BIM FOR ALL STAGES OF THE PROJECT LIFECYCLEKrzysztof Nowosiński –BIM Champion

VSU PROJECT

BEST DEPLOYMENT OF BIM ON A PROJECT, 2012

AWARD WINNING BIM PROJECTS

CASEMENT PARK STADIUM

2013 BIM PROJECT OF THE YEAR

2014 FIATECH CETI AUTOMATED DESIGN AWARD

2014 BIM INITIATIVE OF THE YEAR

“The real clincher was the development of a 5D BIM process with an object based naming convention as a blueprint for future projects – both delivering and learning on the job!

Judging panel comments

To champion lean solutions, including BIM and off-site construction, to minimise carbon emissions, resource use and waste on all our projects

OUR COMMITMENT TO DfMA

Design

Construction

Design for manufacture and assembly

Planning

Asset management

Planning

Planning

New design coordinated with existing asset

VICTORIA STATION UPGRADE (VSU)

Planning

Constraints referenced directly into model

VSU – PROJECT CONSTRAINTS

Planning

Stakeholder assets modelled

VSU – DESIGN DEVELOPMENT

Planning

Geological surfaces imported from Surfer

VSU – ENGINEERING ANALYSIS INTEGRATION

Planning

SUCCESS STORIES – VSU

SUCCESSFULOUTCOMES

Design

Construction

Design for manufacture and assembly

Planning

Asset management

Design

Planning

Design

SUCCESS STORIES – WATER TREATMENT, USA

20%Cut on design time

Design

SUCCESS STORIES – ADELAIDE OVAL

30%Time saving on architectural design

SUCCESS STORIES - CASEMENT PARK

52%Time saving on Tender design

CASEMENT PARK

CLIENT – GAA

£76.4MASPIRATIONAL BRIEF

CENTRAL BIM

4D PROGRAMME 6D ASSETMANAGEMENT

5D COST PLANCLASH DETECTION

BUILDING SERVICESMODEL

ENGINEERINGANALYSIS

THERMAL,BREEAM

FIRE

LIGHTING DESIGN

ENGINEERINGDESIGN

CIVIL INFRASTRUCTURE

CUT & FILLMODELS

DRAINAGE TRAFFICMODELS

WASTESTUDIES

DELIVERY &LOADINGACCESS

STRUCTURALMODEL

WINDANALYSIS

BOWLDESIGN

ROOFDESIGN

BUILDSEQUENCE

CONCEPTUALSTUDIES

DAYLIGHTSTUDIES

SIGHT LINES

VISUALISATION

ARCHITECTURALMODEL

PEOPLEFLOW

3D FLY-THROUGH

‘RIGHT TOLIGHT’

Generative model with input parameters

Revit model exported into CSC Fastrak

Exported to Robot for dynamics calculation

Models exported to Robot

Optimised for minimum steel weight avoiding value engineering

Linked via Geometry Gym and IFC link

Intelligent properties added to rooms and spaces

3D modelling of plant areas and main distribution routes

Energy modelling

Truss feature lighting

Sports lighting analysis

BIM used for elemental quantification

Clash detection between disciplines

4D construction studies

Multidisciplinary reviews

5D PROCESS IMPROVEMENTS

Benefits- Consistent approach to naming conventions- Quantification accuracy within 1%- Real time cost reports- Delivery of better value buildings for our clients5D Publishing Guide now being used on multiple projects

80%Time saving to prepare cost plan

Design

Construction

Design for manufacture and assembly

Planning

Asset management

Construction

Design

Construction Phase

Construction Phase

JET GROUT PILING

Construction Phase

JET GROUT PLANT SELECTION

Plant modelled and maneuverability checks performed

Construction Phase

NEW APPLICATIONS: GROUND TREATMENT

Auto report extraction from model listing unique reference coordinates

Construction Phase

Water Level

Drill Rods left in-situ

Level of assumed clay

Revised level of clay from recent boreholesKnown gap between jet grout

columns

REDUCING RISK USING BIM

Extracts from 3d models used in daily site review meetings

Design

Construction

Design for manufacture and assembly

Planning

Asset management

Design for manufacture and assembly

Construction

Design for manufacture and assembly

ANGLIAN WATER PRODUCT BASED DELIVERY

BIM hugely facilitates offsite manufacture

Design for manufacture and assembly

ANGLIAN WATER PRODUCT BASED DELIVERY

20% Less Carbon

90% Time saving

Design for manufacture and assembly

MinimumAsset

Standard

3D Model

Drawings

Integration Guide

Health & Safety Risk Assessment

Calculations

Specification

Procurement Guide

FrameworkAgreement

BOMCost data

Acceptance Criteria

InstallationGuide

Commissioning Data

Functional Design Spec

Software Block

Maintenance Schedule

Spares Schedule

O&Mdata

SAP ALMdata

JoECarbon

Footprint

Telemetry Standards

Asset MonitoringFrameworks (IRIS)

STANDARDPRODUCTS

Design for manufacture and assembly

HINKLEY C ONSITE CAMPUS

Design

Construction

Design for manufacture and assembly

Planning

Asset managementAsset management

Design for manufacture and assembly

Asset management

ASSET INFORMATION

Asset data GIS dataData

Users

Performance data

Delivery partners Operators Asset Managers

Survey data

Asset management

ASSET INFORMATION

Delivery partners Operators Asset Managers

Mega databaseData

Users

Asset management

INTEGRATED ASSET INFORMATION

Asset data GIS data

Middleware

Data

Users

Performance data

Delivery partners Operators Asset Managers

Survey data

Asset management

As-Built Owner Model

As-Maintained Owner Model

Changes in Maximoupdated inOwner Model

Navisworks for visualization

Links between geometry and data

Empty Maximo Database

Populated Maximo Database

Publish key Revit Data for O&M

EMERGING ASSET MANAGEMENT