MSLB_ProgramaWEB

9
PROGRAM - VERSION 1 EXPERTS, EXPERIENCES AND STATE OF ART ACHIEVEMENTS Alfândega - Porto-Portugal 01-03/JULY/2015

description

Long Bridges

Transcript of MSLB_ProgramaWEB

  • PROGRAM - VERSION 1

    EXPERTS, EXPERIENCES AND STATE OF ART ACHIEVEMENTS

    Alfndega - Porto-Portugal

    01-03/JULY/2015

  • ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS08.00

    chEck IN

    08.1508.3008.4509.00

    kEY NOTE09.1509.30

    OPENING SESSION kEY NOTE kEY NOTE09.4510.00

    kEY NOTEcONcEPTUAL

    DESIGN

    LIFE cYcLESAFETY

    & SERVIcEABILITY

    INTERAcTIVE PLENARY TEchNIcAL

    SESSION

    10.1510.30

    kEY NOTEExPERTS, ExPERIENcES &

    LANDMARk PROjEcTS & cONcEPTUAL DESIGN10.45

    11.00 cOFFEE BREAkcOFFEE BREAk cOFFEE BREAk

    11.15

    ExPERTS, ExPERIENcES & LANDMARk

    PROjEcTS

    STRUcTURAL ANALYSIS

    MONITORING & MAINTENANcE & MANAGEMENT

    11.30

    ExPERTS, ExPERIENcES & LANDMARk

    PROjEcTS

    INNOVATIVE cONSTRUcTION

    METhODS

    SAFETY & SERVIcEABILITY

    cONcEPTUAL DESIGN

    INNOVATIVE cONSTRUcTION

    METhODSMONITORING

    & MAINTENANcE & MANAGEMENT

    11.45

    NEw MATERIALS AND SPEcIAL

    DEVIcES

    12.0012.1512.30 ExPERTS, ExPERIENcES

    & LANDMARk PROjEcTS12.4513.00

    LUNch LUNch LUNch

    13.1513.3013.4514.0014.1514.30

    kEY NOTE kEY NOTESTRUcTURAL

    ANALYSIS

    ExPERTS, ExPERIENcES & LANDMARk

    PROjEcTS

    cONcEPTUAL DESIGN14.4515.00

    kEY NOTE kEY NOTELIFE cYcLE

    15.15 MONITORING & ...15.30

    cONcEPTUAL DESIGN REhABILITATION

    MONITORING & MAINTENANcE & MANAGEMENT

    ExPERTS, ExPERIENcES & LANDMARk

    PROjEcTS

    cONcEPTUAL DESIGN

    STRUcTURAL ANALYSIS

    kEY NOTE15.4516.00 INTERNATIONAL PRIzE - INNOVATION IN BRIDGE ENGINEERING16.15 cLOSING SESSION16.30

    cOFFEE BREAk cOFFEE BREAk16.4517.00

    INNOVATIVE cONSTRUcTION

    METhODS

    ExPERTS, ExPERIENcES & LANDMARk

    PROjEcTS

    AcIDENTS AND INcIDENTS

    & ExTREME LOADSMONITORING

    & MAINTENANcE & MANAGEMENT

    cONcEPTUAL DESIGN

    STRUcTURAL ANALYSIS

    17.1517.3017.45 SPEcIAL FOUNDATIONS

    AND GEOTEchNIcAL AND SITE

    INVESTIGATIONS

    18.0018.1518.30 BOAT TRIP - BRIDGES OF PORTO DINNER OF ThE cONFERENcE

    DAY 3DAY 2DAY 1

    ThE ORGANIzING cOMMITTEE RESERVES ThE RIGhT TO INTRODUcE MINOR chANGES IN PRESENT PROGRAM.

  • DAY 1

    ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS

    08.00 chEck IN

    09.30 OPENING SESSION

    10.00kEY NOTEMULTI-SPAN LARGE BRIDGES INTERAcTION BETwEEN DESIGN AND cONSTRUcTION (kNL7)PRESENTED bY ARNE FREDERIkSEN bAEkSTED

    10.45kEY NOTE MULTI-SPAN ExTRADOSED BRIDGES (kNL1)PRESENTED bY AkIO kASUgA

    11.00 cOFFEE BREAk

    11.15EXPERTS, EXPERIENCES & LANDMARk PROJECTS BRIDGE OVER ThE cDIz BAY, SPAIN (1147) PRESENTED bY A. MARTNEz

    STRUCTURAL ANALYSIS BIG BRIDGE IN PERGOLA FOR hIGh VELOcITY TRAINS IN SPAIN (1036)PRESENTED bY C. JURADO

    MONITORINg & MAINTENANCE & MANAgEMENT SURVEILLANcE OF cONTINUOUS PREcAST cONcRETE BRIDGE DEckS SUPPORTED BY MONITORING-BASED TEchNIqUES (1215)PRESENTED bY C. SOUSA

    11.30EXPERTS, EXPERIENCES & LANDMARk PROJECTS INNOVATIVE EREcTION METhODS OF STEEL cABLE-STAYED BRIDGES (1213) PRESENTED bY M. DE MIRANDA

    STRUCTURAL ANALYSIS ADVANcES OF ExTERNAL PRESTRESSING TENDONS IN MULTI-SPAN cURVED BOx-GIRDER BRIDGES (1071)PRESENTED bY T. Y. SONg

    MONITORINg & MAINTENANCE & MANAgEMENT MONITORING BASED ASSESSMENT OF FATIGUE RESISTANcE OF 40 YEAR OLD Pc BRIDGES (1015)PRESENTED bY H. WEIHER

    11.45EXPERTS, EXPERIENCES & LANDMARk PROJECTS BALUARTE BRIDGE ExEcUTIVE PROjEcT (1248)PRESENTED bY g. R. ARgELLES

    STRUCTURAL ANALYSIS REINVESTIGATION OF POST-TENSIONED BRIDGE OVER BITLIS RIVER (1198)PRESENTED bY b. D. zTRk

    MONITORINg & MAINTENANCE & MANAgEMENT A NOVEL INSPEcTION METhOD FOR ORThOTROPIc STEEL DEckS USING PhASED ARRAY ULTRASONIc TESTING (1074)PRESENTED bY T. MAkITA

    12.00EXPERTS, EXPERIENCES & LANDMARk PROJECTS STRUcTURAL SOLUTIONS AND cONSTRUcTION METhODS FOR ThE MAIN cROSSING OF ThE MERSEY GATEwAY BRIDGE PROjEcT (1163)PRESENTED bY g. D. MOIR

    STRUCTURAL ANALYSIS STRESSING SEqUENcE OF STEEL cABLE-STAYED BRIDGES BUILT BY cANTILEVERING (1193)PRESENTED bY A. RECUPERO

    MONITORINg & MAINTENANCE & MANAgEMENT INVESTIGATIONS OF POST TENSIONED BRIDGES wITh cRITIcAL PRESTRESSING STEEL REGARDING hYDROGEN INDUcED cRAckING (hIc) (1034)PRESENTED bY A. W. gUTSCH

    12.15EXPERTS, EXPERIENCES & LANDMARk PROJECTS DESIGN OF ThE LONG-SPAN FOOTBRIDGE OVER ThE BUG RIVER IN NIEMIRw (1060)PRESENTED bY J. bILISzCzUk

    STRUCTURAL ANALYSIS A GRAPhIc, ExAcT METhOD FOR ANALYzING hYPERSTATIc SPATIAL PERGOLAES (1084)PRESENTED bY A. g. LACORT

    MONITORINg & MAINTENANCE & MANAgEMENT DELAYED DEFORMATIONS OF cONcRETE STRUcTURES: ThE SAVINES BRIDGE AND ThE chEVIRE BRIDGE (1124)PRESENTED bY J-P. SELLIN

    12.30EXPERTS, EXPERIENCES & LANDMARk PROJECTS ThE RUSSkY BRIDGE: PYLONS DESIGN APPROAch OPTIMIzATION (1067)PRESENTED bY V. E. RUSANOV

    STRUCTURAL ANALYSIS INVESTIGATION ON STABILITY PROBLEMS AS A SEcOND ORDER ThEORY PROBLEM FOR PIERS wITh PRAcTIcALLY INFINITE BENDING STIFFNESS (1046)PRESENTED bY V. kARATzAS

    MONITORINg & MAINTENANCE & MANAgEMENT LASER ScANNER IN IDENTIFIcATION OF PAThOLOGIcAL MANIFESTATIONS IN cONcRETE (1191)PRESENTED bY F. bORDIN

    12.45EXPERTS, EXPERIENCES & LANDMARk PROJECTS kASSUENDE BRIDGE OVER zAMBEzI RIVER IN TETE, MOzAMBIqUE (1103)PRESENTED bY T. MENDONA

    STRUCTURAL ANALYSIS SUSPENSION cABLES BRIDGE AND ARchES (1035)PRESENTED bY L. M. LAgINHA

    MONITORINg & MAINTENANCE & MANAgEMENT USING DATA MINING AND NUMERIcAL SIMULATIONS FOR ON-LINE MONITORING OF LONG SPAN BRIDGES (1012)PRESENTED bY J. SANTOS

    13.00 LUNch

  • DAY 1

    ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS

    14.30kEY NOTEVIADUcTS wITh PROGRESSIVELY EREcTED DEckS (kNL3)PRESENTED bY JIRI STRASkY

    14.45

    15.00 kEY NOTEREcENT AchIEVEMENTS IN ThE DESIGN AND cONSTRUcTION OF MULTI-SPAN cABLE SUPPORTED BRIDGES IN chINA (kNL8)PRESENTED bY AIRONg CHEN15.15

    15.30CONCEPTUAL DESIgN ThREE SPAN FLOATING SUSPENSION BRIDGE cROSSING ThE BjRNAFjORD (1090) - PRESENTED bY J. VEIE

    REHAbILITATION INNOVATIVE REhABILITATION OF LARGE BRIDGES- ThE INDIAN wAY (1079) - PRESENTED bY P. Y. MANJURE

    MONITORINg & MAINTENANCE & MANAgEMENTIMPLEMENTATION OF A B-wIM SYSTEM IN A cENTENARY STEEL TRUSS BRIDGE (1220) - PRESENTED bY F. CAVADAS

    15.45CONCEPTUAL DESIgN - LONG RAILwAY VIADUcTS wITh SPEcIAL SPANS: PART-1. ARch cONSTRUcTION BY BALANcED cANTILEVER wITh AUxILIARY cABLES (1155) - PRESENTED bY A. MARTNEz

    REHAbILITATION wIDENING OF SAN TIMOTEO AND cANERO VIADUcTS (1014)PRESENTED bY M. bIEDMA

    MONITORINg & MAINTENANCE & MANAgEMENTMAINTENANcE METhOD FOR cABLE-STAYED AND ExTRADOSED BRIDGE wITh cOMPOSITE MAIN GIRDER (1165) - PRESENTED bY H. SAkAI

    16.00CONCEPTUAL DESIgN DESIGN OF ThE NANAY BRIDGE (1255)PRESENTED bY J. LPEz

    REHAbILITATION - IMPREGNATION TEchNIqUE PROVIDES cORROSION PROTEcTION TO GROUTED POST-TENSIONING TENDONS (1065) PRESENTED bY D. WHITMORE

    MONITORINg & MAINTENANCE & MANAgEMENTcONSTRUcTION cONTROL OF A LONG-SPAN SINGLE PYLON cABLE-STAYED BRIDGE (1011) - PRESENTED bY C. LIU

    16.15CONCEPTUAL DESIgN - A STUDY ON VEhIcULAR LIVE LOAD DESIGN BASED ON AcTUAL VEhIcULAR LOAD FOR A MULTI-SPAN LARGE cABLE-STAYED BRIDGE (1088) - PRESENTED bY H. SUgIYAMA

    REHAbILITATION ASSESSMENT OF EPISTEMIc UNcERTAINTIES IN ThE RESISTANcE OF Rc cOLUMNS cONFINED BY cFR (1175) - PRESENTED bY J. R. FERREIRA

    MONITORINg & MAINTENANCE & MANAgEMENTMONITORED-BASED METhODOLOGY TO PREDIcT ThE INITIATION OF cORROSION IN Rc STRUcTURES (1252) - PRESENTED bY R. A. VOTSIS

    16.30 cOFFEE BREAk

    17.00INNOVATIVE CONSTRUCTION METHODS - AN INNOVATIVE SYSTEM OF PREcAST SEGMENTAL SPAN-BY-SPAN cONSTRUcTION FOR SPAN LENGThS OF ABOVE 100 M (1125) - PRESENTED bY J. MUOz-ROJAS

    EXPERTS, EXPERIENCES & LANDMARk PROJECTS MULTI-SPAN BRIDGE cROSSINGS FOR IMPROVED ROAD AccESS TO SzczEcIN SEA PORT (1039) - Presented by J. Hoowaty

    ACIDENTS AND INCIDENTS & EXTREME LOADS STRUcTURAL PERFORMANcE OF cABLE-STAYED FOOTBRIDGES TO ThE LOSS OF cABLE(S) (1050) - PRESENTED bY O. A. OLAMIgOkE

    17.15INNOVATIVE CONSTRUCTION METHODSFLExIARch-STRESS RIBBON cOMBINATION FOR MULTI-SPAN PEDESTRIAN BRIDGES (1098) - PRESENTED bY A. E. LONg

    EXPERTS, EXPERIENCES & LANDMARk PROJECTS ARMADO GUEBUzA BRIDGE OVER zAMBEzI RIVER IN cAIA, MOzAMBIqUE (1141) - PRESENTED bY T. MENDONA

    ACIDENTS AND INCIDENTS & EXTREME LOADS Causes of the bridge falsework Collapse near levoa in SLOVAkIA (1047) - PRESENTED bY P. PAULk

    17.30INNOVATIVE CONSTRUCTION METHODSBALANcED LIFT METhOD FOR ThE cONSTRUcTION OF BRIDGES wITh TwO SPANS (1078) - PRESENTED bY S. FOREMNIAk

    EXPERTS, EXPERIENCES & LANDMARk PROJECTS - DESIGN AND PROOF chEckING OF FOUNDATION, SUBSTRUcTURE AND SUPERSTRUcTURE OF RAIL cUM ROAD BRIDGE AT MUNGER, BIhAR, INDIA (1190) - PRESENTED bY P. g. VENkATRAM

    ACIDENTS AND INCIDENTS & EXTREME LOADS chARAcTERISTIc OF TRAFFIc LOADING RESPONSE FOR MULTI-SPAN LARGE BRIDGE (1045) - PRESENTED bY J. Y. zHOU

    17.45INNOVATIVE CONSTRUCTION METHODShIGh PRODUcTIVITY IN BRIDGE cONSTRUcTION ThE OPS EFFEcT (1250) - PRESENTED bY H. COELHO

    EXPERTS, EXPERIENCES & LANDMARk PROJECTS & CONCEPTUAL DESIgN hARAMAIN hIGh SPEED RAILwAY LINE (1167)PRESENTED bY J. M. g. PAREJO

    SPECIAL FOUNDATIONS AND gEOTECHNICAL AND SITE INVESTIgATIONS cEIRA BRIDGE FOUNDATIONS: cOMBINED MIcROPILE AND FOOTING FOUNDATIONS (cMFF). STATIc LOAD TESTS (1161) - PRESENTED bY S. gIL

    18.00INNOVATIVE CONSTRUCTION METHODSSwIVEL LOwERING OPERATION OF ThE VIADUcT OVER ThE RIVER TERA (1010) - PRESENTED bY F. J. M. LPEz

    EXPERTS, EXPERIENCES & LANDMARk PROJECTS LARGE MULTI-SPAN BRIDGES BUILT IN REcENT YEARS IN POLAND (1059) - PRESENTED bY J. bILISzCzUk

    SPECIAL FOUNDATIONS AND gEOTECHNICAL AND SITE INVESTIgATIONSTRESFjORD BRIDGE FOUNDATION OF MAIN SPAN ON 40M cAISSON ON SOIL SEABED (1026) - PRESENTED bY k. b. DAHL

    18.15INNOVATIVE CONSTRUCTION METHODS - PRESTRESSED I-BEAMS MADE OF ULTRA-hIGh PERFORMANcE cONcRETE FOR cONSTRUcTION OF RAILwAY BRIDGES (1189) - PRESENTED bY P. TEJ

    EXPERTS, EXPERIENCES & LANDMARk PROJECTS MERI BRIDGE: cONSTRUcTION AND qUALITY cONTROL (1063)PRESENTED bY T. ULUz

    SPECIAL FOUNDATIONS AND gEOTECHNICAL AND SITE INVESTIgATIONSchIAPAS BRIDGE (1249)PRESENTED bY g. R. ARgELLES

    18.30 BOAT TRIP - BRIDGES OF PORTO

  • DAY 2

    ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS

    09.00kEY NOTEThE RUYI SEA cROSSING (kNL11)PRESENTED bY WOLFgANg EILzER

    09.15

    09.30kEY NOTEThIRD BOSPhORUS BRIDGE (kNL10)PRESENTED bY MICHEL VIRLOgEUX

    09.45

    10.00CONCEPTUAL DESIgNDEVELOPMENT OF A SUBMERGED FLOATING TUBE BRIDGE FOR cROSSING OF ThE BjRNAFjORD (1204) - PRESENTED bY M. REISO

    LIFE CYCLEAPPLIcATION OF ThE MONTE-cARLO METhOD TO cALcULATE ThE LIFE-cYcLE cOSTS OF BRIDGES (1001) - PRESENTED bY C. HOFSTADLER

    SAFETY & SERVICEAbILITY - AN EFFIcIENT METhODOLOGY FOR FATIGUE DAMAGE ASSESSMENT OF cRITIcAL DETAILS ON A LONG SPAN cOMPOSITE RAILwAY BRIDGE (1177) - PRESENTED bY C. M. C. ALbUqUERqUE

    10.15CONCEPTUAL DESIgNLONG RAILwAY VIADUcTS wITh SPEcIAL SPANS. PART 2: ARch cONSTRUcTION BY TILTING (1143) - PRESENTED bY J. MUOz-ROJAS

    LIFE CYCLE SELEcTIVE USE OF NON cORROSIVE REBAR TO INcREASE cONcRETE DURABILITY (1174) - PRESENTED bY A. E. C. bORDERON

    SAFETY & SERVICEAbILITY cYcLIc BEhAVIOR OF cONTINUOUS RAILwAY VIADUcTS MADE wITh U-ShAPED PREcAST cONcRETE GIRDERS (1197) - PRESENTED bY C. SOUSA

    10.30CONCEPTUAL DESIgN - PARTIcULAR DESIGN FEATURES FOR A LONG SPAN cABLE-STAYED BRIDGE OVER ThE hARBOUR OF PORT LOUIS, MAURITIUS (1188) - PRESENTED bY J. JUNgWIRTH

    EXPERTS, EXPERIENCES & LANDMARk PROJECTS MULTI-SPAN BRIDGE BYPASS OVER ThE DzIwNA STRAIT (1042)Presented by J. Hoowaty

    SAFETY & SERVICEAbILITYcONcRETE BOx GIRDER BRIDGE ASSESSMENT A STIFFNESS ADAPTATION APPROAch (1251) - PRESENTED bY D. bEgg

    10.45CONCEPTUAL DESIgNFOUR SPANS cONTINUOUS cABLE STAYED BRIDGES wIThOUT ExTRA cABLES (1212) - PRESENTED bY J. ROMO

    EXPERTS, EXPERIENCES & LANDMARk PROJECTS & CONCEPTUAL DESIgNThE TIED ARch BRIDGE OF ThE SAALE-ELSTER-VIADUcT (1186)PRESENTED bY W. EILzER

    SAFETY & SERVICEAbILITYRESIDUAL BRIDGES BEARING cAPAcITY ANALYSIS DURING SERVIcE PERIOD SUBjEcT TO SAFETY VARIABILITY (1061) - PRESENTED bY V. E. RUSANOV

    11.00 cOFFEE BREAk

    11.30EXPERTS, EXPERIENCES & LANDMARk PROJECTS MULTI-SPAN LARGE DEckS ThE ORGANIc PRESTRESSING IMPAcT - PRESENTED bY P. PACHECO

    INNOVATIVE CONSTRUCTION METHODSThE PATANI BRIDGE (NIGERIA): INNOVATIVE cONSTRUcTION METhODS (1135) - PRESENTED bY P. STELLATI

    SAFETY & SERVICEAbILITYALkALI-SILIcA REAcTION, ASR REVIEw ON hOw TO DEAL wITh ASR IN cONcRETE STRUcTURES (1221) - PRESENTED bY J. CUSTDIO

    11.45EXPERTS, EXPERIENCES & LANDMARk PROJECTSRION-ANTIRION BRIDGE chALLENGING EARThqUAkES (1182)PRESENTED bY E. JOLY

    INNOVATIVE CONSTRUCTION METHODSINNOVATIVE SPLIcED GIRDER METhOD FOR MULTI SPAN BRIDGES (1209) - PRESENTED bY N. SkOLNICk

    NEW MATERIALS AND SPECIAL DEVICESLIGhTwEIGhT cONcRETE FOR LONG-SPAN BRIDGES (1164)PRESENTED bY P. HObEN

    12.00EXPERTS, EXPERIENCES & LANDMARk PROJECTS- VIADUcT OVER RIVER ULLA IN ThE SPANISh ATLANTIc hIGh SPEED RAILwAY LINE: AN OUTSTANDING cOMPOSITE STEEL-cONcRETE TRUSS BRIDGE (1170) - PRESENTED bY F. MILLANES

    INNOVATIVE CONSTRUCTION METHODSINNOVATIVE FORMwORk SYSTEMS IN BRIDGE cONSTRUcTION cASE STUDIES (1029) - PRESENTED bY M. kAMLEITHNER

    NEW MATERIALS AND SPECIAL DEVICEScABLE STAYED FOOTBRIDGE wITh ThE DEck MADE OF UhPc (1048)PRESENTED bY J. L. VTEk

    12.15EXPERTS, EXPERIENCES & LANDMARk PROJECTSjUScELINO kUBITSchEk BRIDGE, BRASLIA, BRAzIL (1192)PRESENTED bY F. bOTTO DE bARROS

    INNOVATIVE CONSTRUCTION METHODSBUILDING ThE wORLD LARGEST hIGh SPEED TRAIN ARch BRIDGES wITh MOVABLE ScAFFOLDING SYSTEMS (1038) - PRESENTED bY A. A. PVOAS

    NEW MATERIALS AND SPECIAL DEVICES - NON-DESTRUcTIVE MEASUREMENTS TO EVALUATE FIBER DISPERSION AND cONTENT IN UhPFRc REINFORcEMENT LAYERS (1219) - PRESENTED bY S. NUNES

    12.30EXPERTS, EXPERIENCES & LANDMARk PROJECTSTUNEIT TOwARDS A GLOBAL wORLD (1089)PRESENTED bY E. SIVIERO

    INNOVATIVE CONSTRUCTION METHODS - DEck FORcES OF A cABLE-STAYED BRIDGE - ANALYSIS OF ThE cONSTRUcTION AND ThE IN-SERVIcE PhASES (1227) - PRESENTED bY P. ALMEIDA

    NEW MATERIALS AND SPECIAL DEVICESNEw TEST METhODS FOR STAY cABLE SYSTEMS (1023)PRESENTED bY A. W. gUTSCH

    12.45EXPERTS, EXPERIENCES & LANDMARk PROJECTS cROSSING OF BjRNAFjORDEN FLOATING BRIDGE (1070)PRESENTED bY b. VILLORIA

    INNOVATIVE CONSTRUCTION METHODSPRELIMINARY ASSESSMENT OF wIND AcTIONS IN LARGE SPAN MSS (1109) - PRESENTED bY A. RESENDE

    NEW MATERIALS AND SPECIAL DEVICES - MEchANIcAL PROPERTIES AND ExPLOSIVE SPALLING BEhAVIOR OF ThE REcYcLED STEEL FIBER REINFORcED ULTRA-hIGh-PERFORMANcE cONcRETE (1224) - PRESENTED bY g. F. PENg

    13.00 LUNch

  • DAY 2

    ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS

    14.30 kEY NOTEDESIGN AND cONSTRUcTION OF SEA-cROSSING BRIDGES - A REVIEw (kNL2)PRESENTED bY NAEEM HUSSAIN14.45

    15.00kEY NOTELARGE VIADUcTS, SOME ExEcUTIONS A FEw IDEAS (kNL1)PRESENTED bY JAVIER MANTEROLA

    15.15

    15.30EXPERTS, EXPERIENCES & LANDMARk PROJECTS qUEENSFERRY cROSSING: ROLE OF cONcRETE IN ThE DESIGN AND ExEcUTION OF ThE PROjEcT (1081) - PRESENTED bY P. CURRAN

    CONCEPTUAL DESIgN - BRIDGE AcROSS ThE wASchMhL VALLEY, kAISERSLAUTERN, GERMANY A hARMONIc SYMBIOSIS BETwEEN A hISTORIc MONUMENT AND A NEw INNOVATIVE BRIDGE (1184) - PRESENTED bY W. EILzER

    STRUCTURAL ANALYSISFINITE ELEMENT MODELING OF ThE FATIh SULTAN MEhMET SUSPENSION BRIDGE (1200) - PRESENTED bY S. A. kILIC

    15.45EXPERTS, EXPERIENCES & LANDMARk PROJECTS NEw PUMAREjO BRIDGE OVER ThE RIVER MAGDALENA IN BARRANqUILLA. cOLOMBIA (1153) - PRESENTED bY J. MUOz-ROJAS

    CONCEPTUAL DESIgNMULTI-SPAN BRIDGES: ThE FIRST chILEAN ExPERIENcE AND FUTURE chALLENGES (1093) - PRESENTED bY M. A. VALENzUELA

    STRUCTURAL ANALYSISNUMERIcAL SIMULATION OF wIND PRESSURE OF A cONTINUOUS FIN-BAck BRIDGE (1022) - PRESENTED bY M. FU

    16.00EXPERTS, EXPERIENCES & LANDMARk PROJECTS DELIVERING ThE PADMA MULTIPURPOSE BRIDGE PROjEcT, BANGLADESh (1181) - PRESENTED bY W. k. WHEELER

    CONCEPTUAL DESIgN - OPTIMIzATION OF cABLE wEIGhT IN MULTI-SPAN cABLE-STAYED BRIDGES. APPLIcATION TO ThE FORTh REPLAcEMENT cROSSING (1178) - PRESENTED bY A. bALDOMIR

    STRUCTURAL ANALYSIS - MODELING BRIDGE cONSTRUcTION PhASING BY ThE BALANcED cANTILEVER METhOD cOMPARISON BETwEEN PREDIcTED AND REAL cAMBER VALUES (1226) - PRESENTED bY L. g. CASTRO

    16.15EXPERTS, EXPERIENCES & LANDMARk PROJECTS cONSTRUcTION AND DESIGN FEATURES OF ThE BRIDGE OVER ThE DANUBE RIVER. BULGARIA (1146) - PRESENTED bY A. MARTNEz

    CONCEPTUAL DESIgN - cOMPARATIVE STUDY OF PRESTRESSING cONSUMPTIONS IN 7 DIFFERENT cONSTRUcTIVE METhODS FOR 75 M MULTI-SPAN BOx GIRDERS (1117) - PRESENTED bY b. LIMA

    STRUCTURAL ANALYSISRATIONAL AND PRAcTIcAL METhOD FOR cAMBER cONTROL IN BRIDGES BUILT BY SUccESSIVE SEGMENTS (1096) - PRESENTED bY R. N. OYAMADA

    16.30

    cOFFEE BREAk

    16.45

    17.00MONITORINg & MAINTENANCE & MANAgEMENTDYNAMIc chARAcTERIzATION AND cONTINUOUS DYNAMIc MONITORING OF LONG SPAN BRIDGES (1154) - PRESENTED bY E. CAETANO

    CONCEPTUAL DESIgNkATEMBE BRIDGE OVER ESPRITO SANTO ESTUARY, IN MAPUTO (1085) - PRESENTED bY T. MENDONA

    STRUCTURAL ANALYSISAPPLIcATION OF NONLINEAR FEM TO EVALUATE LOAD BEARING cAPAcITIES - cAPABILITY AND LIMITATIONS (1228) - PRESENTED bY S. kATTENSTEDT

    17.15MONITORINg & MAINTENANCE & MANAgEMENT - INVESTIGATION AND cOUNTERMEASURES FOR FATIGUE cRAckS ThAT EMERGED ON ThE FINGER jOINT OF ThE cABLE-STAYED BRIDGE (1166) - PRESENTED bY T. kOSUgI

    CONCEPTUAL DESIgNThE SOUTh APPROAch VIADUcT OF IzMIT BAY cROSSING PROjEcT (1245) - PRESENTED bY N. gNgR

    STRUCTURAL ANALYSISThERMAL ANALYSIS OF A FIN-BAck BRIDGE UNDER SUDDEN DROP IN TEMPERATURE (1020) - PRESENTED bY F. TIAN

    17.30MONITORINg & MAINTENANCE & MANAgEMENT - EVALUATION OF ThE FATIGUE cRAck FORMATION IN cANTILEVER BRAckETS OF A MULTI-SPAN RAILwAY STEEL BOx GIRDER BRIDGE (1113) - PRESENTED bY L. R. TICONA MELO

    CONCEPTUAL DESIgNPROjEcT wESTGATE LEkkI BELTwAY BRIDGE, LAGOS, NIGERIA (1196) - PRESENTED bY C. M. bEDNARSkI

    STRUCTURAL ANALYSISBEAM SEcTIONAL ANALYSIS AN INNOVATIVE TEchNIqUE FOR ANALYSIS OF BRIDGE SUPERSTRUcTURE (1233) - PRESENTED bY k. kASHEFI

    17.45MONITORINg & MAINTENANCE & MANAgEMENTASSESSMENT OF ThERMAL AcTIONS IN ThE STEEL BOx GIRDER OF ThE MILLAU VIADUcT (1092) - PRESENTED bY z. HAJAR

    CONCEPTUAL DESIgNExPERIENcE OF SOME LONG MULTI-SPAN BRIDGES IN qUEENSLAND, AUSTRALIA (1201) - PRESENTED bY W. k. WHEELER

    STRUCTURAL ANALYSIS - FATIGUE ANALYSIS INDUcED BY VIBRATIONS IN STAY-cABLES SUBjEcTED TO ALONG wIND TURBULENcE cOMPONENT (1027) - PRESENTED bY A. RECUPERO

    DINNER OF ThE cONFERENcE

  • DAY 3

    ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS

    09.30 kEY NOTEThE OcTAVIO FRIAS DE OLIVEIRA AND ANITA GARIBALDI cABLE-STAYED BRIDGES (kNL5)PRESENTED bY CATO FRANCISCO RIbEIRO09.45

    10.00

    INTERAcTIVE PLENARY TEchNIcAL SESSION

    10.15

    10.30

    10.45

    11.00

    cOFFEE BREAk

    11.15

    11.30CONCEPTUAL DESIgNLONG RAILwAY VIADUcTS wITh SPEcIAL SPANS: PART-3. PREcAST GIRDERS (1152) - PRESENTED bY C. IgLESIAS

    INNOVATIVE CONSTRUCTION METHODScABRIEL RIVER VIADUcT IN cOFRENTES (VALENcIA, SPAIN) BYPASS AT N-330. cONSTRUcTION DESIGN (1241) - PRESENTED bY J. F. M. SORIANO

    MONITORINg & MAINTENANCE & MANAgEMENTFATIGUE ANALYSIS OF cABLE ANchORAGES ON cABLE STAYED BRIDGES (1033) - PRESENTED bY N. A. M. kHAIRUSSALEH

    11.45CONCEPTUAL DESIgNcOMPARISON OF VARIANTS FOR NEw PELjESAc BRIDGE IN cROATIA (1246) - PRESENTED bY J. RADIC

    INNOVATIVE CONSTRUCTION METHODScONSTRUcTION OF PANIPAT ELEVATED ExPRESSwAY ON Nh-1 ON BOT BASIS (1073) - PRESENTED bY P. g. VENkATRAM

    MONITORINg & MAINTENANCE & MANAgEMENTEFFEcT OF cABLE cORROSION ON ThE STRUcTURAL RESPONSE OF cABLE-STAYED BRIDGES (1049) - PRESENTED bY O. A. OLAMIgOkE

    12.00CONCEPTUAL DESIgNGEBzE ORhANGAzI IzMIR MOTORwAY, IzMIT BAY SUSPENSION BRIDGE (1244) - PRESENTED bY N. gNgR

    INNOVATIVE CONSTRUCTION METHODSMOLD FOR FULL SPAN METhOD (1176)PRESENTED bY M. kYE

    MONITORINg & MAINTENANCE & MANAgEMENTMANAGEMENT OF ThE SEVERN BRIDGE SUSPENSION BRIDGE (1004)PRESENTED bY C. R. HENDY

    12.15CONCEPTUAL DESIgNcONSTRUcTION OF cABLE- STAYED BRIDGE OVER ThE DRAVA RIVER ON cORRIDOR Vc- cROATIA (1037) - PRESENTED bY P. SESAR

    INNOVATIVE CONSTRUCTION METHODS - SEGMENTAL PREcAST TEchNOLOGY FOR MULTI-SPAN BRIDGES (PRODUcTION, TRANSPORTATION AND LAUNchING) (1180) - PRESENTED bY V. N. HEggADE

    MONITORINg & MAINTENANCE & MANAgEMENTFATIGUE MANAGEMENT OF ThE MIDLAND LINkS STEEL BOx GIRDER DEckS (1003) - PRESENTED bY C. R. HENDY

    12.30CONCEPTUAL DESIgNSTRAIT cROSSING OF ThE ThERMAIkOS GULF wITh A MIxED LONG-SPAN BRIDGE AND SUBSEA TUNNEL SYSTEM (1172) - PRESENTED bY P. SPYRIDIS

    EXPERTS, EXPERIENCES & LANDMARk PROJECTSDESIGN AND cONSTRUcTION OF VIADUcT TO MUMBAI INTERNATIONAL AIRPORT (1075) - PRESENTED bY P. g. VENkATRAM

    MONITORINg & MAINTENANCE & MANAgEMENT - IMPROVED STRUcTURAL hEALTh MONITORING STRATEGIES FOR BETTER MANAGEMENT OF cIVIL INFRASTRUcTURE SYSTEMS (1024) - PRESENTED bY C. R. HENDY

    12.45CONCEPTUAL DESIgNSEGMENTAL PRESTRESSED cONcRETE MULTISPAN LARGE BRIDGES (1151) - PRESENTED bY V. bARATA

    EXPERTS, EXPERIENCES & LANDMARk PROJECTSDESIGN AND cONSTRUcTION OF ELEVATED VIADUcT AT NAShIk, INDIA (1077) - PRESENTED bY k. gANESH

    MONITORINg & MAINTENANCE & MANAgEMENTMANAGEMENT OF ThE M4 ELEVATED SEcTION SUBSTRUcTURES (1002) - PRESENTED bY C. R. HENDY

    13.00 LUNch

  • DAY 3

    ROOM 1 / INFANTE ROOM 2 / D. MARIA ROOM 3 / D. LUS

    14.30STRUCTURAL ANALYSISNON-LINEAR ULS ANALYSIS OF LONG-SPAN REINFORcED cONcRETE ARchES TO EN 1992 (1199) - PRESENTED bY M. ORTEgA

    EXPERTS, EXPERIENCES & LANDMARk PROJECTS - PINhAL INTERIOR MOTORwAY cONcESSION - Ic3 - SEcTION cONDEIxA cOIMBRA SPEcIAL ENGINEERING STRUcTURES cONSTRUcTION PROcESSES (1179) - PRESENTED bY N. AMARO

    CONCEPTUAL DESIgNExPERIENcE OF SOME LONG MULTI-SPAN BRIDGES IN qUEENSLAND, AUSTRALIA, PART 2 (1253) - PRESENTED bY W. k. WHEELER

    14.45STRUCTURAL ANALYSIS - DYNAMIc ANALYSIS FOR FATIGUE ASSESSMENT OF REINFORcED cONcRETE SLABS IN RAILwAY VIADUcTS (1071) - PRESENTED bY J. MALVEIRO

    EXPERTS, EXPERIENCES & LANDMARk PROJECTS - VIADUcT ARARANGU - ThE ALTERNATIVE DESIGN OF VIADUcT OF 1661.59 METERS IN ThE BR-101/Sc BRAzIL (1243) - PRESENTED bY I. C. SANTOS

    CONCEPTUAL DESIgN - DESIGN PARAMETERS OF SUSPENSION BRIDGES: UPDATES OF STATE OF ART AND ITS APPLIcATION ON MULTI-SPAN TYPOLOGY (1069) - PRESENTED bY I. VALLEJO

    15.00STRUCTURAL ANALYSISOPTIMIzED BRIDGE DEck DESIGN USING A GENETIc ALGORIThM (1198) - PRESENTED bY b. LIMA

    EXPERTS, EXPERIENCES & LANDMARk PROJECTSDESIGN AND cONSTRUcTION OF FLYOVERS IN OUTER RING ROAD, DELhI (1091) - PRESENTED bY k. gANESH

    LIFE CYCLESTRATEGY FOR DURABILITY OF STRUcTURAL cONcRETE IN MEGA-SEALINkS IN TROPIcAL SEA-wATERS (1133) - PRESENTED bY V. k. RAINA

    15.15STRUCTURAL ANALYSISSTIFFENED FLANGES USED IN STEEL BOx GIRDER BRIDGES (1193) - PRESENTED bY P. S. FERREIRA

    EXPERTS, EXPERIENCES & LANDMARk PROJECTSVIADUcT OVER RIVER DEBA IN ThE Y-BASqUE hIGh SPEED RAILwAY LINE IN ThE NORTh OF SPAIN (1171) - PRESENTED bY M. ORTEgA

    MONITORINg & MAINTENANCE & MANAgEMENT - ANALYSIS OF INDIcATORS IN cONcRETE PRODUcTION DEcREASE IN DISTRITO FEDERAL - DF: PROBLEM NOTES AND SOLUTIONS (1208) - PRESENTED bY S. DA SILVA ARAJO

    15.30kEY NOTEBETwIxT AND BETwEEN PORTUS AND cALE (kNL4)PRESENTED bY A. ADO DA FONSECA

    15.45

    16.00 INTERNATIONAL PRIzE - INNOVATION IN BRIDGE ENGINEERING

    16.15 cLOSING SESSION