Sb11050175 Bb1031 PDR ADQCK 05000400 H PDR

Transcript of  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number...

Page 1:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Sb11050175 Bb1031PDR ADQCK 05000400H PDR

Page 2:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

II

~

gy\

6 /

'L

( ~

Page 3:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

«NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== EndAvailability: PDR Format: Microfilm Address: 38480-206 38480-206Size: 1p.

Document Type: Incoming Correspondence Issued: 861031Desc/: Package of 78 comments requesting denial of 'util request for exemptionTitle: from full participation exercise-of emergency response plan. Exercise

should be conducted before plant permitted to operate.

Authors: MAY,A.BARKER,L.B.

Recipients:

Affiliation Not AssignedAffiliation Not Assigned

Office of Nuclear Reactor Regulation, Director (8

Dockets: 05080408 50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina

File. Locations: PDR ADOCK 05880480 H 861031 Package: 8611050175 4

ICount: "8

~ ~ ~ ~

<Replace>

Page 4:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...
Page 5:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

)lI wish-to urge denial of CPS,L'8 request forexemption from the requirement, under 10 CER 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted befo're the plant is permitted tooperate at all.ilSincerely,

g /~K(~~

Page 6:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton,,Director„Offi'ce of Nuclear Re'action RegulatiopNuclear Regulatory CommissionWashington, DC '20555

Page 7:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPS,L's request forexemption from the ~requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 8:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionHashi.ngton, DC 20555

Page 9:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CI'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincere y

Page 10:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

M

31 OCT

/9g6

t<cxr D:.48i((qh fp

p «QP@t(- ~«

(;Vi~l)~ 'rOURPQST ~

$

«

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

l

»l(ill�

»» t(t» l(l((l(l»(lJ(l

Page 11:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr.. Denton:

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CPR

Appendix E, that the Company conduct a" fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent 'of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 12:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 13:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton~

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CVR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 14:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

ph, Q l4

/ 31 FACT

yg~(~~ppgE /UC Z.

~~~~@@ p pjl~ y '11$ +f CFQ

I

H

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 15:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CP&L's request forexemption from the requirement, under 10 CUR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 16:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionMashington, DC 20555

Page 17:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPEI.'s request forexemption from the requirement,'nde'r~ 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for 'changes in the evacua-tion plan, -I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincere

Page 18:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

lY Cl31 OC'I

1986

t'cxrD; Wp 'L)ltlclfllf y jg

HAP .)

N(l'Cg5"riovr o"sr PF&0 ~

E

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 19:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear"Mr. Denton:

I wish to urge denial of CPS,1.'s request. forexemption from the requirement, under 10 Ct'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 20:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Plcxr D~- "ir

gy voUR &OS. QFlc .

',N~'

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 21:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr.. benton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at a

Sincerely,

Page 22:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

41a @or ~~L.C m MC .'778

31 CCT

IoQ+

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 23:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPEL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct- a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 24:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

'tC

vDU(l p()5a CP.s')'fQCT ~ mq ait

E

~14

i'r.

Harold Denton, DirectorOffice of Nuclear. Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

lssl(lllsssslslsslslsslslsssllsl

Page 25:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

er

Dear Mr. Denton:5

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 Cl'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercial

~operation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 26:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

2~~nC ~

7'1

OCT

Isa

P~gPPL. <.a5'agia '-

„;,.'r.

Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionNashington, DC 20555

Page 27:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CI'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise sh uld beconducted before the plant is permi ed tooperate at all.Sincerely,

C7 ~/

Page 28:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

t-I

fg Ol

3i OCT

198eA1

S

Mrs Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 29:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

5

Dear Mr..'Denton:

I wish to urge denial of CPS,L's reques't forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe t:his exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 30:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 31:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before -beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 32:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 33:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Hr. Denton:

I wish to urge denial of CPBL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 34:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

)9>36

DQ ssss $ ,

(

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

ls)lslllssssl)ls)lsl)slslss)llsl

Page 35:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dea'r Mr. Denton:

I wish to urge denial of CPLI 's request forexemption from the requirement, under 10 CUR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 36:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr ~ Harold Denton, DirectorOffice of Nucl ear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 37:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Dentons

I wish to urge denial of CPEL's request forexemption from the requirement, under 10 CPR 50,Appendix E,'hat the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating, atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely, g2/L~ I 8

Page 38:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

a t~k

o.VLW 'I'~+w( ~nvd4 C->%RA'g6--

ttEXTO.".'v

>.- <~~ ~-)Sniqlnir gv'i ~

p4»~~s egin~, >)~~

I

~g iigg, pygmy POS. DFr4, CFA

„'N i

Mr. Harold Dentoni DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionHashington, DC 20555

Page 39:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge'enial of CP&L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent" of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 40:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionHashington, DC 20555

Page 41:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dea'r Mr. Denton:

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct. a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

o~ "4N'. V'('<

Page 42:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 43:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CP&L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 44:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 45:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one .year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at M~ l.Sincerely,

Page 46:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

r4

3X OCT

I<a6

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 47:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:0

l wish to urge denial of CPS,I.'s reqdept forexemption from the requirement, unde'r 10 Cl'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 48:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 49:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPSI.'s request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

~ ~ ~~ ffg Pap)g ~4 ~

Page 50:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~c << >a~.

pg/L/Agree w~

1986

2=. +PF'-"',:-;= '<)

'@P,.fl

c'4J& POSTS'jP'g

S

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 51:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

'I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CPR 50,A endix E that the Company conduct a fullparticipation exercise of the Emergency Respon sePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or, before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 52:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

a gPP;l f9$$8'~pis,'

~ ~~Iyp p.ps j@FACE

$'

;14 i

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington> DC 20555

Page 53:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish. to urge denial of CPS,L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan,'. I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 54:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

AH@6 5~4'7OLe ~il/eY

OCXT D>>

QP3pF'BP-

r Ot>IAOT VOVR POSTO:

~ ~ Il Pg~ Sinclair VIS i

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Page 55:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 56:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

r

315cAie85-

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 57:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr-. Denton~

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

Page 58:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 59:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

4

Dear Mr. Denton:/1

I

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 Cl.'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 60:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington> DC 20555

J»l) lit»))l)l»l)l))I)l)»lj)I

Page 61:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responseplan for its Shearon Harris nucleax'ower plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, 1 believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 62:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 63:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Nr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 64:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

1 O'G

19%

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 65:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

3 Dear Mr. Den4on.

I wish to urge denial of CPSI.'s request forexemption from the requirement, urger 10 CPR 50,Appendix E, that the Company conJ ct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.

~Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 66:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

D/)IVl 0 Du>-.H

N< 77<1/

Qpe Hy +PM

31 OCT

/9g6

GIYE TSIJ(jl EB-.

CEBEBB f. PAL'tHELP DISABL>PFLI

„14 i'PMr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

1»l) tll(»fl)l»l)f))ht)))lf)l

Page 67:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear; power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 68:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionMashington, DC 20555

Page 69:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct<a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialopeiation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

,5a «i... ~ I<~>fbi»~

Page 70:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr . Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 71:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10.CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plant .

within one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 72:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 73:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear-Mr. Dentonc

I wish to urge denial of CP6,L's request forexemption from the requirement, under ]0 CFR 50,Appendix E, that the Company conduct' fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted t'ooperate at all.

Page 74:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr ~ Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 75:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Dentons

T wish to urge denial of CP6,L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant 'or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 76:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Ha'roid Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 77:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPEL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullpart.icipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear p'ower plantwithin one year before beginning'commercialoperation of. the plant or',before operating atgreater than five percent of rated power.

~ Because of the need for changes in the evacua-I tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 78:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

)& 98

CC iS $aau CCM ~gg

CD'. "I II'CC CF"

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington> DC 20555

Page 79:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CP&L's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responseplan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

qa)cC

Page 80:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton< DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 81:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CP&L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Response/Plan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or .before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted Co

operate at allSincerely,

Page 82:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

PQpig 4„'PS~biyJ-,;:

I gl $ ~ i lrCVAPO+T C ~FIC

)B i

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 83:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CP&L's request forexemption from the requirement, under 10 CUR 50,Appendix E, that the Company conduct 5 -fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plant.-within one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 84:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton> DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionMashington, DC 20555

l»((lit»iilil(ilili(Ill»)Ilail

Page 85:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before t e plant is permitted tooperate at all.Sincerely,

Page 86:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionNashington, DC 20555

Page 87:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

De'a'r Mr. Dent. on:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at allSincerely,

Page 88:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Ig~S

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 89:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPEL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company'conduct a fullparticipation exercise of the Emergency Respons~Plan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 90:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 91:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Dentonc

I wish to urge denial of CPLL's request forexemption from the requirement, under 10 CVR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 92:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~vg~f&

p>81 i >qlaif-

".-14

('r.

Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 93:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

re

V

Dear Mr. Denton:

wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, l believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 94:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulhtionNuclear Regulatory CommissionWashington, DC 20555 .

Page 95:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

...Dear Mr. Denton:

I .wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 96:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Hr. Harold Denton, DirectorOffice of Nuclear Reaction Regul'~~tiopNuclear Regulatory CommissionWashington, DC 20555

Page 97:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear„ Mr. Denton:

r*4

U

I wish to urge denial of CP8L's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

l~

~ ~ ~ ~

Page 98:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Page 99:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPLL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exert:ise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 100:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

flcxTD:Y

' =

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 101:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:0'

wish to urge denial of CPS.I.'s request forexemption from the requirement, under 10 CER 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely, d

'":'I'e'7"<dd

Page 102:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~"CC;t'-1>Ce h'OVA POSTCfF «USA

-14+

Mr;-'Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashing'ton, DC 20555.

Page 103:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear .Mr. Denton:

I wish to urge denial of CPLI,'s request forexemption from the requirement, under 10 Cl'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for -changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

P.

Page 104:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

K31 "CT

/9'

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 105:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPSI.'s request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company'conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear"power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for .changes in the evacua-

~ tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 106:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

PQ

3i OCS

/986

tlEXfDcY " g"p'+p+8 @'~~laii

)vis,'/A

lg P:-. " >

gg!sr,igt «.-'l.'i 6 D5l'i14 ~

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionMashington, DC 20555

Page 107:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr..Denton: ~,I

E wish to urge denial of CPS I.' reques t forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear'ower plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 108:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 109:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 110:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Haro'ld Denton, DirectorOffice of Nuclear Reaction Regulatiop .

Nuclear Regulatory CommissionWashington, DC 20555

Page 111:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPB,I.'s request Eorexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, l believe this exercise should beconducted before the plant is permitted tooperate at all. gggT g~g Qg gogg~I + p F~p

E 'P<of'LES c'ow~gg~Sincerely,

Page 112:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

32 OC>

Q7$ gQ ass

~gyp~~~~gal@ i

I

~kltlcli1fp yyjs

l"k I

Mr . Harold Den ton , Dire ctorOffice of Nuclear Reaction Regul a tiopNuclear Regulatory Commi s s ionWashington , DC 2 0 5 5 5

Page 113:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPS.L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe thi's exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 114:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

GL ~6H~+

f j MQ so

ll~~gv 1$

Ncxr I: jPirida~iii

p~ p$pgp

s ~~SSAii «„p li Qglkj pQf

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 115:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CP&L's request forexemption from the requirement, under l0 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

Page 116:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

/wC'g~

lg ">0'<4~~+5~ g $ 'Sindhi

y~eaefl 4j 8 ttw4wg« ~" ZpC YCUfrS -Sr OZEgCr,

;l4 1

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionHashington, DC 20555

f»lifll»islil~ilili~lil»ltill

Page 117:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

'ear Mi. Dentonc

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPB 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

Page 118:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 119:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CUR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responseplan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 120:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington< DC 20555

Page 121:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish.to urge denial of CPS,I.'s reque~st forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency responsePlan for its Shearon Harris nuclear pdwer plantwithin one year before beginning commercialoperation of the plant oi before operating atgreater than five percent of rated power.Because of the need for 'changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

Page 122:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 123:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPS,L's request forexemption from the requirement, under l0 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 124:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~~gJ/ 3@9cl+ 7 /~i ., 4/

lfr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 125:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Dentons

1 wish to urge denial of CPS,L's req'uest forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 126:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

libel)lllssitlslitlij)(I<I)<sll)l

Page 127:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~q$ 3P/

Dear Mr. Denton: ~,

I wish to urge denial of CPSI,'s request forexemption from the requirement, undeb 10 CPR 50,Appendix E, that the Company conduct, a fullparticipation exercise of the Emergency Responseplan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 128:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

1 vm>Vi C,+. u

~4~ H.ill

310CV'~e

tfEXF ar.'Y I

Pg @~WgIa)p

SNAIL"cc;OurnCr Vodka PnSr oPrge

llSA

~I% i

Mr. Harold Denton, Director-Office of Nuclear Reaction'egulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 129:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

.I wish to urge denial of CPEL's request forexemption from the requirement, uqder'10 CPR 50,Appendix E, that the Company conduct .a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

Page 130:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~ «ph1r. and htrs. John yl105 Oiler Dri«eCary, Worlh Carolt 7510

sr N',1 )r

T /'~ lj~(

~% % 1 Q p~ j

g|

Siucl»q>'>

'JSA

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 131:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

c5

Den

) E~

Dear Mr ton:

I wish to urge denial of CPS,I.ls request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 132:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~'P M~at ocr.

'o 1 q I M Zgd l9BSc986

Mr. Harold Denton DirectorOffice of Nuclear Reaction Reg~ulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 133:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton~

I wish to urge denial of CPLL's request forexemption from the requirement, under ]0 CPR 50,Appendix E, that the Company conduct a full

~~~;participation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes..in the evacua-tion plan, I believe this exercise should beconducted. before the plant is permitted tooperate at all.Sincerely,

Page 134:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 135:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Hr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct,a, fullparticipation exercise of the Emergehcy ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincere

Page 136:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold", Denton, DirectorOffice of Nuclear Reaction Regu3.atiopNuclear Regulatory CommissionWashington, DC 20555

Page 137:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPS.I.'s request forexemption from the requirement, under 10 CER 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 138:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 139:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:1

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 Ct'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responseplan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

'\

Sincerely,

Page 140:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 141:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton~

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, X believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely, ~~~@ W~~

Page 142:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington< DC 20555

Page 143:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPS,L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company cond@et a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all. IrSincerel

Page 144:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

x~~ ~ 4PM

31 OC'l

Igqf

i blllclgfp~yyj

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 145:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

, Dear Mr. Denton:

I wish to urge denial of CPBL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 146:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

V

R.4, L~ g t Q ~+~]~)sb~44 Gc

~S)I)gl))j)~~J ««

USAB~'

lir. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 147:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPEL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgieater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 148:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

cH

y«~ ~ r„. Mgt shawm

31 QCV

f996

lfEXTDAr

''ItIr

I)j clair+is,'uP

I'rII I I II 'Vh PO 5 T iJC I f-'SA.24

i'r.

Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 149:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Den@on:

l wish to urge denial of CPS*L's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct, a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the p1ant is permitted tooperate at all.Sincerely,

Page 150:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 151:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPEL's request forexemption from the requirement, under 10 CUR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.'Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is perm'd tooperate at all.Sincerely,

Page 152:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington< DC 20555

Page 153:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency responsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 154:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Hr; Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 155:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear .Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 156:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 157:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~ . N

,"4 jlDear .Hg. Denton'i

t' '~ S

I wish to urge denial of CPLI.'s request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year .before beginning. commercialoperation of the plant or before operating atgreater than five percent of rate'd power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 158:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

F985

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 159:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

Page 160:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

H. hl= g Jag

P'~~PC„j~AN~

. sI>OStI

~ plllVCgll ling

;if'4

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 161:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

w I, r

"/I ~ I '

fDear Hr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, 40nder 10 CFR 501Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-t'ion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

0-. g

Page 162:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

/986

fl.-xrD.,"v Dcaergv „

pp'pp&$'g '" .'-

MACOtJTACI YOUIIPOSi+$ I

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Page 163:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~ PI *fil

Dear Mr.S0( e

Denton:

i

0I

I wish to urge denial of CPS,L's request forexemption from the requirement,<under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Response.Plan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating at

~gryater than five percent of rated power.,Because of the need for changes in the evacua-tion" plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 164:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~~5 ~H e~

po 4 ~ Peg» '-

C bc'e/ 4'l( 5~&8Ilk

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Page 165:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

wish to urge denial of CPSL's request forexemption from the requirement @under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsPlan for its Shearon Harris nuclear power plant I

within one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua- .

tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at

all.'incerely,

Page 166:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr,.. Ha'roid Denton, DirectorOffi'ce of Nuclear Reaction RegulatioNuclear Regulatory CommissionWashington, DC 20555

Page 167:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPS L's request forexemption from the requirement, under 10 CE'R 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the, plant or before operating atgreater than five percent of rated power.

.~Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the is erma,t ted too crate at all.Sincerely,

Page 168:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

0 Y. Ve<)0'6 en.rrIn 4 P~ cP I~sgom> ~< >a>a

<Al p p

Acx~81nvh~~F

FXPg~g@c-,;..'

CG/aF<0'p pg Jlpg c ~ 1 4

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 169:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Nr.)D

83tHTmW88804'8@g»

e> U~yggq ~~o,

"'UOQ

4 RUG;l70$

m~h to urge denial of CPS L' request forexemption from the requirement, un'der 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

g beep< zog@»»(=

Page 170:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

. )/z

«//» IN/ ."." GOODWILL INDUSlI lfS

Our BUSINESS IOhk,FOB DISABLED PEI

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555 '

Page 171:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr.,'Denton:

I wish to urge denial of CgB,L's request forexemption from the requireQe~t, under 10 CPR 50,Appendix E, that the Compang~p'onduct a fullparticipation exercise of the Erdergency ResponseP-an for its Shearon Harris nucl'ear power plantwithin one year before beginning commercialoperation of the plant or before operating atgregter than five percent of rated power.Pecause of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

s.c.. ~~lou Ccu l S+ Q~4o~ p~ ~~g~>

Page 172:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionNashington, DC 20555

Page 173:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear'r,. Denton:

I wish to urge denial of CPSL~ request forexempt'ion from the requirement/, under 10 CFR 50,Appendix E, that the Company conductor@ fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerel

Page 174:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

6/ cC

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 175:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

~f.'ish to urge denial of CPBL's request forexemption from the requirement:<~~pnder 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of .the Emergency Response

-~ Plan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 176:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatioNuclear Regulatory CommissionWashington, DC 20555

Page 177:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

4

Dear Mr. Denton:~t

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conducP,"a fullparticipation exercise of the Emergency ResponseP3.an for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 178:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

'> n~M» ~~u, ~~ a)

$22 AUG

1986

Ifr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 179:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPBL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise>of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwx,thin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-t'ion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 180:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

c f

AvN GOOD'jl'IILL INDUSITlg%

OUR BUSiVESS AO.

FOR DlSt BLED PBN"

Mr. Harold Denton, Director *

Office of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 181:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

l g lg I

Dear'Mr. Denton:

Jgr

gog; ~

rg~

I wish to Gage denial of CPSL's request forexemption from the requirement, undjq 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responseplan, for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 182:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

l(-g~ ~

CA

'ZE 'lUG

/986

GOODVIlLL INDUS RK4'

OUR BUSlNESS NOBLES-.~-'OR

DlSABLEQ PEOPLI

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 183:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

N,.C-~ g

.Dear Mr. Denton:

X wish to urge denial of CPSL's~equest forexemption from the requirement, g>der 10 CER 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emerge'ncy ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

/'incerely,

Page 184:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

AL(„~( Ql

22 AUG'~

/996

«e < ',~ y gg'i «I C ~ V«o4 IgSJ))elf)~",g«g +~~"

'USA

tir. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 185:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Dento

I wish to urge denial of CPS''s request for'exemption from the requiremen't, uri8pr 10,CFR 50,Appendix E, that the Company conduct a,fullparticipation exercise of the Emergency ResponseP='an for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgrater than five percent of rated power.Pecause of the need for changes in the evacua-tion plan: I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

f05«%$QspQ- /lid, 2pp($

Page 186:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~ ~

f(ExYDAYDggtyggy

gp~Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Page 187:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. De ..on:

wish to urge denial of CPSL's request forexemption from the requirement, uyder 10 CFR 50,Appendix E, that the Company cond''t a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear 'power plantwi-thj.n one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Io P~ go~cb~ Qg ~~BIO

Page 188:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

22 AUG

/986

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory

Commission'ashington,

DC 20555

Page 189:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plant

~,w".2thin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.because of the need for changes in the evacua-tion plan, l believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 190:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

r2 / f(s. t5 L j ~

Qgc -w~IQp~ ~~ 'llC

XI

t4exr Dav DQPI

conracr vovn nosr os <ea'~>w

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555 t

T

Page 191:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Hr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CER 50,Appendix E, that the Company conduct«a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-Cion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 192:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

-p,PM.5 ~

IVXp

GOODWILL INDUSTI'I~IE(

OUR BUSlNESS VI|ORKF

FOR DISABLED PEO, IL

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionNashington, DC 20555

Page 193:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton9'ish

to urge denial of CPS L ' request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responsepl.an for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 194:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Wr

Ql'PP AUG

Ioe6

GOODWILL INDUSiB)f3'UR

BUSINESS Ui0

FOR DIShBLED PBS

- Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 195:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~ ~Et

L1

I

Dear Mr. Denton:~Ev n

wish to urge denial of CPSL's request forexemption fr~de the requirement,qunder 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of,. the Emergency ResponsePlan for its Shearon Harris nuclear power plant

Iwithin one year before beginning commercialoperation of the plant or before operating at

~ greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerel

Page 196:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Page 197:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responsep='an for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation. of the plant or before operating atgreyter than'3five percent of rated power.Because of (he need- for changes in the evacua-tion plan, p believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 198:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Dent'on,, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

PM( SinqlaiP yvj8,

, ~ J-':

3~ld0' lB', SIG 803

j"'na ~Ao

SHI~iCiiGill'illR0009

g86I9A< 14

Ã'No

Page 199:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Hr. Denton:

I wish to urge denial of CPS,L's request forexemption from the requirement, 'un'der 10 CFR 50,Appendix E, that the Company condu0t a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercial'operation of the plant or before operating atgreater than five percent of rated power.,Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely

Page 200:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~ fi

o <77

:1 LUG

IQGQ

Mr.'. Ha'roid Denton, DirectorOffi;ce of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Page 201:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conBuct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincere

Page 202:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

4

yGH

M

2! AUlp.

I986

MIIIIIT ILL fttp95jlg—OUR BUSI+Foe QisAI!gy ~ '„

'14~ />

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Page 203:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr.,Denton:

We are pleased that you denied "backfit status"for two design changes to Shearon Harris. Weare hoping that you will require CPS,L to meetthe specific NRC regulations in full. We alsohope that you artfully investigating thesubstance of our concerns in'the Petition toIntervene and the Motion to Stay the ImmediateEffectiveness of the NRC's Licensing Board'sFinal Decision on Shearon Harris.

Sincerely,

Page 204:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction Regulation,.Nuclear Regulatory CommissionWashington, DC 20555 o c >

~~C3 C3

z ~r-t 'rl

w Cf~ o- r~~cfTl

Page 205:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement~~nder 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the, Emergency ResponsePlan for its Shearon Harris nuclear power plantwf.thin one year before beginning commercial

~ operation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 206:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

s'55"+

,CONT4~g yy $

~ p

Mr. Harold Denton, DirectorOffice of Nuclear=Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 207:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

'Dear -Mr. Denton:

JaHl ~l,;,'"

882.'

wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 208:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

GOODVIILL INDUS-'fFI S.

OUR BUSINESS VvOR,FOB DISABLED PE PL

Hr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

Page 209:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, unB'er .10 CFR 50,Appendix E, that the Company condbct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialopo.ration of the plant or before operating at,greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 210:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Page 211:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPBL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponseP1an for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Be~ause of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.

Page 212:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Cll

"gP AUG

~lSS6

YIlLL lHDL'M %FOOOO

oua DUslNESS,~~ .K~

Foe DtS<BLED',PE

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionMashington, DC 20555

Page 213:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

Sincerely,

I wish to urge denial of CPSI"s request forexemption from the requirement;, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePla~ for its Shearon Harris nuclear power plantwithi™n one year before beginning commercialope'ration of the plant or before operating atgreater than five percent of rated power.Bee.ause of the need for changes in'he evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all. pe

f oft

Page 214:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

G OODvllLLINEglQI%lfs'UR

BUSINESS4'OR

01SABl.EO'Fs

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatiopNuclear Regulatory CommissionWashington, DC 20555

J

Page 215:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

4 ~

Dear Hr. Denton:I

l wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Response

,-P3.an for its Shearon Harris nuclear power plantwi'thin one year before beginning commercialoperation of the plant or before operating at

- greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 216:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~2l~19'lExrD.$.,

g"gglÃjgMc@

~pgppct 1 0IIR pD$ Y Fjl 'X

Mr. Harold Denton, DirectorOffice. of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Page 217:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

wish to urge denial of CPSL's request forexemption from the requirement, ~under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwit'nin one year before beginning commercialbperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at, all.Sincerely, 2 8/W

Page 218:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffi'ce of Nuclear Reaction RegulatioNuclear Regulatory CommissionWashington, DC 20555

Page 219:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~ SC

t j

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CPR 50Appendix E, that the Company conduct a fullparticipation exercise. of the Emergency Respons,plan for its Shearon Harris nucl'ear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated pover.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 220:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

O8 &kCk~~ PC g. 7 a ~ <

jpgpOlJR BUSIgE<'j,i'@<< ~FOR OfSABLF>~ P'OogQp

'r.

Harold Denton, DirectorOffice of Nuclear React,ion RegulatioNuclear Regulatory CommissionWashington, DC 20555

Page 221:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CER 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 222:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

~ip~eL-.Hru„,~p'lp i

PZF@%.„~;;.~,tYc aiirtc r v our'n,o

Mr. Harold Denton, DirectorOffice of Nuclear Reaction Regulatio.".Nuclear Regulatory CommissionWashington, DC 20555

Page 223:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton.:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,.Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.,Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitti d tooperate at all.Sincerely,

Page 224:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Sf0)

6-

GOOD WILLIIL'/gledOUR BUSIIIIES.~ I,rf

FOR DISABLED)P'l%00

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Page 225:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPSI 's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plant

, within one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 226:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555 t

Page 227:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPEL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Response>lan for its Shearon Harris','nuclear power plant,within one year before beginning commercialoperation of the plant or before operating at.greater than five percent of rated power.

, Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plarit is permitted tooperate at all.Sincerely,

Page 228:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

F3a.v AC/ i~"'c3g p Pgtg D.c

Cp / - il gt~uc

GiVF.-TO UgiTEof,CERESAtii. Phi.sy~k "

HELP DlSABLED P„..[PL,

iv)S

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Page 229:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPBL's r~equest forexemption from the requirement, u™ader 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency Responseplan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.

.Because of the need for changes in the evacua-- tion plan, I believe this exercise should beconducted before the plant is per 'tted tooperate at all.Sincerely,

Page 230:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

(C~gs PQi;

/986

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Page 231:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Hr. Denton:

I wish to urge denial of CPSI 's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plant~within one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.

.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 232:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

C HAPL 4

5~ Mg

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulationNuclear Regulatory CommissionWashington, DC 20555

Page 233:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

Dear Mr. Denton:

I wish to urge denial of CPSL's request forexemption from the requirement, under 10 CFR 50,Appendix E, that the Company,conduct a fullparticipation exercise of the Emergency ResponsePlan for its Shearon Harris nuclear power plantwithin one year before beginning commercialoperation of the plant or before operating atgreater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should beconducted before the plant is permitted tooperate at all.Sincerely,

Page 234:  · «NUDOCS/RD» Nuclear Regulatory Commi ssi on ADQ42 V6 ==== TCON114 ========== Accession Number - 8611050175 ====== Start ==== End Availability: PDR Format: Microfilm ...

QJE TO Uth',HiEQair v(s

nN CEBEBRAL PAL, Y- --.,zi augf Q - HEg+IPPLED PE JF

'l4

E

Mr. Harold Denton, DirectorOffice of Nuclear Reaction RegulatioNuclear Regulatory CommissionWashington, DC ZQ555