Post on 11-Sep-2015
description
PROGRAM - VERSION 1
EXPERTS, EXPERIENCES AND STATE OF ART ACHIEVEMENTS
Alfndega - Porto-Portugal
01-03/JULY/2015
ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS08.00
chEck IN
08.1508.3008.4509.00
kEY NOTE09.1509.30
OPENING SESSION kEY NOTE kEY NOTE09.4510.00
kEY NOTEcONcEPTUAL
DESIGN
LIFE cYcLESAFETY
& SERVIcEABILITY
INTERAcTIVE PLENARY TEchNIcAL
SESSION
10.1510.30
kEY NOTEExPERTS, ExPERIENcES &
LANDMARk PROjEcTS & cONcEPTUAL DESIGN10.45
11.00 cOFFEE BREAkcOFFEE BREAk cOFFEE BREAk
11.15
ExPERTS, ExPERIENcES & LANDMARk
PROjEcTS
STRUcTURAL ANALYSIS
MONITORING & MAINTENANcE & MANAGEMENT
11.30
ExPERTS, ExPERIENcES & LANDMARk
PROjEcTS
INNOVATIVE cONSTRUcTION
METhODS
SAFETY & SERVIcEABILITY
cONcEPTUAL DESIGN
INNOVATIVE cONSTRUcTION
METhODSMONITORING
& MAINTENANcE & MANAGEMENT
11.45
NEw MATERIALS AND SPEcIAL
DEVIcES
12.0012.1512.30 ExPERTS, ExPERIENcES
& LANDMARk PROjEcTS12.4513.00
LUNch LUNch LUNch
13.1513.3013.4514.0014.1514.30
kEY NOTE kEY NOTESTRUcTURAL
ANALYSIS
ExPERTS, ExPERIENcES & LANDMARk
PROjEcTS
cONcEPTUAL DESIGN14.4515.00
kEY NOTE kEY NOTELIFE cYcLE
15.15 MONITORING & ...15.30
cONcEPTUAL DESIGN REhABILITATION
MONITORING & MAINTENANcE & MANAGEMENT
ExPERTS, ExPERIENcES & LANDMARk
PROjEcTS
cONcEPTUAL DESIGN
STRUcTURAL ANALYSIS
kEY NOTE15.4516.00 INTERNATIONAL PRIzE - INNOVATION IN BRIDGE ENGINEERING16.15 cLOSING SESSION16.30
cOFFEE BREAk cOFFEE BREAk16.4517.00
INNOVATIVE cONSTRUcTION
METhODS
ExPERTS, ExPERIENcES & LANDMARk
PROjEcTS
AcIDENTS AND INcIDENTS
& ExTREME LOADSMONITORING
& MAINTENANcE & MANAGEMENT
cONcEPTUAL DESIGN
STRUcTURAL ANALYSIS
17.1517.3017.45 SPEcIAL FOUNDATIONS
AND GEOTEchNIcAL AND SITE
INVESTIGATIONS
18.0018.1518.30 BOAT TRIP - BRIDGES OF PORTO DINNER OF ThE cONFERENcE
DAY 3DAY 2DAY 1
ThE ORGANIzING cOMMITTEE RESERVES ThE RIGhT TO INTRODUcE MINOR chANGES IN PRESENT PROGRAM.
DAY 1
ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS
08.00 chEck IN
09.30 OPENING SESSION
10.00kEY NOTEMULTI-SPAN LARGE BRIDGES INTERAcTION BETwEEN DESIGN AND cONSTRUcTION (kNL7)PRESENTED bY ARNE FREDERIkSEN bAEkSTED
10.45kEY NOTE MULTI-SPAN ExTRADOSED BRIDGES (kNL1)PRESENTED bY AkIO kASUgA
11.00 cOFFEE BREAk
11.15EXPERTS, EXPERIENCES & LANDMARk PROJECTS BRIDGE OVER ThE cDIz BAY, SPAIN (1147) PRESENTED bY A. MARTNEz
STRUCTURAL ANALYSIS BIG BRIDGE IN PERGOLA FOR hIGh VELOcITY TRAINS IN SPAIN (1036)PRESENTED bY C. JURADO
MONITORINg & MAINTENANCE & MANAgEMENT SURVEILLANcE OF cONTINUOUS PREcAST cONcRETE BRIDGE DEckS SUPPORTED BY MONITORING-BASED TEchNIqUES (1215)PRESENTED bY C. SOUSA
11.30EXPERTS, EXPERIENCES & LANDMARk PROJECTS INNOVATIVE EREcTION METhODS OF STEEL cABLE-STAYED BRIDGES (1213) PRESENTED bY M. DE MIRANDA
STRUCTURAL ANALYSIS ADVANcES OF ExTERNAL PRESTRESSING TENDONS IN MULTI-SPAN cURVED BOx-GIRDER BRIDGES (1071)PRESENTED bY T. Y. SONg
MONITORINg & MAINTENANCE & MANAgEMENT MONITORING BASED ASSESSMENT OF FATIGUE RESISTANcE OF 40 YEAR OLD Pc BRIDGES (1015)PRESENTED bY H. WEIHER
11.45EXPERTS, EXPERIENCES & LANDMARk PROJECTS BALUARTE BRIDGE ExEcUTIVE PROjEcT (1248)PRESENTED bY g. R. ARgELLES
STRUCTURAL ANALYSIS REINVESTIGATION OF POST-TENSIONED BRIDGE OVER BITLIS RIVER (1198)PRESENTED bY b. D. zTRk
MONITORINg & MAINTENANCE & MANAgEMENT A NOVEL INSPEcTION METhOD FOR ORThOTROPIc STEEL DEckS USING PhASED ARRAY ULTRASONIc TESTING (1074)PRESENTED bY T. MAkITA
12.00EXPERTS, EXPERIENCES & LANDMARk PROJECTS STRUcTURAL SOLUTIONS AND cONSTRUcTION METhODS FOR ThE MAIN cROSSING OF ThE MERSEY GATEwAY BRIDGE PROjEcT (1163)PRESENTED bY g. D. MOIR
STRUCTURAL ANALYSIS STRESSING SEqUENcE OF STEEL cABLE-STAYED BRIDGES BUILT BY cANTILEVERING (1193)PRESENTED bY A. RECUPERO
MONITORINg & MAINTENANCE & MANAgEMENT INVESTIGATIONS OF POST TENSIONED BRIDGES wITh cRITIcAL PRESTRESSING STEEL REGARDING hYDROGEN INDUcED cRAckING (hIc) (1034)PRESENTED bY A. W. gUTSCH
12.15EXPERTS, EXPERIENCES & LANDMARk PROJECTS DESIGN OF ThE LONG-SPAN FOOTBRIDGE OVER ThE BUG RIVER IN NIEMIRw (1060)PRESENTED bY J. bILISzCzUk
STRUCTURAL ANALYSIS A GRAPhIc, ExAcT METhOD FOR ANALYzING hYPERSTATIc SPATIAL PERGOLAES (1084)PRESENTED bY A. g. LACORT
MONITORINg & MAINTENANCE & MANAgEMENT DELAYED DEFORMATIONS OF cONcRETE STRUcTURES: ThE SAVINES BRIDGE AND ThE chEVIRE BRIDGE (1124)PRESENTED bY J-P. SELLIN
12.30EXPERTS, EXPERIENCES & LANDMARk PROJECTS ThE RUSSkY BRIDGE: PYLONS DESIGN APPROAch OPTIMIzATION (1067)PRESENTED bY V. E. RUSANOV
STRUCTURAL ANALYSIS INVESTIGATION ON STABILITY PROBLEMS AS A SEcOND ORDER ThEORY PROBLEM FOR PIERS wITh PRAcTIcALLY INFINITE BENDING STIFFNESS (1046)PRESENTED bY V. kARATzAS
MONITORINg & MAINTENANCE & MANAgEMENT LASER ScANNER IN IDENTIFIcATION OF PAThOLOGIcAL MANIFESTATIONS IN cONcRETE (1191)PRESENTED bY F. bORDIN
12.45EXPERTS, EXPERIENCES & LANDMARk PROJECTS kASSUENDE BRIDGE OVER zAMBEzI RIVER IN TETE, MOzAMBIqUE (1103)PRESENTED bY T. MENDONA
STRUCTURAL ANALYSIS SUSPENSION cABLES BRIDGE AND ARchES (1035)PRESENTED bY L. M. LAgINHA
MONITORINg & MAINTENANCE & MANAgEMENT USING DATA MINING AND NUMERIcAL SIMULATIONS FOR ON-LINE MONITORING OF LONG SPAN BRIDGES (1012)PRESENTED bY J. SANTOS
13.00 LUNch
DAY 1
ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS
14.30kEY NOTEVIADUcTS wITh PROGRESSIVELY EREcTED DEckS (kNL3)PRESENTED bY JIRI STRASkY
14.45
15.00 kEY NOTEREcENT AchIEVEMENTS IN ThE DESIGN AND cONSTRUcTION OF MULTI-SPAN cABLE SUPPORTED BRIDGES IN chINA (kNL8)PRESENTED bY AIRONg CHEN15.15
15.30CONCEPTUAL DESIgN ThREE SPAN FLOATING SUSPENSION BRIDGE cROSSING ThE BjRNAFjORD (1090) - PRESENTED bY J. VEIE
REHAbILITATION INNOVATIVE REhABILITATION OF LARGE BRIDGES- ThE INDIAN wAY (1079) - PRESENTED bY P. Y. MANJURE
MONITORINg & MAINTENANCE & MANAgEMENTIMPLEMENTATION OF A B-wIM SYSTEM IN A cENTENARY STEEL TRUSS BRIDGE (1220) - PRESENTED bY F. CAVADAS
15.45CONCEPTUAL DESIgN - LONG RAILwAY VIADUcTS wITh SPEcIAL SPANS: PART-1. ARch cONSTRUcTION BY BALANcED cANTILEVER wITh AUxILIARY cABLES (1155) - PRESENTED bY A. MARTNEz
REHAbILITATION wIDENING OF SAN TIMOTEO AND cANERO VIADUcTS (1014)PRESENTED bY M. bIEDMA
MONITORINg & MAINTENANCE & MANAgEMENTMAINTENANcE METhOD FOR cABLE-STAYED AND ExTRADOSED BRIDGE wITh cOMPOSITE MAIN GIRDER (1165) - PRESENTED bY H. SAkAI
16.00CONCEPTUAL DESIgN DESIGN OF ThE NANAY BRIDGE (1255)PRESENTED bY J. LPEz
REHAbILITATION - IMPREGNATION TEchNIqUE PROVIDES cORROSION PROTEcTION TO GROUTED POST-TENSIONING TENDONS (1065) PRESENTED bY D. WHITMORE
MONITORINg & MAINTENANCE & MANAgEMENTcONSTRUcTION cONTROL OF A LONG-SPAN SINGLE PYLON cABLE-STAYED BRIDGE (1011) - PRESENTED bY C. LIU
16.15CONCEPTUAL DESIgN - A STUDY ON VEhIcULAR LIVE LOAD DESIGN BASED ON AcTUAL VEhIcULAR LOAD FOR A MULTI-SPAN LARGE cABLE-STAYED BRIDGE (1088) - PRESENTED bY H. SUgIYAMA
REHAbILITATION ASSESSMENT OF EPISTEMIc UNcERTAINTIES IN ThE RESISTANcE OF Rc cOLUMNS cONFINED BY cFR (1175) - PRESENTED bY J. R. FERREIRA
MONITORINg & MAINTENANCE & MANAgEMENTMONITORED-BASED METhODOLOGY TO PREDIcT ThE INITIATION OF cORROSION IN Rc STRUcTURES (1252) - PRESENTED bY R. A. VOTSIS
16.30 cOFFEE BREAk
17.00INNOVATIVE CONSTRUCTION METHODS - AN INNOVATIVE SYSTEM OF PREcAST SEGMENTAL SPAN-BY-SPAN cONSTRUcTION FOR SPAN LENGThS OF ABOVE 100 M (1125) - PRESENTED bY J. MUOz-ROJAS
EXPERTS, EXPERIENCES & LANDMARk PROJECTS MULTI-SPAN BRIDGE cROSSINGS FOR IMPROVED ROAD AccESS TO SzczEcIN SEA PORT (1039) - Presented by J. Hoowaty
ACIDENTS AND INCIDENTS & EXTREME LOADS STRUcTURAL PERFORMANcE OF cABLE-STAYED FOOTBRIDGES TO ThE LOSS OF cABLE(S) (1050) - PRESENTED bY O. A. OLAMIgOkE
17.15INNOVATIVE CONSTRUCTION METHODSFLExIARch-STRESS RIBBON cOMBINATION FOR MULTI-SPAN PEDESTRIAN BRIDGES (1098) - PRESENTED bY A. E. LONg
EXPERTS, EXPERIENCES & LANDMARk PROJECTS ARMADO GUEBUzA BRIDGE OVER zAMBEzI RIVER IN cAIA, MOzAMBIqUE (1141) - PRESENTED bY T. MENDONA
ACIDENTS AND INCIDENTS & EXTREME LOADS Causes of the bridge falsework Collapse near levoa in SLOVAkIA (1047) - PRESENTED bY P. PAULk
17.30INNOVATIVE CONSTRUCTION METHODSBALANcED LIFT METhOD FOR ThE cONSTRUcTION OF BRIDGES wITh TwO SPANS (1078) - PRESENTED bY S. FOREMNIAk
EXPERTS, EXPERIENCES & LANDMARk PROJECTS - DESIGN AND PROOF chEckING OF FOUNDATION, SUBSTRUcTURE AND SUPERSTRUcTURE OF RAIL cUM ROAD BRIDGE AT MUNGER, BIhAR, INDIA (1190) - PRESENTED bY P. g. VENkATRAM
ACIDENTS AND INCIDENTS & EXTREME LOADS chARAcTERISTIc OF TRAFFIc LOADING RESPONSE FOR MULTI-SPAN LARGE BRIDGE (1045) - PRESENTED bY J. Y. zHOU
17.45INNOVATIVE CONSTRUCTION METHODShIGh PRODUcTIVITY IN BRIDGE cONSTRUcTION ThE OPS EFFEcT (1250) - PRESENTED bY H. COELHO
EXPERTS, EXPERIENCES & LANDMARk PROJECTS & CONCEPTUAL DESIgN hARAMAIN hIGh SPEED RAILwAY LINE (1167)PRESENTED bY J. M. g. PAREJO
SPECIAL FOUNDATIONS AND gEOTECHNICAL AND SITE INVESTIgATIONS cEIRA BRIDGE FOUNDATIONS: cOMBINED MIcROPILE AND FOOTING FOUNDATIONS (cMFF). STATIc LOAD TESTS (1161) - PRESENTED bY S. gIL
18.00INNOVATIVE CONSTRUCTION METHODSSwIVEL LOwERING OPERATION OF ThE VIADUcT OVER ThE RIVER TERA (1010) - PRESENTED bY F. J. M. LPEz
EXPERTS, EXPERIENCES & LANDMARk PROJECTS LARGE MULTI-SPAN BRIDGES BUILT IN REcENT YEARS IN POLAND (1059) - PRESENTED bY J. bILISzCzUk
SPECIAL FOUNDATIONS AND gEOTECHNICAL AND SITE INVESTIgATIONSTRESFjORD BRIDGE FOUNDATION OF MAIN SPAN ON 40M cAISSON ON SOIL SEABED (1026) - PRESENTED bY k. b. DAHL
18.15INNOVATIVE CONSTRUCTION METHODS - PRESTRESSED I-BEAMS MADE OF ULTRA-hIGh PERFORMANcE cONcRETE FOR cONSTRUcTION OF RAILwAY BRIDGES (1189) - PRESENTED bY P. TEJ
EXPERTS, EXPERIENCES & LANDMARk PROJECTS MERI BRIDGE: cONSTRUcTION AND qUALITY cONTROL (1063)PRESENTED bY T. ULUz
SPECIAL FOUNDATIONS AND gEOTECHNICAL AND SITE INVESTIgATIONSchIAPAS BRIDGE (1249)PRESENTED bY g. R. ARgELLES
18.30 BOAT TRIP - BRIDGES OF PORTO
DAY 2
ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS
09.00kEY NOTEThE RUYI SEA cROSSING (kNL11)PRESENTED bY WOLFgANg EILzER
09.15
09.30kEY NOTEThIRD BOSPhORUS BRIDGE (kNL10)PRESENTED bY MICHEL VIRLOgEUX
09.45
10.00CONCEPTUAL DESIgNDEVELOPMENT OF A SUBMERGED FLOATING TUBE BRIDGE FOR cROSSING OF ThE BjRNAFjORD (1204) - PRESENTED bY M. REISO
LIFE CYCLEAPPLIcATION OF ThE MONTE-cARLO METhOD TO cALcULATE ThE LIFE-cYcLE cOSTS OF BRIDGES (1001) - PRESENTED bY C. HOFSTADLER
SAFETY & SERVICEAbILITY - AN EFFIcIENT METhODOLOGY FOR FATIGUE DAMAGE ASSESSMENT OF cRITIcAL DETAILS ON A LONG SPAN cOMPOSITE RAILwAY BRIDGE (1177) - PRESENTED bY C. M. C. ALbUqUERqUE
10.15CONCEPTUAL DESIgNLONG RAILwAY VIADUcTS wITh SPEcIAL SPANS. PART 2: ARch cONSTRUcTION BY TILTING (1143) - PRESENTED bY J. MUOz-ROJAS
LIFE CYCLE SELEcTIVE USE OF NON cORROSIVE REBAR TO INcREASE cONcRETE DURABILITY (1174) - PRESENTED bY A. E. C. bORDERON
SAFETY & SERVICEAbILITY cYcLIc BEhAVIOR OF cONTINUOUS RAILwAY VIADUcTS MADE wITh U-ShAPED PREcAST cONcRETE GIRDERS (1197) - PRESENTED bY C. SOUSA
10.30CONCEPTUAL DESIgN - PARTIcULAR DESIGN FEATURES FOR A LONG SPAN cABLE-STAYED BRIDGE OVER ThE hARBOUR OF PORT LOUIS, MAURITIUS (1188) - PRESENTED bY J. JUNgWIRTH
EXPERTS, EXPERIENCES & LANDMARk PROJECTS MULTI-SPAN BRIDGE BYPASS OVER ThE DzIwNA STRAIT (1042)Presented by J. Hoowaty
SAFETY & SERVICEAbILITYcONcRETE BOx GIRDER BRIDGE ASSESSMENT A STIFFNESS ADAPTATION APPROAch (1251) - PRESENTED bY D. bEgg
10.45CONCEPTUAL DESIgNFOUR SPANS cONTINUOUS cABLE STAYED BRIDGES wIThOUT ExTRA cABLES (1212) - PRESENTED bY J. ROMO
EXPERTS, EXPERIENCES & LANDMARk PROJECTS & CONCEPTUAL DESIgNThE TIED ARch BRIDGE OF ThE SAALE-ELSTER-VIADUcT (1186)PRESENTED bY W. EILzER
SAFETY & SERVICEAbILITYRESIDUAL BRIDGES BEARING cAPAcITY ANALYSIS DURING SERVIcE PERIOD SUBjEcT TO SAFETY VARIABILITY (1061) - PRESENTED bY V. E. RUSANOV
11.00 cOFFEE BREAk
11.30EXPERTS, EXPERIENCES & LANDMARk PROJECTS MULTI-SPAN LARGE DEckS ThE ORGANIc PRESTRESSING IMPAcT - PRESENTED bY P. PACHECO
INNOVATIVE CONSTRUCTION METHODSThE PATANI BRIDGE (NIGERIA): INNOVATIVE cONSTRUcTION METhODS (1135) - PRESENTED bY P. STELLATI
SAFETY & SERVICEAbILITYALkALI-SILIcA REAcTION, ASR REVIEw ON hOw TO DEAL wITh ASR IN cONcRETE STRUcTURES (1221) - PRESENTED bY J. CUSTDIO
11.45EXPERTS, EXPERIENCES & LANDMARk PROJECTSRION-ANTIRION BRIDGE chALLENGING EARThqUAkES (1182)PRESENTED bY E. JOLY
INNOVATIVE CONSTRUCTION METHODSINNOVATIVE SPLIcED GIRDER METhOD FOR MULTI SPAN BRIDGES (1209) - PRESENTED bY N. SkOLNICk
NEW MATERIALS AND SPECIAL DEVICESLIGhTwEIGhT cONcRETE FOR LONG-SPAN BRIDGES (1164)PRESENTED bY P. HObEN
12.00EXPERTS, EXPERIENCES & LANDMARk PROJECTS- VIADUcT OVER RIVER ULLA IN ThE SPANISh ATLANTIc hIGh SPEED RAILwAY LINE: AN OUTSTANDING cOMPOSITE STEEL-cONcRETE TRUSS BRIDGE (1170) - PRESENTED bY F. MILLANES
INNOVATIVE CONSTRUCTION METHODSINNOVATIVE FORMwORk SYSTEMS IN BRIDGE cONSTRUcTION cASE STUDIES (1029) - PRESENTED bY M. kAMLEITHNER
NEW MATERIALS AND SPECIAL DEVICEScABLE STAYED FOOTBRIDGE wITh ThE DEck MADE OF UhPc (1048)PRESENTED bY J. L. VTEk
12.15EXPERTS, EXPERIENCES & LANDMARk PROJECTSjUScELINO kUBITSchEk BRIDGE, BRASLIA, BRAzIL (1192)PRESENTED bY F. bOTTO DE bARROS
INNOVATIVE CONSTRUCTION METHODSBUILDING ThE wORLD LARGEST hIGh SPEED TRAIN ARch BRIDGES wITh MOVABLE ScAFFOLDING SYSTEMS (1038) - PRESENTED bY A. A. PVOAS
NEW MATERIALS AND SPECIAL DEVICES - NON-DESTRUcTIVE MEASUREMENTS TO EVALUATE FIBER DISPERSION AND cONTENT IN UhPFRc REINFORcEMENT LAYERS (1219) - PRESENTED bY S. NUNES
12.30EXPERTS, EXPERIENCES & LANDMARk PROJECTSTUNEIT TOwARDS A GLOBAL wORLD (1089)PRESENTED bY E. SIVIERO
INNOVATIVE CONSTRUCTION METHODS - DEck FORcES OF A cABLE-STAYED BRIDGE - ANALYSIS OF ThE cONSTRUcTION AND ThE IN-SERVIcE PhASES (1227) - PRESENTED bY P. ALMEIDA
NEW MATERIALS AND SPECIAL DEVICESNEw TEST METhODS FOR STAY cABLE SYSTEMS (1023)PRESENTED bY A. W. gUTSCH
12.45EXPERTS, EXPERIENCES & LANDMARk PROJECTS cROSSING OF BjRNAFjORDEN FLOATING BRIDGE (1070)PRESENTED bY b. VILLORIA
INNOVATIVE CONSTRUCTION METHODSPRELIMINARY ASSESSMENT OF wIND AcTIONS IN LARGE SPAN MSS (1109) - PRESENTED bY A. RESENDE
NEW MATERIALS AND SPECIAL DEVICES - MEchANIcAL PROPERTIES AND ExPLOSIVE SPALLING BEhAVIOR OF ThE REcYcLED STEEL FIBER REINFORcED ULTRA-hIGh-PERFORMANcE cONcRETE (1224) - PRESENTED bY g. F. PENg
13.00 LUNch
DAY 2
ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS
14.30 kEY NOTEDESIGN AND cONSTRUcTION OF SEA-cROSSING BRIDGES - A REVIEw (kNL2)PRESENTED bY NAEEM HUSSAIN14.45
15.00kEY NOTELARGE VIADUcTS, SOME ExEcUTIONS A FEw IDEAS (kNL1)PRESENTED bY JAVIER MANTEROLA
15.15
15.30EXPERTS, EXPERIENCES & LANDMARk PROJECTS qUEENSFERRY cROSSING: ROLE OF cONcRETE IN ThE DESIGN AND ExEcUTION OF ThE PROjEcT (1081) - PRESENTED bY P. CURRAN
CONCEPTUAL DESIgN - BRIDGE AcROSS ThE wASchMhL VALLEY, kAISERSLAUTERN, GERMANY A hARMONIc SYMBIOSIS BETwEEN A hISTORIc MONUMENT AND A NEw INNOVATIVE BRIDGE (1184) - PRESENTED bY W. EILzER
STRUCTURAL ANALYSISFINITE ELEMENT MODELING OF ThE FATIh SULTAN MEhMET SUSPENSION BRIDGE (1200) - PRESENTED bY S. A. kILIC
15.45EXPERTS, EXPERIENCES & LANDMARk PROJECTS NEw PUMAREjO BRIDGE OVER ThE RIVER MAGDALENA IN BARRANqUILLA. cOLOMBIA (1153) - PRESENTED bY J. MUOz-ROJAS
CONCEPTUAL DESIgNMULTI-SPAN BRIDGES: ThE FIRST chILEAN ExPERIENcE AND FUTURE chALLENGES (1093) - PRESENTED bY M. A. VALENzUELA
STRUCTURAL ANALYSISNUMERIcAL SIMULATION OF wIND PRESSURE OF A cONTINUOUS FIN-BAck BRIDGE (1022) - PRESENTED bY M. FU
16.00EXPERTS, EXPERIENCES & LANDMARk PROJECTS DELIVERING ThE PADMA MULTIPURPOSE BRIDGE PROjEcT, BANGLADESh (1181) - PRESENTED bY W. k. WHEELER
CONCEPTUAL DESIgN - OPTIMIzATION OF cABLE wEIGhT IN MULTI-SPAN cABLE-STAYED BRIDGES. APPLIcATION TO ThE FORTh REPLAcEMENT cROSSING (1178) - PRESENTED bY A. bALDOMIR
STRUCTURAL ANALYSIS - MODELING BRIDGE cONSTRUcTION PhASING BY ThE BALANcED cANTILEVER METhOD cOMPARISON BETwEEN PREDIcTED AND REAL cAMBER VALUES (1226) - PRESENTED bY L. g. CASTRO
16.15EXPERTS, EXPERIENCES & LANDMARk PROJECTS cONSTRUcTION AND DESIGN FEATURES OF ThE BRIDGE OVER ThE DANUBE RIVER. BULGARIA (1146) - PRESENTED bY A. MARTNEz
CONCEPTUAL DESIgN - cOMPARATIVE STUDY OF PRESTRESSING cONSUMPTIONS IN 7 DIFFERENT cONSTRUcTIVE METhODS FOR 75 M MULTI-SPAN BOx GIRDERS (1117) - PRESENTED bY b. LIMA
STRUCTURAL ANALYSISRATIONAL AND PRAcTIcAL METhOD FOR cAMBER cONTROL IN BRIDGES BUILT BY SUccESSIVE SEGMENTS (1096) - PRESENTED bY R. N. OYAMADA
16.30
cOFFEE BREAk
16.45
17.00MONITORINg & MAINTENANCE & MANAgEMENTDYNAMIc chARAcTERIzATION AND cONTINUOUS DYNAMIc MONITORING OF LONG SPAN BRIDGES (1154) - PRESENTED bY E. CAETANO
CONCEPTUAL DESIgNkATEMBE BRIDGE OVER ESPRITO SANTO ESTUARY, IN MAPUTO (1085) - PRESENTED bY T. MENDONA
STRUCTURAL ANALYSISAPPLIcATION OF NONLINEAR FEM TO EVALUATE LOAD BEARING cAPAcITIES - cAPABILITY AND LIMITATIONS (1228) - PRESENTED bY S. kATTENSTEDT
17.15MONITORINg & MAINTENANCE & MANAgEMENT - INVESTIGATION AND cOUNTERMEASURES FOR FATIGUE cRAckS ThAT EMERGED ON ThE FINGER jOINT OF ThE cABLE-STAYED BRIDGE (1166) - PRESENTED bY T. kOSUgI
CONCEPTUAL DESIgNThE SOUTh APPROAch VIADUcT OF IzMIT BAY cROSSING PROjEcT (1245) - PRESENTED bY N. gNgR
STRUCTURAL ANALYSISThERMAL ANALYSIS OF A FIN-BAck BRIDGE UNDER SUDDEN DROP IN TEMPERATURE (1020) - PRESENTED bY F. TIAN
17.30MONITORINg & MAINTENANCE & MANAgEMENT - EVALUATION OF ThE FATIGUE cRAck FORMATION IN cANTILEVER BRAckETS OF A MULTI-SPAN RAILwAY STEEL BOx GIRDER BRIDGE (1113) - PRESENTED bY L. R. TICONA MELO
CONCEPTUAL DESIgNPROjEcT wESTGATE LEkkI BELTwAY BRIDGE, LAGOS, NIGERIA (1196) - PRESENTED bY C. M. bEDNARSkI
STRUCTURAL ANALYSISBEAM SEcTIONAL ANALYSIS AN INNOVATIVE TEchNIqUE FOR ANALYSIS OF BRIDGE SUPERSTRUcTURE (1233) - PRESENTED bY k. kASHEFI
17.45MONITORINg & MAINTENANCE & MANAgEMENTASSESSMENT OF ThERMAL AcTIONS IN ThE STEEL BOx GIRDER OF ThE MILLAU VIADUcT (1092) - PRESENTED bY z. HAJAR
CONCEPTUAL DESIgNExPERIENcE OF SOME LONG MULTI-SPAN BRIDGES IN qUEENSLAND, AUSTRALIA (1201) - PRESENTED bY W. k. WHEELER
STRUCTURAL ANALYSIS - FATIGUE ANALYSIS INDUcED BY VIBRATIONS IN STAY-cABLES SUBjEcTED TO ALONG wIND TURBULENcE cOMPONENT (1027) - PRESENTED bY A. RECUPERO
DINNER OF ThE cONFERENcE
DAY 3
ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS
09.30 kEY NOTEThE OcTAVIO FRIAS DE OLIVEIRA AND ANITA GARIBALDI cABLE-STAYED BRIDGES (kNL5)PRESENTED bY CATO FRANCISCO RIbEIRO09.45
10.00
INTERAcTIVE PLENARY TEchNIcAL SESSION
10.15
10.30
10.45
11.00
cOFFEE BREAk
11.15
11.30CONCEPTUAL DESIgNLONG RAILwAY VIADUcTS wITh SPEcIAL SPANS: PART-3. PREcAST GIRDERS (1152) - PRESENTED bY C. IgLESIAS
INNOVATIVE CONSTRUCTION METHODScABRIEL RIVER VIADUcT IN cOFRENTES (VALENcIA, SPAIN) BYPASS AT N-330. cONSTRUcTION DESIGN (1241) - PRESENTED bY J. F. M. SORIANO
MONITORINg & MAINTENANCE & MANAgEMENTFATIGUE ANALYSIS OF cABLE ANchORAGES ON cABLE STAYED BRIDGES (1033) - PRESENTED bY N. A. M. kHAIRUSSALEH
11.45CONCEPTUAL DESIgNcOMPARISON OF VARIANTS FOR NEw PELjESAc BRIDGE IN cROATIA (1246) - PRESENTED bY J. RADIC
INNOVATIVE CONSTRUCTION METHODScONSTRUcTION OF PANIPAT ELEVATED ExPRESSwAY ON Nh-1 ON BOT BASIS (1073) - PRESENTED bY P. g. VENkATRAM
MONITORINg & MAINTENANCE & MANAgEMENTEFFEcT OF cABLE cORROSION ON ThE STRUcTURAL RESPONSE OF cABLE-STAYED BRIDGES (1049) - PRESENTED bY O. A. OLAMIgOkE
12.00CONCEPTUAL DESIgNGEBzE ORhANGAzI IzMIR MOTORwAY, IzMIT BAY SUSPENSION BRIDGE (1244) - PRESENTED bY N. gNgR
INNOVATIVE CONSTRUCTION METHODSMOLD FOR FULL SPAN METhOD (1176)PRESENTED bY M. kYE
MONITORINg & MAINTENANCE & MANAgEMENTMANAGEMENT OF ThE SEVERN BRIDGE SUSPENSION BRIDGE (1004)PRESENTED bY C. R. HENDY
12.15CONCEPTUAL DESIgNcONSTRUcTION OF cABLE- STAYED BRIDGE OVER ThE DRAVA RIVER ON cORRIDOR Vc- cROATIA (1037) - PRESENTED bY P. SESAR
INNOVATIVE CONSTRUCTION METHODS - SEGMENTAL PREcAST TEchNOLOGY FOR MULTI-SPAN BRIDGES (PRODUcTION, TRANSPORTATION AND LAUNchING) (1180) - PRESENTED bY V. N. HEggADE
MONITORINg & MAINTENANCE & MANAgEMENTFATIGUE MANAGEMENT OF ThE MIDLAND LINkS STEEL BOx GIRDER DEckS (1003) - PRESENTED bY C. R. HENDY
12.30CONCEPTUAL DESIgNSTRAIT cROSSING OF ThE ThERMAIkOS GULF wITh A MIxED LONG-SPAN BRIDGE AND SUBSEA TUNNEL SYSTEM (1172) - PRESENTED bY P. SPYRIDIS
EXPERTS, EXPERIENCES & LANDMARk PROJECTSDESIGN AND cONSTRUcTION OF VIADUcT TO MUMBAI INTERNATIONAL AIRPORT (1075) - PRESENTED bY P. g. VENkATRAM
MONITORINg & MAINTENANCE & MANAgEMENT - IMPROVED STRUcTURAL hEALTh MONITORING STRATEGIES FOR BETTER MANAGEMENT OF cIVIL INFRASTRUcTURE SYSTEMS (1024) - PRESENTED bY C. R. HENDY
12.45CONCEPTUAL DESIgNSEGMENTAL PRESTRESSED cONcRETE MULTISPAN LARGE BRIDGES (1151) - PRESENTED bY V. bARATA
EXPERTS, EXPERIENCES & LANDMARk PROJECTSDESIGN AND cONSTRUcTION OF ELEVATED VIADUcT AT NAShIk, INDIA (1077) - PRESENTED bY k. gANESH
MONITORINg & MAINTENANCE & MANAgEMENTMANAGEMENT OF ThE M4 ELEVATED SEcTION SUBSTRUcTURES (1002) - PRESENTED bY C. R. HENDY
13.00 LUNch
DAY 3
ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS
14.30STRUCTURAL ANALYSISNON-LINEAR ULS ANALYSIS OF LONG-SPAN REINFORcED cONcRETE ARchES TO EN 1992 (1199) - PRESENTED bY M. ORTEgA
EXPERTS, EXPERIENCES & LANDMARk PROJECTS - PINhAL INTERIOR MOTORwAY cONcESSION - Ic3 - SEcTION cONDEIxA cOIMBRA SPEcIAL ENGINEERING STRUcTURES cONSTRUcTION PROcESSES (1179) - PRESENTED bY N. AMARO
CONCEPTUAL DESIgNExPERIENcE OF SOME LONG MULTI-SPAN BRIDGES IN qUEENSLAND, AUSTRALIA, PART 2 (1253) - PRESENTED bY W. k. WHEELER
14.45STRUCTURAL ANALYSIS - DYNAMIc ANALYSIS FOR FATIGUE ASSESSMENT OF REINFORcED cONcRETE SLABS IN RAILwAY VIADUcTS (1071) - PRESENTED bY J. MALVEIRO
EXPERTS, EXPERIENCES & LANDMARk PROJECTS - VIADUcT ARARANGU - ThE ALTERNATIVE DESIGN OF VIADUcT OF 1661.59 METERS IN ThE BR-101/Sc BRAzIL (1243) - PRESENTED bY I. C. SANTOS
CONCEPTUAL DESIgN - DESIGN PARAMETERS OF SUSPENSION BRIDGES: UPDATES OF STATE OF ART AND ITS APPLIcATION ON MULTI-SPAN TYPOLOGY (1069) - PRESENTED bY I. VALLEJO
15.00STRUCTURAL ANALYSISOPTIMIzED BRIDGE DEck DESIGN USING A GENETIc ALGORIThM (1198) - PRESENTED bY b. LIMA
EXPERTS, EXPERIENCES & LANDMARk PROJECTSDESIGN AND cONSTRUcTION OF FLYOVERS IN OUTER RING ROAD, DELhI (1091) - PRESENTED bY k. gANESH
LIFE CYCLESTRATEGY FOR DURABILITY OF STRUcTURAL cONcRETE IN MEGA-SEALINkS IN TROPIcAL SEA-wATERS (1133) - PRESENTED bY V. k. RAINA
15.15STRUCTURAL ANALYSISSTIFFENED FLANGES USED IN STEEL BOx GIRDER BRIDGES (1193) - PRESENTED bY P. S. FERREIRA
EXPERTS, EXPERIENCES & LANDMARk PROJECTSVIADUcT OVER RIVER DEBA IN ThE Y-BASqUE hIGh SPEED RAILwAY LINE IN ThE NORTh OF SPAIN (1171) - PRESENTED bY M. ORTEgA
MONITORINg & MAINTENANCE & MANAgEMENT - ANALYSIS OF INDIcATORS IN cONcRETE PRODUcTION DEcREASE IN DISTRITO FEDERAL - DF: PROBLEM NOTES AND SOLUTIONS (1208) - PRESENTED bY S. DA SILVA ARAJO
15.30kEY NOTEBETwIxT AND BETwEEN PORTUS AND cALE (kNL4)PRESENTED bY A. ADO DA FONSECA
15.45
16.00 INTERNATIONAL PRIzE - INNOVATION IN BRIDGE ENGINEERING
16.15 cLOSING SESSION