· «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number...

Post on 24-Jan-2021

1 views 0 download

Transcript of  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number...

Sb11050175 Bb1031PDR ADQCK 05000400H PDR

II

~

gy\

6 /

'L

( ~

«NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== EndAvailability: PDR Format: Microfilm Address: 38480-206 38480-206Size: 1p.

Document Type: Incoming Correspondence Issued: 861031Desc/: Package of 78 comments requesting denial of 'util request for exemptionTitle: from full participation exercise-of emergency response plan. Exercise

should be conducted before plant permitted to operate.

Authors: MAY,A.BARKER,L.B.

Recipients:

Affiliation Not AssignedAffiliation Not Assigned

Office of Nuclear Reactor Regulation, Director (8

Dockets: 05080408 50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina

File. Locations: PDR ADOCK 05880480 H 861031 Package: 8611050175 4

ICount: "8

~ ~ ~ ~

<Replace>

Dear Mr. Denton:

)lI wish-to urge denial of CPS,L'8 request forexemption from the requirement, under 10 CER 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted befo're the plant is permitted tooperate at all.ilSincerely,

g /~K(~~

Mr. Harold Denton,,Director„Offi'ce of Nuclear Re'action RegulatiopNuclear Regulatory CommissionWashington, DC '20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request forexemption from the ~requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionHashi.ngton, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CI'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincere y

M

31 OCT

/9g6

t<cxr D:.48i((qh fp

p «QP@t(- ~«

(;Vi~l)~ 'rOURPQST ~

$

«

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

l

»l(ill�

»» t(t» l(l((l(l»(lJ(l

Dear Mr.. Denton:

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CPR

Appendix E, that the Company conduct a" fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent 'of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton~

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CVR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

ph, Q l4

/ 31 FACT

yg~(~~ppgE /UC Z.

~~~~@@ p pjl~ y '11$ +f CFQ

I

H

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CP&L's request forexemption from the requirement, under 10 CUR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionMashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPEI.'s request forexemption from the requirement,'nde'r~ 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for 'changes in the evacua-tion plan, -I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincere

lY Cl31 OC'I

1986

t'cxrD; Wp 'L)ltlclfllf y jg

HAP .)

N(l'Cg5"riovr o"sr PF&0 ~

E

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear"Mr. Denton:

I wish to urge denial of CPS,1.'s request. forexemption from the requirement, under 10 Ct'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Plcxr D~- "ir

gy voUR &OS. QFlc .

',N~'

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr.. benton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at a

Sincerely,

41a @or ~~L.C m MC .'778

31 CCT

IoQ+

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPEL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct- a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

'tC

vDU(l p()5a CP.s')'fQCT ~ mq ait

E

~14

i'r.

Harold Denton, DirectorOffice of Nuclear. Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

lssl(lllsssslslsslslsslslsssllsl

er

Dear Mr. Denton:5

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 Cl'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercial

~operation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

2~~nC ~

7'1

OCT

Isa

P~gPPL. <.a5'agia '-

„;,.'r.

Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionNashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CI'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise sh uld beconducted before the plant is permi ed tooperate at all.Sincerely,

C7 ~/

t-I

fg Ol

3i OCT

198eA1

S

Mrs Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

5

Dear Mr..'Denton:

I wish to urge denial of CPS,L's reques't forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe t:his exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before -beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Hr. Denton:

I wish to urge denial of CPBL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

)9>36

DQ ssss $ ,

(

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

ls)lslllssssl)ls)lsl)slslss)llsl

Dea'r Mr. Denton:

I wish to urge denial of CPLI 's request forexemption from the requirement, under 10 CUR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr ~ Harold Denton, DirectorOffice of Nucl ear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Dentons

I wish to urge denial of CPEL's request forexemption from the requirement, under 10 CPR 50,Appendix E,'hat the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating, atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely, g2/L~ I 8

a t~k

o.VLW 'I'~+w( ~nvd4 C->%RA'g6--

ttEXTO.".'v

>.- <~~ ~-)Sniqlnir gv'i ~

p4»~~s egin~, >)~~

I

~g iigg, pygmy POS. DFr4, CFA

„'N i

Mr. Harold Dentoni DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionHashington, DC 20555

Dear Mr. Denton:

I wish to urge'enial of CP&L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent" of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionHashington, DC 20555

Dea'r Mr. Denton:

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct. a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

o~ "4N'. V'('<

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CP&L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one .year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at M~ l.Sincerely,

r4

3X OCT

I<a6

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:0

l wish to urge denial of CPS,I.'s reqdept forexemption from the requirement, unde'r 10 Cl'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSI.'s request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

~ ~ ~~ ffg Pap)g ~4 ~

~c << >a~.

pg/L/Agree w~

1986

2=. +PF'-"',:-;= '<)

'@P,.fl

c'4J& POSTS'jP'g

S

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

'I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CPR 50,A endix E that the Company conduct a fullparticipation exercise of the Emergency Respon sePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or, before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

a gPP;l f9$$8'~pis,'

~ ~~Iyp p.ps j@FACE

$'

;14 i

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington> DC 20555

Dear Mr. Denton:

I wish. to urge denial of CPS,L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan,'. I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

AH@6 5~4'7OLe ~il/eY

OCXT D>>

QP3pF'BP-

r Ot>IAOT VOVR POSTO:

~ ~ Il Pg~ Sinclair VIS i

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

r

315cAie85-

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr-. Denton~

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

4

Dear Mr. Denton:/1

I

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 Cl.'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington> DC 20555

J»l) lit»))l)l»l)l))I)l)»lj)I

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responseplan for its Shearon Harris nucleax'ower plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, 1 believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Nr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

1 O'G

19%

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

3 Dear Mr. Den4on.

I wish to urge denial of CPSI.'s request forexemption from the requirement, urger 10 CPR 50,Appendix E, that the Company conJ ct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.

~Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

D/)IVl 0 Du>-.H

N< 77<1/

Qpe Hy +PM

31 OCT

/9g6

GIYE TSIJ(jl EB-.

CEBEBB f. PAL'tHELP DISABL>PFLI

„14 i'PMr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

1»l) tll(»fl)l»l)f))ht)))lf)l

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear; power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionMashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct<a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialopeiation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

,5a «i... ~ I<~>fbi»~

Mr . Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10.CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plant .

within one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear-Mr. Dentonc

I wish to urge denial of CP6,L's request forexemption from the requirement, under ]0 CFR 50,Appendix E, that the Company conduct' fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted t'ooperate at all.

Mr ~ Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Dentons

T wish to urge denial of CP6,L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant 'or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Ha'roid Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPEL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullpart.icipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear p'ower plantwithin one year before beginning'commercialoperation of. the plant or',before operating atgreater than five percent of rated power.

~ Because of the need for changes in the evacua-I tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

)& 98

CC iS $aau CCM ~gg

CD'. "I II'CC CF"

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington> DC 20555

Dear Mr. Denton:

I wish to urge denial of CP&L's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responseplan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

qa)cC

Mr. Harold Denton< DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CP&L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Response/Plan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or .before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted Co

operate at allSincerely,

PQpig 4„'PS~biyJ-,;:

I gl $ ~ i lrCVAPO+T C ~FIC

)B i

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CP&L's request forexemption from the requirement, under 10 CUR 50,Appendix E, that the Company conduct 5 -fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plant.-within one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton> DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionMashington, DC 20555

l»((lit»iilil(ilili(Ill»)Ilail

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before t e plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionNashington, DC 20555

De'a'r Mr. Dent. on:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at allSincerely,

Ig~S

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPEL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company'conduct a fullparticipation exercise of the Emergency Respons~Plan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Dentonc

I wish to urge denial of CPLL's request forexemption from the requirement, under 10 CVR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

~vg~f&

p>81 i >qlaif-

".-14

('r.

Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

re

V

Dear Mr. Denton:

wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, l believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulhtionNuclear Regulatory CommissionWashington, DC 20555 .

...Dear Mr. Denton:

I .wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Hr. Harold Denton, DirectorOffice of Nuclear Reaction Regul'~~tiopNuclear Regulatory CommissionWashington, DC 20555

Dear„ Mr. Denton:

r*4

U

I wish to urge denial of CP8L's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

l~

~ ~ ~ ~

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPLL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exert:ise should beconducted before the plant is permitted tooperate at all.Sincerely,

flcxTD:Y

' =

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:0'

wish to urge denial of CPS.I.'s request forexemption from the requirement, under 10 CER 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely, d

'":'I'e'7"<dd

~"CC;t'-1>Ce h'OVA POSTCfF «USA

-14+

Mr;-'Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashing'ton, DC 20555.

Dear .Mr. Denton:

I wish to urge denial of CPLI,'s request forexemption from the requirement, under 10 Cl'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for -changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

P.

K31 "CT

/9'

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSI.'s request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company'conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear"power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for .changes in the evacua-

~ tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

PQ

3i OCS

/986

tlEXfDcY " g"p'+p+8 @'~~laii

)vis,'/A

lg P:-. " >

gg!sr,igt «.-'l.'i 6 D5l'i14 ~

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionMashington, DC 20555

Dear Mr..Denton: ~,I

E wish to urge denial of CPS I.' reques t forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear'ower plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Haro'ld Denton, DirectorOffice of Nuclear Reaction Regulatiop .

Nuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPB,I.'s request Eorexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, l believe this exercise should beconducted before the plant is permitted tooperate at all. gggT g~g Qg gogg~I + p F~p

E 'P<of'LES c'ow~gg~Sincerely,

32 OC>

Q7$ gQ ass

~gyp~~~~gal@ i

I

~kltlcli1fp yyjs

l"k I

Mr . Harold Den ton , Dire ctorOffice of Nuclear Reaction Regul a tiopNuclear Regulatory Commi s s ionWashington , DC 2 0 5 5 5

Dear Mr. Denton:

I wish to urge denial of CPS.L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe thi's exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

GL ~6H~+

f j MQ so

ll~~gv 1$

Ncxr I: jPirida~iii

p~ p$pgp

s ~~SSAii «„p li Qglkj pQf

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CP&L's request forexemption from the requirement, under l0 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

/wC'g~

lg ">0'<4~~+5~ g $ 'Sindhi

y~eaefl 4j 8 ttw4wg« ~" ZpC YCUfrS -Sr OZEgCr,

;l4 1

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionHashington, DC 20555

f»lifll»islil~ilili~lil»ltill

'ear Mi. Dentonc

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPB 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CUR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responseplan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington< DC 20555

Dear Mr. Denton:

I wish.to urge denial of CPS,I.'s reque~st forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency responsePlan for its Shearon Harris nuclear pdwer plantwithin one year before beginning commercialoperation of the plant oi before operating atgreater than five percent of rated power.Because of the need for 'changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request forexemption from the requirement, under l0 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

~~gJ/ 3@9cl+ 7 /~i ., 4/

lfr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Dentons

1 wish to urge denial of CPS,L's req'uest forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

libel)lllssitlslitlij)(I<I)<sll)l

~q$ 3P/

Dear Mr. Denton: ~,

I wish to urge denial of CPSI,'s request forexemption from the requirement, undeb 10 CPR 50,Appendix E, that the Company conduct, a fullparticipation exercise of the Emergency Responseplan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

1 vm>Vi C,+. u

~4~ H.ill

310CV'~e

tfEXF ar.'Y I

Pg @~WgIa)p

SNAIL"cc;OurnCr Vodka PnSr oPrge

llSA

~I% i

Mr. Harold Denton, Director-Office of Nuclear Reaction'egulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

.I wish to urge denial of CPEL's request forexemption from the requirement, uqder'10 CPR 50,Appendix E, that the Company conduct .a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

~ «ph1r. and htrs. John yl105 Oiler Dri«eCary, Worlh Carolt 7510

sr N',1 )r

T /'~ lj~(

~% % 1 Q p~ j

g|

Siucl»q>'>

'JSA

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

c5

Den

) E~

Dear Mr ton:

I wish to urge denial of CPS,I.ls request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

~'P M~at ocr.

'o 1 q I M Zgd l9BSc986

Mr. Harold Denton DirectorOffice of Nuclear Reaction Reg~ulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton~

I wish to urge denial of CPLL's request forexemption from the requirement, under ]0 CPR 50,Appendix E, that the Company conduct a full

~~~;participation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes..in the evacua-tion plan, I believe this exercise should beconducted. before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Hr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct,a, fullparticipation exercise of the Emergehcy ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincere

Mr. Harold", Denton, DirectorOffice of Nuclear Reaction Regu3.atiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS.I.'s request forexemption from the requirement, under 10 CER 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:1

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 Ct'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responseplan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

'\

Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton~

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, X believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely, ~~~@ W~~

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington< DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company cond@et a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all. IrSincerel

x~~ ~ 4PM

31 OC'l

Igqf

i blllclgfp~yyj

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

, Dear Mr. Denton:

I wish to urge denial of CPBL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

V

R.4, L~ g t Q ~+~]~)sb~44 Gc

~S)I)gl))j)~~J ««

USAB~'

lir. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPEL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgieater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

cH

y«~ ~ r„. Mgt shawm

31 QCV

f996

lfEXTDAr

''ItIr

I)j clair+is,'uP

I'rII I I II 'Vh PO 5 T iJC I f-'SA.24

i'r.

Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Den@on:

l wish to urge denial of CPS*L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct, a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the p1ant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPEL's request forexemption from the requirement, under 10 CUR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.'Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is perm'd tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington< DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency responsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Hr; Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear .Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

~ . N

,"4 jlDear .Hg. Denton'i

t' '~ S

I wish to urge denial of CPLI.'s request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year .before beginning. commercialoperation of the plant or before operating atgreater than five percent of rate'd power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

F985

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

H. hl= g Jag

P'~~PC„j~AN~

. sI>OStI

~ plllVCgll ling

;if'4

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

w I, r

"/I ~ I '

fDear Hr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, 40nder 10 CFR 501Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-t'ion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

0-. g

/986

fl.-xrD.,"v Dcaergv „

pp'pp&$'g '" .'-

MACOtJTACI YOUIIPOSi+$ I

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

~ PI *fil

Dear Mr.S0( e

Denton:

i

0I

I wish to urge denial of CPS,L's request forexemption from the requirement,<under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Response.Plan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating at

~gryater than five percent of rated power.,Because of the need for changes in the evacua-tion" plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

~~5 ~H e~

po 4 ~ Peg» '-

C bc'e/ 4'l( 5~&8Ilk

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

wish to urge denial of CPSL's request forexemption from the requirement @under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsPlan for its Shearon Harris nuclear power plant I

within one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua- .

tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at

all.'incerely,

Mr,.. Ha'roid Denton, DirectorOffi'ce of Nuclear Reaction RegulatioNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS L's request forexemption from the requirement, under 10 CE'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the, plant or before operating atgreater than five percent of rated power.

.~Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the is erma,t ted too crate at all.Sincerely,

0 Y. Ve<)0'6 en.rrIn 4 P~ cP I~sgom> ~< >a>a

<Al p p

Acx~81nvh~~F

FXPg~g@c-,;..'

CG/aF<0'p pg Jlpg c ~ 1 4

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Nr.)D

83tHTmW88804'8@g»

e> U~yggq ~~o,

"'UOQ

4 RUG;l70$

m~h to urge denial of CPS L' request forexemption from the requirement, un'der 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

g beep< zog@»»(=

. )/z

«//» IN/ ."." GOODWILL INDUSlI lfS

Our BUSINESS IOhk,FOB DISABLED PEI

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555 '

Dear Mr.,'Denton:

I wish to urge denial of CgB,L's request forexemption from the requireQe~t, under 10 CPR 50,Appendix E, that the Compang~p'onduct a fullparticipation exercise of the Erdergency ResponseP-an for its Shearon Harris nucl'ear power plantwithin one year before beginning commercialoperation of the plant or before operating atgregter than five percent of rated power.Pecause of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

s.c.. ~~lou Ccu l S+ Q~4o~ p~ ~~g~>

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionNashington, DC 20555

Dear'r,. Denton:

I wish to urge denial of CPSL~ request forexempt'ion from the requirement/, under 10 CFR 50,Appendix E, that the Company conductor@ fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerel

6/ cC

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

~f.'ish to urge denial of CPBL's request forexemption from the requirement:<~~pnder 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of .the Emergency Response

-~ Plan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatioNuclear Regulatory CommissionWashington, DC 20555

4

Dear Mr. Denton:~t

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conducP,"a fullparticipation exercise of the Emergency ResponseP3.an for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

'> n~M» ~~u, ~~ a)

$22 AUG

1986

Ifr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPBL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise>of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwx,thin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-t'ion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

c f

AvN GOOD'jl'IILL INDUSITlg%

OUR BUSiVESS AO.

FOR DlSt BLED PBN"

Mr. Harold Denton, Director *

Office of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

l g lg I

Dear'Mr. Denton:

Jgr

gog; ~

rg~

I wish to Gage denial of CPSL's request forexemption from the requirement, undjq 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responseplan, for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

l(-g~ ~

CA

'ZE 'lUG

/986

GOODVIlLL INDUS RK4'

OUR BUSlNESS NOBLES-.~-'OR

DlSABLEQ PEOPLI

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

N,.C-~ g

.Dear Mr. Denton:

X wish to urge denial of CPSL's~equest forexemption from the requirement, g>der 10 CER 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emerge'ncy ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

/'incerely,

AL(„~( Ql

22 AUG'~

/996

«e < ',~ y gg'i «I C ~ V«o4 IgSJ))elf)~",g«g +~~"

'USA

tir. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Dento

I wish to urge denial of CPS''s request for'exemption from the requiremen't, uri8pr 10,CFR 50,Appendix E, that the Company conduct a,fullparticipation exercise of the Emergency ResponseP='an for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgrater than five percent of rated power.Pecause of the need for changes in the evacua-tion plan: I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

f05«%$QspQ- /lid, 2pp($

~ ~

f(ExYDAYDggtyggy

gp~Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. De ..on:

wish to urge denial of CPSL's request forexemption from the requirement, uyder 10 CFR 50,Appendix E, that the Company cond''t a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear 'power plantwi-thj.n one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Io P~ go~cb~ Qg ~~BIO

22 AUG

/986

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory

Commission'ashington,

DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plant

~,w".2thin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.because of the need for changes in the evacua-tion plan, l believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

r2 / f(s. t5 L j ~

Qgc -w~IQp~ ~~ 'llC

XI

t4exr Dav DQPI

conracr vovn nosr os <ea'~>w

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555 t

T

Dear Hr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CER 50,Appendix E, that the Company conduct«a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-Cion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

-p,PM.5 ~

IVXp

GOODWILL INDUSTI'I~IE(

OUR BUSlNESS VI|ORKF

FOR DISABLED PEO, IL

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionNashington, DC 20555

Dear Mr. Denton9'ish

to urge denial of CPS L ' request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responsepl.an for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Wr

Ql'PP AUG

Ioe6

GOODWILL INDUSiB)f3'UR

BUSINESS Ui0

FOR DIShBLED PBS

- Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

~ ~Et

L1

I

Dear Mr. Denton:~Ev n

wish to urge denial of CPSL's request forexemption fr~de the requirement,qunder 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of,. the Emergency ResponsePlan for its Shearon Harris nuclear power plant

Iwithin one year before beginning commercialoperation of the plant or before operating at

~ greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerel

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responsep='an for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation. of the plant or before operating atgreyter than'3five percent of rated power.Because of (he need- for changes in the evacua-tion plan, p believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Dent'on,, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

PM( SinqlaiP yvj8,

, ~ J-':

3~ld0' lB', SIG 803

j"'na ~Ao

SHI~iCiiGill'illR0009

g86I9A< 14

Ã'No

Dear Hr. Denton:

I wish to urge denial of CPS,L's request forexemption from the requirement, 'un'der 10 CFR 50,Appendix E, that the Company condu0t a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercial'operation of the plant or before operating atgreater than five percent of rated power.,Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely

~ fi

o <77

:1 LUG

IQGQ

Mr.'. Ha'roid Denton, DirectorOffi;ce of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conBuct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincere

4

yGH

M

2! AUlp.

I986

MIIIIIT ILL fttp95jlg—OUR BUSI+Foe QisAI!gy ~ '„

'14~ />

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Dear Mr.,Denton:

We are pleased that you denied "backfit status"for two design changes to Shearon Harris. Weare hoping that you will require CPS,L to meetthe specific NRC regulations in full. We alsohope that you artfully investigating thesubstance of our concerns in'the Petition toIntervene and the Motion to Stay the ImmediateEffectiveness of the NRC's Licensing Board'sFinal Decision on Shearon Harris.

Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction Regulation,.Nuclear Regulatory CommissionWashington, DC 20555 o c >

~~C3 C3

z ~r-t 'rl

w Cf~ o- r~~cfTl

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement~~nder 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the, Emergency ResponsePlan for its Shearon Harris nuclear power plantwf.thin one year before beginning commercial

~ operation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

s'55"+

,CONT4~g yy $

~ p

Mr. Harold Denton, DirectorOffice of Nuclear=Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

'Dear -Mr. Denton:

JaHl ~l,;,'"

882.'

wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

GOODVIILL INDUS-'fFI S.

OUR BUSINESS VvOR,FOB DISABLED PE PL

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, unB'er .10 CFR 50,Appendix E, that the Company condbct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialopo.ration of the plant or before operating at,greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPBL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponseP1an for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Be~ause of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

Cll

"gP AUG

~lSS6

YIlLL lHDL'M %FOOOO

oua DUslNESS,~~ .K~

Foe DtS<BLED',PE

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionMashington, DC 20555

Dear Mr. Denton:

Sincerely,

I wish to urge denial of CPSI"s request forexemption from the requirement;, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePla~ for its Shearon Harris nuclear power plantwithi™n one year before beginning commercialope'ration of the plant or before operating atgreater than five percent of rated power.Bee.ause of the need for changes in'he evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all. pe

f oft

G OODvllLLINEglQI%lfs'UR

BUSINESS4'OR

01SABl.EO'Fs

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

J

4 ~

Dear Hr. Denton:I

l wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Response

,-P3.an for its Shearon Harris nuclear power plantwi'thin one year before beginning commercialoperation of the plant or before operating at

- greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

~2l~19'lExrD.$.,

g"gglÃjgMc@

~pgppct 1 0IIR pD$ Y Fjl 'X

Mr. Harold Denton, DirectorOffice. of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

wish to urge denial of CPSL's request forexemption from the requirement, ~under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwit'nin one year before beginning commercialbperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at, all.Sincerely, 2 8/W

Mr. Harold Denton, DirectorOffi'ce of Nuclear Reaction RegulatioNuclear Regulatory CommissionWashington, DC 20555

~ SC

t j

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPR 50Appendix E, that the Company conduct a fullparticipation exercise. of the Emergency Respons,plan for its Shearon Harris nucl'ear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated pover.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

O8 &kCk~~ PC g. 7 a ~ <

jpgpOlJR BUSIgE<'j,i'@<< ~FOR OfSABLF>~ P'OogQp

'r.

Harold Denton, DirectorOffice of Nuclear React,ion RegulatioNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CER 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

~ip~eL-.Hru„,~p'lp i

PZF@%.„~;;.~,tYc aiirtc r v our'n,o

Mr. Harold Denton, DirectorOffice of Nuclear Reaction Regulatio.".Nuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton.:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,.Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.,Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitti d tooperate at all.Sincerely,

Sf0)

6-

GOOD WILLIIL'/gledOUR BUSIIIIES.~ I,rf

FOR DISABLED)P'l%00

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSI 's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plant

, within one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555 t

Dear Mr. Denton:

I wish to urge denial of CPEL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Response>lan for its Shearon Harris','nuclear power plant,within one year before beginning commercialoperation of the plant or before operating at.greater than five percent of rated power.

, Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plarit is permitted tooperate at all.Sincerely,

F3a.v AC/ i~"'c3g p Pgtg D.c

Cp / - il gt~uc

GiVF.-TO UgiTEof,CERESAtii. Phi.sy~k "

HELP DlSABLED P„..[PL,

iv)S

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPBL's r~equest forexemption from the requirement, u™ader 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responseplan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.

.Because of the need for changes in the evacua-- tion plan, I believe this exercise should beconducted before the plant is per 'tted tooperate at all.Sincerely,

(C~gs PQi;

/986

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Dear Hr. Denton:

I wish to urge denial of CPSI 's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plant~within one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.

.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

C HAPL 4

5~ Mg

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company,conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

QJE TO Uth',HiEQair v(s

nN CEBEBRAL PAL, Y- --.,zi augf Q - HEg+IPPLED PE JF

'l4

E

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatioNuclear Regulatory CommissionWashington, DC ZQ555