT AND BID
xx 00.00.00 xxx xxxxx xxxxx
copyright date: 01.01.10
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM Studio, PLLCSecond Floor415 West BroadwayNew York, NY
10012T: 646.522.5550
F: 646.349.5556www.bam-studio.com
BAM
Project No. 08-104.004k
01-LevelBuilding 777Landmark at EastviewBioMed Realty Trust, Inc.
777 Old Saw Mill River RoadTarrytown, NY10591
Combe
02 12.22.10 FOR CONSTRUCTION
MILLWORK SECTIONS AND DETAILSA-501
11"-1'-0"
MILLWORK SECTIONS AND DETAILSA-501
31"-1'-0"
MILLWORK SECTIONS AND DETAILSA-501
21"-1'-0"
MILLWORK SECTIONS AND DETAILSA-501
51"-1'-0"
MILLWORK SECTIONS AND DETAILSA-501
41"-1'-0"
MILLWORK SECTIONS AND DETAILSA-501
61"-1'-0"
1
A-501.00
2
A-501.00
3
A-501.00
5
A-501.00
6
A-501.00
4
A-501.00
MILLWORK SECTIONS AND DETAILSA-501
71"-1'-0"
7
A-501.00
12'' RESIN PANEL
12'' RESIN TRANSACTION
TOP
PLASTIC LAMINATE
WORK SURFACE
12'' RESIN
TRANSACTION TOP
12'' RESIN TRANSACTION
TOP
1'' STAND OFF.
12'' RESINTRANSACTION TOP
12'' RESIN PANEL1'' STAND OFF.
12'' RESIN
TRANSACTION
TOP
PLASTIC LAMINATE
WORK SURFACE
12'' RESIN PANEL
1'' STAND OFF.
SUPPORT
BRACKET
SUPPORT
BRACKET
ADJUSTABLE
SHELF
P-LAM
DRAWER
FRAMELESS MIRROR.
STAINLESS STEEL
SUPPORT.
P-LAM
DOOR
STAINLESS
STEEL
CYLINDERSTAINLESS STEEL
COUNTER
PAINTED G.W.B.
SEE FINISH PLAN
PAINTED G.W.B.
SEE FINISH PLANPAINTED G.W.B.
SEE FINISH PLAN
P-LAM
P-LAM P-LAM
P-LAM P-LAMP-LAM
STAINLESS
STEEL COUNTER
P-LAM
14'' REVEAL
STAINLESS STEEL
COUNTER
FRAMELESS
MIRROR MOUNTED
ON STAINLESS
STEEL SUPPORT.
6" STAINLESS
STEEL ROCKLER
BAR PULLS, TYP.
OFFICE CORRIDOR CHANGING SALONHALLWAY
OFFICE CORRIDOR MIXINGHALLWAY
RECEPTION CORRIDOR CHANGING SALONHALLWAY
SHELVES
ALKALI
FLAM H
NORTH
No. Date Description
REVISIONS
01 10.22.10 FOR PERMIT AND BID
xx 00.00.00 xxx xxxxx xxxxx
copyright date: 01.01.10
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM Studio, PLLCSecond Floor415 West BroadwayNew York, NY
10012T: 646.522.5550
F: 646.349.5556www.bam-studio.com
BAM
Project No. 08-104.004k
01-LevelBuilding 777Landmark at EastviewBioMed Realty Trust, Inc.
777 Old Saw Mill River RoadTarrytown, NY10591
Combe
02 12.22.10 FOR CONSTRUCTION
A-404.00
ELEVATIONS AND
SECTIONS
SECTION ELEVATIONA-404
31/4"-1'-0"
SECTION ELEVATIONA-404
41/4"-1'-0"
SECTION ELEVATIONA-404
11/4"-1'-0"
SECTION ELEVATIONA-404
21/4"-1'-0"
SECTION ELEVATIONA-404
71/4"-1'-0"
SECTION ELEVATIONA-404
51/4"-1'-0"
SECTION ELEVATIONA-404
61/4"-1'-0"
SECTION ELEVATIONA-404
81/4"-1'-0"
GWB CEILING
MILLWORK BASE CABINETLATERAL FILESMILLWORK CABINETS,
PROVIDE BLOCKING
MILLWORK UPPER CABINETS AND SHELVING
PROVIDE BLOCKING, TYP.
RESIN PANEL
WALL SYSTEM
STAINLESS STEEL
COUNTER AND
BACKSPLASH
WALL BASE
ACT CEILING ACT CEILING
ACT CEILING
ACT CEILING
ACT CEILING
GWB CEILING
METAL CASEWORK PHENOLIC RESIN COUNTER, TYP.
MILLWORK CABINET MIRROR
GWB CEILINGMILLWORK UPPER CABINETS,
PROVIDE BLOCKING, TYP.
MILLWORK BASE CABINETS,
COUNTER AND BACKSPLASH
METAL CASEWORK PHENOLIC RESIN
COUNTER, TYP.
SINK AND FAUCET
MILLWORK UPPER CABINETS,
PROVIDE BLOCKING, TYP
MILLWORK BASE CABINETS,
COUNTER AND BACKSPLASH
STAINLESS STEEL COUNTER
AND BACKSPLASH
SECTION ELEVATIONA-404
91/4"-1'-0"
SECTION ELEVATIONA-404
101/4"-1'-0"
SLAB HEIGHT
SLAB HEIGHT
ACT CEILING SLAB HEIGHT
GWB CEILINGSLAB HEIGHT
LAB CASEWORK.
LINE OF EXISTING STEEL BEAM.
LINE OF EXISTING STEEL BEAM.
LINE OF EXISTING STEEL BEAM.
SAFETY GEAR CABINET.
18" FACTORY PAINTED
SHEET METAL PANEL.
18" FACTORY PAINTED
PERFORATED SHEET
METAL PANEL MOUNTED
WITH 'L' BRACKET.
18" FACTORY PAINTED
SHEET METAL PANEL.
18" FACTORY PAINTED
PERFORATED SHEET
METAL PANEL MOUNTED
WITH 'L' BRACKET.
18" FACTORY PAINTED
SHEET METAL PANEL.
18" FACTORY PAINTED
PERFORATED SHEET
METAL PANEL MOUNTED
WITH 'L' BRACKET.
NORTH
No. Date Description
REVISIONS
01 10.22.10 FOR PERMIT AND BID
xx 00.00.00 xxx xxxxx xxxxx
copyright date: 01.01.10
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM Studio, PLLCSecond Floor415 West BroadwayNew York, NY
10012T: 646.522.5550
F: 646.349.5556www.bam-studio.com
BAM
Project No. 08-104.004k
01-LevelBuilding 777Landmark at EastviewBioMed Realty Trust, Inc.
777 Old Saw Mill River RoadTarrytown, NY10591
Combe
02 12.22.10 FOR CONSTRUCTION
A-405
ELEVATIONS AND
SECTIONS
SECTION ELEVATIONA-405
81/4"-1'-0"
SECTION ELEVATIONA-405
61/4"-1'-0"
SECTION ELEVATIONA-405
71/4"-1'-0"
SECTION ELEVATIONA-405
41/4"-1'-0"
SECTION ELEVATIONA-405
91/4"-1'-0"
SECTION ELEVATIONA-405
101/4"-1'-0"
SECTION ELEVATIONA-405
31/4"-1'-0"
SECTION ELEVATIONA-405
21/4"-1'-0"
SECTION ELEVATIONA-405
11/4"-1'-0"
OFFICELAB
H
FLAM
OVEN
LABLAB
REF
OFFICE---
FE
C
TRASH
RECYC
TO
WE
LS
TRASH
CORRIDOR006
MIXING
005
CHANGING
004
002
RECEPTION001
MICRO
REF
WATER
OFFICE009
OFFICE010
OFFICE011
DRYER
CHAIR
LIGHT
BOOTH
BENCH
007
DRYER/
003
LIGHT RM
DIS
PE
NS
ER
BIN
DIS
PE
NS
ER
BIN
DIS
PE
NS
ER
BIN
DIS
PE
NS
ER
BIN
P
1'-8"2'-2"
6"
3'-2"
4"
4'-0"
3'-0" 1'-0"
2"
4"4"
2'-41
2"
8"
1'-4" 1'-4"
A-501.00
MILLWORK SECTIONS AND
DETAILS
KEY PLAN A-501 NOT TO SCALE
NORTH
No. Date Description
REVISIONS
01 10.22.10 FOR PERMIT AND BID
xx 00.00.00 xxx xxxxx xxxxx
copyright date: 01.01.10
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
BAM Studio, PLLCSecond Floor415 West BroadwayNew York, NY
10012T: 646.522.5550
F: 646.349.5556www.bam-studio.com
BAM
Project No. 08-104.004k
01-LevelBuilding 777Landmark at EastviewBioMed Realty Trust, Inc.
777 Old Saw Mill River RoadTarrytown, NY10591
Combe
02 12.22.10 FOR CONSTRUCTION
MILLWORK SECTIONS AND DETAILSA-501
11"-1'-0"
MILLWORK SECTIONS AND DETAILSA-501
31"-1'-0"
MILLWORK SECTIONS AND DETAILSA-501
21"-1'-0"
MILLWORK SECTIONS AND DETAILSA-501
51"-1'-0"
MILLWORK SECTIONS AND DETAILSA-501
41"-1'-0"
MILLWORK SECTIONS AND DETAILSA-501
61"-1'-0"
1
A-501.00
2
A-501.00
3
A-501.00
5
A-501.00
6
A-501.00
4
A-501.00
MILLWORK SECTIONS AND DETAILSA-501
71"-1'-0"
7
A-501.00
12'' RESIN PANEL
12'' RESIN TRANSACTION
TOP
PLASTIC LAMINATE
WORK SURFACE
12'' RESIN
TRANSACTION TOP
12'' RESIN TRANSACTION
TOP
1'' STAND OFF.
12'' RESINTRANSACTION TOP
12'' RESIN PANEL1'' STAND OFF.
12'' RESIN
TRANSACTION
TOP
PLASTIC LAMINATE
WORK SURFACE
12'' RESIN PANEL
1'' STAND OFF.
SUPPORT
BRACKET
SUPPORT
BRACKET
ADJUSTABLE
SHELF
P-LAM
DRAWER
FRAMELESS MIRROR.
STAINLESS STEEL
SUPPORT.
P-LAM
DOOR
STAINLESS
STEEL
CYLINDERSTAINLESS STEEL
COUNTER
PAINTED G.W.B.
SEE FINISH PLAN
PAINTED G.W.B.
SEE FINISH PLANPAINTED G.W.B.
SEE FINISH PLAN
P-LAM
P-LAM P-LAM
P-LAM P-LAMP-LAM
STAINLESS
STEEL COUNTER
P-LAM
14'' REVEAL
STAINLESS STEEL
COUNTER
FRAMELESS
MIRROR MOUNTED
ON STAINLESS
STEEL SUPPORT.
6" STAINLESS
STEEL ROCKLER
BAR PULLS, TYP.
↑ Custom designed reception desk. ↑ Custom designed millwork hair styling stations. ↑ Reception waiting area. ↑ Hair styling stations. ↑ Custom millwork grooming area. ↑ Custom millwork mixing area with integral stainless steel sink, counter and backsplash.
↑ Research lab.
↑ Sections and Elevations.
Combe Inc.research lab & Hair SalonProject Manager / Lead Designer BAM STUDIO ARCHITECTS
completed:2010
site location:Tarrytown, NY
vicinity map
Issues:Create a new research facility and hair salon for a health and beauty company well known for it’s con-sumer brand names.
Action:Working with the challenges of a 1970’s building, the design ap-proach was to create a natural light filled environment to make the space attractive to subjects who agreed to participate in on site testing of the products.
Results:A project that was completed successfully on a tight budget and succeeded in improving the process and appearance of the facility.
↑ North campus feasibility study. 3D view looking northwest.
biomed realty trust
campus planningClient Advocate / Project Manager / Lead Designer BAM STUDIO ARCHITECTS
site location:Tarrytown, NY
vicinity map
Issues:Reposition a major bio-technology campus to be the leading facility in the New York region.
Action:BAM developed master planscenarios ranging from modest to exten-sive, comparing and contrasting the fea-sibility of each to come up with the most effective plan to implement.
Results:BAM and BioMed Realty are building a strong relationship to create work environ-ments for the future.
↑ North campus feasibility study. 3D view looking northwest.
↑ BMR Campus. Aerial view looking north.
↑ South campus main entry schematic design proposal.
↑ North campus feasibility study. Plan view with space planning study.
↑ North campus feasibility study. 3D birdseye view looking north.
↑ North campus feasibility study. 3D view looking south into central courtyard.
↑ North campus feasibility study. 3D view looking south into central courtyard.
↑ North campus feasibility study. 3D view looking northwest.
↑ North Campus schematic design proposal. Handsketches, sketchup and photoshop.
KEYED NOTES
EXTERIOR STAIR.
ADA RAMP. SEE ELEVATIONS AND DETAILS.
RETAINING WALL.
STAIR WITH CANOPY ABOVE. SEE ELEVATION DRAWINGS.
REPAINT/REFURBISH EXISTING STAIR TO LIKE NEW CONDITION.REPLACE RUSTING HARDWARE WITH NEW.
EXISTING BRIDGE ABOVE TO REMAIN.
CURB LINE TO REPLACE EXISTING
EXISTING VENTS TO REMAIN.
EXISTING UTILITY BOX TO REMAIN.
WATERFALL FEATURE.
SANITARY SEWER MANHOLE. SEE CIVIL DRAWINGS.
EXISTING STAIR AND AREAWAY TO REMAIN.
AWNING ABOVE. SEE ELEVATION DRAWINGS.
1. FURNISH AND INSTALL MINIMUM OF 10 WASTE RECEPTACLES, 20
BENCHES AND 20 PLANTERS IN THE NEW HARDSCAPE AREA.
2. FURNISH AND INSTALL BOLLARD LIGHTING, PATHWAY AND STAIR
LIGHTING, AND LIGHTING AT ENTRY STAIRS AND RAMPS.
3. INSTALL NEW TREES, SHRUBS AND GROUND COVERING, INCLUDING
IRRIGATION SYSTEMS IN AND AROUND THE NEW MAIN STREET AREA. SEE
CIVIL ENGINEERING DRAWINGS.
4. CLEAN AND REPAIR ALL LOUVERS AND METAL PANELS AT THE CENTRALUTILITY PLANT.
5. REMOVE AND/OR MODIFY SECTIONS OF THE EXISTING CUP FACADE/CURTAIN
WALL AND REPLACE SCREEN WITH NEW CURTAIN WALL ELEMENTS. SEE CUP
PLANS AND ELEVATIONS.
6. REPAIR THE CENTRAL UTILITY PLANT TO BE CODE COMPLIANT, INCLUDING
DOORS, EXIT SIGNS AND LIGHTING. SEE ARCHITECTURAL AND ENGINEERING
DRAWINGS.
7. INSTALL UP TO 20 NEW SITE LIGHTING STANDARDS AND FIXTURES AND
REPAIR EXISTING ISTE LIGHTING IN PARKING AREAS AND WALKWAYS. SEE CIVIL
ENGINEERING DRAWINGS.
8. INSTALL ADDITIONAL TREES, SHRUBS, GROUND COVER AND GRASS AREAS
THROUGHOUT THE PROJECT SITE INCLUDING IRRIGATION SYSTEMS.
9. REPLACE OLD WALKWAYS OR REPAIR EXISTING WALKWAYS, PATHS AND ADA
ACCESS AREAS THROUGHOUT THE PROJECT SITE. SEE PLANS AND ELEVATIONS.
SEE CIVIL ENGINEERING DRAWINGS.
10. INSTALL NEW WAYFINDING AND BASIC CAMPUS SIGNAGE AND ASSOCIATED
LIGHTING. COORDINATE LOCATIONS AND QUANTITY WITH BMR AND ARCHITECT.
11. PROVIDE NEW PROJECT MAIN MONUMENT SIGN AND ASSOCIATED LIGHTING
AT PROJECT ENTRY. COORDINATE LOCATION AND DESIGN WITH BMR AND
ARCHITECT.
SITE PLAN GENERAL NOTES
12. RAZE THE EXISTING CAFETERIA BUILDING. EXISTING CAFETERIA
FOUNDATION WALLS MAY REMAIN IN PLACE SERVING AS RETAINING WALLS FOR
LANDSCAPE. EXISTING UTILITY CONNECTIONS WILL BE CUT AND CAPPED IN
PLACE. CAFETERIA BUILDING FOOTPRINT WILL BE REMOVED AND PLANTED WITH
LANDSCAPE MATERIAL. FURNISH AND INSTALL SOLID WOOD FENCE TO INFILL
GAP AT DEMOLISHED STOREFRONT FACING MAIN STREET.
CENTRAL UTILITY
PLANT (CUP)
UP
CONNECTOR
BUILDING
DN
BUILDING 420
BUILDING 410
BUILDING 440 CAFETERIA
UP
UP
UP
UP
P1
P1P1
P1
P1
P1
P1
P1
P1
P1 P1
P1
P1
P1
P1
P1
P1
P1
P1
P1P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
Q
Q
Q Q
Q
Q
Q
Q
P1
P1
P1
P1 P1
P1
S S
Q
Q
Q
TR
TR
TR
TR
TR
TR
TR
TR
TR
TR
T
T
TT
T
P2
P2
P2
P2 P2 P2
P2
P2
P2
P2
P1
P1
T
T
DNDN
DN DN
UP
DNDN
SITE PLAN LEGEND
PERVIOUS PAVER SYSTEM. COORDINATE DRAINAGE WITH CIVIL ENGINEERING DRAWINGS.
GRASS/PLANTS
STONE DUST PATHWAY.
TREE
HEDGE
LIGHT BOLLARD. COORDINATE WITH ELECTRICAL ENGINEERING DRAWINGS.
DIRECTIONAL SIGNAGE
MONUMENT SIGNAGE
TR
LITTER RECEPTACLE
BIKE RACKS
P
Q ROUND IN-GROUND LED LIGHT. COORDINATE WITH ELECTRICAL ENGINEERING DRAWINGS.
BUILDING ENTRANCE
All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.
BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012
T: 646.522.5550F: 646.349.5556www.bam-studio.com
NORTH
A r c h i t e c t u r e S t u d i o
Building 5807 East Main St.Durham, NC27701
T: 919.890.3880F: 646.349.5556www.bam-studio.com
M-E Engineers5th Floor29 West 38th StreetNew York, NY10018
Thornton TomasettiT: 917.661.7800F: 917.661.7801
51 Madison AvenueNew York, NY10010
John Meyer Consulting, PC
T: 914.273.5225F: 914.273.2102
120 Bedford RoadArmonk, NY10504
T: 212.447.6770F: 212.447.6615
Project No. 08-104.034
Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502
No. Date Description
REVISIONS
01 03.21.11 FOR CONSULTANT REVIEW
copyright date: 06.01.08
No. Date Description
02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY
ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID
01 08.16.11 ADDENDUM 1
11 09.09.11 FOR CONSTRUCTION
02 09.09.11 ADDENDUM 2
A-101.00
SITE PLAN - ENLARGED
SITE PLAN AT MAIN STREET AND CONNECTOR AREAA-101
2SCALE: 1/16"=1'-0"
SITE PLAN AT CENTRAL UTILITY PLANTA-101
1SCALE: 1/16"=1'-0"
01
01
CONNECTOR
BUILDING
ENTRANCE
BUILDING
420
NORTH
ENTRANCE
BUILDING 410
SOUTH
ENTRANCE
11
08 08
06
0203
05
05
09
12
13 13
WATER FEATURE
04
5'-0"
3'-6"
5'-0" 30'-0"
S-9
S-10
S-10
S-10
S-9 S-9
delete dims aftersurvey.-Tony 080211
21 31.1
S-10
S-10
S-10
S-11 S-11
S-9
P-12
S-10
S-11
NEW ELEV:+ 147.8' -TJ
S-9 S-9
S-9
S-10
S-10
S-10
S-10
S-11
S-10
S-10
S-10
S-10S-10
DN
UP
UP
DNDN
DN DN
DNDN
F-11 S-12
F-11
F-11
F-10F-10
F-11
All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.
BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012
T: 646.522.5550F: 646.349.5556www.bam-studio.com
NORTH
A r c h i t e c t u r e S t u d i o
Building 5807 East Main St.Durham, NC27701
T: 919.890.3880F: 646.349.5556www.bam-studio.com
M-E Engineers5th Floor29 West 38th StreetNew York, NY10018
Thornton TomasettiT: 917.661.7800F: 917.661.7801
51 Madison AvenueNew York, NY10010
John Meyer Consulting, PC
T: 914.273.5225F: 914.273.2102
120 Bedford RoadArmonk, NY10504
T: 212.447.6770F: 212.447.6615
Project No. 08-104.034
Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502
No. Date Description
REVISIONS
01 03.21.11 FOR CONSULTANT REVIEW
copyright date: 06.01.08
No. Date Description
02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY
ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID
01 08.16.11 ADDENDUM 1
11 09.09.11 FOR CONSTRUCTION
02 09.09.11 ADDENDUM 2
A-606.00
FINISH ELEVATIONS& LANDSCAPE FINISHES
FINISH EAST ELEVATIONA-606
2SCALE: 1/16''=1'-0''
FINISH WEST ELEVATION/SECTIONA-606
1SCALE: 1/16''=1'-0''
SECTION LOOKING NORTHA-606
3SCALE: 1/8''=1'-0''
FINISH: SOUTH ELEVATIONA-606
4SCALE: 1/8''=1'-0''
METAL PANEL WITH
PLYWOOD BACKING. FINISH
TO MATCH EXISTING.
LANDSCAPE FINISHESA-606
4SCALE: 1/8''=1'-0''
STAINLESS STEEL CHANNEL
STAINLESS STEEL CHANNEL
EXISTING STONE WALL.
EXISTING STONE WALL.
CONCRETE WITH BROOM
FINISH
CONCRETE WITH BROOM
FINISH
All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.
BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012
T: 646.522.5550F: 646.349.5556www.bam-studio.com
NORTH
A r c h i t e c t u r e S t u d i o
Building 5807 East Main St.Durham, NC27701
T: 919.890.3880F: 646.349.5556www.bam-studio.com
M-E Engineers5th Floor29 West 38th StreetNew York, NY10018
Thornton TomasettiT: 917.661.7800F: 917.661.7801
51 Madison AvenueNew York, NY10010
John Meyer Consulting, PC
T: 914.273.5225F: 914.273.2102
120 Bedford RoadArmonk, NY10504
T: 212.447.6770F: 212.447.6615
Project No. 08-104.034
Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502
No. Date Description
REVISIONS
01 03.21.11 FOR CONSULTANT REVIEW
copyright date: 06.01.08
No. Date Description
02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY
ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID
01 08.16.11 ADDENDUM 1
11 09.09.11 FOR CONSTRUCTION
02 09.09.11 ADDENDUM 2
A-405.00
CUP ELEVATION/SECTIONS
CUP FRONT ELEVATIONA-405
2SCALE: 1/16''=1'-0''
CUP LOUVER FRAMING ELEVATIONA-405
3SCALE: 1/16''=1'-0''
CUP EXISTING FRONT ELEVATIONA-405
1SCALE: 1/16''=1'-0''
2
A-531
1
A-530
CUP BUILDING SECTIONA-405
4SCALE: 1/16''=1'-0''
4
A-405
CUP BUILDING SECTIONA-405
5SCALE: 1/16''=1'-0''
CUP BUILDING SECTIONA-405
6SCALE: 1/16''=1'-0''
CUP BUILDING SECTIONA-405
7SCALE: 1/16''=1'-0''
5
A-405
6
A-405
7
A-405
3
A-531
UP
UP
H
1 1.9 2 2.1
2.2 43.232.9
2.8
GG
.aF
F.a
SWITCHLL-003
GEAR ROOM
MECHANICALLL-004
ROOM
MECHANICALLL-005
TUNNEL
DATALL-006
ROOM
CLOSETLL-00X
CLOSETLL-00X
CLOSETLL-00X
CLOSETLL-00X
STORAGELL-00X
SPACE
MECHANICALLL-001
ROOMSTORAGE
LL-002
ROOM
MECHANICALLL-007
CORRIDOR
STAIR #2LL-00F
ELEC. CLOSETLL-00X MECHANICAL
LL-00X
ROOM
UP
UP
H
1 1.9 2 2.1
2.2 43.232.9
2.8
GG
.aF
F.a
SWITCHLL-003
GEAR ROOM
MECHANICALLL-004
ROOM
MECHANICALLL-005
TUNNEL
DATALL-006
ROOM
CLOSETLL-00X
CLOSETLL-00X
CLOSETLL-00X
CLOSETLL-00X
STORAGELL-00X
SPACE
MECHANICALLL-001
ROOMSTORAGE
LL-002
ROOM
MECHANICALLL-007
CORRIDOR
STAIR #2LL-00F
ELEC. CLOSETLL-00X MECHANICAL
LL-00X
ROOM
21 3
D
B
C
B
21 3
A.a
D
C
1.1
1.1
AA
D.a
EE
FF
24
24
24
24
24
24
01
KEYED NOTES
EXTERIOR STAIR AND HANDRAILS. SEE ELEVATIONS AND DETAILS.
ADA RAMP, SEE ELEVATIONS AND DETAILS.
EXISTING RETAINING WALL TO REMAIN.
RETAINING WALL.
DOOR SHALL NOT BE INCLUDED IN SCOPE OF WORK.
PARTITIONS SHOWN AS HATCHED IN THIS AREA SHALL NOT BE
INCLUDED IN SCOPE OF WORK.
EXPANSION JOINT.
PARTITION SHOWN AS HATCHED SHALL NOT BE INCLUDED IN SCOPE
OF WORK.
MECHANICAL LOUVERS.
REPLACE EXISTING STOREFRONT. SEE ELEVATIONS AND DETAILS
FOOTPRINT OF NEW KITCHEN AREA.
LOADING DOCK LEVELER, SEE FFE LEGEND.
COORDINATE WITH SITE PLAN. SEE A-100.00
CURTAIN WALL. SEE ELEVATION DRAWINGS.
CURB LINE TO REPLACE EXISTING.
STAIR WITH CANOPY ABOVE.
STAIR TO REPLACE EXISTING WOODEN STAIR STRUCTURE.
REPAINT/REFURBISH EXISTING STAIR.
HVAC SHAFT.
WINDOWS BAYS TO REPLACE EXISTING DOUBLE DOOR.
SHAFT.
LINE OF GRADE BEAM. SEE STRUCTURAL DRAWINGS.
LINE OF RETAINING WALL FOOTING. SEE STRUCTURAL DRAWINGS.
CONNECTOR BUILDING FOOTING. SEE STRUCTURAL DRAWINGS.
FUTURE ELEVATOR PROVIDED BY TENANT.
PATCH/ LAMINATE EXISTING PARTITIONS AS REQUIRED TO ACHIEVE RATING.
U.O.N. GC TO RE-INSTALL PARTITIONS, CEILINGS, SOFFITS, LIGHTING, SPRINKLERHEADS, AND FINISHES TO PRE-DEMOLITION CONDITION AFTER CONSTRUCTIONOF CONNECTOR IS COMPLETE. COORDINATE WITH ENGINEERING DRAWINGS.
EXISTING BRIDGE TO REMAIN.
ROOFTOP UNIT SCREEN. SEE FFE LEGEND.
INFILL SLAB TO LEVEL OUT FLOOR.
CONCRETE PAD. SEE MEP DRAWINGS.
CANOPY BELOW.
UP
UP
H
1 1.9 2 2.1
2.2 43.232.9
2.8
GG
.aF
F.a
EC
BA
DC
.b
SWITCH
LL-003
GEAR ROOM
MECHANICALLL-004
ROOM
MECHANICALLL-005
TUNNEL
DATA
LL-006
ROOM
CLOSET
LL-00X
CLOSET
LL-00X
CLOSET
LL-00X
CLOSET
LL-00X
STORAGE
LL-00X
SPACE
MECHANICAL
LL-001
ROOMSTORAGE
LL-002
ROOM
MECHANICALLL-007
CORRIDOR
STAIR #2LL-00F
ELEC. CLOSETLL-00X MECHANICAL
LL-00X
ROOM
UP
UP
H
1 1.9 2 2.1
2.2 43.232.9
2.8
GG
.aF
F.a
EC
BA
DC
.b
SWITCH
LL-003
GEAR ROOM
MECHANICALLL-004
ROOM
MECHANICALLL-005
TUNNEL
DATA
LL-006
ROOM
CLOSET
LL-00X
CLOSET
LL-00X
CLOSET
LL-00X
CLOSET
LL-00X
STORAGE
LL-00X
SPACE
MECHANICAL
LL-001
ROOMSTORAGE
LL-002
ROOM
MECHANICALLL-007
CORRIDOR
STAIR #2LL-00F
ELEC. CLOSETLL-00X MECHANICAL
LL-00X
ROOM
420 Mech Level
36'-712"7'-6"4'-6"
3'-10
1 2"
4'-5
1 2"
11'-1"
15'-4"
10'-6"
20'-8"
21 3
D
B
C
B
A.a
D
C
1.1
AA
D.a
EE
FF
2'-4
"
24
24
24
24
24
24
01
A-200KEY PLANA-200
3SCALE: 1/32"=1'-0"
All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.
BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012
T: 646.522.5550F: 646.349.5556www.bam-studio.com
NORTH
A r c h i t e c t u r e S t u d i o
Building 5807 East Main St.Durham, NC27701
T: 919.890.3880F: 646.349.5556www.bam-studio.com
M-E Engineers5th Floor29 West 38th StreetNew York, NY10018
Thornton TomasettiT: 917.661.7800F: 917.661.7801
51 Madison AvenueNew York, NY10010
John Meyer Consulting, PC
T: 914.273.5225F: 914.273.2102
120 Bedford RoadArmonk, NY10504
T: 212.447.6770F: 212.447.6615
Project No. 08-104.034
Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502
No. Date Description
REVISIONS
01 03.21.11 FOR CONSULTANT REVIEW
copyright date: 06.01.08
No. Date Description
02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY
ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID
01 08.16.11 ADDENDUM 1
11 09.09.11 FOR CONSTRUCTION
02 09.09.11 ADDENDUM 2
MATCH LINE
CONNECTOR FOOTING PLANBUILDING 420 LOWER LEVELMECHANICAL ROOMS
PARTITION PLAN - CONNECTOR SLAB AND FOOTING PLAN AND BUILDING 420 LOWER LEVEL MECHANICAL ROOMSA-200
1SCALE: 1/8"=1'-0"
PARTITION PLAN - CONNECTOR SLAB AND FOOTING PLAN AND BUILDING 420 LOWER LEVEL MECHANICAL ROOMSA-200
2SCALE: 1/8"=1'-0"
LINE OF
CONNECTOR
SLAB ABOVE.
LINE OF BUILDING
410 SLAB ABOVE.
25
LINE OF BUILDING 410 SLAB ABOVE
UPUP
UP
MEN'S LL-029
ROOM
WOMEN'S LL-027
ROOM
IDFLL-025
ROOMPANTRYLL-026
ELEVATORLL-00C
STAIR #2LL-00B
9 10 11 13 14 15 16 17
A
C
E
12
B
D
SWITCHBOARDLL
ROOM
EMERGENCYLL
ROOM
---LL- 00X
ELEVATORMACHINE RM.
STORAGELL
ROOM
FIRE ALARMLL
CLOSET
-49
STORAGELL-006
CORRIDORLL-045
STAIR # 4LL-00E
STAIR # 5LL-00E
01 01
03
05
04
D
D
D
D
BB
04
03
04
0404
05
07
08
02
0530 05
K
D
G
L
UP
ATSLL-004
ROOM
STAIRLL-00A
#1
CORRIDORLL-040
JCLL-042
MEN'SLL-038
ROOM
WOMEN'SLL-039
ROOM
ELEC.LL-036
ROOM
IDFLL-035
ROOM
CORRIDORLL-037
MECHANICALLL-006
ROOM
1 2 4 6 7 8 953
MECHANICALLL-00X
ROOM
TELEPHONE/LL-001
DATA RM
FURNITURELL-003
OFFICESTORAGELL-004A
STORAGELL-006
BOILERLL--XXX
ROOM
ELEC CL01-034
STORAGE01-004
OFFICE03-005
OFFICE01-006
BREEZEWAY03-00H
OFFICE01-011
CORRIDOR01-007
CORRIDOR01-003
VESTIBULE01-00G
LOBBY01-001
STORAGE01-029
HR RECEPTION01-026
AREA
MEETING01-025
ROOM
OFFICE01-024
CONFERENCE01-023
ROOM
OFFICE01-022
OFFICE01-021
OFFICE01-020
OFFICE01-019
WS AREA01-018
OFFICE01-017
OFFICE01-016
WS AREA01-015
OFFICE01-014
OFFICE01-013
WS AREA01-012
SUPPLY01-035
ROOM
HR TESTING01-032
ROOM
HR FILE/01-003
WORK ROOM
WS AREA01-036
H
1 1.9 2 43.23
G
G.a
F
F.a
E
D
C
B
A
C.b
2.1 2.82.2 2.2
DN
UP
DN
UP
WOMEN'S01-031
ROOM
MEN'S01-030
ROOM
OFFICE01-027
TELE RM.
COPY RM/01-028
PANTRY
ELEV.01-00B
#1IDF01-00A
STAIR01-00C
#1
COATS01-002
ELEV.01-00D
#2
STAIR #201-0OF
DN
DN
ELEC. CLOSET01-XXX
IDF RM01-XXX
ELEVATOR01-XXX
MACHINE RM
SUPPLY01-XXX
CLOSET
21 3
D
B
C
B
21 3
A.a
D
C
1.1
1.1
AA
D.a
EE
FF
LOADING DOCK01-XXX
H
01
01
0304
05
0909
11
08
02
04
04
10
06
E
BH
BB
B
B
B
D
H
C
H
H
B
H
H
H
B
B
B
G
G
D
D
D
D
F
FF
F
01
02
03
25
12
25
04
04D
05
04
27
27
27
27
04
02
30
30
D
09
07
06
D
05
KEYED NOTES
EXTERIOR STAIR AND HANDRAILS. SEE ELEVATIONS AND DETAILS.
ADA RAMP, SEE ELEVATIONS AND DETAILS.
EXISTING RETAINING WALL TO REMAIN.
RETAINING WALL.
DOOR SHALL NOT BE INCLUDED IN SCOPE OF WORK.
PARTITIONS SHOWN AS HATCHED IN THIS AREA SHALL NOT BE
INCLUDED IN SCOPE OF WORK.
EXPANSION JOINT.
PARTITION SHOWN AS HATCHED SHALL NOT BE INCLUDED IN SCOPE
OF WORK.
MECHANICAL LOUVERS.
REPLACE EXISTING STOREFRONT. SEE ELEVATIONS AND DETAILS
FOOTPRINT OF NEW KITCHEN AREA.
LOADING DOCK LEVELER, SEE FFE LEGEND.
COORDINATE WITH SITE PLAN. SEE A-100.00
CURTAIN WALL. SEE ELEVATION DRAWINGS.
CURB LINE TO REPLACE EXISTING.
STAIR WITH CANOPY ABOVE.
STAIR TO REPLACE EXISTING WOODEN STAIR STRUCTURE.
REPAINT/REFURBISH EXISTING STAIR.
HVAC SHAFT.
WINDOWS BAYS TO REPLACE EXISTING DOUBLE DOOR.
SHAFT.
LINE OF GRADE BEAM. SEE STRUCTURAL DRAWINGS.
LINE OF RETAINING WALL FOOTING. SEE STRUCTURAL DRAWINGS.
CONNECTOR BUILDING FOOTING. SEE STRUCTURAL DRAWINGS.
FUTURE ELEVATOR PROVIDED BY TENANT.
PATCH/ LAMINATE EXISTING PARTITIONS AS REQUIRED TO ACHIEVE RATING.
U.O.N. GC TO RE-INSTALL PARTITIONS, CEILINGS, SOFFITS, LIGHTING, SPRINKLERHEADS, AND FINISHES TO PRE-DEMOLITION CONDITION AFTER CONSTRUCTIONOF CONNECTOR IS COMPLETE. COORDINATE WITH ENGINEERING DRAWINGS.
EXISTING BRIDGE TO REMAIN.
ROOFTOP UNIT SCREEN. SEE FFE LEGEND.
INFILL SLAB TO LEVEL OUT FLOOR.
CONCRETE PAD. SEE MEP DRAWINGS.
CANOPY BELOW.
UP
UPUP
UP
1 2 4 6 7 8 9 10 11 13 14 15 16 171253
-49
STORAGE01-004
OFFICE03-005
OFFICE01-006
BREEZEWAY
03-00H
OFFICE
01-011
CORRIDOR01-007
CORRIDOR01-003
VESTIBULE
01-00G
LOBBY01-001
STORAGE
01-029
HR RECEPTION01-026
AREA
MEETING
01-025
ROOM
OFFICE
01-024
CONFERENCE
01-023
ROOM
OFFICE
01-022
OFFICE
01-021
OFFICE
01-020
OFFICE01-019
WS AREA
01-018
OFFICE
01-017
OFFICE
01-016
WS AREA
01-015
OFFICE01-014
OFFICE
01-013
WS AREA
01-012
SUPPLY
01-035
ROOM
HR TESTING01-032
ROOM
HR FILE/
01-003
WORK ROOM
WS AREA01-036
H
1 1.9 2 43.23
G
G.a
F
F.a
E
D
C
B
A
C.b
2.1 2.82.2 2.2
DN
UP
DN
UP
DN
DN
21 3
D
B
C
B
A.a
D
C
1.1
AA
D.a
EE
FF
PARTITION PLAN - FIRST FLOORA-201
2SCALE: 1/8"=1'-0"
A-201.00
PARTITION PLANFIRST FLOOR
PARTITION PLAN - FIRST FLOORA-201
1SCALE: 1/8"=1'-0"
KEY PLANA-201
3SCALE: 1/32"=1'-0"
All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.
BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012
T: 646.522.5550F: 646.349.5556www.bam-studio.com
NORTH
A r c h i t e c t u r e S t u d i o
Building 5807 East Main St.Durham, NC27701
T: 919.890.3880F: 646.349.5556www.bam-studio.com
M-E Engineers5th Floor29 West 38th StreetNew York, NY10018
Thornton TomasettiT: 917.661.7800F: 917.661.7801
51 Madison AvenueNew York, NY10010
John Meyer Consulting, PC
T: 914.273.5225F: 914.273.2102
120 Bedford RoadArmonk, NY10504
T: 212.447.6770F: 212.447.6615
Project No. 08-104.034
Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502
No. Date Description
REVISIONS
01 03.21.11 FOR CONSULTANT REVIEW
copyright date: 06.01.08
No. Date Description
02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY
ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID
01 08.16.11 ADDENDUM 1
11 09.09.11 FOR CONSTRUCTION
02 09.09.11 ADDENDUM 2
MATCH LINE
1
A-410.00
12
A-410.00
MEN'S01-065
ROOM
ELEV #101-00C
ROOM
STAIR #201-00B
ROOM
WOMEN'S01-070
ROOM
COPY/01-072
PANTRY
ELEC CL.01-071
IDF01-064
ROOM
ELEV01-067
LOBBY
UPUP
9 10 11 13 14 15 16 17
A
C
E
12
B
DJANITOR'SCLOSET
VESTIBULE01-029
CORRIDOR01-076
CORRIDOR01-075
SUPPLY01-0XX
ROOM
DNDN
DN
UP
UP
TR
TR
TR
DNDN
DN DN
DNDN
17
13
16 15
26
03
03
02EE
E E E
A
G
G
L
F
F
OFFICE02-005
OFFICE02-004
OFFICE02-007
W.S AREA02-008
OFFICE02-009
OFFICE02-010
OFFICE02-003
W.S. AREA02-002
OFFICE02-001
OFFICE02-003
OFFICE02-003
MEETING02-011
AREA
OFFICE02-012
FILE02-013
ROOM
BREAK OUT02-031
AREA
CONFERENCE02-033
ROOM
OFFICE02-030
OFFICE02-029
OFFICE02-027
OFFICE02-028
OFFICE02-026
OFFICE02-025
OFFICE02-024
OFFICE02-023
WS AREA02-022
OFFICE02-021
OFFICE02-020
OFFICE02-019
WS AREA02-018
OFFICE02-017
OFFICE02-016
OFFICE02-015
OFFICE02-014
LEGAL FILE02-040
LIBRARY02-039
COPY ROOM02-041
WS AREA02-006
UP
DN
UP
DN
STAIR02-00C
#1
ELEV.02-00B
#1
COPY02-036
AREA
IDF02-00A
PIPE02-00D
CL
PANTRY02-035
ELEV.02-00E
#2
ELEC CL02-00H
JAN. CL02-00G
STAIR #202-00F
WOMEN'S02-038
ROOM
MEN'S ROOM02-037
H
1 1.9 2 43.23
G
G.a
F
F.a
E
D
C
B
A
C.b
2.1 2.82.2 2.2
STAIR01-00A
#1
CORRIDOR01-079
COAT CL.01-052
MEN'S01-054
ROOM
WOMEN'S01-056
ROOM
ELEC. CL.01-053
1 2 4 6 7 8 953
IDF ROOM01-00X
VESTIBULE01-006
CORRIDOR01-078
CORRIDOR01-077
UP
21 3
D
B
C
B
21 3
A.a
D
C
1.1
1.1
AA
D.a
EE
FF
UP
UP
UP
TR
TR
UP
14
E
E
02
13 12
17 17
4
H
C
C
B
H
C
C
H
H
H
B
G
G
H
C
C
10
14
08
04
27
27
27
27
22
H
C
08
13
B
E E E
F
OFFICE
02-005
OFFICE
02-004
OFFICE
02-007
W.S AREA02-008
OFFICE
02-009
OFFICE
02-010
OFFICE
02-003
W.S. AREA
02-002
OFFICE02-001
OFFICE
02-003
OFFICE
02-003
MEETING
02-011
AREA
OFFICE
02-012
FILE
02-013
ROOM
BREAK OUT02-031
AREA
CONFERENCE02-033
ROOM
OFFICE
02-030
OFFICE02-029
OFFICE
02-027
OFFICE
02-028
OFFICE
02-026
OFFICE
02-025
OFFICE02-024
OFFICE02-023
WS AREA02-022
OFFICE02-021
OFFICE
02-020
OFFICE02-019
WS AREA02-018
OFFICE02-017
OFFICE
02-016
OFFICE
02-015
OFFICE02-014
LEGAL FILE
02-040
LIBRARY02-039
COPY ROOM02-041
WS AREA02-006
UP
DN
UP
DN
H
1 1.9 2 43.23
G
G.a
F
F.a
E
D
C
B
A
C.b
2.1 2.82.2 2.2
UPUP
1 2 4 6 7 8 9 10 11 13 14 15 16 171253
DNDN
UP
21 3
D
B
C
B
A.a
D
C
1.1
AA
D.a
EE
FF
UP
DN
UP
UP
UP
TR
TR
TR
TR
DNDN
DN DN
UP
DNDN
14
08
04
27
27
27
27
17
16
08
13
26
KEYED NOTES
EXTERIOR STAIR AND HANDRAILS. SEE ELEVATIONS AND DETAILS.
ADA RAMP, SEE ELEVATIONS AND DETAILS.
EXISTING RETAINING WALL TO REMAIN.
RETAINING WALL.
DOOR SHALL NOT BE INCLUDED IN SCOPE OF WORK.
PARTITIONS SHOWN AS HATCHED IN THIS AREA SHALL NOT BE
INCLUDED IN SCOPE OF WORK.
EXPANSION JOINT.
PARTITION SHOWN AS HATCHED SHALL NOT BE INCLUDED IN SCOPE
OF WORK.
MECHANICAL LOUVERS.
REPLACE EXISTING STOREFRONT. SEE ELEVATIONS AND DETAILS
FOOTPRINT OF NEW KITCHEN AREA.
LOADING DOCK LEVELER, SEE FFE LEGEND.
COORDINATE WITH SITE PLAN. SEE A-100.00
CURTAIN WALL. SEE ELEVATION DRAWINGS.
CURB LINE TO REPLACE EXISTING.
STAIR WITH CANOPY ABOVE.
STAIR TO REPLACE EXISTING WOODEN STAIR STRUCTURE.
REPAINT/REFURBISH EXISTING STAIR.
HVAC SHAFT.
WINDOWS BAYS TO REPLACE EXISTING DOUBLE DOOR.
SHAFT.
LINE OF GRADE BEAM. SEE STRUCTURAL DRAWINGS.
LINE OF RETAINING WALL FOOTING. SEE STRUCTURAL DRAWINGS.
CONNECTOR BUILDING FOOTING. SEE STRUCTURAL DRAWINGS.
FUTURE ELEVATOR PROVIDED BY TENANT.
PATCH/ LAMINATE EXISTING PARTITIONS AS REQUIRED TO ACHIEVE RATING.
U.O.N. GC TO RE-INSTALL PARTITIONS, CEILINGS, SOFFITS, LIGHTING, SPRINKLERHEADS, AND FINISHES TO PRE-DEMOLITION CONDITION AFTER CONSTRUCTIONOF CONNECTOR IS COMPLETE. COORDINATE WITH ENGINEERING DRAWINGS.
EXISTING BRIDGE TO REMAIN.
ROOFTOP UNIT SCREEN. SEE FFE LEGEND.
INFILL SLAB TO LEVEL OUT FLOOR.
CONCRETE PAD. SEE MEP DRAWINGS.
PARTITION PLAN - SECOND FLOORA-202
2SCALE: 1/8"=1'-0"
A-202.00
PARTITION PLANSECOND FLOOR
PARTITION PLAN - SECOND FLOORA-202
1SCALE: 1/8"=1'-0"
KEY PLANA-202
3SCALE: 1/32"=1'-0"
All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.
BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012
T: 646.522.5550F: 646.349.5556www.bam-studio.com
NORTH
A r c h i t e c t u r e S t u d i o
Building 5807 East Main St.Durham, NC27701
T: 919.890.3880F: 646.349.5556www.bam-studio.com
M-E Engineers5th Floor29 West 38th StreetNew York, NY10018
Thornton TomasettiT: 917.661.7800F: 917.661.7801
51 Madison AvenueNew York, NY10010
John Meyer Consulting, PC
T: 914.273.5225F: 914.273.2102
120 Bedford RoadArmonk, NY10504
T: 212.447.6770F: 212.447.6615
Project No. 08-104.034
Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502
No. Date Description
REVISIONS
01 03.21.11 FOR CONSULTANT REVIEW
copyright date: 06.01.08
No. Date Description
02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY
ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID
01 08.16.11 ADDENDUM 1
11 09.09.11 FOR CONSTRUCTION
02 09.09.11 ADDENDUM 2
RETAINING WALL BELOW
1213
13
04
1213
10
1
A-411
17
A-411
12
A-411
2
A-507
↑ Schematic Models
biomed realty trust
ardsley corporate campuscompleted:In construction
site location:Ardsley, NY
vicinity mapvicinity map
DN
+5 +5
+5 +5
UP
E
UP
+6
+6+6
+6
+6
+5
+5
-71
+15
+5+5
+5
+5
+5
+5
+5
+5
+5
+5
+5
+16
+16+5
+5 +5
+5
+5
+5
+5
+5 +5
+5
+9
+5
+10
+10
+5 +5
+6
+6
+15 +15
+5
+15
+15
+15
-136
UP
+0
+4
+12
+6
+15+15+15
15'-5"E
E
EE
E
E
E
E
EXISTING BULKHEAD
KEYED NOTES
EXISTING ROOF EQUIPMENT STRUCTURE
EXISTING MECHANICAL EQUIPMENT EXHAUST
METAL FRAME, SEE A-403.00
METAL SLATS/LOUVERS, SEE A-403.00
PLANTERS WITH UP LIGHTING BEHIND, SEE A-403.00
BACKLIGHTING FOR EXISTING LOUVERS, SEE A-403.00
EXISTING CONCRETE STRUCTURE
EXISTING I BEAM STRUCTURE
--
EXISTING DAMAGED ASPHALT.
EXISTING CONCRETE CURB.
EXISTING PIT. GC TO MAKE SAFE WITH HAND AND SAFETY RAILS.
--
--
--
GC TO ADD SAFETY RAIL TO MAKE SAFE.
---
EXISTING WOODEN STAIR
EXISTING CATWALK
EXISTING PIT WITH ENTRANCE TO TUNNEL.
EXISTING CONCRETE PAD, TYPICAL
EXISTING TRENCH WITH METAL GRATE, TYPICAL
EXISTING SPIRAL STAIRCASE
EXISTING TOILET, URINAL, SINKS, AND SHOWER
EXISTING MECHANICAL EQUIPMENT
EXISTING MECHANICAL EQUIPMENT WITH CEILING EXHAUST All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.
BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012
T: 646.522.5550F: 646.349.5556www.bam-studio.com
NORTH
A r c h i t e c t u r e S t u d i o
Building 5807 East Main St.Durham, NC27701
T: 919.890.3880F: 646.349.5556www.bam-studio.com
M-E Engineers5th Floor29 West 38th StreetNew York, NY10018
Thornton TomasettiT: 917.661.7800F: 917.661.7801
51 Madison AvenueNew York, NY10010
John Meyer Consulting, PC
T: 914.273.5225F: 914.273.2102
120 Bedford RoadArmonk, NY10504
T: 212.447.6770F: 212.447.6615
Project No. 08-104.034
Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502
No. Date Description
REVISIONS
01 03.21.11 FOR CONSULTANT REVIEW
copyright date: 06.01.08
No. Date Description
02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY
ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID
01 08.16.11 ADDENDUM 1
11 09.09.11 FOR CONSTRUCTION
02 09.09.11 ADDENDUM 2
A-205.00
CUP PARTITION PLAN - FIRST,SECOND, AND ROOF PLANS
2ND FLOOR PLANA-205
2SCALE: 1/8"=1'-0"
ROOF PLANA-205
1SCALE: 1/8"=1'-0"
1ST FLOOR PLANA-205
3SCALE: 1/8"=1'-0"
3
A-403.01
5
A-405
6
A-405
7
A-405
8
A-405
Client Advocate / Project Manager / Lead Designer BAM STUDIO ARCHITECTS
5'-0"
3'-6"
5'-0" 30'-0"
S-9
S-10
S-10
S-10
S-9 S-9
delete dims aftersurvey.-Tony 080211
21 31.1
S-10
S-10
S-10
S-11 S-11
S-9
P-12
S-10
S-11
NEW ELEV:+ 147.8' -TJ
S-9 S-9
S-9
S-10
S-10
S-10
S-10
S-11
S-10
S-10
S-10
S-10S-10
DN
UP
UP
DNDN
DN DN
DNDN
F-11 S-12
F-11
F-11
F-10F-10
F-11
All drawings and written materials represented on this sheet constitute thecopyrighted work and are the sole property of BAM Architecture Studio. This sheetmay not be reproduced or copied in whole or in part, nor may any of the drawings orwritten materials appearing within, be incorporated into another work for any reasonwithout the written consent of BAM Architecture Studio. This sheet must bereturned upon the request of the Architect.
BAM Architecture StudioSecond Floor415 West BroadwayNew York, NY10012
T: 646.522.5550F: 646.349.5556www.bam-studio.com
NORTH
A r c h i t e c t u r e S t u d i o
Building 5807 East Main St.Durham, NC27701
T: 919.890.3880F: 646.349.5556www.bam-studio.com
M-E Engineers5th Floor29 West 38th StreetNew York, NY10018
Thornton TomasettiT: 917.661.7800F: 917.661.7801
51 Madison AvenueNew York, NY10010
John Meyer Consulting, PC
T: 914.273.5225F: 914.273.2102
120 Bedford RoadArmonk, NY10504
T: 212.447.6770F: 212.447.6615
Project No. 08-104.034
Ardsley Park410-420 Saw Mill River Rd.Ardsley, NY 10502
No. Date Description
REVISIONS
01 03.21.11 FOR CONSULTANT REVIEW
copyright date: 06.01.08
No. Date Description
02 03.24.11 FOR CLIENT REVIEW03 03.30.11 FOR PRELIMINARY
ZONING REVIEW04 04.01.11 FOR CONSULTANT REVIEW05 04.05.11 FOR CLIENT REVIEW06 04.22.11 FOR TOWN REVIEW07 05.17.11 FOR CLIENT REVIEW08 06.01.11 100% DESIGN DEVELOPMENT09 07.05.11 FOR CLIENT REVIEW10 07.29.11 FOR PERMIT AND BID
01 08.16.11 ADDENDUM 1
11 09.09.11 FOR CONSTRUCTION
02 09.09.11 ADDENDUM 2
A-606.00
FINISH ELEVATIONS& LANDSCAPE FINISHES
FINISH EAST ELEVATIONA-606
2SCALE: 1/16''=1'-0''
FINISH WEST ELEVATION/SECTIONA-606
1SCALE: 1/16''=1'-0''
SECTION LOOKING NORTHA-606
3SCALE: 1/8''=1'-0''
FINISH: SOUTH ELEVATIONA-606
4SCALE: 1/8''=1'-0''
METAL PANEL WITH
PLYWOOD BACKING. FINISH
TO MATCH EXISTING.
LANDSCAPE FINISHESA-606
4SCALE: 1/8''=1'-0''
STAINLESS STEEL CHANNEL
STAINLESS STEEL CHANNEL
EXISTING STONE WALL.
EXISTING STONE WALL.
CONCRETE WITH BROOM
FINISH
CONCRETE WITH BROOM
FINISH
biomed realty trust
ardsley corporate campuscompleted:In construction
site location:Ardsley, NY
vicinity mapvicinity mapClient Advocate / Project Manager / Lead Designer BAM STUDIO ARCHITECTS
SYMBOL LEGEND
PROJECT DATA
VICINITY MAP
1
I-8.0
I-8.0
1
I-6.0
1
OFFICE2001
X
ELEVATION
SECTION
ENLARGED PLAN
COLUMN LINE
ROOM NAME/NUMBER
AREA NOT IN CONTRACT
CLIENT:
WESTCHESTER MEDICAL CENTER
VALHALLA CAMPUS
MOUNT PLEASANT, NY 10595
CONTACT: ANTHONY COSTELLO
EMAIL: COSTELLOAE@WCMC.COM
TEL: 914.493.7028
ARCHITECT:
BAM STUDIO, PLLC
SECOND FLOOR
415 WEST BROADWAY
NEW YORK, NY 10012
CONTACT: PETER WILSON
EMAIL: PWILSON@BAM-STUDIO.COMTEL: 646.522.5502
FAX: 646.349.5556
PROJECT DESCRIPTION:
RECONFIGURATION OF EXISTING PARTITIONS
AND CEILING AS PROPOSED IN DESIGN
NO CHANGE IN USE, OCCUPANCY, OR EGRESS
PROJECT DIRECTORY DRAWING LIST
ARCHITECTURE
ABBREVIATIONS
AMERICANS WITH DISABILITIES ACT
ADJUSTABLE
ABOVE FINISHED FLOOR
ALUMINUM
ACOUSTICAL CEILING TILE
BUILDING
BUILDING STANDARD
CENTER LINE
CEILING
CONCRETE MASONRY UNIT
COLUMN
CONCRETE
DEPTH
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIMENSION
DOWNDETAIL
EXISTING
EACH
ELECTRIC/ELECTRICAL
ELEVATION/ELEVATOR
EMERGENCY
EQUAL
EXISTING TO REMAIN
EXISTING
FIRE ALARM
FIRE EXTINGUISHER CABINET
FLOOR DRAIN
FLUORESCENT
FINISH
FOOT/FEET
FURNISH AND INSTALL
GAUGE
GYPSUM
GYPSUM WALLBOARD
HEIGHT
HIGH INTENSITY DISCHARGE
HOLLOW METAL
HEATING, VENTING AND AIR CONDITIONING
HARDWARE
JUNCTION BOX
LENGTH
LAVATORY
LINEAR FEET
A.D.A.
ADJ.A.F.F.
ALUM.
A.C.T.
BLDG.
BLDG. STD.
C.L.
CLG.
C.M.U.
COL.
CONC.
DD.F.
DIA.
DIAG.
DIM.DN
DTL.
EEA.
ELEC.
ELEV.EM.
EQ.
E.T.R.
E/EXIST
F.A.
F.E.C.
F.D.
FLUOR.
FNSH.
FT
F / I
GA.
GYP.
G.W.B
HH.I.D.
H.M.
HVACHW.
J.B.
L
LAV.L.F.
MAXIMUM
MEDIUM DENSITY FIBERBOARD
MECHANICAL
MANUFACTURER
MINIMUM, MINUTESMETAL
NOT APPLICABLE
NOT IN CONTRACTNUMBER
PLASTIC LAMINATE
PLYWOOD
PANEL
PROJECTION SCREEN
PRESSURE TREATED
QUANTITY
RELOCATED
RADIUS
REFLECTED CEILING PLAN
ROOF DRAIN
REFRIGERATOR
ROOM
ROUGH OPENING
RENTABLE SQUARE FEET
ROOF TOP UNIT
SQUARE FEET
STAINLESS STEEL
STANDARD
STEEL
TELEPHONE
THICKNESS
TOP OF
TYPICAL
UNDER CUT
UNLESS OTHERWISE NOTED
USABLE SQUARE FOOTAGE
VERIFY IN FIELD
VINYL COMPOSITION TILE
WIDTHWITH
WITHOUT
WALLCOVERING
WOOD
WATER FOUNTAINWATER HEATER
WORKING POINT
WEIGHT
MAX.MDF
MECH.MFR.
MIN.MTL.
N/A
N.I.C.
NO.
P.LAM
PLYWDPNL.
PROJ.
P.T.
QTY.
R
RAD.
R.C.P.R.D.
REF.RM.
R.O.
R.S.F.R.T.U.
S.F.
S.S.
STD.
STL.
TEL.
THK.
T.O.
TYP.
U.C.
U.O.N.
U.S.F.
V.I.F.
V.C.T.
W
W/
W/O
WC
WD.WF
W.H.WP.
WT.
ENGINEER:
M-E ENGINEERS
417 FIFTH AVENUE
FIFTH FLOOR
NEW YORK, NY 10016
CONTACT: CHARLES WARNER
EMAIL: CWARNER@ME-ENGINEERS.COM
TEL: 212.447.6770 x19
FAX: 212.447.6615
SITE:
SEVENTH FLOOR NORTH
MAIN BUILDING
WESTCHESTER MEDICAL CENTER
VALHALLA CAMPUS
VALHALLA, NY 10595
WESTCHESTER MEDICAL CENTER
APPLICABLE CODES:
BUILDING:
FIRE SAFETY:
ELECTRICAL:
MECHANICAL:
PLUMBING:
HANDICAPPED:
ENERGY:
12,255 USF
TYPE I-2 - INSTITUTIONAL
BUILDING DESIGN:
TOTAL AREA:
OCCUPANCY TYPE:
NEW YORK STATE BUILDING CODE
NEW YORK STATE BUILDING CODE
NEW YORK STATE ELECTRICAL CODE
NEW YORK STATE BUILDING CODE
NEW YORK STATE BUILDING CODE
ANSI A117.1
NEW YORK STATE ENERGY CODE
M-0.7.1
MD-3.7.1
M-3.7.1
M-4.7.1M-5.7.1
P-0.7.1
PD-2.7.1
P-2.6.1
P-2.7.1
P-5.7.1
SP-0.7.1
SPD-3.7.1
SP-3.7.1
SP-4.7.1
SP-5.7.1
ED-2.7.1E-2.7.1
E-3.7.1
E-5.7.1
E-5.7.2
E-5.7.3
MEP
MECHANICAL LEGEND AND SCHEDULES
MECHANICAL 7TH FL DEMOLITION PLAN
MECHANICAL 7TH FL CONSTRUCTION PLAN
MECHANICAL 7TH FL SECTIONS
MECHANICAL DETAILS SHEET
PLUMBING LEGEND AND SCHEDULES
PLUMBING 7TH FL DEMOLITION PLAN
PLUMBING 6TH FL CONSTRUCTION PLAN
PLUMBING 7TH FL CONSTRUCTION PLAN
PLUMBING DETAILS
SPRINKLER LEGENDS AND SCHEDULES
SPRINKLER 7TH FL DEMOLITION PLAN
SPRINKLER 7TH FL CONSTRUCTION PLAN
SPRINKLER RISERS
SPRINKLER DETAILS
ELECTRICAL 7TH FLOOR DEMOLITION PLAN
ELECTRICAL 7TH FLOOR CONSTRUCTION PLAN
ELECTRICAL 7TH FLOOR LIGHTING PLAN
ELECTRICAL RISER DIAGRAMS AND DETAILS
ELECTRICAL SCHEDULES
ELECTRICAL SCHEDULES
INFECTION CONTROL NOTES:
ALL CONTRACTORS SHALL IMPLEMENT THE FOLLOWING NOTES IN ALL AREAS OF
WORK:
1. OBTAIN INFECTION CONTROL GUIDELINES BEFORE CONSTRUCTION BEGINS.
2. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHODS
BEFORE CONSTRUCTION BEGINS.
3. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO GOWN IN TYVEK
SUIT. SUITS ARE REMOVED IN THE ANTEROOM BEFORE LEAVING THE WORK SITE.
4. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
6. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA
EQUIPMENT AIR FILTRATION UNITS.
7. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
8. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
9. WET MOP WITH DISINFECTANT.
10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS TO DESIGNATED ELEVATOR / SITE.
11. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
12. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS
THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES AND CLEARED BY ICRA
COMMITTEE MEMBER.
13. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT
AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
14. ROUTE FOR WASTE TRANSPORT MUST BE APPROVED.
A-201.0 0
SHEET NAMING
DISCIPLINE DEMOLITION
ARCHITECTURE
ELECTRICAL
FIRE ALARM
FIRE PROTECTION
MECHANICAL
PLUMBING
PUBLIC ASSEMBLY
STRUCTURAL
SPRINKLER
DMA
E
FAFP
MP
PA
S
SP
COVER, SCHEDULES, GENERAL NOTES
SITE PLAN/ PHASING PLANS/ LIFE SAFETY PLAN
FLOOR PARTITION PLAN
REFLECTED CEILING PLAN
ELEVATIONS AND SECTIONS
CONSTRUCTION AND MILLWORK DETAILS
FINISH PLAN
FURNITURE, FIXTURE AND EQUIPMENT PLAN
POWER AND COMMUNICATION PLAN
0
1
2
34
5
67
8
SERIES
SUFFIX IDENTIFIES MULTIPLE DRAWINGS WITHIN A SERIES
DRAWING REVISION NUMBER
DETAIL BLOW OUT NUMBER
IF REQUIRED, A LOWERCASE LETTER
IDENTIFIES DETAILED BLOWOUT OF
ORIGINAL DRAWING.
A-001.0.0
A-002.0.0
A-003.0.0
A-004.0.0
A-005.0.0DM-201.0.0
DM-301.0.0
A-101.0.0
A-201.0.0
A-202.0.0A-301.0.0
A-401.0.0
A-402.0.0
A-403.0.0
A-404.0.0
A-405.0.0A-406.0.0
A-407.0.0
A-501.0.0
A-502.0.0
A-503.0.0A-601.0.0
A-602.0.0
A-701.0.0
A-801.0.0
COVER
GENERAL NOTES
GENERAL NOTES
GENERAL NOTES
TYPICAL MOUNTING HEIGHTS
DEMOLITION PLAN - 7TH FLOOR
DEMOLITION REFLECTED CEILING - 7TH FLOOR
LIFE SAFETY / PHASING PLANS - 7TH FLOOR
PARTITION PLAN - 7TH FLOOR
DIMENSIONED PARTITION & REFLECTED CEILING PLAN - 7TH FLOOR
REFLECTED CEILING PLAN - 7TH FLOOR
ELEVATIONS & SECTIONS - 7TH FLOOR
ELEVATIONS & SECTIONS - 7TH FLOOR
ELEVATIONS & SECTIONS - 7TH FLOOR
ELEVATIONS & SECTIONS - 7TH FLOOR
ELEVATIONS & SECTIONS - 7TH FLOOR
ELEVATIONS & SECTIONS - 7TH FLOOR
ELEVATIONS & SECTIONS - 7TH FLOOR
CONSTRUCTION & MILLWORK DETAILS - 7TH FLOOR
CONSTRUCTION & MILLWORK DETAILS - 7TH FLOOR
CONSTRUCTION & MILLWORK DETAILS - 7TH FLOOR
FINISH PLAN - 7TH FLOOR
FINISH ELEVATIONS - 7TH FLOOR
FURNITURE, FIXTURES AND EQUIPMENT PLAN - 7TH FLOOR
POWER & COMMUNICATION PLAN - 7TH FLOOR
CMC-7121 PATIENT WING RENOVATIONS: 7 SOUTH CHANGE ORDER N-1 (7 NORTH)OGS- S4963
STRUCTURAL:
SEVERUD ASSOCIATES
469 SEVENTH AVENUE
SUITE 900
NEW YORK, NY 10018
CONTACT: J. BENJAMIN ALPER
EMAIL: JALPER@SEVERUD.COM
TEL: 212.986.3700
FAX: 212.687.6467
S-1
STRUCTURAL
PARTITION FRAMING PLAN, SECTIONS,
DETAILS AND GENERAL NOTES
SPR
AIN
BR
OO
K P
AR
KW
AY
WO
OD
S R
OAD
HOSPITAL SERVICE ROAD
SUNSHINE COTTAGE ROAD
BEHAVIORALHEALTHCENTER(BHC)
TAYLOR CARECENTER(TCC)
MAIN
MACY
CHILDREN'S
HOSPITAL
MAIN/
TOWER
AREA
OF
WORK
Project No. 06-104.024
No. Date Description
REVISIONS
01 05.22.09 FOR DEMOLITION
copyright date: 05.01.09
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
Valhalla Campus
Valhalla, New York 10595
Westchester Medical Center
Main Building
7 North Renovation
BAM StudioSecond Floor415 West Broadway
New York, NY10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
NORTH
02 06.18.09 FOR COORDINATION
03 07.02.09 FOR MEP COORDINATION
04 07.10.09 FOR PRICING
05 08.04.09 FOR CLIENT REVIEW
06 08.19.09 FOR PRICING
CMC-7121 7 South Change Order N-1 GC/H/E/P
OGS-S4963
07 09.22.09 FOR ABATEMENT COORDINATION
10.26.09 FOR CLARIFICATION
08.28.09 FOR CLARIFICATION
08 11.24.09 FOR PERMIT AND CONSTUCTION
A-001.00
SEVENTH FLOOR
COVER
1
OFFICE TASK CHAIR (BY OTHERS)
GENERAL NOTES
1. ELECTRIC AND DATA RECEPTACLES SHOWN FOR COORDINATION PURPOSES. SEE ELECTRICAL DRAWINGS FOR CIRCUITING.
2. G.C.SHALL PROVIDE AND INSTALL SOLAR SHADES ON ALL PERIMETER WINDOWS. ARCHITECT TO CONFIRM COLOR PRIOR TO ORDER AND INSTALLATION. SEE DETAIL
SHEETS FOR MOUNTING DETAILS AND POWER PLAN FOR POWER REQUIREMENTS.
3. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY FURNITURE VENDOR AND INSTALLER PRIOR TO ORDER. CONTACT ARCHITECT PRIOR TO FURNITURE ORDER FOR ANY
DISCREPANCIES. CLIENT AND ARCHITECT SHALL NOT BE RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH MODIFYING FURNITURE TO FIT FIELD CONDITIONS.
4. ALL WHIP LOCATIONS TO BE CONFIRMED AND CLEARLY NOTED IN PLANS PROVIDED BY FURNITURE VENDOR. CONTACT ARCHITECT FOR ANY DISCREPANCIES.
5. ALL ELECTRICAL AND DATA LOCATIONS SHALL BE CONFIRMED IN THE FIELD BY THE FURNITURE VENDOR PRIOR TO WIRING AND INSTALLATION.
6. FURNITURE VENDOR SHALL PROVIDE SPECIFICATIONS OF THE PROPOSED WIRING CONFIGURATIONS AND COORDINATE WITH ELECTRICAL ENGINEER. CLIENT AND
ARCHITECT SHALL NOT BE RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH MODIFYING ELECTRICAL COMPONENTS TO FIT FIELD CONDITIONS.
7. FURNITURE VENDOR SHALL PROVIDE AXONOMETRIC AND PLAN DRAWINGS, IN .DWG AND .PDF FORMAT, WITH ALL QUOTES. ARCHITECT WILL NOT REVIEW FURNITURE
QUOTE UNTIL AXONOMETRIC AND PLAN DRAWINGS ARE RECEIVED.
KOHLER KINGSTON ADA-COMPLIANT, WALL-MOUNTED, REAR-SPUD TOILET
#K-4330-0:COLOR WHITE; SLOAN SLIMLINE BEDPAN WASHER
FLUSHOMETER #BPW-1105; SEE MEP DRAWINGS. KOHLER LUSTRA OPEN
FRONT SEAT WITH ANTI-MICROBIAL AGENT #K-4670-CA. SEE TYPICAL
MOUNTING HEIGHTS SHEET.
PURELL HAND SANITIZER (BY OTHERS)
42" 5HIGH LATERAL FILE (BY OTHERS)
18" PEDESTAL FILE (BY OTHERS)
PRINTER 21"HX16"WX16"D (BY OTHERS)
TV (BY OTHERS). GC TO PROVIDE BLOCKING AND COORDINATE POWER.
COORDINATE FINAL LOCATION AND TYPE WITH WMC.TV
KEYED NOTES
18" WIDE X 36" HIGH ANGLED WALL-MOUNTED MIRROR:BOBRICK# B-293 1836. SATIN STAINLESS STEEL FINISH.COORDINATE WITH LOCATION OF VANITY FIXTURE. SEE RCP.
WALL-MOUNTED SOAP DISPENSER (BY WMC, INSTALLED BY GC)
WALL MOUNTED PAPER TOWEL DISPENSER: GEORGIA PACIFICCOMBINATION C-FOLD/ MULTIFOLD PAPER TOWEL DISPENSERITEM# 56650-01 UPC UCC: 12 073310566504.FINISH: TRANSLUCENT SMOKE
WALL-MOUNTED TOILET PAPER DISPENSER: BOBRICK # B-4288,SATIN STAINLESS STEEL FINISH.
WALL-MOUNTED SANITARY NAPKIN DISPOSAL: BOBRICK # B-254,SATIN STAINLESS STEEL FINISH.
SURFACE MOUNTED TOWEL PIN: BOBRICK # B-677.
GRAB BARS: ELCOMA STAINLESS STEEL GRAB BARS: 24"#01-2224-KC, 36" #01-2236-KC, 42" #01-2242-KC. REFER TO PLANAND ELEVATIONS FOR SIZE.
PULL DOWN GRAB BARS: ELCOMA 30" FLIP UP SAFETY RAILSTAINLESS STEEL WITH TOILET PAPER HOLDER; MODEL#96-2230SW05-TF
VERTICAL GRAB BARS: ELCOMA 18" STAINLESS STEEL GRAB BAR,#01-2218-KC.
SHOWER ROD AND HOOKS: SHOWER CURTAIN ROD WITHCONCEALED MOUNTING 1" (25MM) DIAMETER ROD, 20-GAUGE(1.0MM), TYPE 304 STAINLESS STEEL, SATIN FINISH.BOBRICK 204-1 SHOWER CURTAIN HOOKS. BOBRICK TB-207 YPE304 STAINLESS STEEL. VERIFY REQUIRED LENGTHS IN FIELD.
**SEE TYPICAL MOUNTING HEIGHTS SHEET AND SHEETS A-401THROUGH SHEET A-407 FOR INSTALLATION LOCATIONS.
SHELV. SHELVING (BY OTHERS)
UNDER COUNTER REFRIGERATOR (BY OTHERS).
GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.
PLUMBING GASES LEGEND
SYMBOL DESCRIPTION
V
O
A
W
H
C
OXYGEN CONNECTION
AIR CONNECTION
VACUUM CONNECTION
WASTE CONNECTION
HOT WATER CONNECTION
COLD WATER CONNECTION
PLUMBING CONNECTIONS ARE SHOWN FOR COORDINATION PURPOSES ONLY. SEE PLUMBING DRAWINGS FOR DETAILS.
NOTE:
18" x 48" COFFEE TABLE (BY OTHERS)
24" x 24" COFFEE TABLE (BY OTHERS)
TWO SEAT GANGED LOUNGE CHAIR (BY OTHERS)
"M"
"H"
"MP"
"T"
"N"
"Q"
"G"
"PG"
"VG"
"C"
NOTE: SHOWN FOR COORDINATION PURPOSES ONLY. SEE ENGINEERING DRAWINGS
FLOOR
MOUNTDESCRIPTION
CLNG
MOUNTMOUNT
WALL
LIFE SAFETY/SECURITY/EQUIPMENT LEGEND
REMARKS
MEDICAL GAS SHUT-OFF VALVE
FIRE EXTINGUISHER AND RECESSED
CABINET (STAINLESS STEEL)
SEE SHEET FA-1 FOR GENERAL LOCATION. CONFIRM LOCATIONS WITH ARCHITECT PRIOR TO
INSTALLATION.
MG
FEC
BEDSIDE CABINET (BY OTHERS)
PYXISIVDD
COF
ICE
EKG
MW
SOAP DISPENSER (BY OTHERS)
LH LINEN HAMPER 33"HX18"WX20"D (BY OTHERS)
DIGITAL CLOCK. PRIMEX SNS7Y202F-1: WIRELESS SYNCHRONOUS NETWORK
SYSTEM (SNST). DISPLAY DIMMER CONTROLLED. 6-DIGIT DISPLAY, RED LED,
FLUSH MOUNT. 120VAC/50-60 CYCLE 18” CORD W/PIGTAIL. GC TO
COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.
CL
COMPACT MICROWAVE (BY OTHERS). GC TO COORDINATE POWER, SEE PC
PLAN AND ELEVATIONS.
COFFEE MACHINE (BY OTHERS).
GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.
WALL MOUNTED ICEMAKER (BY OTHERS). GC TO COORDINATE POWER,
BLOCKING, WALL BRACKETS AND WATER/ DRAINAGE REQUIREMENTS, SEE PC
PLAN, MEP DRAWINGS AND ARCHITECTURAL ELEVATIONS.
ELECTROCARDIOGRAM: 46"HX18"WX29"D (BY OTHERS)
DOUBLE PYXIS IV DISPENSER UNIT 79-1/2"HX52"WX28D (BY OTHERS)
CORIAN INTEGRAL SINK #810 WITH SLOAN FAUCET ETF-700-4-BDM: 4 TRIM
PLATE, PLUG-IN TRANSFORMER, BELOW DECK MECHANICAL MIXING VALVE.
TRANSFORMERS: ETF-233 120 VAC/24 VAC, 50/60 HZ (35 VA). 30 SECOND
TIME OUT. SEE MEP DRAWINGS. SEE TYPICAL MOUNTING HEIGHTS SHEET
AND F-2.7 FOR DETAILS.
EQUIPMENT LEGEND
HOSPITAL BED, HEADBOARD, BED LOCATOR AND PHYSIOLOGIC
MONITOR DOCKING STATION (BY WMC, INSTALLED BY GC)
DF
HOUSE
CART
LINEN
CART
HOUSEKEEPING CART (BY OTHERS)
DEFIBRILLATOR 40HX24WX24D (BY OTHERS)
LINEN CART 36"HX36"WX22"D (BY OTHERS)
CRASH CART (BY OTHERS)
ALL CONTRACTORS SHALL IMPLEMENT THE FOLLOWING NOTES IN ALL AREAS OF WORK:
1. OBTAIN INFECTION CONTROL GUIDELINES BEFORE CONSTRUCTION BEGINS.
2. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHODS BEFORE CONSTRUCTION BEGINS.
3. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO GOWN IN TYVEK SUIT. SUITS ARE REMOVED IN THE ANTEROOM BEFORE LEAVING THE WORK SITE.
4. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
6. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPMENT AIR FILTRATION UNITS.
7. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
8. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
9. WET MOP WITH DISINFECTANT.
10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS TO DESIGNATED ELEVATOR / SITE.
11. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
12. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES AND CLEARED BY ICRA
COMMITTEE MEMBER.
13. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
14. ROUTE FOR WASTE TRANSPORT MUST BE APPROVED.
15. GC SHALL HAVE ACCESS TO ELEVATORS FROM 7PM-6AM, ALL DAYS. GC SHALL PROTECT ELEVATOR AT START OF WORK EACH DAY AND SHALL REMOVE PROTECTION
AND LEAVE ELEVATOR BROOM CLEAN BY 6AM OF EACH DAY. IF DUST IS FOUND TO MIGRATE OUT OF SHAFT INTO OTHER SPACES OUTSIDE OF THE CONSTRUCTION SITE
AND THE GROUND FLOOR LEVEL, GC SHALL PROVIDE PLASTIC SEAL OVER ELEVATOR DOORS ON NORTH SIDE OF SHAFT ON 7TH FLOOR AND/OR ALL DOORS ON OTHER
FLOORS OPENING ON TO THIS SHAFT.
FURNITURE/ PLUMBING LEGEND
SYMMONS # 1-801S-458-FSB. HYDAPIP SURFACE MOUNTED
SHOWER SYSTEM WITH HAND SPRAY.
PL-10
PL-5
PL-3
PL-2
CORIAN INTEGRAL SINK MODEL #820 WITH SLOAN FAUCET ETF-700-4-BDM: 4
TRIM PLATE, PLUG-IN TRANSFORMER, BELOW DECK MECHANICAL MIXING
VALVE. TRANSFORMERS: ETF-233 120 VAC/24 VAC, 50/60 HZ (35 VA). 30
SECOND TIME OUT. SEE MEP DRAWINGS. SEE TYPICAL MOUNTING HEIGHTS
SHEET AND F-2.7 FOR DETAILS.
PL-6
FIAT SB SERIES SB2424. PRECAST TERRAZZO ONE PIECE MOP
BASIN WITH 6” HIGH CURB.
ELKAY LUSTERTONE DEEP SINGLE BOWL SINK #LR2522; SINGLE
HOLE; ELKAY #LK500GN05L2 GOOSENECK COMMERCIAL FAUCET;
DUAL PADDLE CONTROL.
NURSE STATION TASK CHAIR (BY OTHERS)
LOUNGE TASK CHAIR (BY OTHERS)
5H 42
OFFICE GUEST CHAIR (BY OTHERS)
DESK WITH RETURN AND OVERHEAD CABINETS (BY OTHERS). DIMENSIONS
VARY BY ROOM. COORDINATE BLOCKING LOCATIONS WITH FURNITURE
VENDOR.
REF
MED
REF
MEDICATION REFRIGERATOR: 34.5"X27"X28" (BY OTHERS).
GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.
"B" SHOWER SEAT: BOBRICK FOLDING SHOWER SEAT WITH PADDED
CUSHION #B-517 / B-518 (SEE PLAN FOR R/L ORIENTATION).
WALL MOUNTED PAPER TOWEL DISPENSER: G.C. TO CONFIRM MODEL WITH
W.M.C.
WALL MOUNTED PAPER TOWEL DISPENSER AT VANITY: G.C. TO CONFIRM
MODEL WITH W.M.C.
WALL-MOUNTED PAPER TOWEL/WASTE DISPOSAL UNIT: BOBRICK# B-43699,
SATIN STAINLESS STEEL FINISH.
CB
O2
CONFIDENTIALITY BIN 36"HX19"WX19"D (BY OTHERS)
OXYGEN CART 4512"HX231
2"WX18"D (BY OTHERS)
FAP FIRE ALARM PANEL EXISTING TO REMAIN
FIRE ALARM PULL EXISTING TO BE RELOCATED.FP
PROVIDE BLOCKING AS REQUIRED FOR ALL WALL MOUNTED
EQUIPMENT AND MILLWORK, TYP. COORDINATE LOCATIONS AND WITH
ARCHITECT AND WMC.
TEMPORARY PARTITION TO BE INSTALLED IN THIS AREA. SEE
PARTITION AND PHASING PLANS.
FHCFIRE HOSE CABINET EXISTING TO REMAIN
SRA
SIMPLEX (FIRE ALARM) REMOTE
ANNUNCIATOR.EXISTING TO BE RELOCATED.
CODE
CART IV
CODE CART (WITH IV POLE, SHARPS AND OXYGEN TANK ATTACHED):
55"HX38"WX25"D (BY OTHERS)
CENTRAL LINE CART: 47"HX32"WX24"D (BY OTHERS)
GOMCO SUCTION: 33-1/2"HX16"WX16"D (BY OTHERS).
LINE
CART
GS
ROLLING BLOOD PRESSURE MACHINE 54"HX20"WX20"D (BY OTHERS).BP
WOW: LAP-TOP WITH CART 44"HX30"WX24"D (BY OTHERS).WOW
SCALE HOYER: 50"HX28"WX48"D (BY OTHERS).
SAGE WARMER: 52"HX32"WX20"D (BY OTHERS).
SCALE WHEELCHAIR: 50"HX24"WX36"D (BY OTHERS).
SCALE
HOYER
SGW
SC
WC
PYXIS COMPUTER CART: 57"HX23"WX28"D (BY OTHERS)
PYXIS STORAGE CART: 48"HX23"WX27"D (BY OTHERS)
PYXIS TOWER: 78"HX30"X28"D (BY OTHERS)
PYXIS
CC
PYXIS
SC
PYXIS
TWR
COPY/
FAX
COPY AND FAX MACHINE: 45"HX39"WX49"D (BY OTHERS).
GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.
NDL/
STRNEEDLE/SYRINGE STORAGE 79-1/2"HX31"WX28D" (BY OTHERS)
TM
SHP
SHARPS WALL MOUNTED DISPOSAL 22"HX14"WX8"D (BY OTHERS)
PACS MONITOR 13"HX16"WX6"D -- 18"H WITH STAND ( BY OTHERS).
PREMISE MONITORS 13"HX16"WX6"D EACH -- TWO STACKED TOTAL 30- 12"H
WITH STAND (BY OTHERS).
NURSE CALL MONITOR 11"HX14"WX6"D EACH -- 18"H WITH STAND
(BY OTHERS).
KEYBOARD, CPU, AND MONITOR (BY OTHERS)
ELECTRONIC WHITE-BOARD, DIMENIONS TBD (BY OTHERS). GC TO PROVIDE
BLOCKING AND COORDINATE POWER. COORDINATE FINAL LOCATION AND
TYPE WITH WMC.
WS STANDARD WASTE RECEPTACLE 31"HX20"WX16"D (BY OTHERS)
EWB
TRANSPORT MONITOR 12"HX12"WX12"D (BY OTHERS)
a
b
c
d
THREE SEAT GANGED LOUNGE CHAIR (BY OTHERS)CRASH
CART
CHEMO
BIN
RED
WASTE
BINRED WASTE BIN (BY OTHERS).
CHEMO BIN (BY OTHERS)
CA
PL-13
ELKAY LUSTERTONE DEEP SINGLE BOWL SINK #DLFR(Q)191810;
SINGLE HOLE; ELKAY #LK500GN05L2 GOOSENECK COMMERCIAL
FAUCET; DUAL PADDLE CONTROL.
FUTURE TV (BY OTHERS). GC TO PROVIDE BLOCKING AND COORDINATE
POWER. COORDINATE FINAL LOCATION AND TYPE WITH WMC.FTV
RECESSED DIALYSIS CONNECTION. MATCH MOUNTING HEIGHTS TO 7
SOUTH.
FUTURE LOCATION FOR TV, TYP. .
KOHLER KINGSTON ADA-COMPLIANT, WALL-MOUNTED, REAR-SPUD TOILET
#K-4330-0:COLOR WHITE; SLOAN UPPERCUT DUAL-FLUSH FLUSHOMETER
#WES-111; SEE MEP DRAWINGS. KOHLER LUSTRA OPEN FRONT SEAT WITH
ANTI-MICROBIAL AGENT #K-4670-CA. SEE TYPICAL MOUNTING HEIGHTS
SHEET.
BEDSIDE GUEST CHAIR (BY OTHERS)
PL-14
KOHLER MORNINGSIDE WHEELCHAIR LAVATORY K-12638 WITH SLOAN FAUCET
ETF-700-4-BDM;4 TRIM PLATE, PLUG-IN TRANSFORMER, BELOW DECK
MECHANICAL MIXING VALVE. TRANSFORMERS: ETF-233 120 VAC/24 VAC, 50/60
HZ (35 VA). 30 SECOND TIME OUT. SEE MEP DRAWINGS.
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
TELE758
STAFF LOUNGE778
ELEVATOR LOBBY700
WOMEN746
MEN745
PANTRY762ANCS
760ELEC761
ON CALL748
ON CALL748b
WC749a
NURSE7s
STATION
MEDICATION759
MEDICATION752
HOOD756
JC753
FAMILY 754
LOUNGE
PATIENT ROOM712
PATIENT ROOM711
NURSE MGR.751c
WC750
PATIENT ROOM710
PATIENT ROOM709
PATIENT ROOM708
PATIENT ROOM707
PATIENT ROOM706
PATIENT ROOM705
PATIENT ROOM704
PATIENT ROOM703
PATIENT ROOM702
PATIENT ROOM701
PATIENT ROOM713
PATIENT ROOM714
PATIENT ROOM715
PATIENT ROOM716
PATIENT ROOM717
PATIENT ROOM718
PATIENT ROOM719
PATIENT ROOM720
PATIENT ROOM722
O
VV
O
AA
V O
A
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E E E
E
E E
E
E
E
E
E E
E
E E
E
E E E
E
E
E E
EE
E
E E
E E
E
STAIR
---CM CM
CM CM
ON CALL748c
EQUIPMENT765
SH
ELV
. C.HOOD757
CH
EM
O H
OO
D(D
UC
TE
D)
LA
MIN
AR
FL
OW
HO
OD
ANTE RM755
SH
ELV
.S
HE
LV
.
PHARMACY752a
MG
MG
NURSE PRACTITIONER764
LOCKER ROOM778b
OFFICE775c
ELECT. CLOS.
766b
PATIENT LOUNGE769
PATIENT ROOM744
PATIENT ROOM743
PATIENT ROOM742
PATIENT ROOM741
PATIENT ROOM740
PATIENT ROOM739
PATIENT ROOM738
PATIENT ROOM737
PATIENT ROOM736
PATIENT ROOM735
PATIENT ROOM734
PATIENT ROOM723
PATIENT ROOM724
PATIENT ROOM725
PATIENT ROOM726
PATIENT ROOM727
PATIENT ROOM728
PATIENT ROOM729
PATIENT ROOM730
PATIENT ROOM731
PATIENT ROOM732
PATIENT ROOM733
NURSE7N
STATION
DIRTY764b
LINEN ALCOVE765b
C.O.W
HOYER
LIFT
ME
D.
CA
RT
CODE
CART
W
H
C
W
H
C
W
H
C
W
H
C
HOCLEAN
764a
SUPPLY
SOCIAL749
WORKER
C.O.W.
C
CARMEL'S747
OFFICE
W
H
C
W
H
C
W
H
C
W
H
C
W
H
C
W
H
C
W
H
C
W
H
CW
H
C
W
H
C
W
H
C
W
H
C
W
H
C
W
H
C
W
H
W
H
C
CC
CC
FSU
PS
PS
FSU
36
P
36
PP
P
CC
CC
BB36
BB36
MG
FEC
E
EE
E
E EE
EE
EE
O
VV
O
AA
A
EE
EEE
E EE
EE
EE
O
VV
O
AA
E
EE
EEE
E EE
EE
EE
O
VV
O
AA
EE
EEE
E EE
EE
EE
OOV
V
AA
EE
EE
E
E
O
V O
V
A A
EE
EEE
E EE
EE
E O
VV
O
AA
EE
EEE
E EE
EE
EE
O
VV
O
AA
E
EE
EEE
E EE
EE
EE
O
VV
O
A
EE
EEE
E EE
EE
EE
O
VV
O
AA
EE
EEE
E EE
EE
EE
O
VV
O
AA
EE
EEE
E
E
E
CL
E
E
E
E
E
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CLCLCL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CLCL
CA
CODE
CART
M
CA
WL
LHWS
WL
REF
DF
PY
X
TM
PY
X
DD
A
PY
X
SM
HOUSE
CART
TV IV WL
IVC WL CR
AS
H
CA
RT
M
MED.
CART
PY
X
TM
PY
X
SM
PYXDM
PYX
DA
PY
X
DD
A
PYX
DM
PYX
DA
COF
ICE
REF/
FRZREF/
FRZ
UC EC SH
LIN
EN
CA
RT
REF/FRZ
MW
TV
TV
WS
CA
CA
WS
WSLH
WL
WL
WL
WL
WL
WL WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
LH
LH
LH LH
LH
LH LH LH LH
CA CA
CA CA
CA CA CA CA CA
WL
WL
LHWS
WS
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
LH LH LH LH LH LH LH LH LH LH
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WSWS WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WLS H S H S H S H S H S H S H S H S H S H S H
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TVTVTV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
ABCDEFGHIJKL
1
2
3
4CHEMO
BIN
SH
ELV
.
RED
WASTE
BIN
PA
SS
-T
HR
U
36
365H
30
5H
30
5H
stack of
4 extra chairs
O
V
A
V
A
O
5H
3'-0"
4'-0"
4'-0"
4'-0"
COPIER
3'-3"3'-3"
NURSE PRACTITIONER764
36 5H
COPIER
3'-3"3'-3"
---765
MGE
MGE
FHC
E
FEC
FHCE
EWB
EXAM 771
ROOM
NOURISHMENT780
STATION
CLEAN HOLDING778
ROOM
SOILED777
HOLDING
REST 776
ROOM
NURSE7N
STATION
MEDICATION774
JAN. CL.773
TELE768
CLEAN HOLDING #2772
EQUIP. 782
STORAGE
EQUIP. 779
STORAGE
ICE
CORRIDOR 7NW
PATIENT ROOM721
TUBE FOOD781
STORAGE
REF
MW
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E E
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E E
EE
EE
E E
EE
EE
W
H
C
W
H
CS S
CO
PIE
R
S SS S S SS S S
C
W
H
WH
C
TV
STAIR
---
E
E
E
SC
SC
HOUSE
CART
O
V
A
V
A
O
PL-3
PL-2
PL-3
PL-2
PL-3
PL-2
PL-3
PL-2
PL-3
PL-2
PL-3
PL-2
PL-3
PL-2 PL-2
PL-3
PL-2
PL-3
PL-2
PL-3
PL-2
PL-3
PL-10
PL-10
PL-11
PL-3
PL-3
PL-2
PL-3
PL-2
PL-3 PL-3PL-3 PL-3 PL-3 PL-3 PL-3 PL-3 PL-3
PL-6PL-2
5H
42
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CRASH
CART
EC UC
PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5
PL-5
PL-5PL-5PL-5PL-5PL-5PL-5PL-5PL-5PL-5PL-5
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
S
36
36
P
H H H H H
HHHHH
H H H H
HHHHHH
FP
E
EE
EE
E
H
PL-13
PL-5SB
SB
SC
SC
SC
CORRIDOR 7NE
POTENTIAL HOIST
LOCATION, IF
AUTHORIZED BY
OWNER
KRR
SRA, RFP, R
31
1
2
2
2 32
3
1
3
1
2
E
5H
5H
5H
5H
5H 60
36
72
72
84
PYXIS
CC
PYXIS
SC
PL-11
WOW
MED
REF
NDL/
STR
PYXIS
IVDD
SHP
PYXIS
CC
PYXIS
SC
WOW
MEDREF
NDL/
STR
PYXIS
IVDD
SW
SW
TM
TM
d
a
a
a
a
a
a
a
a
a
cb
cb
a
a
P
EWB
SHP SHP SHP SHP SHP SHP SHP SHP SHP SHP SHP
SHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHP
CODE
CART IVDF
LINE
CARTGS
BP
BP
EKGWOW
WOW
WOW WOW
WOW
WOW
SCALE
HOYERLINEN
CART
SGW
SGW
SC
WC
CB
O2
CB
O2
SW SW SW SW SW
SW SW
SW SW SW SW
SW SW SW SW SW SW SW SW SW SW
CA CA CA CA CA
CA CA
CA CA CA CA
CA CA CA CA CA
LH LH LH LH LH LH LH LH LH LH LH
LHLHLHLHLHLHLHLHLHLHLH
S
CA CA
CA CACA CACA CACA CACA
CLOSET766 SHP
CA CA CA CA CA CA
CA CACA CACA CACA CACA
H
ADA RESTROOM766a
ELEVATOR LOBBY700N
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
TV
CL
TV
CL
PL-14 PL-1A
SW
Project No. 06-104.024
No. Date Description
REVISIONS
01 05.22.09 FOR DEMOLITION
copyright date: 05.01.09
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
Valhalla Campus
Valhalla, New York 10595
Westchester Medical Center
Main Building
7 North Renovation
BAM StudioSecond Floor415 West Broadway
New York, NY10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
NORTH
02 06.18.09 FOR COORDINATION
03 07.02.09 FOR MEP COORDINATION
04 07.10.09 FOR PRICING
05 08.04.09 FOR CLIENT REVIEW
06 08.19.09 FOR PRICING
CMC-7121 7 South Change Order N-1 GC/H/E/P
OGS-S4963
07 09.22.09 FOR ABATEMENT COORDINATION
10.26.09 FOR CLARIFICATION
08.28.09 FOR CLARIFICATION
08 11.24.09 FOR PERMIT AND CONSTUCTION
A-701.0.0
SEVENTH FLOOR
FURNITURE, FIXTURES
AND EQUIPMENT PLAN
FURNITURE, FIXTURES AND EQUIPMENT PLANA-701
1SCALE:1/8"=1'-0"
1
1
1
11
1
1
1
1
1 1 1 1 1 11 1 1 1
11 1 1 1 1 1 11 1 1 1
1
1
1
1
1
1
1
1
ACYLIC LENS1
4" SEMI-OPAQUEPLEXIGLASS.
SOLID SURFACE
WORKSTATIONS.
SOLID SURFACE
WORKSTATION.SOLID SURFACE
WORKSTATION.
GWB CEILING.
CHART RACK
SOLID SURFACE
WORKSTATION.
SLIDING DOORS. SLIDING DOORS.
SLIDING
CABINET
DOORS.
UNDERCABINET
LIGHT, TYP.7'-2"
DECORATIVE PANEL
BRACKET
PAPER CUBBIES
LATERAL FILE
RECESSED DOOR PULL:
SUGATSUNE HH-AS2, TYP.
LAMINATE
COUNTER
SUPPORTS
LIGHT
2'-10"
1'-8"
2'-6"
1'-1"HOLD
1'-1"HOLD
2'-6"
1'-8"
3'-0"
2'-0''
8" 8"
5"1'-3" 1'-3"
6"
3'-0"
14'' SATIN STAINLESS STEEL COUNTER SUNK TAMPER
PROOF SCREW (3)
3/4'' SATIN STAINLESS STEEL PANEL FASTENED
T0 PLYWOOD BACKING
(2) LAYERS OF 3 8''WACKY WOOD
HUNG ON Z CLIPS,
SHIPLOOSE
PLYWOOD STUD
PLASTIC LAMINATE
1/8'' PAINTED REVEAL
PLASTIC LAMINATE
PLYWOOD
BACKING
6" 2" x 2" STEEL TUBE WELDED TO STEEL PLATE
THAT IS BOLTED TO FLOOR SLAB, TYP.
SOLID SURFACE
COUNTER BELOW
EQEQEQEQEQEQ
EQEQEQEQEQEQ
15'-10''
2" 2"
2" 2"
5"
PLYWOOD STUD, TYP.
1'-512"
2'-7"
1'-512" 10'-101
2"
2'-7"
R6'-312"
1'-512"
R5"
R5"
1 12 "
R8'-3"
3"
3"3"
3"R5"
R5"
8"
1'-1012"
2'-0"R6'-312"
1'-1"
HO
LD
1'-1"
HO
LD CENTER POINT OF
RADIUS, TYP.
14'' SATIN STAINLESS
STEEL END CAP
COUNTER SUNK
TAMPER PROOF
SCREW (2)
18'' SATIN STAINLESS
STEEL PANEL
FASTENED T0
PLYWOOD BACKING
(2) LAYERS OF 3 8''WACKY WOOD
12''SOLID SURFACE
PLASTIC LAMINATE
2" x 2" STEEL TUBE BOLTED
TO FLOOR SLAB, TYP.
18'' SATIN STAINLESS
STEEL PANEL
1/8'' PAINTED REVEAL
PLYWOOD BACKING
34''
PLASTIC LAMINATE
18'' SATIN STAINLESS
STEEL EDGE PIECE
34''
34''
34''
34''
34'' PLYWOOD
STUD
4" PLASTIC LAMINATE
23
4''
23
4''
51 2"1
4'' SATIN STAINLESSSTEEL END CAP
COUNTER SUNK TAMPER
PROOF SCREW (2)
18'' SATIN STAINLESS
STEEL PANEL
FASTENED T0
PLYWOOD BACKING(2) LAYERS OF 3 8''WACKY WOOD
12''SOLID SURFACE
PLASTIC LAMINATE
2" x 2" STEEL TUBE BOLTED
TO FLOOR SLAB, TYP.
18'' SATIN STAINLESS
STEEL PANEL
1/8'' PAINTED REVEAL
PLYWOOD BACKING
PLASTIC LAMINATE
18'' SATIN STAINLESS
STEEL EDGE PIECE
PLASTIC LAMINATE
PLYWOOD STUD, TYP.
PLYWOOD STUD, TYP.
2'-0" 2
'-6"
PRINTER
SOLID SURFACE
WORKSTATION
1'-8"
10"
GROMMET HOLE
FOR ELECT./DATA
CABLES
4'-4"
2'-0"
7'-2"
10"
BRACKET
10'' SATIN STAINLESS
STEEL BASE TYP.
34' STAINLESS STEEL
P-LAM. SEE FINISH
SCHEDULE
SOLID SURFACE
WORK STATION
PRINTER
CABINET BEYOND
SOLID SURFACE COUNTER
SOLID SURFACE WORK
SURFACE
MILLWORK ACESS PANEL
BRACKET PLASTIC LAMINATE
SOLID SURFACE COUNTER
CONFIDENTIALITY BIN AND
OXYGEN NICHE
STAINLESS STEEL EDGE
PIECE
BRACKET
2'-6"
3'-6"
4'-2"
SATIN STAINLESS STEEL BASE
MILLWORK ACESS PANELMILLWORK ACESS PANEL
4'-2"
3'-7"
CONFIDENTIALITY
BIN
OXYGEN
TANK
STORAGE
STAINLESS STEEL
PANEL
SOLID SURFACE COUNTER
PLASTIC LAMINATE
SOLID SURFACE
ACRYLIC LENS
LIGHT
PENDANT
8"
3'-0"
6"
MGE
MGE
Project No. 06-104.024
No. Date Description
REVISIONS
01 05.22.09 FOR DEMOLITION
copyright date: 05.01.09
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
Valhalla Campus
Valhalla, New York 10595
Westchester Medical Center
Main Building
7 North Renovation
BAM StudioSecond Floor415 West Broadway
New York, NY10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
NORTH
02 06.18.09 FOR COORDINATION
03 07.02.09 FOR MEP COORDINATION
04 07.10.09 FOR PRICING
05 08.04.09 FOR CLIENT REVIEW
06 08.19.09 FOR PRICING
CMC-7121 7 South Change Order N-1 GC/H/E/P
OGS-S4963
07 09.22.09 FOR ABATEMENT COORDINATION
10.26.09 FOR CLARIFICATION
08.28.09 FOR CLARIFICATION
08 11.24.09 FOR PERMIT AND CONSTUCTION
A-502.0.0
SEVENTH FLOOR
SECTIONS AND DETAILS
SECTION THROUGH NURSE STATION MILLWORKA-502
1SCALE: 1"-1'-0"
SECTION THROUGH NURSE STATION MILLWORKA-502
2SCALE: 1"-1'-0"
SECTION THROUGH NURSE STATION MILLWORKA-502
3SCALE: 1"-1'-0"
PLAN SECTION THROUGH NURSE STATION MILLWORKA-502
8SCALE: 1"-1'-0"
PLAN SECTION THROUGH NURSE STATION MILLWORKA-502
5SCALE:1"-1'-0"
1
A-502
6
A-502
8
A-502
PLAN SECTION THROUGH NURSE STATION MILLWORKA-502
6SCALE: 1"-1'-0"
NURSE STATION FLOOR PLAN A-502 3/8"= 1'-0"
5
A-502
9
A-502
ELEVATION NURSE STATION MILLWORKA-502
9SCALE: 1"-1'-0"
4
A-502
ELEVATION NURSE STATION MILLWORKA-502
4SCALE: 1"-1'-0"
ELEVATION NURSE STATION MILLWORKA-502
7SCALE: 1"-1'-0"
7
A-502
3
A-502
1
A-503
1
1
11
1 1
2
A-502
5
A-502
1
MONITOR
MONITOR MONITOR MONITOR
ALIGN GWB LIGHT COVE
BEYOND
GWB LIGHT SOFFIT
MILLWORK
PANEL.
ACT CEILING.
STAINLESS STEEL
PANEL MOUNTED TO
MDF BACKING. CENTER
PANEL ON CENTERLINE
OF HANDRAIL AS
INDICATED. SEE FINISH
LEGEND.
BASE, SEE
FINISH PLAN.
C
CORNER
GUARD
HANDRAIL.
PROVIDE BACKING FOR
MOUNTING BRACKETS
AS NECESSARY.
L
EQ
EQ
10"
3'-0"
MILLWORK
PANEL.
MILLWORK
PANEL.
STAINLESS
STEEL CORNER
GUARD
GWB
PARTITION.
HO
LD
, T
YP
. F
OR
AL
L H
AN
DR
AIL
S
STAINLESS
STEEL EDGE
2'-4"
J CLIP
WALLCOVERING
12" THK. SIDE FACE W/ TRIM
METAL STUD FRAMING
LIGHT FIXTURE,SURFACE-MOUNTED
MIRROR, FLUSH-MOUNTEDIN CORIAN
SENSOR-ACTIVATED FAUCET.SEE PLUMBING DRAWINGS.
STEEL FRAMING TIED BACK TOPARTITION BLOCKING.
12" THK. BOWL #820 SEE
FFE/ FINISH PLAN.
SEE MEP DRAWINGS FORPLUMBING DETAILS
MDF W/ P-LAM
METAL STUD FRAMING
12" THK. SOLID SURFACE W/ FACE TRIM, 1"
RADIUS. PROVIDE BLOCKING BEHIND ALLRADII, AS SHOWN. PROVIDE BLOCKING INPARTITION BEHIND THROUGHOUT, ASNECESSARY, TYP. SEE FINISH PLAN FORALL MATERIAL SPECIFICATIONS.
WALL-MOUNTED DISPENSERS,PROVIDED BY CLIENT
12" THK. SOLID SURFACE W/
FACE TRIM, 5" RADIUS
6" RADIUS
12" THK. SOLID SURFACE INTERIOR
ENCLOSURE
712"
14" RADIUS
MDF W/ P-LAM FACE,REMOVABLE W/ Z CLIPS.
STEEL FRAMING TIED BACK TOPARTITION BLOCKING.
8"
2'-3"
6"
12" THK. MDF W/ P-LAM
95°
1'-8
1 2"
WOOD BLOCKING, TYPICAL.
LOCATION OF ELECTRONICFAUCET CONTROL. COORDINATEWITH ELECTRIC DRAWINGS.
STEEL TUBE SINKSUPPORT AND FLANGE
VP
2'-10"
2'-0"
1'-7
1 2"
FACE, SEE SECTION FOR
MORE INFORMATION..
12" THICK SIDE PANEL,
BOTH SIDES, PROVIDE
BLOCKING SUPPORT
THROUGHOUT.
CORIAN W/ FACE TRIM
MDF PANEL W/ P-LAM
VISA LIGHTING ASTA
LIGHT FIXTURE -
SURFACE MOUNTED
4'-9"
5"
1'-6"
1'-4"
1'-2"
7"
8"
2'-4"
6"
LIGHT FIXTURE
CORIAN PANEL - 'AURORA'
LINE OF WALL-MOUNTED PAPER
TOWEL DISPENSER.
SENSOR-ACTIVATED
FAUCET. SEE
PLUMBING DRAWINGS.
12" THK. VANITY - 'CAMEL'
P.LAM SHROUD/
REMOVABLE PANEL
1"X1" METAL CORNER GUARD
(12" VISIBLE AT FRONT FACE)
CORIAN SINK #820 - 'BONE'
LINE OF CORIAN
CURVATURE, TYP.
LINE OF WALL BASE
MIRROR, FLUSH-
MOUNTED IN CORIAN
LINE OF CONCEALED, WALL-
MOUNTED SOAP DISPENSER.
PAINTED GWB
LINE OF DOOR FRAME
VP H
TV DISPLAY. SEE
FFE PLAN FOR
DETAILS
34" MDF DOOR W/
PLASTIC
LAMINATE,
TYP.SEE FINISH
PLAN
WOOD BLOCKING,
TYP.
1'-6"
EXISTING
PARTITION
WALL BASE
ADJUSTABLE
SHELF
1'-0"
1 1
2''
1 1
2''
1'-0"
STAINLESS STEEL
PANEL/CRASH
GUARD MOUNTED
TO MDF BACKING.
MILLWORK
P-LAM MILLWORK
PANEL, SEE FINISH
PLAN, TYP.
WALL BASE
EXISTING
PARTITION.
STAINLESS
EDGE TRIM.
STAINLESS STEEL
EDGE TRIM. FINISH
TO MATCH CRASH
GUARD.
ALIGN
STAINLESS STEEL
EDGE TRIM. FINISH
TO MATCH CRASH
GUARD.
ALIG
N
P-LAM MILLWORK
PANEL, SEE FINISH
PLAN, TYP.
34" MDF W/
PLASTIC
LAMINATE. SEE
FINISH PLAN
1 12" MDFCOUNTERTOP W/
PLASTIC LAMINATE.
SEE FINISH PLAN
BACKERBOARD
W/ PLASTIC
LAMINATE. SEE
FINISH PLAN
2'-0"
1'-0"
EXISTING
PARTITION
1"
1"
2'-6"
6'-1"
4"
6"
2'-0
"
312"
1'-0"
2" 8" 2"
1"
21 2"
8"
112" 61
2"4"
V.I.F.V.I.F.V.I.F.
ALIGN
34
"
2" 8" 2"
V.I.F.
6'-2
''
4'-5
1 2"
3'-3"
34''
11 2"
2'-012
"
V.I.F.
812"
112
"
1'-10"
11 2"
2'-9"3
'-3
''
RECESSED
DOOR PULL:
SUGATSUNE
HH AS2 METAL PLATE FOR TOUCH
AND RELEASE HARDWARE:
RECESSED METAL PLATE.
PROFILE AND DIMENSIONS
TO MATCH HAFELE MORTISE
PULL: ITEM: 151.01.729.
3.29''HX1.5''W. FINISH TO
MATCH CORNER GUARDS,
SEE FINISH PLAN.
1'-8 1/2''
MIN.
1'-2 ''
Project No. 06-104.024
No. Date Description
REVISIONS
01 05.22.09 FOR DEMOLITION
copyright date: 05.01.09
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
Valhalla Campus
Valhalla, New York 10595
Westchester Medical Center
Main Building
7 North Renovation
BAM StudioSecond Floor415 West Broadway
New York, NY10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
NORTH
02 06.18.09 FOR COORDINATION
03 07.02.09 FOR MEP COORDINATION
04 07.10.09 FOR PRICING
05 08.04.09 FOR CLIENT REVIEW
06 08.19.09 FOR PRICING
CMC-7121 7 South Change Order N-1 GC/H/E/P
OGS-S4963
07 09.22.09 FOR ABATEMENT COORDINATION
10.26.09 FOR CLARIFICATION
08.28.09 FOR CLARIFICATION
08 11.24.09 FOR PERMIT AND CONSTUCTION
A-501.0.0
SEVENTH FLOOR
SECTIONS AND DETAILSTYP. SECTION AT PATIENT ROOM ENTRY A-501
7SCALE: 1"-1'-0"
SECTION THROUGH SINK MILLWORKA-501
3SCALE: 1"-1'-0"
SECTION THROUGH SINK MILLWORKA-501
2SCALE: 1"-1'-0"
1
A-501
TYP. SECTION AT PATIENT ROOM ENTRY A-501
8SCALE: 1"-1'-0"
SECTION THROUGH PATIENT ROOM SINK VANITY MILLWORKA-501
1SCALE: 1"-1'-0"
PATIENT LOUNGE MILLWORK SECTIOA-501
5SCALE: 1"-1'-0"
PATIENT LOUNGE MILLWORK SECTIONA-501
6SCALE: 1"-1'-0"
SECTION THROUGH NURSE SERVER CABINETA-501
4BSCALE: 1"-1'-0"
PLAN SECTION THROUGH NURSE SERVER CABINETA-501
4DSCALE: 1"-1'-0"
4D
A-501
4C
A-501 PLAN SECTION THROUGH NURSE SERVER CABINETA-501
4CSCALE: 1"-1'-0"
SECTION THOUGH CORNER GUARD A-501
9SCALE: 1"-1'-0"
8
A-501
SECTION THROUGH SINK MILLWORKA-501
3ASCALE: 3"-1'-0"
3A
A-501
SECTION THROUGH SINK MILLWORKA-501
3BSCALE: 3"-1'-0"
3B
A-501
'OUTWATER' SOSS INVISIBLE HINGE
WALL-MOUNTED DISPENSERS,
PROVIDED BY CLIENT.
SENSOR-ACTIVATED FAUCET.
SEE PLUMBING DRAWINGS.
12" THK. SOLID SURFACE INTERIOR
ENCLOSURE
14" RADIUS
12" THK. SOLID SURFACE W/ FACE TRIM,
1" RADIUS. PROVIDE BLOCKING BEHIND
ALL RADII, AS SHOWN. PROVIDE
BLOCKING IN PARTITION BEHIND
THROUGHOUT, AS NECESSARY, TYP.
SEE FINISH PLAN FOR ALL MATERIAL
SPECIFICATIONS.
12" THK. SIDE
FACE W/ TRIM
PLASTIC LAMINATE ON3
4'' MDF MILLWORKPANEL MOUNTED ON
J-CLIPS.
18'' REVEAL.
18'' THICK STAINLESS STEEL
CORNER GUARD, FINISH TO
MATCH STAINLESS STEEL CRASH
GUARD PANEL, SEE FINISH PLAN.
MDF W/ P-LAM FACE,
REMOVABLE W/ Z CLIPS.
MDF W/ P-LAM
METAL STUD FRAMING
LOCATION OF ELECTRONIC
FAUCET CONTROL. COORDINATE
STEEL FRAMING TIED
BACK TO PARTITION
BLOCKING.
12" THK. BOWL #820
SEE FFE/ FINISH
PLAN.
12" THK. MDF
W/ P-LAM
PATIENT ROOM WINDOW SHADE DETAILA-501
4SCALE: 1/2"-1'-0"
Z-CLIP
4A
A-501
PATIENT ROOM WINDOW SHADE DETAILA-501
4ASCALE: 3"-1'-0"
EXISTING STEEL
HEADER. MODIFY
EXISTING STEEL AS
NEEDED. COORDINATE
WITH STRUCTURAL
ENGINEER AND
ARCHITECT PRIOR TO
PERFORMING ANY STEEL
WORK.
EXISTING WINDOW
FRAME.
EXISTING WINDOW
ACT CEILING
C-CHANNEL
INDUCTION UNIT
COVER, SEE
FINISH AND
PARTITION PLAN
PATCH EXISTING GWB
FASCIA ABOVE WINDOW
HEADER, TYP.
FABRICATE NICHE FOR
RECESSED
MECHOSHADE MECHO/4
WIDE BRACKET WITH 2"
CLOSURE MOUNT AND
WALL ANGLE.
COORDINATE WITH
WINDOW SHADES. SEE
ELEVATIONS, FINISH
PLAN & DETAILS.
STEEL TUBE SINK SUPPORT ANF FLANGE
SECTION THOUGH CORNER GUARD A-501
10SCALE: 1"-1'-0"
WALL COVERING
TACK WALLCOVERING
BEHIND MILLWORK REVEAL.
4B
A-501
18'' REVEAL
TACK WALLCOVERING BEHIND
MILLWORK REVEAL
10
A-501
WALL BASE
WALL BASE
PAINTED WOOD
WEDGE IN REVEAL
9
A-501
REPLACE
INSULATION BELOW
WINDOWSILL 4A
A-501
PARTITION
1
1
1
1 1
1
1
1 1
1
11
TV TV2'-11
1 2"
3'-8"
2'-2"
1'-9''
23
4"
34
"
9"
6"
1'-0"
1"
2'-2"
1'-01
2"
EQ EQ
2'-6"
4'-11"
10" 6'-212"
1"5'-11" 6'-21
2"
1"10" 3'-9"3'-9"10" 10"
MGE
MGE
MGE
MGE
1'-3"
2'-0"
R2"
R5"2'-51
2"
11
'-7"
2'-512"
2'-0"
1'-3"
R5"
R2"R5"
R5"
2'-0"
1'-3"R
14
'-312"
61 2"
212"
2"
R18
'-512"
R14
'-412
"
2'-5
1 2"
R2"
41 2"
6'-91 2"
6'-3"
6'-5"
5'-11"
6'-9
1 2"
101 2"
2'-0
1 2"
1'-21 2"
2'-01 2"
1'-2
1 2"
R2'-7"
41 2"
R1'-912"
R6 1
2 "
R6"
R9"
101 2"
2'-51 2"
212"
11 2"
61 2"
1'-9"
R2"
R22'-4
"
R18
'-512"
R2"
1'-3"
1'-5
1 2"
R22
' -4"
1'-3
"1'-5 12 "
4'-7
"
2'-7"
2'-7"
4'-7" 21
2"
2"
212"
1"
11 2"
1"
R9"
9"
9"
1'-634"
6"
111
2"
7"
1"
6" 6"
1'-01
2"
1'-01
2"
1'-81
2"
2'-6"
512"
1112"
EQ
.
1"
2"
712"
23
4"
3"
34
"
EQ
.E
Q.
EQ
.E
Q.
EQ
.
2'-2"
6"
1'-01
2"
1'-01
2"
6" 6"
1'-01
4"
1'-63
4"
9"
MIN
.
Project No. 06-104.024
No. Date Description
REVISIONS
01 05.22.09 FOR DEMOLITION
copyright date: 05.01.09
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
Valhalla Campus
Valhalla, New York 10595
Westchester Medical Center
Main Building
7 North Renovation
BAM StudioSecond Floor415 West Broadway
New York, NY10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
NORTH
02 06.18.09 FOR COORDINATION
03 07.02.09 FOR MEP COORDINATION
04 07.10.09 FOR PRICING
05 08.04.09 FOR CLIENT REVIEW
06 08.19.09 FOR PRICING
CMC-7121 7 South Change Order N-1 GC/H/E/P
OGS-S4963
07 09.22.09 FOR ABATEMENT COORDINATION
10.26.09 FOR CLARIFICATION
08.28.09 FOR CLARIFICATION
08 11.24.09 FOR PERMIT AND CONSTUCTION
A-503.0.0
SEVENTH FLOOR
SECTIONS AND DETAILS
ELEVATION NURSE STATION MILLWORKA-503
11/2"=1'-0"
NURSE STATION FLOOR PLAN A-503 1/2"= 1'-0"
DETAIL NURSE STATION MILLWORKA-503
23"=1'-0"
DETAIL NURSE STATION MILLWORKA-503
41"=1'-0"
DETAIL NURSE STATION MILLWORKA-503
33"=1'-0"
1
A-503
2
A-503
4
A-503
3
A-503
METAL DIVIDERSLIDING
DOORS
CHART
RACK.
BEDBOARD
ACRYLIC
LENS.
COPIER/FAX
BEDBOARD
ACRYLIC LENSED LIGHT POCKETA-503
63"=1'-0"
LIGHT FIXTURE
ACRYLIC LENS
THUMB HOLE 36" O.C.
EM
EM EM
EM
OPEN
CORRIDOROPEN
CORRIDOR
1
1
1
METAL DIVIDER
SECTION NURSE STATION MILLWORKA-503
51/2"=1'-0"
BEDBOARD BEDBOARD
CHART RACK CHART RACK
CABINET CABINET
1
2 LAYERS OF
WACKY WOOD
WITH PLASTIC
LAMINATE FRONTICE, TYP.
5
A-503
18"X1
8" REVEAL.
METAL CHART DIVIDERS.
34" P-LAM DIVIDERS, TYP.
ACRYLIC LENS WITH
THUMBHOLES AT 36" O.C..
LIGHT FIXTURE.
1
34"
P-LAM
DIVIDER.
ANGLED METAL BRACKET.
METAL BRACKET.
34" P-LAM DIVIDERS, TYP.
LINE OF SLOT BEYOND
FOR METAL DIVIDER, TYP.
SLOT FOR METAL
DIVIDER, TYP.
METAL DIVIDER
SLOT FOR METAL
DIVIDER, TYP.
SLOT BELOW
FOR METAL
DIVIDER, TYP.
1
TELE758
STAFF LOUNGE778
ELEVATOR LOBBY700
WOMEN746
MEN745
PANTRY762ANCS
760ELEC761
ON CALL748
ON CALL748b
WC749a
NURSE7s
STATION
MEDICATION759
MEDICATION752
HOOD756
JC753
FAMILY 754
LOUNGE
PATIENT ROOM712
PATIENT ROOM711
NURSE MGR.751c
WC750
PATIENT ROOM710
PATIENT ROOM709
PATIENT ROOM708
PATIENT ROOM707
PATIENT ROOM706
PATIENT ROOM705
PATIENT ROOM704
PATIENT ROOM703
PATIENT ROOM702
PATIENT ROOM701
PATIENT ROOM713
PATIENT ROOM714
PATIENT ROOM715
PATIENT ROOM716
PATIENT ROOM717
PATIENT ROOM718
PATIENT ROOM719
PATIENT ROOM720
PATIENT ROOM722
STAIR
---
BBBB
B
BB
BB
BB
BB
BB
BB
BB
B
B B
BB
B B
BB
B B
BBBB
B B B B
B
B B
B B
B B
B
B B B
B
B B
B B
B B
B B
B B
B B
B
B
B B
B B
B
B
B B
B
B
B B
B
BB
B BB
BB
BB
BB
BB
BB
BB
BB
B
B
A2
A
A
A
A
A
A
A
A
A
A
A
AA
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A A
A
A
A
A
D
8'-10" A
8'-10" A8'-10" A8'-10" A8'-10" A
8'-10" A
8'-10" A 8'-10" A 8'-10" A 8'-10" A 8'-10" A
8'-10" A8'-10" A8'-10" A
8'-0" A
8'-0" F 8'-0" F 8'-0" F 8'-0" F 8'-0" F 8'-0" F 8'-0" F 8'-0" F 8'-0" F 8'-0" F 8'-0" F
8'-0" F8'-0" F8'-0" F8'-0" F8'-0" F8'-0" F8'-0" F8'-0" F8'-0" F8'-0" F8'-0" F
8'-0" G
8'-10" G
X'-X" C
8'-0" G
7'-11" C
8'-0" G 8'-0" G 8'-0" G 8'-0" G 8'-0" G
8'-0" G8'-0" G8'-0" G8'-0" G8'-0" G8'-0" G
8'-0" B
8'-0" B
8'-0" B
8'-0" B
8'-0" G
8'-0" B
CCCCCCCC C C C
CCCCCCCCCCC
G
G
F FF
8'-0" B 8'-0" B 8'-0" B
8'-0" C
8'-0" C
8'-0" G
A
A
AA
F
F
D D D D DDDDDD
D D D D D D D D D DD
7'-11" D
ON CALL748c
EQUIPMENT765
A
A
A
A
J J JJ
A
K KK KK K K K K KK
K K K K K K K K K K K
A
8'-0" B
A
A
8'-10" A 8'-10" A 8'-10" A 8'-10" A 8'-10" A 8'-10" A 8'-10" A 8'-10" A
F F
F
F
F
F F
F
C.HOOD757
A
ANTE RM755
A
A
A
A
L
L
LLL
LL
Q
Q
Q
N N N N N N N N N NN
N N N N N N N N N N
PHARMACY752a
A
NURSE PRACTITIONER764
LOCKER ROOM778b
OFFICE775c
ELECT. CLOS.
766b
PATIENT LOUNGE769
PATIENT ROOM744
PATIENT ROOM743
PATIENT ROOM742
PATIENT ROOM741
PATIENT ROOM740
PATIENT ROOM739
PATIENT ROOM738
PATIENT ROOM737
PATIENT ROOM736
PATIENT ROOM735
PATIENT ROOM734
PATIENT ROOM723
PATIENT ROOM724
PATIENT ROOM725
PATIENT ROOM726
PATIENT ROOM727
PATIENT ROOM728
PATIENT ROOM729
PATIENT ROOM730
PATIENT ROOM731
PATIENT ROOM732
PATIENT ROOM733
NURSE7N
STATION
DIRTY764b
LINEN ALCOVE765b
CLEAN764a
SUPPLY
SOCIAL749
WORKER
F
F
L
L
L L
L
F
F
Q
F
F
7'-11" C
A A
D2
BB
BB
D2
D2
J J JJ
D
CARMEL'S747
OFFICE
Q
8'-0" B
Q
D2
Q
Q
D
F F
F
F
8'-0" B
B
B
A
A
A
8'-0" B
8'-0" C
8'-0" C
8'-0" B
8'-0" B
8'-0" B8'-0" B
8'-0" B
8'-0" G
8'-0" B
8'-0" B
8'-0" B
8'-0" B
8'-0" G
8'-0" G
A AAA
AA
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S SS S
S S
S S
S S
S S
S S
S S S
S
A2
A2A2
A2 A2
A2A2
D
D
Q
Q
8'-0" A 8'-0" A 8'-0" A 8'-0" A 8'-0" A 8'-0" A 8'-0" A 8'-0" A 8'-0" A 8'-0" A
8'-0" A8'-0" A8'-0" A8'-0" A8'-0" A8'-0" A8'-0" A8'-0" A8'-0" A
8'-0" A
AA
8'-0" G
7'-11" C
8'-0" C
7'-11" C
7'-11" C
8'-0" B
A A A A A A A A A
A AAAAAA
A A
D2
D2 D2 D2 D2 D2 D2 D2D2 D2 D2 D2
D2 D2 D2
D2
D2 D2 D2D2
D2
A
D2
D
A
A
A
A
A
A
A
A
A
SC
SC
SC
SC
SC
SC
ABCDEFGHIJKL
1
2
3
4
N
N2
8'-0" C8'-0" C8'-0" C8'-0" C8'-0" C8'-0" C
7'-11" C
7'-11" C
7'-11" D
7'-11" D 7'-11" D 7'-11" D 7'-11" D
7'-11" D7'-11" D7'-11" D7'-11" D7'-11" D
7'-11" D
8'-0" C 8'-0" C 8'-0" C 8'-0" C
8'-0" G
A
NURSE PRACTITIONER764
---765
X-XXS
8'-0"E
EXAM 771
ROOM
NOURISHMENT780
STATION
CLEAN HOLDING778
ROOM
SOILED777
HOLDING
REST 776
ROOM
NURSE7N
STATION
MEDICATION774
JAN. CL.773
TELE768
CLEAN HOLDING #2772
EQUIP. 782
STORAGE
EQUIP. 779
STORAGE
CORRIDOR 7NW
PATIENT ROOM721
TUBE FOOD781
STORAGE
F
F
F
F
A
A
C
S
S
A
A
A
A
C
A
A
C
S
S
A
S
S
A
A
A
C
S
S
A
A
C
S
S
A
A
A
A
C
A
A
C
S
S
A
S
S
A
A
A
C
A
A
C
S
S
A
S
S
A
A A
A
S SAA
C C
A
A
C
S
S
A
A
A
C
S
S
A
A
A
C
S
S
A
A
A
C
S
S
A
A
A
C
S
S
A
A
A
C
S
S
A
C
A
A
A
S
S
C
A
A
A
S
S
C
A
A
A
S
S
C
A
A
A
S
S
C
A
A
A
S
S
Q Q
W
A
A
A
A
A
A
A
A
A
A
A
A
JJJ
A
W
W
W
Q
Q
Q
Q
J
JJJ
J
W
A2 A2
A2A2
A2 A2
A2A2
A
A
L
K K K K K K K K K K K
K K K K K K
A
F F
B B
B
B
B
B
B
B
B
B
A
A
A
A
A
G
F
7'-11" C
8'-0''G
7'-11" C
F
7'-11" C
B
B
B
B
BBB
B
B
B
B
B
B
B
BBBB
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
BBBBBB
B
B
B
BBBBBBBBBBBBBB
B B B B B B B
8'-0''G
8'-0''G
B
B
B
B
B
B
B
B
B
B
7'-11" C
7'-11" C
7'-11" C
7'-11" C
B B
AA
7'-11" D7'-11" D 7'-11" D 7'-11" D 7'-11" D
7'-11" D
7'-11" C
8'-0''C
8'-0''C8'-0''C8'-0''C8'-0''C
8'-0''C 8'-0''C 8'-0''C
8'-0''C
8'-0''C8'-0''G8'-0''G8'-0''G8'-0''G
8'-0''G
8'-0''G8'-0''G8'-0''G8'-0''G8'-0''G
8'-0''A
8'-0''G
8'-0''A
8'-0''A
8'-0''A
8'-10''A8'-10''A8'-10''A8'-10''A8'-10''A8'-10''A8'-10''A8'-10''A8'-10''A8'-10''A8'-10''A
8'-10''A 8'-10''A 8'-10''A 8'-10''A 8'-10''A 8'-10''A 8'-10''A 8'-10''A 8'-10''A 8'-10''A 8'-10''A
8'-10''A 8'-10''A
8'-0''F 8'-0''F
8'-0''F 8'-0''F 8'-0''F 8'-0''F8'-0''F8'-0''F8'-0''F8'-0''F8'-0''F
8'-0''F 8'-0''F 8'-0''F 8'-0''F 8'-0''F 8'-0''F 8'-0''F 8'-0''F 8'-0''F 8'-0''F 8'-0''F
8'-0''B
8'-0''B
7'-11" D7'-11" D7'-11" D
7'-11" D
7'-11" D
7'-11" D
8'-10''G
7'-11''C
7'-11''C
8'-10''G
8'-0''G
X' X''C
AA
BB
BBB B
A A
8'-0''G
8'-0''G
7'-11''C
F F
BB
F
8'-7" C 8'-7" C 8'-7" C 8'-7" C 8'-7" C 8'-7" C 8'-7" C 8'-7" C 8'-7" C 8'-7" C 8'-7" C
8'-7" C 8'-7" C8'-7" C8'-7" C8'-7" C8'-7" C8'-7" C8'-7" C8'-7" C8'-7" C8'-7" C
8'-0''A
8'-0''A
STAIR
---F F
Q
A A A A A A A A A A A
AAAAAAAAA
SC
SC
7'-11''C
K KKKK
8'-0''G
Q
F
SC
SC
SC
7'-11" A
8'-7" C
CORRIDOR 7NE
POTENTIAL HOIST
LOCATION, IF
AUTHORIZED BY
OWNER
31
1
2
2
2 32
3
1
3
1
2
7'-11''C
8'-0''A
A A
F
F
F
F
W
CLOSET766
F
8'-0" C
8'-0''C
ADA RESTROOM766a
AA
ELEVATOR LOBBY700N
6'-8''C
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U2
U1
U2
V
V
U
U
U
V
U
U
U
V
G
REMARKS
NOTE:
SYMBOL DESCRIPTION
REFLECTED CEILING PLAN LEGEND
SUBSCRIPT 'E' DENOTES EXISTING TO REMAIN
SUBSCRIPT 'R' DENOTES EXISTING TO BE RELOCATED
1. SEE ELECTRICAL DRAWINGS FOR LOCATIONS OF EMERGENCY FIXTURES. SEE PC PLAN FOR LOCATION OF HILL-ROM DEVICES.
2. SEE MEP DRAWINGS FOR LOCATIONS OF ALL CEILING MOUNTED DEVICES.
3. COORDINATE LOCATIONS OF ALL CEILING MOUNTED DEVICES WITH CEILING GRID, LIGHT FIXTURES AND ARCHITECT IN FIELD.
A
U
2'-0"x 2'-0" RECESSED CEILING MOUNT LENSED
FLUORESCENT
LIGHTOLIER SILVERESCENT 2' x 2' RECESSED FLUORESCENT STATIC LENS TROFFER #
EX-S-2-G-FS-VA-2-U4-277V-SB; 277V ELECTROLIC RAPID-START BIAX BALLAST; (2) T8 LAMPS.
3'-0" LINEAR FLUORESCENT MOUNTED ABOVE MILLWORKLEGION SERIES 1520; MINI-STAGGERED CHANNEL; 1520-225-3 EBO-DIM-SYM; DIMENSIONS: 4"WX36"LX2 5
8"H(NOMINAL LENGTH: 39"); LAMP: (2) FO25-OCT - T8; REMOTE ELECTRONIC RAPID-START BALLAST. PROVIDE
CUSTOM ACRYLIC LENS FOR INFECTION CONTROL, SEE ELEVATIONS AND DETAILS.
6" COMPACT FLUORESCENT DIMMABLE DOWNLIGHTLIGHTOLIER CALCULITE; COMPACT FLUORESCENT HORIZONTAL OPEN DOWNLIGHT; REFLECTOR:
8031-CCLW-PC8; COMFORT CLEAR FINISH, WHITE TRIM RING; FRAME-IN KIT: 6132B-U-PC8; ELECTRONIC RAPID
START BALLAST; LAMP: (1) 32W TTT. COORDINATE WITH EXISTING BUILDING SWITCHING CONTROLS.
P FLUSH CEILING/WALL MOUNT
SPEAKER
SPEAKERS FURNISHED BY CLIENT, INSTALLED BY CONTRACTOR. CONTRACTOR TO RUN 16 GA.
PLENUM RATED STEREO SPEAKER WIRE TO SPEAKER LOCATIONS.
B6" COMPACT FLUORESCENT DIMMABLE WALLWASHER
LIGHTOLIER CALCULITE; COMPACT FLUORESCENT HORIZONTAL OPEN WALLWASHER; REFLECTOR:
8081-CCLW-PC8; COMFORT CLEAR FINISH, WHITE TRIM RING; FRAME-IN KIT: 6132BCU3; DIMMING BALLAST; LAMP:
(1) 32W TTT. ARROW INDICATES DIRECTION OF REFLECTOR. COORDINATE WITH EXISTING BUILDING SWITCHING
CONTROLS.
C FLUSH-MOUNTED FLUORESCENT CEILING FIXTURETECH LIGHTING BOXIE CEILING COLLECTION 700BXLS-CF SURFACE MOUNTED. ELECTRONIC BALLAST. LAMP: (2)
13W 2GX7 BASE TWIN TUBE. DIMENSIONS: 9"x9"x2.2" HIGH
F
G FLUORESCENT WALL SCONCESHAPER SERIES 652 FLUORESCENT INTERIOR WALL LUMINAIRE #652-CFL/1-120V-NA; DIMMING BALLAST; (1) 32W
LAMP. SEE ELEVATIONS FOR MOUNTING HEIGHTS.
JHALOGEN PENDANT FIXTURE
MONORAIL LIGHTING ONYX TEARDROP PENDANT LIGHT #HS178; BRONZE FINISH; 35W MR16 HALOGEN LAMP;
12V MINIATURE ELECTRONIC TRANSFORMER.
LIGHTOLIER ALTER SOFT LIGHTS 2'x4' INDIRECT FLUORESCENT 2 LAMP, T8 18" DEEP MICROPERFORATED MESH
LAMP SHIELD. #QVS2GPFOS232277SR; 277V ELECTRONIC RAPID START BALLAST. G.C TO COORDINATE NUMBER
OF FIXTURES WITH LENGTHS OF RUNS.
VANITY FIXTURE
L 2'x4' LIGHTOLIER FLUORESCENT DIRECT/INDIRECT
FIXTURE
QUNDER-COUNTER TASK LIGHTING
LIGHTOLIER PRISTINE HW SERIES TASK LIGHT #PC2W13T2 120V;PT;HW; 22" LENGTH.
SEE TYPICAL MOUNTING HEIGHTS SHEET. GC TO CENTER FIXTURE RUNS WITHIN OPENINGS, G.C TO
COORDINATE NUMBER OF FIXTURES WITH LENGTHS OF RUNS.
SHAPER 605 SERIES INTERIOR WALL LUMINAIRE #605-25-T5/2/14-120V-SCL-DL. 25" LENGTH; (2) 14W T5 LAMPS;
120V BALLAST; LACQUERED SATIN CHROME FINISH; DAMP LOCATION. INSTALL FIXTURE ABOVE MIRROR, TYP.
HILL-ROM SPECIALITE WALL-MOUNTED PATIENT LIGHT #P645; (4) 48" T8 BULBS; 25W RAPID-START BALLAST.
LIGHT PROVIDED BY CLIENT; GC TO PROVIDE WIRING AND INSTALLATION.WALL-MOUNTED BEDLIGHT
CEILING-MOUNT SECURITY CAMERA COORDINATE WITH ENGINEERING DRAWINGS AND WMC.SC
VISA LIGHTING CB6504 CUSTOM 14" LENGTH. LAMP: (1) FS 8W-BSIL-BSIL. 120 V. CENTERED ABOVE SINK.
COORDINATE WITH ELEVATIONS AND DETAILS.MILLWORK MOUNTED FLUORESCENT VANITY LIGHT
K 2" ADJUSTABLE RECESSED FIBER-OPTIC DOWNLIGHT
FIBERSTARS FUTURA ADJUSTABLE RECESSED ACCENT FIXTURE #FE-1604; ALUMINUM FINISH; 25° BEAM
SPREAD; 75 FSPT FIBERS PER FIXTURE. ILLUMINATOR: FIBERSTARS ILLUMINATOR #405N; SPECIAL 400 FIBER
CAPACITY; NO COLOR FILTER; DIMMING WHEEL; 277V. GC TO COORDINATE LOCATIONS AND QUANTITIES OF
ILLUMINATORS. ALL FIBERS TO BE EQUAL LENGTH.
W DIMMABLE LINEAR FLUORESCENT MOUNTED IN COVE
LEGION SERIES 820; REMOTE STAGGERED CHANNELS; 820-260 EBO; LENGTH: VIF; LAMP: (2) 40W T8; REMOTE
DIMMABLE BALLAST. PROVIDE COMBINATION OF LENGTHS AS NECESSARY TO FIT IN RUN OF COVE. PROVIDE
CUSTOM ACRYLIC LENS FOR INFECTION CONTROL.
U1
U2
4'-0" LINEAR FLUORESCENT MOUNTED ABOVE MILLWORK
5'-0" LINEAR FLUORESCENT MOUNTED ABOVE MILLWORK
DIMMABLE LINEAR FLUORESCENT BELOW MILLWORKBARTCO LIGHTING BFL281; LOW PROFILE LINEAR T5 FLUORESCENT WITH INTEGRAL DIMMING BALLAST;
LENGTH: 58"; LAMP: (1) 35W T5; PROVIDE UNIVERSAL OPAL LENS WITH SNAP-ON COVER (LNO).V
LEGION SERIES 1520; MINI-STAGGERED CHANNEL; 1520-232-4 EBO-DIM-SYM; DIMENSIONS: 4"WX48"LX2 58"H
(NOMINAL LENGTH: 51"); LAMP: (2) FO32-OCT - T8; REMOTE ELECTRONIC RAPID-START BALLAST. PROVIDE
CUSTOM ACRYLIC LENS FOR INFECTION CONTROL, SEE ELEVATIONS AND DETAILS.
LEGION SERIES 1520; MINI-STAGGERED CHANNEL; 1520-240-5 EBO-DIM-SYM; DIMENSIONS: 4"WX60"LX2 58"H
(NOMINAL LENGTH: 63"); LAMP: (2) FO40-OCT - T8; REMOTE ELECTRONIC RAPID-START BALLAST. PROVIDE
CUSTOM ACRYLIC LENS FOR INFECTION CONTROL, SEE ELEVATIONS AND DETAILS.
8'-0" CEILING HEIGHT TYPICAL U.O.N.B 9'-0"
REMARKSDESCRIPTIONSYMBOL
CEILING TYPE LEGEND
CEILING TYPE /
CEILING HEIGHT
B NOT USED NOT USED.
CEILING GRID: ARMSTRONG SUSPENSION SYSTEM WITH15
16" CLEAN ROOM GRID. CEILING TILE: 2' x 2' x 58" THICK
CLEAN ROOM VL 868, TYPICAL. PAINT ALL EXPOSED
CUT EDGES WITH MANUFACTURER'S RECOMMENDED
PAINT SPECIFICATION.
SEE GENERAL NOTES FOR INSULATION REQUIREMENTS
ON UNDERSIDE OF SLAB ABOVE.
2'x2' ACOUSTICAL
CEILING TILEA
FURNISH AND INSTALL EDGE BEAD WITH JOINT
COMPOUND AT ALL EXPOSED GYPSUM WALLBOARD
EDGES. TAPE SPACKLE AND PREPARE FOR NEW FINISH.
SEE SECTIONS AND DETAILS. PROVIDE FACED
INSULATION SECURED TO UNDERSIDE OF SLAB ABOVE.
GYPSUM WALLBOARD
CEILING WITH GWB FASCIA
AT CEILING HEIGHT
CHANGES
C
SEE FINISH PLAN FOR VENEER SPECIFICATIONS.MDF CEILING SOFFIT W/
WOOD VENEERD
---EXISTING CEILING TO
REMAINE
FURNISH AND INSTALL EDGE BEAD WITH JOINT
COMPOUND AT ALL EXPOSED GYPSUM WALLBOARD
EDGES. TAPE SPACKLE AND PREPARE FOR NEW FINISH.
SEE SECTIONS AND DETAILS. SEE GENERAL NOTES
FOR INSULATION REQUIREMENTS ON UNDERSIDE OF
SLAB ABOVE.
MOISTURE-RESISTANT
GYPSUM WALLBOARD
CEILING WITH GWB FASCIA
AT CEILING HEIGHT
CHANGES
F
G
CEILING GRID: ARMSTRONG SUSPENSION SYSTEM15
16" PRELUDE XL GRID. CEILING TILE: 2' x 2' x 34" THICK
OPTIMA #3150, TYPICAL. PAINT ALL EXPOSED CUT EDGES
WITH MANUFACTURER'S RECOMMENDED PAINT
SPECIFICATION. SEE GENERAL NOTES FOR INSULATION
REQUIREMENTS ON UNDERSIDE OF SLAB ABOVE.
2'x2' ACOUSTICAL
CEILING TILE
S ---EXISTING SLAB
FIRE PROTECTION/LIFE SAFETY PLAN LEGEND
CEILING MOUNT/WALL
MOUNT SELF
ILLUMINATING EXIT LIGHT
DESCRIPTIONSYMBOL REMARKS
1. EXISTING FIRE PROTECTION AND LIFE SAFETY DEVICES, INCLUDING SPEAKERS, STROBES,
EMERGENCY FIXTURES, EXIT LIGHTS, SMOKE DETECTORS AND SPRINKLERS TO BE REUSED
TO FULLEST EXTENT POSSIBLE.
2. SEE ENGINEERING DRAWINGS FOR FIRE ALARM AND LIFE SAFETY DEVICES.
3. COORDINATE LOCATIONS OF ALL CEILING MOUNTED DEVICES WITH CEILING GRID, LIGHT
FIXTURES AND ARCHITECT IN FIELD.
NOTES:
RECESSED MOUNT, EDGE LIT. SHADED QUADRANT
INDICATES ILLUMINATED FACE. ARROWS INDICATE
DIRECTION OF TRAVEL. COORDINATE WITH
BUILDING STANDARD.
REFLECTED CEILING PLAN GENERAL NOTES
1. EACH FIXTURE LOCATED IN DROPPED ACOUSTICAL CEILING SHALL BE CENTERED ON
EACH 2'X2' TILE, AS SHOWN.
2. ALL ELECTRICAL SWITCHES AND COVER PLATES SHALL BE MOUNTED VERTICALLY,
STRAIGHT, AND ALIGNED, AND SHALL MATCH SPEC INFO AS NOTED.
3. CEILING SUSPENSION RODS AND BLACK IRONS SHALL BE HUNG BY SECURING TO THE
CLIP TABS ON THE STRUCTURAL METAL DECK. NO SCREWS OR OTHER MECHANICAL
STUDS OR FASTENERS SHALL BE USED IN THE DECK UNLESS APPROVED, IN WRITING, BY
BUILDING MANAGEMENT.
4. ALL DIMMERS, SWITCHES, AND COVERPLATES TO BE LIGHTOLIER; MODEL: VEGA SLIDE
OR EQ., COLOR: WHITE U.O.N. COORDINATE WITH BUILDING STANDARD.
5. LETTERS NEXT TO LIGHT FIXTURES INDICATE SPECIFICATION INFORMATION FOR EACH
FIXTURE. SEE REFLECTED CEILING PLAN LEGEND FOR CLARIFICATION.
6. NUMBERS NEXT TO FIXTURES INDICATE SWITCH GROUPINGS.
7. ALL SWITCHES IN A GROUP ARE TO BE GANGED WHERE POSSIBLE WITH A SINGLE
COVERPLATE.
8. PROVIDE MINIMUM OF (1) ONE LIGHT SWITCH PER FIXTURE TYPE PER ROOM, U.O.N.
9. ALL LAMPS SHALL BE RATED 3000°K COLOR TEMPERATURE. LAMPS THAT DO NOT
MEET THESE SPECIFICATIONS WILL NOT BE ACCEPTED.
10. ANY ADDITIONAL EQUIPMENT NEEDED FOR INSTALLATION OF THE SPECIFIED
FIXTURES SHALL BE PROVIDED BY THE CONTRACTOR.
11. ANY NECESSARY GRID LOCATION CHANGES OR FIXTURE LOCATION CHANGES SHALL
BE APPROVED BY THE ARCHITECT PRIOR TO INSTALLATION.
12. ALL DIMENSIONS ARE TO CENTER OF THE FIXTURE AND ARE TAKEN FROM THE
FINISHED FACE OF WALL.
13. SEE SECTIONS AND ELEVATIONS FOR CEILING HEIGHTS NOT NOTED.
14. LAMP ALL FIXTURES FOLLOWING SUBSTANTIAL COMPLETION.
15. EXISTING LIGHTING TO REMAIN WHERE NOTED. CONTRACTOR TO SURVEY EXISTING LOADS
AND CIRCUITING AND RECIRCUIT/REWIRE AS NECESSARY.
16. CONTRACTOR TO FURNISH AND INSTALL FIRE AND SMOKE DAMPERS AS NECESSARY IN
NEW AND EXISTING DUCTWORK TO ACHIEVE REQUIRED FIRE COMPARTMENTALIZATION.
17. FOR EXTENT OF EXISTING DUCTWORK TO REMAIN, SEE MECHANICAL DRAWINGS.
18. NOTIFY ARCHITECT IF GRID LAYOUT RESULTS IN A TILE 6" OR LESS IN ANY DIMENSION,
PRIOR TO INSTALLATION.
19. UNDER NO CIRCUMSTANCE SHALL ANY FASTENING TO FACE OF WINDOW BLIND POCKET
OCCUR.
20. PROTECT, TO SATISFACTION OF BUILDING MANAGEMENT, EXISTING DUCT SMOKE
DETECTORS OR REPLACE FOLLOWING SUBSTANTIAL COMPLETION.
21. CAULK BETWEEN CEILING GRID EDGE AND WALLS AT ALL VISIBLE LOCATIONS, TYP. MATCH
COLOR OF CAULK TO COLOR OF CEILING GRID.
22. LIGHTING FIXTURE COMPONENTS SHALL BE SUITABLE FOR THE VOLTAGE OF THE BUILDING
CIRCUITS TO WHICH THEY ARE APPLIED. DIMMERS SHALL BE SIZED FOR INDICATED LOADS.
23. ALL DIMMING CIRCUITS SHALL HAVE SEPARATE NEUTRALS. SEE ELECTRIC DRAWINGS
24. ALL BALLASTS TO BE BUILDING APPROVED OR EQ. SEE BUILDING RULES AND
REGULATIONS.
25. FURNISH AND INSTALL HOLD DOWN CLIPS FOR RECESSED PARABOLIC FIXTURES, TYP.
26. PAINT ALL EXPOSED CUT EDGES OF CEILING TILES WITH MANUFACTURER APPROVED
PAINT, TYP. MATCH COLOR TO TILE.
27. SEE SHEET A-202.0.0 FOR RCP DIMENSIONS
28. FURNISH AND INSTALL ACRYLIC LIGHT SHELF COVER AT ALL OPEN LIGHT FIXTURES. SEE
FINISH, ELEVATIONS AND SECTIONS.
29. PROVIDE RIGID INSULATION SECURED TO UNDERSIDE OF SLAB ABOVE, TYP. AT ALL
LOCAITONS BELOW ROOF. INSULATION NOT REQUIRED ON UNDERSIDE OF SLAB BELOW MER.
ALL CONTRACTORS SHALL IMPLEMENT THE FOLLOWING NOTES IN ALL AREAS OF WORK:
1. OBTAIN INFECTION CONTROL GUIDELINES BEFORE CONSTRUCTION BEGINS.
2. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHODS BEFORE CONSTRUCTION BEGINS.
3. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO GOWN IN TYVEK SUIT. SUITS ARE REMOVED IN THE ANTEROOM BEFORE LEAVING THE WORK SITE.
4. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
6. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPMENT AIR FILTRATION UNITS.
7. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
8. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
9. WET MOP WITH DISINFECTANT.
10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS TO DESIGNATED ELEVATOR / SITE.
11. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
12. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES AND CLEARED BY ICRA COMMITTEE MEMBER.
13. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
14. ROUTE FOR WASTE TRANSPORT MUST BE APPROVED.
15. GC SHALL HAVE ACCESS TO ELEVATORS FROM 7PM-6AM, ALL DAYS. GC SHALL PROTECT ELEVATOR AT START OF WORK EACH DAY AND SHALL REMOVE PROTECTION AND LEAVE ELEVATOR
BROOM CLEAN BY 6AM OF EACH DAY. IF DUST IS FOUND TO MIGRATE OUT OF SHAFT INTO OTHER SPACES OUTSIDE OF THE CONSTRUCTION SITE AND THE GROUND FLOOR LEVEL, GC SHALL PROVIDE
PLASTIC SEAL OVER ELEVATOR DOORS ON NORTH SIDE OF SHAFT ON 7TH FLOOR AND/OR ALL DOORS ON OTHER FLOORS OPENING ON TO THIS SHAFT.
KEYED NOTES
PATCH EXISTING GWB FASCIA ABOVE WINDOW HEADER, TYP. FABRICATE NICHE FOR
RECESSED MECHOSHADE MECHO/4 WIDE BRACKET WITH 2" CLOSURE MOUNT AND WALL
ANGLE. COORDINATE WITH WINDOW SHADES. SEE ELEVATIONS, FINISH PLAN & DETAILS.
GWB SOFFIT, TYP.. SEE DETAIL SHEET.
MILLWORK SOFFIT, TYP.. SEE ELEVATIONS, DETAILS AND FINISH PLAN.
CURTAIN TRACK, TYP. SILENT GLISS USA: SYSTEM 6010 WITH 61475 GLIDER STAINLESS
STEEL HOOK. SEE FINISH PLAN FOR CURTAIN MATERIAL SPECIFICATION.
LOW POINT OF BOWED CEILING. SEE ELEVATIONS FOR DETAILS AND HEIGHTS.
LIGHT FIXTURE MOUNTED IN PARTIAL HEIGHT PARTITION BELOW. SEE SECTIONS AND
DETAILS.
TEMPORARY 2-HOUR-RATED FIRE PARTITION TO BE INSTALLED IN THIS AREA. CEILING
GRID, TILES AND FIXTURES TO REMAIN IN THIS AREA TO GREATEST EXTENT POSSIBLE.
REPLACE CEILING GRID AND TILES AS REQUIRED UPON DEMOLITION OF TEMPORARY
PARTITION.
GC TO PROVIDE TEMPORARY EXIT SIGNAGE. COORDINATE LOCATION WITH ARCHITECT.
EXTEND GWB HEADER ABOVE NURSE SERVER CABINET TO SLAB, TYP. COORDINATE
HEIGHT OF CEILING WITH MILLWORK. SEE ELEVATIONS AND DETAILS.
PROVIDE BLOCKING ABOVE CEILING FOR FUTURE CEILING-MOUNTED SIGNAGE.
COORDINATE LOCATION WITH ARCHITECT AND WMC.
LINE OF LIGHT COVE ABOVE, SEE ELEVATIONS AND DETAILS.
COORDINATE INFILL OF EXISTING SLAB ABOVE WITH STRUCTURAL DRAWINGS.
---
---
---
---
Project No. 06-104.024
No. Date Description
REVISIONS
01 05.22.09 FOR DEMOLITION
copyright date: 05.01.09
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
Valhalla Campus
Valhalla, New York 10595
Westchester Medical Center
Main Building
7 North Renovation
BAM StudioSecond Floor415 West Broadway
New York, NY10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
NORTH
02 06.18.09 FOR COORDINATION
03 07.02.09 FOR MEP COORDINATION
04 07.10.09 FOR PRICING
05 08.04.09 FOR CLIENT REVIEW
06 08.19.09 FOR PRICING
CMC-7121 7 South Change Order N-1 GC/H/E/P
OGS-S4963
07 09.22.09 FOR ABATEMENT COORDINATION
10.26.09 FOR CLARIFICATION
08.28.09 FOR CLARIFICATION
08 11.24.09 FOR PERMIT AND CONSTUCTION
A-301.00
SEVENTH FLOOR
REFLECTED CEILING PLAN
REFLECTED CEILING PLANA-301
1SCALE:1/8"=1'-0"
1
1
1
1
1
1
1
1
1
1
1
111111
111111
1
3'-3" EQ1 1'-0" EQ1 EQ2 EQ2 EQ3 1'-0" EQ3 EQ4 EQ4 EQ5 1'-0" EQ5
C W H C W H
STAFF LOUNGE
778
ELEVATOR LOBBY700
WOMEN746
MEN745
PANTRY762S ELEC
761
ON CALL748
OM PATIENT ROOM704
PATIENT ROOM703
PATIENT ROOM702
PATIENT ROOM701
OM PATIENT ROOM719
PATIENT ROOM720
PATIENT ROOM722
ON CALL748c
EQUIPMENT765
NURSE PRACTITIONER764
LOCKER ROOM778b
OFFICE775c
ELECT. CLOS.
766b
PATIENT LOUNGE769
PATIENT ROOM744
PATIENT ROOM743
PATIENT ROOM742
PATIENT ROOM741
PATIENT ROOM740
PATIENT ROOM739
PATIENT ROOM738
PATIENT ROOM737
PATIENT ROOM736
PATIENT ROOM735
PATIENT ROOM734
PATIENT ROOM723
PATIENT ROOM724
PATIENT ROOM
725
PATIENT ROOM726
PATIENT ROOM727
PATIENT ROOM
728PATIENT ROOM
729
PATIENT ROOM
730PATIENT ROOM
731
PATIENT ROOM
732
PATIENT ROOM
733
NURSE7N
STATION
DIRTY
764b
LINEN ALCOVE
765b
HOCLEAN
764a
SUPPLY
CARMEL'S747
OFFICE
W
H
C
W
H
C
W
H
C
W
H
CW
H
C
W
H
C
W
H
C
W
H
C
W
H
C
W
H
C
NURSE PRACTITIONER764
---765 FHC
E
FEC
FHCE
EXAM 771
ROOM
NOURISHMENT780
STATION
CLEAN HOLDING778
ROOM
SOILED777
HOLDING
REST 776
ROOM
NURSE7N
STATION
MEDICATION774
JAN. CL.773
TELE768
CLEAN HOLDING #2772
EQUIP. 782
STORAGE
EQUIP. 779
STORAGE
CORRIDOR 7NW
PATIENT ROOM721
TUBE FOOD781
STORAGE
W
H
C
W
H
C
C
W
H
WH
C
STAIR
--- E
FP
CORRIDOR 7NE
E
CLOSET
766
ADA RESTROOM766a
ELEVATOR LOBBY700N
A-401.00
SEVENTH FLOOR
ELEVATIONS AND
SECTIONS
SECTION ELEVATIONA-401
11/4"-1'-0"
ACT CEILING
Project No. 06-104.024
No. Date Description
REVISIONS
01 05.22.09 FOR DEMOLITION
copyright date: 05.01.09
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
Valhalla Campus
Valhalla, New York 10595
Westchester Medical Center
Main Building
7 North Renovation
BAM StudioSecond Floor415 West Broadway
New York, NY10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
NORTH
02 06.18.09 FOR COORDINATION
03 07.02.09 FOR MEP COORDINATION
04 07.10.09 FOR PRICING
05 08.04.09 FOR CLIENT REVIEW
06 08.19.09 FOR PRICING
CMC-7121 7 South Change Order N-1 GC/H/E/P
OGS-S4963
07 09.22.09 FOR ABATEMENT COORDINATION
10.26.09 FOR CLARIFICATION
08.28.09 FOR CLARIFICATION
08 11.24.09 FOR PERMIT AND CONSTUCTION
SECTION ELEVATIONA-401
21/4"-1'-0"
SECTION ELEVATIONA-401
31/4"-1'-0"
SECTION ELEVATIONA-401
41/4"-1'-0"
KEY PLAN A-401
0NOT TO SCALE
1
A-401
2
A-401
3
A-401
4
A-401
ACT CEILING
ACT CEILING
6'' WALL BASE
6'' WALL BASE
STAINLESS STEEL CORNER GUARD AT
ALL OUTSIDE CORNERS, TYP.
CLERK DESK
GC TO INSTALL BLACKIRON AS
REQUIRED, TYP.
HANDRAIL
DIALYSIS CONNECTIONS
WALL INDUCTION UNIT
MILLWORK NURSE
SERVER CABINET
LINE OF REVEAL
LINE OF REVEAL
MILLWORK
PANELS WITH
METAL TRIM
MILLWORK
P-LAM CABINET
LINE OF MILLWORK NURSE
SERVER CABINET BEYOND.
SEE DETAILS.
GWB CEILING, TYP.
ACT CEILINGGWB CEILING, TYP.
MILLWORK VANITY SINK WITH MIRROR
AND LIGHT
2
A-501
HAND SANITIZER DISPENSER
01
A-405
PATIENT ROOM 743PATIENT ROOM 744 PATIENT ROOM 741PATIENT ROOM 742 PATIENT ROOM 739PATIENT ROOM 740 PATIENT ROOM 737PATIENT ROOM 738 PATIENT ROOM 735PATIENT ROOM 736 PATIENT ROOM 734
PATIENT LOUNGE 769
JC 773
EQUIPMENT STORAGE 782
MEDICATION 774 NURSE STATION 7N RESTROOM 776 SOILED HOLDING 777
PATIENT ROOM 744 PATIENT ROOM 743 PATIENT ROOM 742 PATIENT ROOM 741 PATIENT ROOM 740 PATIENT ROOM 739 PATIENT ROOM 738 PATIENT ROOM 737 PATIENT ROOM 736 PATIENT ROOM 735 PATIENT ROOM 734
PATIENT ROOM 734 PATIENT ROOM 735 PATIENT ROOM 736
6'' WALL BASEDIALYSIS CONNECTIONS
PATIENT ROOM 737 PATIENT ROOM 738 PATIENT ROOM 739 PATIENT ROOM 740 PATIENT ROOM 741 PATIENT ROOM 742 PATIENT ROOM 743 PATIENT ROOM 744
RECESSED CABINET
PULLS, SEE DETAIL
SHEETS.
RECESSED CABINET
PULLS, SEE DETAIL
SHEETS.
TOUCH AND RELEASE CABINET
HARDWARE SEE DETAILS SHEETSCLOSER WITH HOLD OPEN,
SEE DETAIL SHEETS
MILLWORK CEILING BEYOND
MILLWORK PANEL
6'' WALL BASE
6'' WALL BASE
RECEPTACLES
1 1 1 1 11
1 1 1 1 1
1
OFFICE TASK CHAIR (BY OTHERS)
GENERAL NOTES
1. ELECTRIC AND DATA RECEPTACLES SHOWN FOR COORDINATION PURPOSES. SEE ELECTRICAL DRAWINGS FOR CIRCUITING.
2. G.C.SHALL PROVIDE AND INSTALL SOLAR SHADES ON ALL PERIMETER WINDOWS. ARCHITECT TO CONFIRM COLOR PRIOR TO ORDER AND INSTALLATION. SEE DETAIL
SHEETS FOR MOUNTING DETAILS AND POWER PLAN FOR POWER REQUIREMENTS.
3. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY FURNITURE VENDOR AND INSTALLER PRIOR TO ORDER. CONTACT ARCHITECT PRIOR TO FURNITURE ORDER FOR ANY
DISCREPANCIES. CLIENT AND ARCHITECT SHALL NOT BE RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH MODIFYING FURNITURE TO FIT FIELD CONDITIONS.
4. ALL WHIP LOCATIONS TO BE CONFIRMED AND CLEARLY NOTED IN PLANS PROVIDED BY FURNITURE VENDOR. CONTACT ARCHITECT FOR ANY DISCREPANCIES.
5. ALL ELECTRICAL AND DATA LOCATIONS SHALL BE CONFIRMED IN THE FIELD BY THE FURNITURE VENDOR PRIOR TO WIRING AND INSTALLATION.
6. FURNITURE VENDOR SHALL PROVIDE SPECIFICATIONS OF THE PROPOSED WIRING CONFIGURATIONS AND COORDINATE WITH ELECTRICAL ENGINEER. CLIENT AND
ARCHITECT SHALL NOT BE RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH MODIFYING ELECTRICAL COMPONENTS TO FIT FIELD CONDITIONS.
7. FURNITURE VENDOR SHALL PROVIDE AXONOMETRIC AND PLAN DRAWINGS, IN .DWG AND .PDF FORMAT, WITH ALL QUOTES. ARCHITECT WILL NOT REVIEW FURNITURE
QUOTE UNTIL AXONOMETRIC AND PLAN DRAWINGS ARE RECEIVED.
KOHLER KINGSTON ADA-COMPLIANT, WALL-MOUNTED, REAR-SPUD TOILET
#K-4330-0:COLOR WHITE; SLOAN SLIMLINE BEDPAN WASHER
FLUSHOMETER #BPW-1105; SEE MEP DRAWINGS. KOHLER LUSTRA OPEN
FRONT SEAT WITH ANTI-MICROBIAL AGENT #K-4670-CA. SEE TYPICAL
MOUNTING HEIGHTS SHEET.
PURELL HAND SANITIZER (BY OTHERS)
42" 5HIGH LATERAL FILE (BY OTHERS)
18" PEDESTAL FILE (BY OTHERS)
PRINTER 21"HX16"WX16"D (BY OTHERS)
TV (BY OTHERS). GC TO PROVIDE BLOCKING AND COORDINATE POWER.
COORDINATE FINAL LOCATION AND TYPE WITH WMC.TV
KEYED NOTES
18" WIDE X 36" HIGH ANGLED WALL-MOUNTED MIRROR:BOBRICK# B-293 1836. SATIN STAINLESS STEEL FINISH.COORDINATE WITH LOCATION OF VANITY FIXTURE. SEE RCP.
WALL-MOUNTED SOAP DISPENSER (BY WMC, INSTALLED BY GC)
WALL MOUNTED PAPER TOWEL DISPENSER: GEORGIA PACIFICCOMBINATION C-FOLD/ MULTIFOLD PAPER TOWEL DISPENSERITEM# 56650-01 UPC UCC: 12 073310566504.FINISH: TRANSLUCENT SMOKE
WALL-MOUNTED TOILET PAPER DISPENSER: BOBRICK # B-4288,SATIN STAINLESS STEEL FINISH.
WALL-MOUNTED SANITARY NAPKIN DISPOSAL: BOBRICK # B-254,SATIN STAINLESS STEEL FINISH.
SURFACE MOUNTED TOWEL PIN: BOBRICK # B-677.
GRAB BARS: ELCOMA STAINLESS STEEL GRAB BARS: 24"#01-2224-KC, 36" #01-2236-KC, 42" #01-2242-KC. REFER TO PLANAND ELEVATIONS FOR SIZE.
PULL DOWN GRAB BARS: ELCOMA 30" FLIP UP SAFETY RAILSTAINLESS STEEL WITH TOILET PAPER HOLDER; MODEL#96-2230SW05-TF
VERTICAL GRAB BARS: ELCOMA 18" STAINLESS STEEL GRAB BAR,#01-2218-KC.
SHOWER ROD AND HOOKS: SHOWER CURTAIN ROD WITHCONCEALED MOUNTING 1" (25MM) DIAMETER ROD, 20-GAUGE(1.0MM), TYPE 304 STAINLESS STEEL, SATIN FINISH.BOBRICK 204-1 SHOWER CURTAIN HOOKS. BOBRICK TB-207 YPE304 STAINLESS STEEL. VERIFY REQUIRED LENGTHS IN FIELD.
**SEE TYPICAL MOUNTING HEIGHTS SHEET AND SHEETS A-401THROUGH SHEET A-407 FOR INSTALLATION LOCATIONS.
SHELV. SHELVING (BY OTHERS)
UNDER COUNTER REFRIGERATOR (BY OTHERS).
GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.
PLUMBING GASES LEGEND
SYMBOL DESCRIPTION
V
O
A
W
H
C
OXYGEN CONNECTION
AIR CONNECTION
VACUUM CONNECTION
WASTE CONNECTION
HOT WATER CONNECTION
COLD WATER CONNECTION
PLUMBING CONNECTIONS ARE SHOWN FOR COORDINATION PURPOSES ONLY. SEE PLUMBING DRAWINGS FOR DETAILS.
NOTE:
18" x 48" COFFEE TABLE (BY OTHERS)
24" x 24" COFFEE TABLE (BY OTHERS)
TWO SEAT GANGED LOUNGE CHAIR (BY OTHERS)
"M"
"H"
"MP"
"T"
"N"
"Q"
"G"
"PG"
"VG"
"C"
NOTE: SHOWN FOR COORDINATION PURPOSES ONLY. SEE ENGINEERING DRAWINGS
FLOOR
MOUNTDESCRIPTION
CLNG
MOUNTMOUNT
WALL
LIFE SAFETY/SECURITY/EQUIPMENT LEGEND
REMARKS
MEDICAL GAS SHUT-OFF VALVE
FIRE EXTINGUISHER AND RECESSED
CABINET (STAINLESS STEEL)
SEE SHEET FA-1 FOR GENERAL LOCATION. CONFIRM LOCATIONS WITH ARCHITECT PRIOR TO
INSTALLATION.
MG
FEC
BEDSIDE CABINET (BY OTHERS)
PYXISIVDD
COF
ICE
EKG
MW
SOAP DISPENSER (BY OTHERS)
LH LINEN HAMPER 33"HX18"WX20"D (BY OTHERS)
DIGITAL CLOCK. PRIMEX SNS7Y202F-1: WIRELESS SYNCHRONOUS NETWORK
SYSTEM (SNST). DISPLAY DIMMER CONTROLLED. 6-DIGIT DISPLAY, RED LED,
FLUSH MOUNT. 120VAC/50-60 CYCLE 18” CORD W/PIGTAIL. GC TO
COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.
CL
COMPACT MICROWAVE (BY OTHERS). GC TO COORDINATE POWER, SEE PC
PLAN AND ELEVATIONS.
COFFEE MACHINE (BY OTHERS).
GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.
WALL MOUNTED ICEMAKER (BY OTHERS). GC TO COORDINATE POWER,
BLOCKING, WALL BRACKETS AND WATER/ DRAINAGE REQUIREMENTS, SEE PC
PLAN, MEP DRAWINGS AND ARCHITECTURAL ELEVATIONS.
ELECTROCARDIOGRAM: 46"HX18"WX29"D (BY OTHERS)
DOUBLE PYXIS IV DISPENSER UNIT 79-1/2"HX52"WX28D (BY OTHERS)
CORIAN INTEGRAL SINK #810 WITH SLOAN FAUCET ETF-700-4-BDM: 4 TRIM
PLATE, PLUG-IN TRANSFORMER, BELOW DECK MECHANICAL MIXING VALVE.
TRANSFORMERS: ETF-233 120 VAC/24 VAC, 50/60 HZ (35 VA). 30 SECOND
TIME OUT. SEE MEP DRAWINGS. SEE TYPICAL MOUNTING HEIGHTS SHEET
AND F-2.7 FOR DETAILS.
EQUIPMENT LEGEND
HOSPITAL BED, HEADBOARD, BED LOCATOR AND PHYSIOLOGIC
MONITOR DOCKING STATION (BY WMC, INSTALLED BY GC)
DF
HOUSE
CART
LINEN
CART
HOUSEKEEPING CART (BY OTHERS)
DEFIBRILLATOR 40HX24WX24D (BY OTHERS)
LINEN CART 36"HX36"WX22"D (BY OTHERS)
CRASH CART (BY OTHERS)
ALL CONTRACTORS SHALL IMPLEMENT THE FOLLOWING NOTES IN ALL AREAS OF WORK:
1. OBTAIN INFECTION CONTROL GUIDELINES BEFORE CONSTRUCTION BEGINS.
2. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHODS BEFORE CONSTRUCTION BEGINS.
3. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO GOWN IN TYVEK SUIT. SUITS ARE REMOVED IN THE ANTEROOM BEFORE LEAVING THE WORK SITE.
4. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.
6. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPMENT AIR FILTRATION UNITS.
7. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
8. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
9. WET MOP WITH DISINFECTANT.
10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS TO DESIGNATED ELEVATOR / SITE.
11. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING.
12. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES AND CLEARED BY ICRA
COMMITTEE MEMBER.
13. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
14. ROUTE FOR WASTE TRANSPORT MUST BE APPROVED.
15. GC SHALL HAVE ACCESS TO ELEVATORS FROM 7PM-6AM, ALL DAYS. GC SHALL PROTECT ELEVATOR AT START OF WORK EACH DAY AND SHALL REMOVE PROTECTION
AND LEAVE ELEVATOR BROOM CLEAN BY 6AM OF EACH DAY. IF DUST IS FOUND TO MIGRATE OUT OF SHAFT INTO OTHER SPACES OUTSIDE OF THE CONSTRUCTION SITE
AND THE GROUND FLOOR LEVEL, GC SHALL PROVIDE PLASTIC SEAL OVER ELEVATOR DOORS ON NORTH SIDE OF SHAFT ON 7TH FLOOR AND/OR ALL DOORS ON OTHER
FLOORS OPENING ON TO THIS SHAFT.
FURNITURE/ PLUMBING LEGEND
SYMMONS # 1-801S-458-FSB. HYDAPIP SURFACE MOUNTED
SHOWER SYSTEM WITH HAND SPRAY.
PL-10
PL-5
PL-3
PL-2
CORIAN INTEGRAL SINK MODEL #820 WITH SLOAN FAUCET ETF-700-4-BDM: 4
TRIM PLATE, PLUG-IN TRANSFORMER, BELOW DECK MECHANICAL MIXING
VALVE. TRANSFORMERS: ETF-233 120 VAC/24 VAC, 50/60 HZ (35 VA). 30
SECOND TIME OUT. SEE MEP DRAWINGS. SEE TYPICAL MOUNTING HEIGHTS
SHEET AND F-2.7 FOR DETAILS.
PL-6
FIAT SB SERIES SB2424. PRECAST TERRAZZO ONE PIECE MOP
BASIN WITH 6” HIGH CURB.
ELKAY LUSTERTONE DEEP SINGLE BOWL SINK #LR2522; SINGLE
HOLE; ELKAY #LK500GN05L2 GOOSENECK COMMERCIAL FAUCET;
DUAL PADDLE CONTROL.
NURSE STATION TASK CHAIR (BY OTHERS)
LOUNGE TASK CHAIR (BY OTHERS)
5H 42
OFFICE GUEST CHAIR (BY OTHERS)
DESK WITH RETURN AND OVERHEAD CABINETS (BY OTHERS). DIMENSIONS
VARY BY ROOM. COORDINATE BLOCKING LOCATIONS WITH FURNITURE
VENDOR.
REF
MED
REF
MEDICATION REFRIGERATOR: 34.5"X27"X28" (BY OTHERS).
GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.
"B" SHOWER SEAT: BOBRICK FOLDING SHOWER SEAT WITH PADDED
CUSHION #B-517 / B-518 (SEE PLAN FOR R/L ORIENTATION).
WALL MOUNTED PAPER TOWEL DISPENSER: G.C. TO CONFIRM MODEL WITH
W.M.C.
WALL MOUNTED PAPER TOWEL DISPENSER AT VANITY: G.C. TO CONFIRM
MODEL WITH W.M.C.
WALL-MOUNTED PAPER TOWEL/WASTE DISPOSAL UNIT: BOBRICK# B-43699,
SATIN STAINLESS STEEL FINISH.
CB
O2
CONFIDENTIALITY BIN 36"HX19"WX19"D (BY OTHERS)
OXYGEN CART 4512"HX231
2"WX18"D (BY OTHERS)
FAP FIRE ALARM PANEL EXISTING TO REMAIN
FIRE ALARM PULL EXISTING TO BE RELOCATED.FP
PROVIDE BLOCKING AS REQUIRED FOR ALL WALL MOUNTED
EQUIPMENT AND MILLWORK, TYP. COORDINATE LOCATIONS AND WITH
ARCHITECT AND WMC.
TEMPORARY PARTITION TO BE INSTALLED IN THIS AREA. SEE
PARTITION AND PHASING PLANS.
FHCFIRE HOSE CABINET EXISTING TO REMAIN
SRA
SIMPLEX (FIRE ALARM) REMOTE
ANNUNCIATOR.EXISTING TO BE RELOCATED.
CODE
CART IV
CODE CART (WITH IV POLE, SHARPS AND OXYGEN TANK ATTACHED):
55"HX38"WX25"D (BY OTHERS)
CENTRAL LINE CART: 47"HX32"WX24"D (BY OTHERS)
GOMCO SUCTION: 33-1/2"HX16"WX16"D (BY OTHERS).
LINE
CART
GS
ROLLING BLOOD PRESSURE MACHINE 54"HX20"WX20"D (BY OTHERS).BP
WOW: LAP-TOP WITH CART 44"HX30"WX24"D (BY OTHERS).WOW
SCALE HOYER: 50"HX28"WX48"D (BY OTHERS).
SAGE WARMER: 52"HX32"WX20"D (BY OTHERS).
SCALE WHEELCHAIR: 50"HX24"WX36"D (BY OTHERS).
SCALE
HOYER
SGW
SC
WC
PYXIS COMPUTER CART: 57"HX23"WX28"D (BY OTHERS)
PYXIS STORAGE CART: 48"HX23"WX27"D (BY OTHERS)
PYXIS TOWER: 78"HX30"X28"D (BY OTHERS)
PYXIS
CC
PYXIS
SC
PYXIS
TWR
COPY/
FAX
COPY AND FAX MACHINE: 45"HX39"WX49"D (BY OTHERS).
GC TO COORDINATE POWER, SEE PC PLAN AND ELEVATIONS.
NDL/
STRNEEDLE/SYRINGE STORAGE 79-1/2"HX31"WX28D" (BY OTHERS)
TM
SHP
SHARPS WALL MOUNTED DISPOSAL 22"HX14"WX8"D (BY OTHERS)
PACS MONITOR 13"HX16"WX6"D -- 18"H WITH STAND ( BY OTHERS).
PREMISE MONITORS 13"HX16"WX6"D EACH -- TWO STACKED TOTAL 30- 12"H
WITH STAND (BY OTHERS).
NURSE CALL MONITOR 11"HX14"WX6"D EACH -- 18"H WITH STAND
(BY OTHERS).
KEYBOARD, CPU, AND MONITOR (BY OTHERS)
ELECTRONIC WHITE-BOARD, DIMENIONS TBD (BY OTHERS). GC TO PROVIDE
BLOCKING AND COORDINATE POWER. COORDINATE FINAL LOCATION AND
TYPE WITH WMC.
WS STANDARD WASTE RECEPTACLE 31"HX20"WX16"D (BY OTHERS)
EWB
TRANSPORT MONITOR 12"HX12"WX12"D (BY OTHERS)
a
b
c
d
THREE SEAT GANGED LOUNGE CHAIR (BY OTHERS)CRASH
CART
CHEMO
BIN
RED
WASTE
BINRED WASTE BIN (BY OTHERS).
CHEMO BIN (BY OTHERS)
CA
PL-13
ELKAY LUSTERTONE DEEP SINGLE BOWL SINK #DLFR(Q)191810;
SINGLE HOLE; ELKAY #LK500GN05L2 GOOSENECK COMMERCIAL
FAUCET; DUAL PADDLE CONTROL.
FUTURE TV (BY OTHERS). GC TO PROVIDE BLOCKING AND COORDINATE
POWER. COORDINATE FINAL LOCATION AND TYPE WITH WMC.FTV
RECESSED DIALYSIS CONNECTION. MATCH MOUNTING HEIGHTS TO 7
SOUTH.
FUTURE LOCATION FOR TV, TYP. .
KOHLER KINGSTON ADA-COMPLIANT, WALL-MOUNTED, REAR-SPUD TOILET
#K-4330-0:COLOR WHITE; SLOAN UPPERCUT DUAL-FLUSH FLUSHOMETER
#WES-111; SEE MEP DRAWINGS. KOHLER LUSTRA OPEN FRONT SEAT WITH
ANTI-MICROBIAL AGENT #K-4670-CA. SEE TYPICAL MOUNTING HEIGHTS
SHEET.
BEDSIDE GUEST CHAIR (BY OTHERS)
PL-14
KOHLER MORNINGSIDE WHEELCHAIR LAVATORY K-12638 WITH SLOAN FAUCET
ETF-700-4-BDM;4 TRIM PLATE, PLUG-IN TRANSFORMER, BELOW DECK
MECHANICAL MIXING VALVE. TRANSFORMERS: ETF-233 120 VAC/24 VAC, 50/60
HZ (35 VA). 30 SECOND TIME OUT. SEE MEP DRAWINGS.
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
TELE758
STAFF LOUNGE778
ELEVATOR LOBBY700
WOMEN746
MEN745
PANTRY762ANCS
760ELEC761
ON CALL748
ON CALL748b
WC749a
NURSE7s
STATION
MEDICATION759
MEDICATION752
HOOD756
JC753
FAMILY 754
LOUNGE
PATIENT ROOM712
PATIENT ROOM711
NURSE MGR.751c
WC750
PATIENT ROOM710
PATIENT ROOM709
PATIENT ROOM708
PATIENT ROOM707
PATIENT ROOM706
PATIENT ROOM705
PATIENT ROOM704
PATIENT ROOM703
PATIENT ROOM702
PATIENT ROOM701
PATIENT ROOM713
PATIENT ROOM714
PATIENT ROOM715
PATIENT ROOM716
PATIENT ROOM717
PATIENT ROOM718
PATIENT ROOM719
PATIENT ROOM720
PATIENT ROOM722
O
VV
O
AA
V O
A
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E E E
E
E E
E
E
E
E
E E
E
E E
E
E E E
E
E
E E
EE
E
E E
E E
E
STAIR
---CM CM
CM CM
ON CALL748c
EQUIPMENT765
SH
ELV
. C.HOOD757
CH
EM
O H
OO
D(D
UC
TE
D)
LA
MIN
AR
FL
OW
HO
OD
ANTE RM755
SH
ELV
.S
HE
LV
.
PHARMACY752a
MG
MG
NURSE PRACTITIONER764
LOCKER ROOM778b
OFFICE775c
ELECT. CLOS.
766b
PATIENT LOUNGE769
PATIENT ROOM744
PATIENT ROOM743
PATIENT ROOM742
PATIENT ROOM741
PATIENT ROOM740
PATIENT ROOM739
PATIENT ROOM738
PATIENT ROOM737
PATIENT ROOM736
PATIENT ROOM735
PATIENT ROOM734
PATIENT ROOM723
PATIENT ROOM724
PATIENT ROOM725
PATIENT ROOM726
PATIENT ROOM727
PATIENT ROOM728
PATIENT ROOM729
PATIENT ROOM730
PATIENT ROOM731
PATIENT ROOM732
PATIENT ROOM733
NURSE7N
STATION
DIRTY764b
LINEN ALCOVE765b
C.O.W
HOYER
LIFT
ME
D.
CA
RT
CODE
CART
W
H
C
W
H
C
W
H
C
W
H
C
HOCLEAN
764a
SUPPLY
SOCIAL749
WORKER
C.O.W.
C
CARMEL'S747
OFFICE
W
H
C
W
H
C
W
H
C
W
H
C
W
H
C
W
H
C
W
H
C
W
H
CW
H
C
W
H
C
W
H
C
W
H
C
W
H
C
W
H
C
W
H
W
H
C
CC
CC
FSU
PS
PS
FSU
36
P
36
PP
P
CC
CC
BB36
BB36
MG
FEC
E
EE
E
E EE
EE
EE
O
VV
O
AA
A
EE
EEE
E EE
EE
EE
O
VV
O
AA
E
EE
EEE
E EE
EE
EE
O
VV
O
AA
EE
EEE
E EE
EE
EE
OOV
V
AA
EE
EE
E
E
O
V O
V
A A
EE
EEE
E EE
EE
E O
VV
O
AA
EE
EEE
E EE
EE
EE
O
VV
O
AA
E
EE
EEE
E EE
EE
EE
O
VV
O
A
EE
EEE
E EE
EE
EE
O
VV
O
AA
EE
EEE
E EE
EE
EE
O
VV
O
AA
EE
EEE
E
E
E
CL
E
E
E
E
E
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CLCLCL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CLCL
CA
CODE
CART
M
CA
WL
LHWS
WL
REF
DF
PY
X
TM
PY
X
DD
A
PY
X
SM
HOUSE
CART
TV IV WL
IVC WL CR
AS
H
CA
RT
M
MED.
CART
PY
X
TM
PY
X
SM
PYXDM
PYX
DA
PY
X
DD
A
PYX
DM
PYX
DA
COF
ICE
REF/
FRZREF/
FRZ
UC EC SH
LIN
EN
CA
RT
REF/FRZ
MW
TV
TV
WS
CA
CA
WS
WSLH
WL
WL
WL
WL
WL
WL WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
LH
LH
LH LH
LH
LH LH LH LH
CA CA
CA CA
CA CA CA CA CA
WL
WL
LHWS
WS
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
LH LH LH LH LH LH LH LH LH LH
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WSWS WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WS
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WL
WLS H S H S H S H S H S H S H S H S H S H S H
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TVTVTV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
ABCDEFGHIJKL
1
2
3
4CHEMO
BIN
SH
ELV
.
RED
WASTE
BIN
PA
SS
-T
HR
U
36
365H
30
5H
30
5H
stack of
4 extra chairs
O
V
A
V
A
O
5H
3'-0"
4'-0"
4'-0"
4'-0"
COPIER
3'-3"3'-3"
NURSE PRACTITIONER764
36 5H
COPIER
3'-3"3'-3"
---765
MGE
MGE
FHC
E
FEC
FHCE
EWB
EXAM 771
ROOM
NOURISHMENT780
STATION
CLEAN HOLDING778
ROOM
SOILED777
HOLDING
REST 776
ROOM
NURSE7N
STATION
MEDICATION774
JAN. CL.773
TELE768
CLEAN HOLDING #2772
EQUIP. 782
STORAGE
EQUIP. 779
STORAGE
ICE
CORRIDOR 7NW
PATIENT ROOM721
TUBE FOOD781
STORAGE
REF
MW
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
OOV
V
AA
EE
EE
E
E
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E E
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E E
EE
EE
E E
EE
EE
W
H
C
W
H
CS S
CO
PIE
R
S SS S S SS S S
C
W
H
WH
C
TV
STAIR
---
E
E
E
SC
SC
HOUSE
CART
O
V
A
V
A
O
PL-3
PL-2
PL-3
PL-2
PL-3
PL-2
PL-3
PL-2
PL-3
PL-2
PL-3
PL-2
PL-3
PL-2 PL-2
PL-3
PL-2
PL-3
PL-2
PL-3
PL-2
PL-3
PL-10
PL-10
PL-11
PL-3
PL-3
PL-2
PL-3
PL-2
PL-3 PL-3PL-3 PL-3 PL-3 PL-3 PL-3 PL-3 PL-3
PL-6PL-2
5H
42
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CRASH
CART
EC UC
PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5 PL-5
PL-5
PL-5PL-5PL-5PL-5PL-5PL-5PL-5PL-5PL-5PL-5
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
CHEMO
BIN
RED
WASTE
BIN
S
36
36
P
H H H H H
HHHHH
H H H H
HHHHHH
FP
E
EE
EE
E
H
PL-13
PL-5SB
SB
SC
SC
SC
CORRIDOR 7NE
POTENTIAL HOIST
LOCATION, IF
AUTHORIZED BY
OWNER
KRR
SRA, RFP, R
31
1
2
2
2 32
3
1
3
1
2
E
5H
5H
5H
5H
5H 60
36
72
72
84
PYXIS
CC
PYXIS
SC
PL-11
WOW
MED
REF
NDL/
STR
PYXIS
IVDD
SHP
PYXIS
CC
PYXIS
SC
WOW
MEDREF
NDL/
STR
PYXIS
IVDD
SW
SW
TM
TM
d
a
a
a
a
a
a
a
a
a
cb
cb
a
a
P
EWB
SHP SHP SHP SHP SHP SHP SHP SHP SHP SHP SHP
SHPSHPSHPSHPSHPSHPSHPSHPSHPSHPSHP
CODE
CART IVDF
LINE
CARTGS
BP
BP
EKGWOW
WOW
WOW WOW
WOW
WOW
SCALE
HOYERLINEN
CART
SGW
SGW
SC
WC
CB
O2
CB
O2
SW SW SW SW SW
SW SW
SW SW SW SW
SW SW SW SW SW SW SW SW SW SW
CA CA CA CA CA
CA CA
CA CA CA CA
CA CA CA CA CA
LH LH LH LH LH LH LH LH LH LH LH
LHLHLHLHLHLHLHLHLHLHLH
S
CA CA
CA CACA CACA CACA CACA
CLOSET766 SHP
CA CA CA CA CA CA
CA CACA CACA CACA CACA
H
ADA RESTROOM766a
ELEVATOR LOBBY700N
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
FTV
TV
CL
TV
CL
TV
CL
PL-14 PL-1A
SW
Project No. 06-104.024
No. Date Description
REVISIONS
01 05.22.09 FOR DEMOLITION
copyright date: 05.01.09
All drawings and written materials represented on this sheet constitute the copyrighted work and
are the sole property of BAM Studio. This sheet may not be reproduced or copied in whole or in
part, nor may any of the drawings or written materials appearing within, be incorporated into
another work for any reason without the written consent of BAM Studio. This sheet must be
returned upon the request of the Architect.
No. Date Description
Valhalla Campus
Valhalla, New York 10595
Westchester Medical Center
Main Building
7 North Renovation
BAM StudioSecond Floor415 West Broadway
New York, NY10012
T: 646.522.5550
F: 646.349.5556www.bam-studio.com
NORTH
02 06.18.09 FOR COORDINATION
03 07.02.09 FOR MEP COORDINATION
04 07.10.09 FOR PRICING
05 08.04.09 FOR CLIENT REVIEW
06 08.19.09 FOR PRICING
CMC-7121 7 South Change Order N-1 GC/H/E/P
OGS-S4963
07 09.22.09 FOR ABATEMENT COORDINATION
10.26.09 FOR CLARIFICATION
08.28.09 FOR CLARIFICATION
08 11.24.09 FOR PERMIT AND CONSTUCTION
A-701.0.0
SEVENTH FLOOR
FURNITURE, FIXTURES
AND EQUIPMENT PLAN
FURNITURE, FIXTURES AND EQUIPMENT PLANA-701
1SCALE:1/8"=1'-0"
1
1
1
11
1
1
1
1
1 1 1 1 1 11 1 1 1
11 1 1 1 1 1 11 1 1 1
1
1
1
1
1
1
1
1
Westchester Medical Center
Oncology SuiteProject Manager / Lead Designer BAM STUDIO ARCHITECTS
completed:2010
site location:Valhalla, NY
vicinity mapvicinity map
Issues:Renovation to the seven floors of in patient rooms needed to be phased to maintain hospital capacity. One floor at a time was renovated in a rolling, phased plan.
Action:Incorporated feedback gleaned from the tours of the full scale mock-up, BAM created a design that meets the needs of staff, doctors, patients and their families.
Results:Renovation of the first of seven floors was completed and passed inspections for full occupancy. Additional phases of renovation are currently underway.
↑ Corridor and entry to executive training theater and conference room. ↑ Reception desk. ↑ Corridor from reception to conference room area. ↑ Reception area.
↑ Executive conference room. ↑ Executive training theater. ↑ Executive conference room.
lexisnexis
corporate headquartersProject Manager / Lead Designer BAM STUDIO ARCHITECTS
completed:2005
site location:New York, NY
vicinity map
Issues:Part of one of the world’s largest publish-ers, LexisNexis needed their headquarters to reflect their strength as a technically saavy information systems provider for high-level potential customers.
Action:Working closely with the facilities group, BAM met with key internal executives to gain insight and feed- back. We synthesized their facility needs with their strategic goal to utilize the latest technology.
Results:Technologically advanced environment viewed as a model facility. Executives and customers strongly approve.
↑ Ponte Vecchio - Florence ↑ Public Bath - Tivoli
↑ Marble S. Sebastiano fouri le Mura - Rome
↑ Fountain and Stair- Villa d’Este
↑ Etruscan Headress
↑ Etruscan Serpent Bracelet
↓ Vicinity Map Sketches/Notes - Venice ↓ Form and Massing Studies ↓ Lighting, Circulation and Spatial Studies
↑ Roman Bath - Rome
university of washington masters program architecture in rome program - Fall 2000
university of washington - master’s thesis a public bath in venice
Faculty:Frank Ching - DrawingDavid Miller - DesignTom Bosworth - History
Thesis Committee:David Miller - DesignTom Bosworth - History
sketchbook concept sketches