MSDII MANAGERIAL REVIEWP10011
Rochester Institute of Technology
05/19/2010
Project Status• Flex Sensor Update
• Conceptually not fit for elbow• Ergonomic issues
– Infeasible implementation
– Pursue other uses of Flex
Project Status - Dan• Budget• Risk Assessment Update• Project Plan• Engineering Specs• Customer Satisfaction
Bill of MaterialsPart Name Material Distributor Distributor
Part #Quantity Needed
Unit Price Total Price Lead Time
Status
Attachment
18-8 Helical Insert 4-40
Stainless Steel Mcmaster-Carr 91732A701 1 $5.56 $ 5.56 1 week Received
Zinc-Plated 4-40 .5in slotted machine
screws
Steel Mcmaster-Carr 90275A110 1 $2.91 $ 2.91 1 week Received
Zinc-Plated 4-40 5/16in slotted
machine screws
Steel Mcmaster-Carr 90275A107 1 $3.32 $ 3.32 1 week Received
Spirit Gum Ben Nye SG-1 1 $5.00 $ 5.00 1 week Received
Prohstetic Adhesive Ben Nye AD-1 1 $7.50 $ 7.50 1 week Received
Mastisol Medical Adhesive Ferndale Labs 1 $3.95 $ 3.95 1 week Received
Detachol Medical Adhesive remover
Ferndale Labs 1 $17.89 $ 17.89 1 week Received
Medical adhesive Hollister 7730 1 $25.99 $ 25.99 1 week Received
Locktite 4014 Medical grade super glue
Mcmaster-Carr 1818A43 1 $16.39 $ 16.39 1 week Received
Cinched Velcro Band Velcro strip + buckle Mcmaster-Carr 3955T349 1 $5.79 $ 5.79 1 week Received
Heavy Duty Velcro Band
military grade velcro harness and metal
buckle
Mcmaster-Carr 3955T71 3 $2.62 $ 7.86 1 week Received
Enclosure
Neoprene 4x4x4" cube
neoprene Mcmaster-Carr 8882K13 1 $3.49 $ 3.49 1 week Received
Polyethelene 4x6x6" sheet
Polyethelene Mcmaster-Carr 8752K972 1 $41.65 $ 41.65 1 week Received
Rectangular Bar 5/8x1.5x12"
Black Delrin Mcmaster-Carr 8662K88 1 $12.71 $ 12.71 1 week Received
Rectangular Bar 1.25x2.25x12"
White Delrin Mcmaster-Carr 8739K59 1 $34.22 $ 34.22 1 week Received
Polyethelene 3/32x12x12" sheet
HDPE Sheet Mcmaster-Carr 8619K71 1 $4.76 $ 4.76 1 week Received
Ultra Soft sheet 1/8x12x12"
polyurethane 40 OO Duometer
Mcmaster-Carr 8514K411 1 $18.94 $ 18.94 1 week Received
Super Soft Sheet 1/8x12x12"
Neoprene 10A Durometer
Mcmaster-Carr 9109K22 1 $40.23 $ 40.23 1 week Received
Men's UA Eliminate MPZ
padded Under Armor UnderArmor 1201198 1 $64.99 $64.99 1-2 weeks
Received
Misc.Locktite Superflex General Purpose
SiliconeMcMaster-Carr 74945A65 1 $4.70 $ 4.70 1 week Received
Totals $ 323.15
Totals minus donated material $ 293.51
Risk Assessment• Risk: Patient cannot move naturally while using system
• Would adulterate reported data• Reviewed results with Customer and Advisor• Mitigated during design phase by making people’s movements a design
concern
• Risk: Testing phase does not occur under realistic circumstances• Enclosures would not survive ‘real’ conditions• Exposed enclosures to expected usage• Mitigated by testing beyond overloading test conditions upon completion to
find approximate factor of safety.
Risk Assessment
• Major Risk: Interfaces do not stay on patient• Sensor package reports useless data
• Solution• Careful attention paid to making the system viable for
patients with many body types• Mitigated by delivering multiple attachment styles
Risk Assessment• Risk: Lack of communication between P10010 and
P10011• Incomplete Design• Failure to explore possibilities completely• Mitigated by ensuring regular between groups and/or bi-weekly
meetings
Success Evaluation• Areas of success:
• Designed functional prototype• Tested several attachment techniques• Documented all results for future team
• Areas of lack of success• Flex sensor implementation
Joe Piehler• Punctual
• Attended all relevant meetings, on time• Prepared to work on arrival
• Thorough and Accurate • Test plan results recording• Majority of paper writing and proofreading
• Communicative • Always available by text or e-mail
• Professional and Ethical • Dedicated
• Never asked more of the team than I was willing to do myself
Joe Piehler• Test Plan
• Designed majority of tests• Carried out many tests individually• Designed and updated results of testing
• Project Plan• Updated as needed
• Wrote majority of final paper
Dan Shields• Punctual
• Always attended meetings• Attended associated presentations when possible
• Thorough and Accurate • Communicative
• Hard to reach by email• Professional and Ethical • Dedicated
• Underestimated project complexity• Overestimated my own productivity• I hate the flu• Stubbornness and Vindication Trap
Dan Shields• Acquired materials• Pursued Informed suggestions for attachments• Performed concept testing• Lead attachment• Testing of enclosures
Alex Frechette• Punctual
• Always made necessary meetings• Not always present for Fridays, my work was complete for what the
testing team needed on Fridays when testing was completed• Thorough and Accurate
• Comprehensive manufacturing plan• Manufactured quality hard enclosures
• Communicative • Easily assessable through email and phone
• Professional and Ethical • Dedicated
Alex Frechette
Hard Enclosure Manufacturing Lead
Learn Manufacturing techniques
Switching MaterialsModifications to design on fly
Delivering 6 enclosures
Small Hard Enclosure
Alex FrechetteWearing units testingApply Knowledge to appropriate sections of paperLoading Documents on Edge
Deliverables Checklist Manufacturing Plan Updated Project Plan Final BOM Test Results Updated Edge Functional Prototypes Paper Poster Foundation for Future Teams
Alex – MSD I Lessons Learned UniGraphics NX Software Pushed to order materials at end of MSD I Paid more attention to Material Selection
Polyethylene was chosen during BOM stage based on price and availability
Learned importance of the design process and documents Project plan, selection process,
Ask questions during design process Easier to ask questions early then make changes later
How to work as a team to complete deliverables
Alex – MSD II Lessons LearnedPlan accordingly to meet deadlines for teamParallel Manufacturing and testingValue of finding the right toolsPolyethylene poor machining propertiesDelrin is a much better choiceCommunication with P10010 Overall, learned how valuable the design process can be
Dan - Lessons Learned• Overextended• 80% confidence
• 20% whispering doubt, saying do more testing
• Communication• Give honest critique• Speak Up• Reinforce Others
• Limits• Organized Planning
Joe – MSD I Lessons Learned• Communication• Recording information• Risk Assessment and Project Plan• More expertise needed earlier• Tradeoffs between academic and practical goals• Effectiveness of Design Process
Joe – MSD II Lessons Learned• Communication!• Sliding scope of project• Facility Contingency• Earlier Flex testing
RUBRIC REVIEW